STATE OF HARYANA & ANR. v. DEVANDER SAGAR & ORS.

Case / Petition Number:
Civil Appeal No. 318 of 2011; Civil Appeals Nos. 459-460 of 2011; Civil Appeals Nos. 461-462 of 2011
Neutral Citation:[2015] 13 S.C.R. 1057

Case Synopsis & Summary

This Supreme Court decision concerns the validity and procedural compliance of land acquisition under the Land Acquisition Act, 1894 (as amended) and the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The State of Haryana invoked urgency under Section 17(1) and 17(4) of the LA Act, 1984, following a 4(1) notification dated 18.01.2001 for acquiring land in Khera Markanda and Ratgal for a sewer, sewage treatment plant and crematorium. An initial Declaration under Section 6 was issued on 19.01.2001. Interim orders were passed in 2002, and the State proceeded to award on 08.02.2002, taking possession despite interim orders. The High Court quashed the 6 Declaration for (i) failure to pay 80% of compensation when urgency was invoked and (ii) lack of urgency since no award was passed within a year of declaration. The High Court then allowed landowners to file 5A objections and permitted a fresh Section 6 Declaration (30.12.2004). The landowners challenged the 18.01.2001 notification and the 30.12.2004 declaration. The Court reiterates that time-bound strict compliance is essential; Section 17(3A)/(3B) cannot be rendered nugatory, and the overall acquisition must be completed within three years for finality (as per Section 11A and 24 of the 2013 Act). The Supreme Court upholds the High Court’s view that the 30.12.2004 declaration cannot stand as a continuation and dismisses the State’s appeals, clarifying that quashing of a portion of proceedings does not automatically nullify the entire acquisition. The decision emphasizes strict statutory interpretation, protection of landowners’ rights, and the principle that no party should suffer for judicial error, while recognizing the need to apply Padma Sundara Rao’s ratio to the Section 6 framework.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Vikramajit Sen
  • Abhay Manohar Sapre
Judgment Date
2015-09-07
Court Decision / Holding
The Supreme Court dismissed the appeals and upheld the High Court’s order quashing the Section 6 Declaration dated 30.12.2004 as not a valid continuation of the initial declaration, while recognizing that quashing does not automatically nullify an entire acquisition but reiterating the need to adhere to time limits and 80% compensation payments when invoking urgency. The Court also allowed CA Nos. 461-462 of 2011 in part by setting aside certain orders of the Division Bench and holding that compensations and possession already in place do not automatically validate the entire process if statutory timelines were breached.
Final Disposition
Appeals disposed of. Civil Appeal No. 318 of 2011 and Civil Appeals Nos. 459-460 of 2011 dismissed; Civil Appeals Nos. 461-462 of 2011 allowed (with related orders partially set aside).

Parties to the Case

Appellants / Petitioners

  • State of Haryana and Anr.

Respondents

  • Devander Sagar and others

Legal Representation & Advocates

Counsels for Petitioners

  • • Amrender Sharan, Sr. Adv.
  • • Ajay Bansal, AAG
  • • Govind Goel
  • • Sanjay Kumar
  • • Yadav
  • • Ankit Goel
  • • Dr. Kailash Chand
  • • C.D. Singh
  • • Gaurav Yadava
  • • Sachin Jain
  • • Ms. Kumud Lata Das
  • • Sanjai Kumar Pathak
  • • Ms. Madhu Moolchandani
  • • S.N. Gupta
  • • Surya Kant

Counsels for Respondents

  • • Amrender Sharan, Sr. Adv.
  • • Ajay Bansal, AAG
  • • Govind Goel
  • • Sanjay Kumar
  • • Yadav
  • • Ankit Goel
  • • Dr. Kailash Chand
  • • C.D. Singh
  • • Gaurav Yadava
  • • Sachin Jain
  • • Ms. Kumud Lata Das
  • • Sanjai Kumar Pathak
  • • Ms. Madhu Moolchandani
  • • S.N. Gupta
  • • Surya Kant

Provisions of Law Cited

Section 4 of Land Acquisition Act, 1894Section 6 of Land Acquisition Act, 1894Section 5A of Land Acquisition Act, 1894Section 11A of Land Acquisition Act, 1894Section 17(1) and 17(4) of Land Acquisition Act, 1894 (special powers in cases of urgency)Section 17(3A) and 17(3B) of Land Acquisition Act, 1964 (as amended)Section 24 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013

Legal Doctrines & Maxims

  • actus_curiae_neminem_gravabit
  • Expropriatory_law_must_be_construed_strictly
  • The_act_must_be_done_in_that_manner_or_not_at_all
  • No_party_should_suffer_for_the_mistake_of_the_Court
  • Property_rights_protected_under_Article_300A_(Constitution_of_India)
  • Time_prescription_in_LA_Act_is_peremptory_in_nature

Submissions & Arguments

Contentions of Appellants / Petitioners

The State contends that the Division Bench’s 12.01.2004 order allowing a fresh Section 6 Declaration, and the subsequent 30.12.2004 Declaration, should be sustained in light of Padma Sundara Rao. It argues that the entire acquisition process must be completed within three years from the Section 4 notification, that 80% compensation must be paid before invoking urgency under Section 17, and that withholding payment undermines the statutory scheme. The State maintains that the 80% payment reliance and 11A timelines should be calculated from the declaration date, and that any continuation would be consistent with the statutory framework.

Contentions of Respondents

The landowners contest the State’s invocation of urgency and the allowing of a fresh Section 6 Declaration. They argue that Section 6(1) has a clear, unambiguous timeline that cannot be extended by Court orders, that 80% compensation was not paid at the time of invoking urgency, and that the 30.12.2004 Declaration cannot be treated as a continuation of the initial declaration. They rely on Padma Sundara Rao to insist on strict time limits (3 years for completion; 2-year award window under 11A) and contend that quashing only parts of proceedings does not salvage the overall legality of the acquisition without reinitiation under proper procedure and compensation. They also emphasize that the 2013 Act’s finality requirements under Section 24 were not met in this case.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (11)

Case NameCitationTreatmentExplanation
Padma Sundara Rao v. State of Tamil Nadu2002 (2) SCR 383; (2002) 3 SCC 533PositiveConstitution Bench held that Section 6 must be read strictly with time limits; the ratio is used to reject the idea of a continuation of the declaration.
Greater Naida Industrial Development Authority v. Devendra Kumar2011) 12 SCC 375PositiveClarified that proceeding from the Section 4 stage cannot be bypassed by later declarations; reinforces strict time-limits.
Kiran Singh v. Chaman Paswan1955 1 SCR 117PositiveEstablished the principle that a decree without jurisdiction is a nullity; invoked to reject improper continuations.
Dr. Jogmittar Sain Bhagat v. Dir. Health Services, Haryana2013 (8) SCR 77; 2013 (10) SCC 136PositiveExpropriatory legislation must be construed strictly; supports strict interpretation of LA Act provisions.
Babu Verghese v. Bar Council of Kerala1999 3 SCC 422; 1999 (1) SCR 1121PositiveThe act must be done in the manner prescribed; foundational principle cited in the judgment.
Nazir Ahmad v. King EmperorAIR 1936 PC 253PositiveCited for the principle that the manner of doing acts must follow statutory prescriptions.
Rao Shiv Bahadur Singh v. State of Vindhya PradeshAIR 1954 SC 322; 1954 SCR 1038PositivePart of the chain of authority requiring strict adherence to statutory procedures.
State of U.P. v. Singhara SinghAIR 1964 SC 358PositiveSupporting strict construction and adherence to timelines.
Taylor v. Taylor1875 1 Ch D 426PositiveOrigin of the principle that the prescribed manner of performing acts must be followed.
Shyam Nandan Prasad v. State of Bihar1993 4 SCC 255PositiveQuashing of acquisition proceedings does not nullify the entire acquisition.
Ram Chand v. Union of India1994 1 SCC 44PositiveRecognition that action should be taken within a reasonable time where no period is prescribed.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•7,233 words•~33 min read

In The Court Record

STATE OF HARYANA & ANR. v. DEVANDER SAGAR & ORS.

## [2015) 13 S.C.R. 1057 ## STATE OF HARYANA&ANR. A v. ## DEVAN DER SAGAR & ORS. (Civil Appeal Ne. 318 of2011 etc.) B SEPTEMBER 07, 2015 ## **[VIKRAMAJIT SEN AND ABHAY MANOHAR SAPRE,JJ.)** . _Land Acquisition Act, 1894_ - ss. _4, 6,_ SA, _11 A and 17_ - _s.4 notification dated 18.01.2001_ - _Invoking urgency_ c _provision u/s.17(1) and 17(4)-Declaration u/s. 6 issued the_ - _next ciay The notification and the declaration challenged_ - _in the court by land-owners Court passed interim order on_ - _07.02.2002 The State on 08.02.2002 passed award, oblivious to the interim orders and took possession of certain_ o - _parts of Schedule iand The High Court by order dated 12.1.2004 further quashed the declaration on the grounds that the State failed to adhere to mandatory requirement of payment of 80% compensation; and that it did not qualify_ as _a case of urgency_ as _the State failed to pass the award within_ E _one year from the date of the declaration- However, the High Court permitted the land-owners to file objections u/s._ SA _within· 30 days and also permitted the_ State _to issue fresh declaration u/s. 6, if it found substance in those objections_ - _Objections filed on 11.02.2004 were dismissed_ - _Fresh_ F - _declaration u/s. 6 was issued on 30.12.2004 The landowners again challenged the s.4 notifjcation dated 18.01.2002_ as _well_ as _declaration dated 30.12.2004-High Court quashed the acquisition proceedings holding that declaration dated 30.12.2004 was issued beyond the_ G _statutory period from the date of_ s. _4 notification and that award was also not passed within two years, thus falling foul of_ s. _11A- On appeal, held: The entire exercise of/and acquisition proceedings has to be completed within three years_ - _There_ H 1057 [2015) 13 S.C.R. 1058 ## SUPREME COURT REPORTS - ...- - A _are lapses on the part of the State in the manner in which it_ - - _conducted the acquisition No compensation was paid at_ - - _the time of invocation of urgency provision Once the State invoked s. 17, it was necessary for it to tend the payment of 80% of the compensation- Section 17(3A) and 17(38) cannot_ - B _be rendered nugatory- The Declaration dated 30.12.2004 cannot be upheld and the same cannot be considered as continuation of initial Declaration_ - _the order dated 12. 1. 2004 was erroneous and prejudicial to the landowners and hence the State cannot be permitted to rely on that- No party should_ - C _suffer for the mistake of the Court_ - _Order of High Court upheld._ _s. 17_ - _Invocation of- By State_ - _Without paying 80%_ - _of the compensation Held: The State cannot be permitted_ D _to invoke one part of s. 17 while discarding another_ - _If the manner of doing_ a _particular act is prescribed under_ a _statute, the act must be done in that manner or not at all._ - - - _ss. 4 and 6 Land acquisition Payment of_ - E _compensation to land-owners- Possession of the land taken_ - - _by the beneficiary Thereafter acquisition proceedings challenged_ - _Held: As per s. 24 of 2013 Act, the requirements for an acquisition to attain finality are passing of award,_ - - _payment of compensation and taking of possession In the_ - F _present case, since the land-owners allowed the acquisition to become final, they cannot challenge it thereafter- In the facts of the case, challenge to acquisition proceedings was_ - - - _also belated Hence, acquisition proceedings upheld Right to Fair Compensation and Transparency in Land_ - - G _Acquisition, Rehabilitation and Resettlement Act, 2013 s.24._ - - _Interpretation of Statutes Expropriatory legislation_ - _Interpretation of Held: Expropriatory legislation such_ as H _Land Acquisition Act, must be construed strictly- Legislation._ ## STATE OF HARYANA &ANR. v. DEVANDER SAGAR & ORS. 1059 _Decree_ - _Challenge to- When_ - _Held: A decree without_ A _jurisdiction is_ a _nullity_ - _Its invalidity could be a subject at any stage in any proceedings, even at the stage of execution._ Dismissing C.A.Nos. 318 of 2011 and 459-460 of 2011 and allowing C.A. Nos. 461-462, the Court 8 HELD: C.A. Nos. 318 of2011and495-460 of2011: 1. The entire exercise in the land acquisition P(Oceedings has to be completed within three years. C This time prescription is intended to ensure that the landowners whose lands have been expropriated on the State's continuing powers of eminent domain, receive the market price for their property in close proximity of _the time of acquisition. These persons would thus be in D a position to purchase alternate property, which indubitably would not be possible if the compensation award is implemented after delay. ·courts must be ever vigilant and _resolute in protecting these persons from E unfair treatment by the State. Parliament was alive to the injury that would inexorably visit the landowners if acquisition proceedings were not circumscribed by time, as compensi)tion is pegged to the date of the Notification. Parliament has, in terms of the Right to Fair F Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013, provided amelioration against Governmental apathy. [Para 3] [1068-C-E] _Greater Naida Industrial Development Authority vs. Devendra Kumar_ (2011) 12 SCC 375; _Kiran Singh vs. Chaman Paswan_ (1955) 1 SCR 117; _Dr. Jogmittar Sain Bhagat vs. Dir. Health Services, Haryana_ 2013 (8) SCR 77: (2013) 10 SCC 136 - relied on. G H [2015] 13 S.C.R. 1060 SUPREME COURT REPORTS A _Padma Sundara Rao vs._ State _of Tamil Nadu_ 2002.(2) SCR 383: (2002) 3 SCC 533-referred to. 2. Even though the holding of property is no longer a fundamental right guaranteed under Part Ill of the 8[Constitution ][of ][India, ][it ][has been given constitutional ] protection under Article 300A. The Constitution now guarantees that no person shall be deprived of his property save by authority of law. That authority, _inter alia,_ is the necessity to tend the payment of 80 per cent c of the compensation estimated by the Collector in the event that Section 17 is to be pressed into service, with the objective of denying the landowners remonstration rights by filing Objections in consonance with Section 5A of the L.A. Act. Expropriatory legislation, such as the D L.A. Act, must compulsorily be construed strictly. The appellant State cannot be permitted to invoke one part of Section 17 while discarding another. Sections 17(3A) and 17(38), cannot be.rendered nugatory. "It is the basic principle of law long settled that if the manner of doing a E particular act is prescribed under any statute, the act must be done in that manner or not at all." [Para 6] [1071G; 1072-A-D, E] 3. There are lapses on the part of the Appellant State F in the manner in which it conducted the acquisition. No compensation whatsoever, leave alone the 80 per cent postulated by the Statute under Section 17(3), was given at the time that the urgency provisions were invoked. This exercise ought to have been carried out by passing G a provisional or _ad hoc_ Award containing the Collector's estimation of the compensation to be paid to the landowners. [Para 5] [1070-B-C] _Babu Verghese v. Bar Council of Kera/a_ (1999) 3 SCC 422: 1999 (1) SCR 1121; _Nazir Ahmad v._ H ## STATE OF HARYANA &ANR. v. DEVAN DER SAGAR & ORS. 1061 _King Emperor_ AIR 1936 PC 253; _Rao Shiv_ A _Bahadur Singh v. State of Vindhya Pradesh_ AIR 1954 SC 322: 1954 SCR 1038; _State of U.P. v. Singhara Singh_ AIR 1964 SC 358; _Hussein Ghadial/y v. State of Gujarat_ (2014) 8 SCC 425 - relied on. B B _Taylor v. Taylor_ (1875) 1 Ch D 426 - referred to. 4. _Prima facie,_ time for filing of s. 5A Objections would have to be computed to have commenced on the date of the Order, i.e. 12.1.2004, and further there seems c to be no alternative but to deem the issuance of the Section 4 Notification forthe same date. The High Court in the previous litigation ought to have simply quashed the Section 4 Notification in _personam,_ or if circumstances so commanded, in _rem._ By enjoining the D petitioners to file Objections, the High Court has causad a piquant position to come into place .. But, no party can be made to suffer any disadvantage due to an act of the Court. [Para 7] [1072-G; 1073-A·B] E 5. According to Section 11A of the L.A. Act, the award has to be made within two years of the date of the Declaration, which requirement was met in this case. There was no basis on which to calculate this period from the date of the previous Order, as the Division Bench F has done. [Para 8] [1073-G-H] 6.1 The Division Bench Order dated 12.1.2004, which allowed for filing of a fresh Section 6 Declaration, ought to have be.en assailed by the State since its G conclusions were contrary to the ratio of the Constitution Bench of this Court in _*Padma Sundara Rao_ c~se. The landowners could equally have challenged this Order. However, given the resources available virtually at the beck and call of the State, it cannot be excused for its H · [2015] 13 S.C.R. 1062 SUPREME COURT REPORTS A neglect or jural folly and must be held responsible for its failures. This is especially so since the concerned citizens face the draconian consequences of expropriation of their land with its attendant loss of income. (Para 10] (1074-F-H; 1075-A-B] B 6.2 The Division Bench has predicated its decision to set aside the Notification as well as the Declaration which ironically the previous Division Bench had failed to follow. The decision of the Constitutional Bench in C _*Padma Sundara Rao_ held that the language in Section 6(1) is clear and unambiguous, and the time period cannot be stretched as this would not be in keeping with the legislative intent. The contention of the appellant State that the Declaration dated 30.12.2004 is a D continuation of the initial Declaration is thus clearly erroneous, as such a finding would be in the face of the strict interpretation of time prescribed by _*Padma Sundara Rao_ and the unambiguous language of Section 6. Had the Legislature intended to allow for such a _E_ continuation, it would have done so by specifically providing for it, as it has done for periods covered by orders of stay and injunction. Furthermore, the appellant State cannot place reliance on an erroneous Order which F caused grave prejudice to the rights of the Respondents. No party should suffer for the mistake of the Court. (Para 11] (1077-E-H; 4178-A] _E_ 6.3 Since compensation is calculated based on the value of the land on the date of Section 4 Notification, G the Order of the Division Bench dated 12.1.2004 resulted in the landowners getting compensation at 2001·- rates even thqugh the Award was finally passed in 2006 and the compensation is yet to be paid to the Respondents. H Had the Division Bench Order struck down only the ## STATE OF HARYANA &ANR. v. DEVAN DER SAGAR & ORS. 1063 Declaration, which. in turn would have resulted in the A entire acquisition lapsing, the Appellant State would have had to reinitiate acquisition proceedings, resulting in the Respondents receiving compensation at the market rates current at the time of the fresh Notification. Therefore, the Declaration dated 30.12.2004 cannot be B upheld merely by virtue of the previous Division Bench's erroneous and prejudicial Order. [Para 11] [1078-A-D] _*Padma Sundara Rao vs. State of Tamil Nadu_ 2002 (2) SCR 383 : (2002) 3 SCC 533 - relied on. C 7. The quashing of the entire acquisition proceeding has to be explicitly expressed. Quashing of acquisition proceedings at the instance of one or two 0 landowners does not have the effect of nullifying the entire acquisition. Landowners who are aggrieved by the acquisition proceedings would have to lay a challenge to them at least before an Award is pronounced and possession of the land is taken over by the Government. E However, generally speaking, Courts come to the succour of those, who approach it. In some instances equities are equalized by allowing subsequentslothful petitioners, belatedly and conveniently jumping on the bandwagons, to receive, at the highest, compensation F granted to others _sans_ interest. [Para 9] [1074-B-F] _Sh yam Nandan Prasad v. State of Bihar_ (1993) 4 sec 255 : 1993 (1) Suppl. SCR 533; _Abhey Ram, Delhi Administration v. Gurdip Singh Uban_ (1999) 7 sec 44 : 1999 (1) Suppl. scR 650; _Delhi Administration v. Gurdip Singh Uban_ (2000) 7 sec 296 : 2000 (2) Suppl. SCR 496; _The Chairman and M.D., TNHB v._ S. _Saraswathy2015_ AIR2315;A.P. _Industrial Infrastructure Corporation·_ G H • [2015] 13 S.C.R. 1064 ## SUPREME COURT REPORTS A _Limited v. Chinthamaneni Narasimha Rao_ (2012) 12 sec 797 - relied on. ## C.A. Nos. 461-462 of2011: 8.1 In the appeals compensation has been paid to B the contesting respondents, whose land is now in the possession of Haryana Urban Development Authority. Section 24 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and C Resettlement Act, 2013 makes it clear that the three requirements for an acquisition to attain finality are the passing of an award, payment of compensation and taking of possession, all of which are met here. [Para 13] [1078-G-H; 1079-A] D 8.2 The Contesting Respondents in these Appeals also had not been parties before the Division Bench in its Judgment dated 12.3.2008. As that Judgment did not explicitly state that it would apply to all the landowners E affected by the impugned acquisition process, it was limited in scope to the parties before it. The Contesting Respondents in these Appeals only filed writ petitions challenging the acquisition after the Judgment dated 12.3.2008 was passed. Till the date of the 12.3.2008 F Judgment, these Respondents had acquiesced to the acquisition and had allowed it to become final, and therefore they could not seek to challenge it by placing reliance on a Judgment that did not enure to their benefit. [Para 13] [1079-B-D] G 8.3 A number of Proforma Respondents were impleaded in Civil Appeal No. 462 vide order dated 12.4.2013, who first challenged the acquisition by filing a writ petition in 2010, well after the Judgment dated 12.3.2008~ It is thus clear that these Respondents, too, H ## STATE OF HARYANA &ANR. v. DEVAN DER SAGAR & ORS. 1065 initially consented to the acquisition process and only A challenged it belatedly by seeking to rely upon a favourable Judgment that did not relate or pertain to them. [Para 14) [1079-F] ## Case Law Reference |Case Law Reference||| |---|---|---| |Case Law Reference||B| |referredto|Para4|| |relied on|Para4|| |reliedon<br>reliedon|Para4<br>Para 4 ·|c| |relied on|Para6|| |referredto|Para 6|| |relied on|Para 6|D| |relied on|Para 6|| |relied on|Para 6|| |reliedon<br>relied on|Para 6 ·<br>Para9|E| |reliedon|Para 9|| |relied on|Para 9|| |reliedon|Para 9|F| |relied on|Para 9|| 2002 (2) SCR 383 c2011) 12 sec 375 (1955) 1 SCR 117 2013 (8) SCR 77 1999 (1) SCR 1121 (1875) 1 Ch D 426 AIR 1936 PC 253 1954 SCR 1038 1964 SC 358 (2014) 8 sec 425 · 1993 (1) Suppl. SCR 533 1999 (1) Suppl. SCR 650 2000 (2) Suppl. SCR 496 ## 2015AIR 2315 ## (2012) 12sec191 CIVILAPPELLATE JURISDICTION: Civil Appeal No. 318 of2011. From the Judgment and Order dated 12.03.2008 of[G ] Division Bench of the High Court of Punjab and Haryana at Chandigarh in CWP No. 1123 of 2006. WITH C;A. No. 459-462 of 2011. H 1066 • SUPREME COURT REPORTS [2015] 13 S.C.R. /' A Amrender Sharan, Sr. Adv, Ajay Bansal, AAG, Govind ' Goel, SanjaY. Kumar, Yadav, Ankit Goel, Dr. Kailash Chand, C.D. Singh, GauravYadava, Sachin Jain, Ms. Kumud Lata Das, Sanjai Kumar Pathak, Ms. Madhu Moolchandani, S.N. Gupta, Surya Kant, Advs., for the appearing parties. B ## The Judgment of the Court was delivered by **VIKRAMAJIT SEN, J.** ## **Civil Appeal No. 318 OF 2011** c D E F G H 1. This Appeal questions the correctness of the Judgment dated 12.3.2008 delivered by the Division Bench of the High Court of Punjab and Haryana in C.W.P. No. 1123 of 2006, on the basis of which the High Court had also allowed C. W. P. No. 1465 of 2006, C.W.P. No. 2166 of 2007, C.W.P. No. 7066 of 2008 and C.W.P. No~ 7353 of 2008. Civil Appeal No. 318 of 2011 and Civil Appeal Nos. 459-462 of 2011 respectively assail these Judgments. It merits to mention that the connected Civil Appeal No. 535 of2011 was, on the unrefuted submission made by the learned counsel for the Respondents/Landowners. in that Appeal, dismissed as infructuous by an Order dated 11.3.2015 of this Court; the submission was that the Public Notice dated 8.4.2010 had released the subject land from acquisition. 2. The State of Haryana had issued a Notification under Section 4 of the Land Acquisition Act, 1984 ('L.A. Act' for brevity) on 18.1.2001 to acquire 12.18 acres of land falling in Village Khera Markanda and 11.64 acres of land falling in Village Ratgal as mentioned in the Schedule thereto for the construction of a fell-storm sewer, a sewage-treatment plant and a crematorium _(Shamshan Ghat)_ at Kurukshetra. Simultaneous with the issuance of this Notification, the Appellant State had also invoked the urgency provisions STATE OF HARYANA &ANR. v. DEVANDER SAGAR & ORS. 1067 [VIKRAMAJIT SEN, J.] contained in Sections 17(1) and 17(4 ), thereby denying to the A landowners (some of whom are the Respondents before us) the opportunity to file Objections under Section SA of the L.A. Act. A Declaration under Section 6 of the L.A. Act was issued the very next day, i.e. 19.1.2001. It was at this juncture that the Respondents/Landowners filed C.W.P. No. 2503 of 2002 and B C.W.P. No. 8696 of 2002, (along with a third party namely Neelam Ram, the petitioner in C.W.P. Ne. 4887 of 2002) challenging the Section 4 Notification dated 18.1.2001 and the Section 6 Declaration dated 19.1.2001. c 3. It will be pertinent to point out that by the time interim orders came to be passed in the Writ Petitions by the Division Bench on 7.2.2002, the one year period prescribed in the statute to advance from Notification to Declaration stage had already elapsed. It is also relevant to record that D notwithstanding the interim order dated 7 .2.2002, the Appellant State passed an Award on the next day, namely 8.2.2002, obviously oblivious of those interim orders. It also took possession of certain parts of the Scheduled lands. The one year prescription having been transgressed, the subject E acquisition would have met its statutory death but for the feature that the urgency provisions had been invoked by the State in the event without legal propriety. The time table established under the L.A. Act requires to be recalled. Upon the publication of a Notification, affected landowners are required to file F Objections within thirty days. Although no period has been prescribed for disposal of Objections by the Collector, this exercise must reach its culmination within one year of the Notification's issuance. If these actions are _SD_ done, the G Government must direct the Collector to "take order for the acquisition of the land" which·is a statutory provision which smacks superficiality. The Collector must also mark and measure the land in question, cause public notice to be given of the Government's intention to take possession of the land H ' [2015] 13 S.C.R. 1068 SUPREME COURT REPORTS - A and invite claims for compensation etc. After deciding any objection or representation received from the interested parties, an Award has to be made within two years of the Declaration, failing which the entire acquisition proceedings would lapse. Of course the period covered by stay orders - B granted by a Court would be excluded. Parliament was, as is manifestly evident, alive to the injury that would inexorably visit the landowners if acquisition proceedings were not circumscribed by time, as compensation is pegged to the date of the Notification. The entire exercise has to be completed - C within three years. This time prescription is thus obviously intended to ensure that the landowners whose lands have been expropriated on the State's continuing powers of eminent domain receive the market price for their property in close - D proximity of the time of acquisition. These persons would thus be in a position to purchase alternate property, which indubitably would not be possible if the compensation award is implemented after delay. Courts must be ever vigilant and resolute in protecting these persons from unfair treatment by - E the State. Thankfully, Parliament has, in terms of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013, provided amelioration against Governmental apathy. F 4. By a brief Order delivered on 12.1.2004, that is in the era of **Padma Sundara Rao** vs. State of Tamil Nadu (2002) 3 SCC533, the Division Bench of the Punjab and Haryana High Court, noting the contentions that the Appellant State had not adhered to the mandatory ·requirement of payment of 80 per G cent comper;isation to the landowners and that it did not qualify as a case of urgency since the Appellant State passed had failed to publish an Award within one year after the Section 6 Declaration, quashed the latter. However, for reasons recondite, the Division Bench simultaneously permitted the H petitioners before it to file Section SA Objections within thirty STATE OF HARYANA &ANR. v. DEVANDER SAGAR & ORS. 1069 [VIKRAMAJIT SEN, J.] days and permitted the Appellant State to issue a fresh Section A 6 Declaration in the event that it found no substance in those Objections. The directions could not have been given by the Division Bench. Instead, the Division Bench should have simply quashed the Section 6 Declaration, at which point the Section 4 Notification would have lapsed, due to the fact that the one B year period for filing a Declaration had already elapsed. In Greater Naida Industrial Development Authority vs. Devendra Kumar (2011) 12 SCC 375 it has been clarified that it is impermissible for the Government to proceed with the acquisition from the stage of Section 4. Applying the ratio of C **Kiran Singh** vs. Chaman Paswan (1955) 1 SCR 117 which has been followed in Dr. Jogmittar Sain Bhagat vs. Dir. Health Services, Haryana (2013) 10 SCC 136 to the effect that a decree without jurisdiction is a nullity and its invalidity could be D a subject at any stage in any proceedings and even at the stage of execution, the said Order of the Division Bench can be ignored. We think it appropriate to reproduce the operative part of this Order for reasons that will become apparent later:- "l n the facts and circumstances of the case, as E mentioned above, in our view, interest of justice would . be served, if we quash declaration under Section 6 of the Act dated 19.1.2001, and all subsequent proceedings that might have been taken thereafter with F liberty **to the petitioners** to file objections under Section 5-A of the Act within 30 days from the date of receipt of a certified copy of the order, which, naturally shall be heard by the State or the authority constituted by the State for that purpose, in accordance with law G and after giving an appropriate hearing to the petitioners if the objections are rejected, naturally, the Government will be in its power to issue declaration under Section 6 of the Act. **H** _I_ 1070 SUPREME COURT REPORTS [2015] 13 S.C.R. A Petition is disposed of accordingly. However, parties are left to bear their own costs." (emphasis supplied) 5. We must highlight the lapses by the Appellant State in the manner in which it conducted the acquisition. B Significantly, no compensation whatsoever, leave alone the 80 per cent postulated by the Statute under Section 17(3), was given at the time that the urgency provisions were invoked. This exercise ought to have been carried out by passing a provisional or ad hoc Award containing the Collector's C estimation of the compensation to be paid to the landowners. The State seems to be oblivious of the law and impervious to the plight of the landowners whose livelihood is virtually deracinated. Section 6 requires particular perusal and we are extracting its relevant portions for convenience. Also, for facility D of reference, Sections 17(3A) is reproduced in order to emphasize that those provisions could be correctly and properly resorted to only if the State Government, through its Collector, had tendered 80 per cent of the compensation estimated by him. E - **Section 6 - Declaration that land is required for** - - **a public purpose** (1) Subject to the provisions of Part VII of th is Act, when the appropriate Government is satisfied, after considering the report, it any, made under - F section 5A, sub-section (2), that any particular land is needed for a public purpose, or for a Company, a declaration shall be made to that effect under the signature of a Secretary to such Government or of some officer duly authorized to certify its orders, and different - G declarations may be made from time to time in respect of different parcels of any land covered by the same notification under section 4, sub-section (1) irrespective of whether one report or different reports has or have been made (wherever required) under section 5A, sub- - H section (2): H ## STATE OF HARYANA &ANR. v. DEVAN DER SAGAR & ORS. 1071 [VIKRAMAJIT SEN, J.] Provided that no declaration in respect of any A particular land covered by a notification under section 4, sub-!ection (1 ),_ - (i) xxx xxx ,• xxx - (ii) Published after the commencement of the Land Acquisition (Amendment) Act, 1984, shall be made after the expiry of one year from the date of the publication of the notification: ## **17. Special powers in cases of urgency** - B c ## xxx xxx xxx (3A) Before taking possession of any land under subsection ( 1) or sub-section (2), the Collector shall, without o prejudice to the provisions of sub-section (3), - - (a) tender payment of eighty per centum of the compensation for such land as estimated by him to the persons interested entitled thereto, and E - (b·) pay it to them, unless prevented by some one or more of the contingencies mentioned in section 31, sub-section (2), and where the Collector is so prevented, the provisions F of section 31, sub-section (2) (except the second provision thereto), shall apply as they apply to the payment of compensation under that section. 6. Even though the holding of property is no longer a G fundamental right guaranteed under Part Ill of the Constitution of India, it has been given constitutional protection under Artiele 300A which came to be inserted into the Constitution by the Constitution (Forty-fourth Amendment)Act, 1978 which omitted Article 19( 1 )(f), viz., "to acquire, hold and dispose of propertY'. **H** [201S] 13 S.C.R. 1072 SUPREME COURT REPORTS A The Constitution now guarantees that no person shall be deprived of his property save by authority of law. We have mentioned this for the reason that if the UnioA or the State Government is desirous of depriving any person of his property it can only do so by authority of law. That authority, as is facially B evident, inter alia, is the necessity to tend the payment of 80 per cent of the compensation estimated by the Collector in the event that Section 17 is to be pressed into service, with the objective of denying the landowners remonstration rights by filing Objections in consonance with Section SA of the L.A. C Act. Expropriatory legislation, such as the L.A. Act, must compulsorily be construed strictly. The Appellant.State cannot be permitted to invoke one part of Section 17 while discarding another. Sections 17(3A) and 17(3B), which were inserted by the Act 68 of 1964 with effect from 24.9.1994, cannot be 0 rendere~ nugatory. In this regard, we are reminded of the Judgment of this Court in Babu Verghese v. Bar Council of Kerala (1999) 3 SCC 422 which held that: "It is the basic principle of law long settled that if the manner of doing a E particular act is prescribed under any statute, the act must be done in that manner or not at all.• The origin of this rule is traceable to the decision in Taylor v. Taylor (187S) 1 Ch D 426 which was followed by Lord Roche in Nazir Ahmad v. King Emperor AIR 1936 PC 2S3, and has been upheld in Rao Shiv F Bahadur Singh v. State of Vindhya Pradesh AIR 1954 SC 322, State of U.P. v. Singhara Singh AIR 1964 SC 3S8 and Hussein Ghadiallyv. State of Gujarat (2014) 8 SCC 425. 7. Prima facie, time for filing of SA Objections would G have to be computed to have commenced on the date of the Order, i.e. 12.1.2004, and further there seems to be no alternative but to deem the issuance of the Section 4 Notification for the same date. Hence the Section 6 Declaration would have to be made at the latest by 11.1.200S. However, H we reiterate that the High Court ought to have simply quashed STATE OF HARYANA &ANR. v. DEVAN DER SAGAR & ORS. 1073 [VIKRAMAJIT SEN, J.] the Section 4 Declaration in personam, or if circumstances so A commanded, in rem. By permitting nay enjoining the petitioners to file Objections, the High Court has caused a piquant position · to come into place. But, as is trite, no party can be made to suffer any disadvantage due to an act of the Court. The Respondents filed Objections on 11.2 .2004 which were B dismissed in September 2004 paving the way for the passing of a fresh Section 6 Declaration on 30.12.2004. The Respondents thereupon challenged the Section 4 Notification dated 18.1.2002 and the Section 6 Declaration dated 30.12.2004 in terms of C.W.P. No.1123 of2006, C.W.P. No. C 1465 of 2006 and C.W.P. No. 2166 of 2007. B 8. In the second salvo of writ petitions, the Division Bench has found in the impugned Judgment dated 12.3.2008 that the second Section 6 Declaration had been made after D the passing of the period prescribed in the L.A. Act, as the Section 4 Notification was issued on 18.1.2001. It noted that this Court had held in **Padma Sundara Rao** that the subject statutory period has to be imparted a strict construction; the period could be increased only in the circumstances postulated E and provided for in the Act itself. The Division Bench also observed that even if the second Section 6 Declaration were to be accepted as valid by construing the one year period from the date of the Order of the previous Division Bench dated 12.1.2004, the Appellant State had failed to pass an Award F within two years, thus falling foul of Section 11 A of the L.A. Act. The Section 4 Notification, the Section 6 Declaration and all proceedings pursuant thereto were therefore quashed. We find it apposite to note the error in the latter observation. According G to Section 11 A of the L.A. Act, the award hbs to be made within two years of the date of the Declaration, which requirement was met in this case. There was no basis on which to calculate this period from the date of the previous Order, as the Division Bench has done. H [2015] 13 S.C.R. 1074 ## SUPREME COURT REPORTS A 9. It would be pertinentto clarify thatthe quashing of the entire acquisition proceeding has to be explicitly expressed. This Court has in Shyam Nandan Prasad v. State of Bihar (1993) 4 SCC 255, Abhey Ram, Delhi Administration v. Gurdip Singh Uban (1999) 7 SCC44, Delhi Administration v. Gurdip B Singh Uban (2000) 7 SCC 296 and The Chairman and M.D., TNHB v. S. Saraswathy (Judgment delivered on 11.5.2015 in Civil Appeal Nos. 736-737 of 2008) reiterated and restated the established and consistent view that quashing of acquisition proceedings at the instance of one or two landowners does C not have the effect of nullifying the entire acquisition. In A.P. Industrial Infrastructure Corporation Limited v. Chinthamaneni Narasimha Rao (2012) 12 SCC 797, this Court has reiterated the established proposition that landowners who are aggrieved D by the acquisition proceedings would have to lay a challenge to them at least before an Award is pronounced and possession of the land is taken over by the Government. Numerous decisions of this Court have been discussed obviating the need to analyze all of them once again. However, E generally speaking, Courts come to the succour of those who approach it. In some instances equities are equalized by allowing subsequent slothful petitioners, belatedly and conveniently jumping on the bandwagons, to receive, at the highest, compensation granted to others sans interest. A F 10. The Appellant State has filed thisAppeal contending that the parties are bound by the Division Bench Order dated 12.1.2004, which allowed for filing of a fresh Section 6 Declaration. This is a specious submission because the State G ought to have assailed that Order since its conclusions were contrary to the ratio of the Constitution Bench of this Court in Padma Sundara Rao. It may be contended that the landowners could equally have challenged this Order. However, given the resources available virtually at the beck H and call of the State, it cannot be excused for its neglect or STATE OF HARYANA &ANR. v. DEVANDER SAGAR & ORS. 1075 [VIKRAMAJIT SEN, J.] jural folly and must be held responsible for its failures. This is A especially so since the concerned citizens face the draconian consequences of expropriation of their land with its attendant loss of income. The Appellant State further contended that the initial Section 6 Declaration was within the statutory time period and upon the curing of technical defects, the original Section B 6 Declaration continued. The Appellant State also argued that the possession of certain lands has already been taken by the Haryana Urban Development Authority (HUDA) and therefore those matters have acquired finality in accordance with the ratio of **Padma Sundara Rao,** which is available in these C extracted paragraphs: **11.** It may be pointed out that the stipulation regarding the urgency in terms of Section 5-A of the Act has no role to play when the period of limitation under Section D 6 is reckoned. The purpose for providing the period of limitation seems-to be the avoidance of inconvenience to a person whose land is sought to be acquired. Compensation gets pegged from the date of notification under Section 4( 1 ). Section 11 provides that the E valuation of the land has to be done on the date of publication of notification under Section 4(1 ). Section 23 deals with matters to be considered in determining the compensation. It provides that the market value of F the land is to be fixed with reference to the date of publication of the notification under Section 4( 1) of the Act. The prescription of time-limit in that background is, therefore, peremptory in nature. In _Ram Chandv. Union of India_ (1994) 1 SCC 44 it was held by this Court that G though no period was prescribed, action within a reasonable time was warranted. The said case related to a dispute which arose before prescription of specific periods. After the quashing of declaration, the same became non est and was effaced. It is fairly conceded H [2015] 13 S.C.R. 1076 SUPREME COURT REPORTS A by learned counsel for the respondents that there is no bar on issuing a fresh declaration after following the due procedure. It is, however, contended that in case a fresh notification is to be issued, the market value has to be determined on the basis of the fresh notification under B Section 4( 1) of the Act and it may be a costly affair for the State. Even if it is so, the interest of the person whose land is sought to be acquired, cannot be lost sight of. He is to be compensated for acquisition of his land. If the acquisition soughtto be made is done in an illogical, c illegal or irregular manner, he cannot be made to suffer on that count. ****** D E F G 14. While interpreting a provision the court only interprets the law and cannot legislate it. If a provision of law is misused and subjected to the abuse of process of law, it is for the legislature to amend, modify or repeal it, if deemed necessary. (See _Rishabh Agro Industries Ltd._ v. _P.N.B. Capital Services Ltd.)_ The legislative casus omissus cannot be supplied by judicial interpretative process. Language of Section 6(1) is plain and unambiguous. There is no scope for reading something into it, as was done in _Narsimhaiah case._ In _Nanjudaiah case_ the period was further stretched to have the time period run from date of service of the High Court's order. Such a view cannot be reconciled with the language of Section 6( 1 ). If the view is accepted it would mean that a case can be covered by not only clause _(1)_ and/or clause _(ii)_ of the proviso to Section 6(1 ), but also by a non-prescribed period. Same can never be the legislative intent. ***** H STATE OF HARYANA &ANR. v. DEVANDER SAGAR & ORS. 1077 [VIKRAMAJIT SEN, J.] **16.** The plea relating to applicability of the stare decisis A principles is clearly unacceptable. The decision in _K._ . _Chinnathambi Gounder v. Government of Tamil Nadu_ AIR 1980 Mad 251 : (1980) 2 MLJ 269 (FB)was rendered on 22-6-1979 i.e. much prior to the amendment by the 1984Act. lfthe legislature intended B to give a new lease of life in those cases where the declaration under Section 6 is quashed, there is no reason why it could not have done so by specifically providing for it. The fact that the legislature specifically provided for periods covered by orders of stay or C injunction clearly shows that no other period was intended to be excluded and that there is no scope for providing any other period of limitation. The maxim _actus curiae neminem gravabit_ highlighted by the Full Bench 0 of the Madras High Court has no application to the fact situation of this case. 11. The Division Bench has predicated its decision to set aside the Notification as well as the Declaration on **P ... dma Sundara Rao,** which ironically the previous Division Bench E had failed to follow. The decision of the Constitutional Bench in **Padma Sundara Rao** held that the language in Section 6(1) is clear and unambiguous, and the time period cannot be stretched as this would not be in keeping with the legislative intent. The contention of the Appellant State that the Declaration F dated 30.12.2004 is a continuation of the initial Declaration is thus clearly erroneous, as such a finding would be in the face of the strict interpretation of time prescribed by **Padma Sundara Rao** and the unambiguous language of Section 6. G Had the Legislature intended to allow for such a continuation, it would have done so by specifically providing for it, as it has done for periods covered by orders of stay and injunction. Furthermore, the Appellant State cannot place reliance on an erroneous Order which caused grave prejudice to the rights of H [2015] 13 S.C.R. 1078 ## SUPREME COURT REPORTS A the Respondents. It would be apt to mention the legal principle that no party should suffer for the mistake of the Court. Since compensation is calculated based on the value of the land on the date of the Section 4 Notification, the Order of the Division Bench dated 12.1.2004 resulted in the landowners getting B compensation at 2001 rates even though the Award was finally passed in 2006 and the compensation is yet to be paid to the Respondents. Had the Division Bench Order struck down only the Declaration, which in turn would have resulted in the entire acquisition lapsing, the Appellant State would have had to C reinitiate acquisition proceedings, resulting in the Respondents receiving compensation at the market rates current at the time of the fresh Notification. We therefore find that the Declaration dated 30.12.2004 cannot be upheld merely by virtue of the D previous Division Bench's erroneous and prejudicial Order. We are in agreement with the decision of the High Court in the impugned Judgment and consequently dismiss the Appeal. ## C.A. Nos. 459-460 of 2011 E 12. We are of the opinion thatthe substance of the issues in question in this batch of petitions are analogous to those in Civil Writ Petition No. 1123 of 2006 which has been assailed in Civil Appeal No. 318 of 2011, save for the difference that it is the Haryana Urban Development Authority which has filed F the Appeal. In that light, the findings made in the preceding Appeal apply squarely to this batch of Appeals as well, and are decided in the same terms. E ## C.A. Nos. 461-462 of2011 ## G G 13. The factual scenario in these Appeals is different from Civil Appeal No. 318 of 2011, in that compensation has been paid to the Contesting Respondents, whose land is now in the possession of Haryana Urban Development Authority. Section 24 of the Right to Fair Compensation and H Transparency in Land Acquisition, Rehabilitation and STATE OF HARYANA &ANR. v. DEVAN DER SAGAR & ORS. 1079 [VIKRAMAJIT SEN, J.) Resettlement Act, 2013 makes it clear that the three A requirements for an acquisition to attain finality are the passing of an award, payment of compensation and taking of possession, all of which are met here. Furthermore, the Contesting Respondents in these Appeals had not been parties before the Division Bench in its Judgment dated B 12.3.2008. As that Judgment di<;I not explicitly state that it would apply to all the landowners affected by the impugned acquisition process, it was limited in scope to the parties before it, for reasons that we have already discussed herein. It would also be pertinent to note that the Contesting C Respondents in these Appeals only filed writ petitions challenging the acquisition after the Judgment dated 12.3.2008 was passed. We find that till the date of the 12.3.2008 Judgment, these Respondents had acquiesced to 0 the acquisition and had allowed it to become final, and therefore they could not seek to challenge it by placing reliance .,;n a Judgment that did not enure to their benefit. 14. A number of Proforma Respondent& were impleaded in Civil Appeal No. 462 vide order dated 12.4.2013, E and we are not aware of whether the acquisitions with regard to their land has become final. However, these Proforma Respondents first challenged the acquisition by filing a writ petition in 2010, well after the Judgment dated 12.3.2008. It is thus clear that these Respondents, too, initially consented F to the acquisition process and only challenged it belatedly by seeking to rely upon a favourable Judgment that did not relate or pertain to them. The impugned Orders dated 12.5.2008 in C.W.P. No 7066 of 2008 and 13.5.2008 in C.W.P. No. 7353 of G 2008 as well as Order dated 19.1.2010 in C.W.P. No. 163 of 2010 are therefore set aside, and these Appeals are accordingly allowed. Kalpana K. Tripathy Appeals disposed of. H
End of Judgment Record
Browse All Supreme Court of India (2015) Decisions
2015-09-30

The Committee-GFIL v. Libra Buildtech Private Ltd. & Ors.

The Committee-GFIL v. Libra Buildtech Private Ltd. & Ors. concerns a court-monitored sale of assets of Golden Forest India Limited (GFIL) conducted by the GFIL Committee in liquidation. Bidders Libra Buildtech Pvt. Ltd. and other investors were declared successful at auction and deposited substantial sums. The Supreme Court later confirmed the sale in 2009 and directed possession to be handed over, but the transfer of ownership did not occur. On 26 September 2012, the Court cancelled the sale and directed the GFIL Committee to refund the entire sale consideration with interest, while permitting the bidders to pursue a refund of stamp duty from the State Government. The GFIL Committee refunded the sale price but deducted TDS, prompting the bidders to seek refund of stamp duty totaling Rs. 6.22 crores. The State of Punjab, through the SDM, Dera Bassi, and others, rejected the stamp duty refund on the grounds of limitation. The Supreme Court held that the stamp duty refund claim cannot be time-barred given the court-monitored nature of the transaction, the equity involved, and the fact that the contract was cancelled by the Court. It relied on the Indian Stamp Act provisions (ss. 49(d)(2) and 50(3)), the Contract Act (s. 65), and the maxim actus curiae neminem gravabit to justify refund. The Court ultimately allowed IA Nos. 9 and 10, directing the State to refund Rs. 6.22 crores within four weeks.

2015-03-19

HMT WATCHES LTD. v. M.A. ABIDA & ANR.

These appeals challenge a Kerala High Court order that quashed multiple criminal complaints under Section 138 of the Negotiable Instruments Act, 1881, by invoking jurisdiction under Section 482 of the Code of Criminal Procedure. The Supreme Court held that the High Court committed a grave error of law in quashing the proceedings by accepting disputed factual defences and treating them as uncontroverted at the Section 482 stage. The disputed issues — such as whether the cheques were given as security, whether there was an outstanding liability, or whether the signatory of the demand notice was authorized — were factual in nature and could only be resolved by the trial court after producing evidence. The Court reaffirmed that the jurisdiction under Section 482 Cr.P.C. is limited and should not be invoked to decide disputed questions of fact or to bypass the proper trial procedure. It also clarified that an instruction of stop payment can attract liability under Section 138 NI Act, citing Pulsive Technologies, Modi Cements, and related authorities. The judgment underscores that the purpose of criminal proceedings under Section 138 is to secure prompt payment, and courts should avoid premature discharge of the proceedings when material facts remain in dispute. Accordingly, the appeals are allowed and the trial court is directed to proceed with the trials.

2015-12-01

Medical Council of India v. Mediciti Institute of Medical Sciences (MIMS) & Ors.

This is a Civil Appeal involving the renewal of permission for increasing MBBS admissions at Mediciti Institute of Medical Sciences (MIMS) from 100 to 150 for the academic year 2015-16. The Medical Council of India (MCI) conducted inspections in December 2014 and subsequently in May 2015, finding deficiencies in faculty strength, resident numbers, facilities (including a girls’ common room and operating theatres), and other norms. The Executive Committee of the MCI recommended against renewing the permission for the 4th batch of 150 MBBS seats. MIMS challenged the decision in the Delhi High Court, which directed the MCI to conduct a re-inspection to verify whether deficiencies had been removed. The Supreme Court, however, reversed the High Court’s direction, holding that where the norms set by the apex regulatory body are not fulfilled, the judiciary should not compel the regulator to deviate from those fixed standards or to indulge in an additional inspection beyond the prescribed schedule. It emphasized the Establishment of Medical College Regulations, 1999 and the time schedule laid down by this Court for grant of permissions, noting that re-inspection is not warranted. The result: appeals allowed, with no order as to costs, and the High Court’s direction stood set aside.

2015-04-17

H. Lakshmaiah Reddy v. L. Venkatesh Reddy

This Supreme Court is hearing Civil Appeal Nos. 3725-3726 of 2015 arising from a dispute between H. Lakshmaiah Reddy (and others) and L. Venkatesh Reddy regarding the title to a suit property originally owned by Guramma, mother of the plaintiff and first wife of the first defendant. After Guramma’s death, the first defendant furnished a declaration before revenue authorities to change the Katha in the plaintiff’s name, and mutation was effected, with revenue records showing the plaintiff as owner for a long period. The first defendant later married again and had further children; the plaintiff and the first defendant, as class-I heirs, claimed half-share each in the property. The trial court dismissed the suit, the lower appellate court partially decreed in favor of the plaintiff, and the High Court allowed the respondent’s Second Appeal. The core legal issue concerns whether mutation entries in revenue records convey title. The Court held that mutation does not create or extinguish title and is only for land-revenue purposes; it cannot divest the first defendant of his half share. The High Court’s view that the first defendant’s conduct, via mutation, divested him of title was incorrect. The Court affirmed the lower appellate court’s decree, set aside the High Court judgment, and allowed the appeals, emphasizing that Article 142 relief is not to override the governing law of succession. The order closes with “Appeals allowed” and no costs.