The Committee-GFIL v. Libra Buildtech Private Ltd. & Ors.

Case / Petition Number:
SLP(C) Nos. 23886-23887 of 2012
Neutral Citation:[2015] 11 S.C.R. 420

Case Synopsis & Summary

The Committee-GFIL v. Libra Buildtech Private Ltd. & Ors. concerns a court-monitored sale of assets of Golden Forest India Limited (GFIL) conducted by the GFIL Committee in liquidation. Bidders Libra Buildtech Pvt. Ltd. and other investors were declared successful at auction and deposited substantial sums. The Supreme Court later confirmed the sale in 2009 and directed possession to be handed over, but the transfer of ownership did not occur. On 26 September 2012, the Court cancelled the sale and directed the GFIL Committee to refund the entire sale consideration with interest, while permitting the bidders to pursue a refund of stamp duty from the State Government. The GFIL Committee refunded the sale price but deducted TDS, prompting the bidders to seek refund of stamp duty totaling Rs. 6.22 crores. The State of Punjab, through the SDM, Dera Bassi, and others, rejected the stamp duty refund on the grounds of limitation. The Supreme Court held that the stamp duty refund claim cannot be time-barred given the court-monitored nature of the transaction, the equity involved, and the fact that the contract was cancelled by the Court. It relied on the Indian Stamp Act provisions (ss. 49(d)(2) and 50(3)), the Contract Act (s. 65), and the maxim actus curiae neminem gravabit to justify refund. The Court ultimately allowed IA Nos. 9 and 10, directing the State to refund Rs. 6.22 crores within four weeks.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • J. Chelameswar
  • Abhay Manohar Sapre, J.J.
Judgment Date
2015-09-30
Court Decision / Holding
IA Nos. 9 and 10 allowed. The State of Punjab through the S.D.M., Dera Bassi is directed to refund the entire stamp duty amount of Rs. 6.22 crores spent by the applicants for purchasing stamp papers for execution of sale deeds, within four weeks from the date of the order.
Final Disposition
IA Nos. 9 and 10 allowed; State of Punjab directed to refund entire stamp duty Rs.6.22 crores within four weeks.

Parties to the Case

Appellants / Petitioners

  • Libra Buildtech Private Ltd. & Ors. (and other bidders: Saffron Town Planners Pvt. Ltd.; Aries Buildwell Pvt. Ltd.; Flamingo Propbuild Pvt. Ltd.; Swans Town Planners Pvt. Ltd.)

Respondents

  • Golden Forest India Limited (GFIL) Committee
  • State of Punjab
  • S.D.M., Dera Bassi
  • Union of India

Legal Representation & Advocates

Counsels for Petitioners

  • • Shyam Divan

Counsels for Respondents

  • • Harpawan Kumar Arora
  • • Shyam Divan
  • • Sanchar Anand
  • • AAG
  • • Manali Singhal
  • • Santosh Sachin
  • • Abhikalp Pratap Singh
  • • Deepak Singh Rawat
  • • Abhijat P. Medh
  • • Arijit Prasad
  • • Poornima G Bhat
  • • Gargi Khanna
  • • Anil Katiyar
  • • Apoorv Singhal
  • • Devendra Singh

Provisions of Law Cited

Stamp Act, 1899 ss. 49(d)(2) and 50Indian Stamp Act, 1899 s. 49(d)(2) read with s. 50(3)Indian Contract Act, 1872 s. 65

Legal Doctrines & Maxims

  • Actus curiae neminem gravabit (An Act of the Court shall prejudice no man)
  • Equity principle: expiry of limitation may bar the remedy but not the right

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contended that the court-monitored sale failed due to reasons beyond their control. After the Court directed refund of the sale consideration with interest and permitted them to seek refund of stamp duty from the State, equity requires refund of the entire stamp duty. They argued that Sections 49(d)(2) read with 50(3) of the Stamp Act authorize the State to entertain such refunds, supported by the maxim actus curiae neminem gravabit and the principle that a party should not be penalized for factors outside their control. They asserted the right to refund accrued on 26.09.2012 and should not be blocked by technical limitations; the Court should treat the claim as within time under the equitable interpretation of the law.

Contentions of Respondents

The respondents contended that the stamp duty refund claim was barred by limitation and should be dismissed. They argued that the remedy for refund was governed by the time limits in Section 50 of the Stamp Act, and that even though the contract was cancelled, the State could not be compelled to refund stamp duty beyond prescribed periods. They asserted that the Court’s earlier orders did not automatically create an entitlement to refund of stamp duty, and that technical compliance and statutory limits should be respected.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Busching Schmitz Pvt. Ltd. v. P.T. Menghani & Anr.1977 (3) SCR 312; 1977 (2) SCC 835PositiveCited to support the equity-based maxim actus curiae neminem gravabit and the principle that justice should prevail in court-monitored transactions.
Raj Kumar Dey & Ors. v. Tarapada Dey & Ors.1988 (1) SCR 118; (1987) 4 SCC 398PositiveCited as part of the maxims and equitable principles invoked in the judgement.
Firm Kaluram Sitaram v. The Dominion of IndiaAIR 1954 Bombay 50PositiveApproved for its broad equity-based stance on state action and access to justice.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,600 words•~26 min read

In The Court Record

The Committee-GFIL v. Libra Buildtech Private Ltd. & Ors.

[2015) 11S.C.R.420 A ## THE COMMITTEE-GFIL ## v. LIBRA BUILDTECH PRIVATE LTD. & ORS. I.A. Nos. 7-8 & 9-10 OF 2015 B IN (Special Leave Petition (Civil) Nos.23886-23887 of 2012) SEPTEMBE.R 30, 2015 C **[J. CHELAMESWAR AND ABHAY MANOHAR** · **SAPRE,** JJ.] _Stamp Act, 1899_ - _ss. 49(d)(2) and 50_ - _Property in question (which belonged to the company under liquidation)_ D _taken over by a Committee constituted by Supreme Court-_ - _Auction sale of the property by the Committee Sale_ - _confirmed in favour of the highest bidders/applicants The case transferred by Supreme Court to High Court for further action -As per the direction of High Court bidders/applicants_ · E _deposited the stamp papers with the Committee for execution_ - _of sale deed Sale deeds though executed, possession of_ - _the property could not be handed-over to the bidders The Committee directed by High Court to refund the amount_ - _deposited by the bidders Direction challenged by the_ F _Committee_ - _Supreme Court confirmed the direction of High Court to refund the entire amount deposited towards sale consideration and gave liberty to the applicants to approach the State Government for refund of stamp duty-Applicants' application for refund of stamp duty rejected by the competent_ - G _authority on the ground of limitation Present applications challenging the order denying refund of stamp duty- Held: The claim for refund of stamp duty cannot be said to be timebarred because the sale transaction being court monitored_ H _transaction, the party could not have taken any steps_ 420 THE COMMITTEE-GFIL v. LIBRABUILDTECH PRIVATE LTD.&ORS. 421 _regarding the claim prior to permission of the court_ - _Thus_ A _the right to claim the refund accrued only after the order of_ - _Supreme Court On the contract of sale having become void as a result of its cancellation by Supreme Court, in the light of the principle contained in s. 65 of the Contract Act, the applicants are entitled to restoration of all such benefits_ B _from the State which it took from the contract of sale- On the basis of principle of equity, that a person cannot be penalized for no fault of his and the act of the court would cause no prejudice to any of his rights, also the_ bona fide _claim for_ C _refund cannot be denied- Even if the claim was time-barred, the application for refund, could have been entertained by the State uls. 49(d)(2) r/w. s. 50(3)- Therefore, the applicants_ - _are entitled to refund of the entire stamp duty- Limitation Equity- Contract Act, 1872_ - _s. 65._ D - - - _Limitation Expiry of period of limitation Effect of Held: Expiry of limitation period may bar the remedy, but not the right._ _Equity_ - _Principles of equity that_ a _person cannot be_ E _penalized for no fault of his and the act of the court would_ - - _cause no prejudice to any of his rights Applicability of Discussed._ - _Interpretation of Statutes Interpretation which advances the cause of justice and is based on the principle of equity, should be preferred._ - _Maxim 'Actus curiae neminem gravabit'-Applicability_ - _of Discussed._ G ## Allowing the applications, the Court HELD: 1. The applicants are entitled to claim the refund of entire stamp duty amount of Rs.6.22 crores H SUPREME COURT REPORTS [2015] 11 S.C.R. 422 A from the State Exchequer. which they spent for execution of sale deeds in their favour in relation to the properties in question. Firstly because the transaction originally intended between the parties, i.e., sale of properties in question by GFIL-Committee to the applicants was not B accomplished and failed due to reasons beyond the control of the parties. Secondly, because this Court after taking into consideration all facts and circumstances also came to the conclusion that it was not possible for the parties to conclude the transactions originally C intended and while cancelling the same directed the seller (GFIL-Committee) to refund the entire sale consideration to the applicants and simultaneously permitted the applicants to claim refund of stamp duty 0[amount ][from ][the State ][Government ][by ][order ][dated ] 26.09.2012. Thirdly, because as a result of the order of this Court, a right to claim refund of amount paid towards the stamp duty accrued to the applicants. Fourthly, because this being a court monitored transaction, no E party was in a position to take any steps in the matter without the permission of the Court. Fifthly, because the applicants throughout performed their part of the contract and ensured that transaction in question is accomplished as was originally intended but for the F reasons to which they were not responsible, the transaction could not be accomplished. Lastly, because the applicants in law were entitled to claim restoration of all such benefits/advantages from the State once the transaction was cancelled by this Court on 26.09.2012 G in the light of the principle contained in Section 65 of the Contract Act which enable the party to a contract to seek restoration of all such advantage from other party which they took from such contract when the contract is discovered to be void or becomes void. In the present H case, the contract in question became void as a result THE COMMITTEE-GFIL v. LIBRA BUILDTECH PRIVATE 423 LTD.&ORS. of its cancellation by order of this Court dated 26.09.2012. A [Para 35, 36) [434-D-H; 435-D) 2. The maxim of equity, which is well settled namely _"actus curiae neminem gravabif'_ meaning -An Act of the Court shall prejudice no man. It is founded upon justice B and good sense and afforded a safe and certain guide for the administration of law. This principle is fundamental to any system of justice and applies to the Indian jurisprudence. It is thus a settled principle of law based on principle of equity that a person cannot be C penalized for no fault of his and the act of the court would cause no prejudice to any of his right. The aforesaid maxim would apply with full vigour in the facts of the present case and therefore, the applicants are entitled to claim the refund of entire amount of stamp duty from D the State Government which they spent in purchasing the stamp duty for execution of sale deed in relation to the properties in question. The applicants' _bona fide_ genuine claim of refund cannot be denied on technical grounds such as limitation. [Paras 37, 38 and 39) [435E H; 436-A-C] _Busching Schmitz Pvt. Ltd. vs. PT. Menghani_ & _Anr._ 1977 (3) SCR 312: (1977) 2 sec 835; _Raj Kumar Dey_ & _Ors. vs. Tarapada Dey_ & _Ors._ 1988 - (1) SCR 118: (1987) 4 sec 398 relied on. F _Firm Kaluram Sitaram vs. The Dominion of India_ - AIR 1954 Bombay 50 approved. G _Broom's Leal Maxims 10'h Edition, 1939 p.73;_ - _Jenk. Cent. 118_ referred to. 3. Even when the case of the applicants is examined in the light of Sections 49 and 50 of the Stamp H [2015] 11 S.C.R. 424 SUPREME COURT REPORTS A Act, the case of the applicants can be brought u/s.49(d)(2) r/w. s. 50(3) of the Act to enable the State to entertain the application made by the applicants seeking refund of stamp duty amount. The interpretation, which advance the cause of justice and is based on the principle of B equity, should be preferred. [Para 43] [437-A-B] 4. It is not in dispute that this Court on 26.09.2012 cancelled the transaction in question, and hence by reason of the orders of this Court, the stamps used for c an instrument executed by the applicants were found unfit thereby defeating the purpose originally intended. Since the execution of sale deeds and its implementation was subject to the orders of the court, the parties were required to apply the court for appropriate qrders for D every step. It is due to this reason, the right to claim the refund of the amount of stamp duty arose for the first time in applicants' favour on 26.09.2012. The applicants had accordingly filed their applications within 6 months from the date of this order, as provided in s.50. In the E light of these facts, the applications should have been entertained treating the same to have been filed u/ s.49(d)(2) r/w. s.50 of the Act for grant of refund of stamp duty amount claimed therein by the applicants. [Para 44] [437-C-F] F 5. Even if it is found that the applications for claiming refund of stamp duty amount were rightly dismissed by the SOM on the ground of limitation prescribed u/s.50 of the Act yet keeping in view the G settled principle of law that the expiry of period of limitation prescribed under any law may bar the remedy but not the right, the applicants are still held entitled to claim the refund of stamp duty amount on the basis of the grounds mentioned above. [Para 45] [437-G-H; H 438-A] THE COMMITIEE-GFIL v. LIBRABUILDTECH PRIVATE 425 LTD.&ORS. 6. The State through the SOM is directed to refund A the entire stamp duty amounting to Rs.6.22 crores spent by the applicants for purchasing of stamps papers for execution of sale deeds in relation to purchase of the properties in question. [Para 46] [438-C] B ## Case Law Referece 1977 (3) SCR 312 relied on. Para 37 1988 (1) SCR 118 relied on. Para 37 c AIR 1954 Bombay 50 approved. Para 40 CIVILAPPELLATE JURISDICTION: I. A. NOS. 7-8 and 9-10 of2015 IN D ·special Leave Petition (Civil) No. 23886-23887 OF 2012 From the Judgment and Order dated 09.07.2012 of the High Court of Delhi at New Delhi in Civil Misc. No. 8029 of E 2012 in Writ Petition (C) No. 1399 of 2010 and Oder dated 30.07.2012 in Civil Review Application No. 423 of 2012 in Civil Misc No. 8029 of 2012 in Writ Petiton (C) No. 1399 of 2010 F Harpawan Kumar Arora, C. L. Sahu for the Appellant. Shyam Divan, Sanchar Anand, AAG, Manali Singhal, Santosh Sachin, Abhikalp Pratap Singh, Deepak Singh Rawat, Abhijat P. Medh, (AP & J Chambers, Arijit Prasad, Poornima G Bhat, Gargi Khanna, Anil Katiyar, Apoorv Singhal, Devendra Singh for the Respondents. · The Judgment of the Court was delivered by H [2015] 11 S.C.R. SUPREME COURT REPORTS 426 A **ABHAY MANOHAR SAPRE,** J. 1. In the light of the order dated 22.01.2015 already passed by this Court in I.A. Nos. 7- 8 as mentioned in the Office Report dated 11.02.2015, no further order on these IAs. is required. B 2. I.A. Nos. 9 and 10 - these two applications are filed by the applicants/respondent Nos.1- 4. - Libra Buildtech Private Ltd. & Ors. (hereinafter referred to as 'the applicants') for direction by this Court to State of Punjab and S.D.M. Dera Bassi to refund the full amount of stamp duty to the applicants. c 3. In order to appreciate the nature of controversy involved and the direction sought for refund of the amount paid by the applicants for purchase of stamp duty for execution of sale deeds in relation to properties in question, it is necessary to D set out the undisputed factual background of the case infra. 4. Golden Forest India Limited (GFIL), (hereinafter referred to as 'the company') was a company in.:. ... rporated under the Companies Act on 23.02.1987. On 06.03.1987, it E was granted certificate of commencement of business. This company went into liquidation. The creditors of the company, therefore, filed various claim petitions against the company in various courts across the country. This Court therefore, on an application filed, transferred all the cases pending in various F courts in the country to this Court. 5. This Court thereafter constituted a Committee, namely, GFIL Committee (Petitioner in S.L.P.(C) Nos. 23886-87 of 2012) to take over the assets of the company and dispose of G the same for paying the debts of various investors/creditors. 6. By order dated 05.09.2006 in I.A. Nos.28, 36. etc. in T.C.(C) No. 2 of 2004 etc. this Court directed the GFIL Committee to sell the properties of the company. In H compliance of the above said order, the GFIL Committee THE COMMITTEE-GFIL v. LIBRA BUILDTECH PRIVATE LTD. & ORS. [ABHAY MANOHAR SAPRE, J.] 427 . published an advertisement for the auction of certain properties A of the company. The applicants herein participated in the auction and submitted their bid to purchase the properties advertised for sale. After auction, the applicants herein were declared as successful bidders in respect of five properties namely-. B B (a) Property No.1 (Central Office Building Village Jharmari, Tehsil Dera Bassi, bid by Libra Buildtech Pvt. Ltd.) for Rs.34 crores, c (b) Property No.2 (Hotel behind Central office at village Jharmari, bid by Saffron Town Planners Pvt. Ltd.) for Rs.16.25 crores. (c) Property No.3 (Farm lands & Buildings behind semiconstructed Hotel at village Jharmari, bid by Swans Town Planners Pvt. Ltd.) for Rs.15.25 crores. D (d) Property No. 7 (10 Residential and 2 Office buildigs at village Jarout by Aries Buildwell Pvt. Ltd.) for Rs.9.05 crores. E (e) Property No.9 (Farm Lands at village Kurali, bid by Flamingo Propbuild Pvt. Ltd.) for Rs.27.25 crores. As per auction conditions, the applicants immediately F deposited 25% of the bid amount, i.e., Rs.25.45 crores with the GFIL Committee on 06.12.2006 7. By order dated 14.05.2007, this Court directed the GFIL Committee to invest the bid amount received by them in G FDRs till the sale in favour of the applicants was confirmed. 8. On 29.07.2009, this Court confirmed the sale of the properties in favour of the then Director of the applicantCompanies and granted them six months' time to pay the H 428 SUPREME COURT REPORTS [2015] 11 S.C.R. · A balance amount of 75% towards the sale price. However, the said time to pay the balance amount was further extended by 14 days vide order dated 29.01.2010. This Court also directed that on deposit of the full amount, the GFIL Committee would ensure that the properties in question are put in possession of B the purchasers (applicants). 9. As per the direction of this Court, the applicantCompanies accordingly deposited the balance 75% of the bid amount on 10.02.2010 with the GFIL Committee, i.e. C (Rs.101.80crores). 10. Thereafter, this Court transferred the pending cases to the Delhi High Court for further action. D 11. In pursuance thereof, the Division Bench of the High Court of Delhi by order dated 03.08.2011 in W.P.(C) No. 1399 of 2010 directed the successful bidders/applicants herein to deposit the stamp papers within two weeks and further directed the GFIL Committee to execute the sale deed within a period E of four weeks thereafter. 12. In terms of the directions issued by the High Court, on 02.09.2011, the applicants purchased the stamp papers for a sum of Rs.6.22 crores and gave the same to the GFIL F Committee to execute the sale deeds and handover the possession of the properties to them. G 13. On 23.12.2011, sale deeds were accordingly executed in favour of the applicants and even registration was effected in respect of two of the applicants. 14. Despite payment and execution of sale deeds, the GFIL Committee did not handover the possession of the properties to the applicants and hence this led to filing of applications by the applicants being CMP No. 8029 of2012 H in W.P. No. 1399 of2010. THE COMMITTEE-GFIL v. LIBRA BUILDTECH PRIVATE 429 LTD. & ORS. [ABHAY MANOHAR SAPRE, J.] 15. By order dated 09.07.2012, the High Court directed A the GFIL Committee to refund the amount deposited by the bidders within one week till they are in a position to handover the possession of the properties. 16. Against this order, the GFIL Committee filed a review B petition being R.P. No. 423 of2012 in C.M. No.8029 of2012 in W.P.(C) No. 1399 of2010. By order dated 30.07.2012, the High Court dismissed the same. 17. Instead of refunding the amount, the GFIL Committee c challenged both the orders dated 09.07.2012 and 30.07 .2012 by way of abovementioned special leave petitions i.e. SLP (C) Nos.23886-23887 of 2012 before this Court. 18. This Court, by order dated 26.09.2012, disposed of 0 these Special Leave Petitions with a direction to the GFIL Committee to refund the entire amount deposited by the applicants by way of sale consideration with interest and also recorded that as far as payment of stamp duty amount is concerned, the applicants would take up the matter with the E State Government for refund of the said amount. 19. In pursuance of the aforesaid order of this Court, the GFIL Committee on 06.10.2012 refunded the entire sale consideration with interest to the applicants. However, while refunding it, the GFIL deducted the TDS on the interest accrued o·n the amount deposited by the applicants despite the fact that the bank had already deducted the same. F 20.Aggrieved by the TDS deducted by the GFIL Committee, the applicants filed I.A. Nos. 3-4 of 2013 ~efore G this Court for seeking refund of the said amount. 21. By order dated 23.02.2015, this Court directed the GFIL Committee as well as the Union of India to refund a sum H [2015] 11 S.C.R. SUPREME COURT REPORTS 430 - A of Rs.3.4 crores because it was noticed that TDS was already deducted twice over. 22. Out of five applicants, four of them, namely, Libra Build Tech Pvt. Ltd., Saffron Town Planners Pvt. Ltd., Aries B Buildwell Pvt. Ltd. and Flamingo Propbuild Pvt. Ltd. applied on 22.10.2012 to tl'le Government of Punjab through S.D.M. Dera Bassi for refund of stamp duty amoun"t. One applicant, namely, Swans Town Planners Pvt. Ltd. applied to the Government of Punjab through S.D.M., Dera Bassi for refund C of stamp duty amount on 02.11.2012. 23. The S.D.M., Dera Bassi, filed his reply stating therein that vide letter dated 18.07.2013, he has already rejected the claims of the applicants for refund of stamp duty amount on D the ground that the applications made by the applicants to claim refund of stamp duty amount were time barred and hence the claims for refund h~e already been consigned to the records as not maintainable. E 24. It is with this background, as mentioned above, I.A. No.9 and 10 are filed by the applicants praying for a direction to the State of Punjab and S.D.M. Dera Bassi to refund the entire amount of stamp duty (Rs.6.22 crores) to the applicants. Notice on IAs. was given to all the concerned parties including F State of Punjab and S.D.M. Dera Bassi who were impleaded as party respondent by IA Nos.7 and 8. They are served and duly represented. 25. Learned senior counsel Shri Shaym Divan appearing G for the applicants has urged three points in support of the prayer made in the applications. In the first place, he contended that when admittedly the purpose for which the applicants had · deposited the money-sale consideration with the GFIL Committee as per court's directions has failed namely - H **"purchase of the properties in questions by the** THE COMMITTEE-GFIL v. LIBRABUILDTECH PRIVATE 431 ## LTD. & ORS. [ABHAY MANOHAR SAPRE, J.) applicants" and when the Court as a consequence thereof A directed refunding of the entire sale consideration money with interest to the applicants by order dt. 26.09.2012, a _fortiori,_ the applicants are also entitled to claim refund of the entire amount of stamp duty from the State exchequer. In other words, the submission of the learned counsel is that when the original B · purpose intended between the parties, namely "sale of the properties to the applicants by the GFIL Committee" failed or had become impossible to perform due to reasons beyond the control of the vendors (GFIL Committee), the applicants are entitled to claim the refund of the entire stamp duty amount C from the State exchequer, because in such circumstances, the State has no right to retain the stamp duty money consequent upon failure of performance of contract in relation to sale of properties by the parties. D 26. In the second place, learned counsel contended that direction to refund the amount of stamp duty could always be issued against the State Government by taking recourse to powers contained in Sections 49 and 50 of the Indian Stamp Act, 1899 (for short called 'the Act') read with Section 65 of E the Indian Contract Act, 1872. Learned counsel also placed strong reliance upon the principle of law contained in the maxim - _actus curiae neminem gravabit_ (Act of the court shall prejudice no man) and contended that admittedly, there was F no fault on the part of the applicants in execution of the entire transaction for which they could have been penalised for not getting their money back and hence keeping in view the principle contained in this maxim, the applicants are entitled to claim the return of amount of stamp duty. G 27. In the third place, learned counsel contended thatthe SOM was not right in rejecting the applicants' claim of refund on the ground of it being barred by limitation because according to learned counsel, the right to claim refund of stamp H [2015] 11 S.C.R. SUPREME COURT REPORTS 432 A duty amount arose for the first time in applicants' favour on 26.09.2012 when this Court by order dated 26.09.2012 directed the GFIL Committee to refund the entire sale consideration to the applicants due to failure on the part of the GFI L Committee to handover the possession of the properties B in question to the applicants and in the same order granted liberty to the applicants to approach the State Government to claim refund of stamp duty amount. Learned counsel pointed outthat the applicants, in compliance to liberty granted, applied to the State Government on 22.10.2012/02.11.2012 which was C within the time prescribed in Section 50 of the Act. It was, therefore, his submission that the State Government (SOM, Dera Bassi) should have entertained the applicants' application treating the same to have been filed within time and accordingly should have granted refund of entire stamp duty amount to the 0 applicants, as was claimed by the"m in their applications. 28. In reply, learned counsel for the respondents supported the impugned order of rejection passed by the SOM and contended that the applicants' claim was rightly rejected E on the ground of limitation. 29. Having heard the learned counsel for the parties and on perusal of the record of the case, we find force in the submissions urge~ by the learned counsel for the applicants. F 30. The question which arises for consideration in this case is whether the applicants are entitled to claim refund of . stamp duty amount of Rs.6 .. 22 crores. G 31. From the facts set out supra which are part of judicial record of the cases decided by this Court and the Delhi High Court, it is clear that despite applicants depositing the entire sale consideration (Rs.101.80 crores) and Rs (6.22 crores) for stamp duty to purchase the properties in question, and H having performed their part of contr::ict, in letter and spirit, the THE COMMITIEE-GFIL v. LIBRA BUILDTECH PRIVATE 433 ## LTD. & ORS. [ABHAY MANOHAR SAPRE, J.] GFIL Committee i.e. seller failed to place the applicants in A possession of the properties. This event resulted in frustrating the purpose as was originally intended between the parties. 32. As mentioned supra, this Court, therefore, passed an order on 26.09.2012 and cancelled the transaction in B question and directed the GFIL Committee to refund the entire sale consideration with interest to the applicants. So far as the refund of stamp duty amount was concerned, this Court on a statement made by counsel for the applicants permitted the applicants to approach the State Government to claim refund C from the State Government. 33. The order dated 26.9.2012 reads as under:- "Whatever be the reason, it has been submitted by Mr. Vivek Tankha, learned senior counsel appearing for the respondents, that they are willing to have the sale deeds cancelled and to receive the entire amounts,_ which they had paid along with t'1e interest accrued thereon. As far as payment of stamp duty is concerned, it is submitted that the respondents would take up the matter with the Government for refund. Having heard Mr. V.G. Jhanji, learned senior counsel appearing for the Committee-GFIL and Mr. Vivek Tankha, learned senior counsel for the respondents, and in view of the offer, which has been accepted by the respondents, we dispose of the special leave petitions, with a direction to the Committee to refund to the five concerned respondents the amounts deposited by them by way of sale consideration, together with the interest D E F G H [2015] 11 S.C.R. SUPREME COURT REPORTS 434 A accrued thereon till date, expeditiously, but if possible, within a week from date. Upon refund of the entire amount, the sale deeds shall stand cancelled and the Committee will not be bound by the same." B 34. In compliance to the aforesaid order, the committee accordingly refunded the entire sale consideration to the applicants on 06.10,2012. So far as claim for refund of the stamp duty amount was concerned, the applicants filed an c application to the State Government (S.D.M., Dera Bassi) on 22.10.2012/02.11.2012. 35. In our considered opinion, keeping in view the undisputed facts mentioned above, the applicants are also 0 entitled to claim the refund of entire stamp duty amount of Rs.6.22 crores from the State Exchequer, which they spent for execution of sale deeds in their favour in relation to the properties in question. This we say for the following reasons. E 36. In the first place, admittedly the transaction originally intended between.the parties, i.e., sale of properties in question by GFIL-Committee to the applicants was not accomplished and failed due to reasons beyond the control of the parties. Secondly, this Court after taking into consideration all facts F and circumstances also came to the conclusion that it was not possible for the parties to conclude the transactions originally intended and while cancelling the same directed the seller . (GFIL-Committee) to refund the entire sale consideration to the applicants and simultaneously permitted the applicants to G claim refund of stamp duty amount from the State Government by order dated 26.09.2012. Thirdly, as a result of the order of this Court, a right to claim refund of amount paid towards the stamp duty accrued to the applicants. Fourthly, this being a court monitored transaction, no party was in a position to take H any steps in the matter without the permission of the Court. THE COMMITTEE-GFIL v. LIBRA.BUILDTECH PRIVATE LTD. & ORS. [ABHAY MANOHAR SAPRE, J.] 435 Fifthly, the applicants throughout performed their part of the A contract and ensured that transaction in question is accomplished as was originally intended but for the reasons to which they were not responsible, the transaction could not be accomplished. Lastly, the applicants in law were entitled to claim restoratiQn of all such benefits/advantages from the B State once the transaction was cancelled by this Court on 26.09.2012 in the light of the principle contained in Section 65 of the Contract Act which enable the party to a contractto seek restoration of all such advantage from other party which they took from such contract when the contract is discovered to be C void or becomes void. This was a case where contract in question became void as a result of its cancellation by order of this Court dated 26.09.2012 which entitled the applicants to seek restitution of the money paid to the State for purchase 0 of stamp duty. 37. In our considered opinion, while deciding a case of this nature, we have to also bear in mind one maxim of equity, which is well settled namely _**"actus curiae neminem gravabit**_ "meaning **-An Act of the Court shall prejudice no man. In E** Broom's Legal Maxims 10th edition, 1939 at page 73 this maxim is explained saying that i~ is founded upon justice and good sense and afforded a safe and certain guide for th.e administration of law. This maxim is also explained in the same F words in _**[(Jenk. Cent.118)].**_ This principle is fundamental to any system of justice and applies to our jurisprudence. **(See: Busching Schmitz Pvt. Ltd. vs. P.T. Menghani &Anr.(1977) 2 SCC 835 and Raj Kumar Dey & Ors. vs. Tarapada Dey** & **Ors.(1987) 4 sec 398) G** **G** 38. It is thus a settled principle of law based on principle of equity that a person cannot be penalized for no fault of his and the act of the court would cause no prejudice to any of his right. **H** [2015] 11 S.C.R. SUPREME COURT REPORTS 436 A 39. In our considered opinion, the aforesaid maxim would apply with full vigour in the facts of this case and if that is the position then applicants, in our opinion, are entitled to claim the refund of entire amount of stamp duty from the State Government which they spent in purchasing the stamp duty for B execution of sale deed in relation to the properties in question. Indeed in the light of six reasons set out supra which, in our considered opinion, in clear terms attracts the principle contained in the aforesaid maxim, the State has no right to de.fend the order of SOM for retaining the amount of stamp C duty paid by the applicants with them. The applicants' bona fide genuine claim of refund cannot be denied on such technical grounds. A 40. This case reminds us of the observations made by D the Chief Justice M.C. Chagla in a case reported in Firm Kaluram Sitaram vs. The Dominion of India (AIR 1954 Bombay50). 41. The learned Chief Justice in his distinctive style of E writing observed as under in para 19: " ..... we have often had occasion to say that when the State deals with a citizen it should not ordinarily reply on technicalities, F and if the State is satisfied that the case of the citizen is a just one, even though legal defences may be open to it, it must act, as has been said by eminent Judges, as an honest person." G 42. We are in respectful agreement with the aforementioned observations, as in our considered opinion these observations apply fully to the case in hand against the State because except the plea of limitation, the State has no H case to defend their action. THE COMMITTEE-GFIL v. LIBRA BUILDTECH PRIVATE 437 LTD. & ORS. JABHAY MANOHAR SAPRE, J.] 43. Even apart from what we have held above, when we A examine the case of the applicants in fhe light of Sections 49 and 50 of the Act, we find that the case of the applicants can be brought under Section 49 (d)(2) read with Section 50(3) of the Act to enable the State to entertain the application made by the applicants seeking refund of stamp duty amount. The B interpretation, which advance the cause of justice and is based on the principle of equity, should be preferred. We hereby do so, 44. As mentioned above, it is not in dispute that this Court C on 26.09.2012 cancelled the transaction in question, and hence by reason of the orders of this Court, the stamps used for an ·instrument executed by the applicants were found unfit thereby defeating the purpose originally intended. This occurred either due to some error or mistake therein. Since D the exe~ution of sale deeds and its implementation was subject to the orders of the court, the parties were required to apply the court for appropriate orders for every step. It is due to this reason, the right to claim the refund of the amount of stamp duty arose for the first time in applicants' favour on 26.09.2012. E The applicants had accordingly filed their applications within 6 months from the date of this order, as provided in Section 50. In the light of these facts, the applications should have been entertained treating the same to have been filed under Section F 49 (d)(2) read with Section 50 of the Act for grant of refund of stamp duty amount claimed therein by the applicants. 45. In our considered opinion, even if we find that applications for claiming refund of stamp duty amount were rightly dismissed by the SOM on the ground of limitation G prescribed under Section 50 of the Act yet keeping in view the settled principle of law that the expiry of period of limitation prescribed under any law may bar the remedy but not the right, the applicants are still held entitled to claim the refund of stamp H [2015] 11 S.C.R. SUPREME COURT REPORTS 438 A duty amount on the basis of the grounds mentioned above. In other words, notwithstanding dismissal of the applications on the ground of limitation, we are of the view that the applicants are entitled to claim the refund of stamp duty amount from the State in the light of the grounds mentioned above. B 46. lnviewoftheforegoing discussion, I.A. Nos. 9 and 10 filed by the applicants deserve to be allowed and are accordingly allowed. The State of Punjab through the SOM, Dera Bassi is directed to refund the entire stamp duty C amounting to Rs.6.22 crores spent by the applicants for purchasing of stamps papers for execution of sale deeds in relation to purchase of the properties in question. Let the refund of money as directed above be paid to the applicants within four weeks from the date of this order. D Kalpana K. Tripathy I.As. allowed.
End of Judgment Record
Browse All Supreme Court of India (2015) Decisions
2015-03-19

HMT WATCHES LTD. v. M.A. ABIDA & ANR.

These appeals challenge a Kerala High Court order that quashed multiple criminal complaints under Section 138 of the Negotiable Instruments Act, 1881, by invoking jurisdiction under Section 482 of the Code of Criminal Procedure. The Supreme Court held that the High Court committed a grave error of law in quashing the proceedings by accepting disputed factual defences and treating them as uncontroverted at the Section 482 stage. The disputed issues — such as whether the cheques were given as security, whether there was an outstanding liability, or whether the signatory of the demand notice was authorized — were factual in nature and could only be resolved by the trial court after producing evidence. The Court reaffirmed that the jurisdiction under Section 482 Cr.P.C. is limited and should not be invoked to decide disputed questions of fact or to bypass the proper trial procedure. It also clarified that an instruction of stop payment can attract liability under Section 138 NI Act, citing Pulsive Technologies, Modi Cements, and related authorities. The judgment underscores that the purpose of criminal proceedings under Section 138 is to secure prompt payment, and courts should avoid premature discharge of the proceedings when material facts remain in dispute. Accordingly, the appeals are allowed and the trial court is directed to proceed with the trials.

2015-12-01

Medical Council of India v. Mediciti Institute of Medical Sciences (MIMS) & Ors.

This is a Civil Appeal involving the renewal of permission for increasing MBBS admissions at Mediciti Institute of Medical Sciences (MIMS) from 100 to 150 for the academic year 2015-16. The Medical Council of India (MCI) conducted inspections in December 2014 and subsequently in May 2015, finding deficiencies in faculty strength, resident numbers, facilities (including a girls’ common room and operating theatres), and other norms. The Executive Committee of the MCI recommended against renewing the permission for the 4th batch of 150 MBBS seats. MIMS challenged the decision in the Delhi High Court, which directed the MCI to conduct a re-inspection to verify whether deficiencies had been removed. The Supreme Court, however, reversed the High Court’s direction, holding that where the norms set by the apex regulatory body are not fulfilled, the judiciary should not compel the regulator to deviate from those fixed standards or to indulge in an additional inspection beyond the prescribed schedule. It emphasized the Establishment of Medical College Regulations, 1999 and the time schedule laid down by this Court for grant of permissions, noting that re-inspection is not warranted. The result: appeals allowed, with no order as to costs, and the High Court’s direction stood set aside.

2015-04-17

H. Lakshmaiah Reddy v. L. Venkatesh Reddy

This Supreme Court is hearing Civil Appeal Nos. 3725-3726 of 2015 arising from a dispute between H. Lakshmaiah Reddy (and others) and L. Venkatesh Reddy regarding the title to a suit property originally owned by Guramma, mother of the plaintiff and first wife of the first defendant. After Guramma’s death, the first defendant furnished a declaration before revenue authorities to change the Katha in the plaintiff’s name, and mutation was effected, with revenue records showing the plaintiff as owner for a long period. The first defendant later married again and had further children; the plaintiff and the first defendant, as class-I heirs, claimed half-share each in the property. The trial court dismissed the suit, the lower appellate court partially decreed in favor of the plaintiff, and the High Court allowed the respondent’s Second Appeal. The core legal issue concerns whether mutation entries in revenue records convey title. The Court held that mutation does not create or extinguish title and is only for land-revenue purposes; it cannot divest the first defendant of his half share. The High Court’s view that the first defendant’s conduct, via mutation, divested him of title was incorrect. The Court affirmed the lower appellate court’s decree, set aside the High Court judgment, and allowed the appeals, emphasizing that Article 142 relief is not to override the governing law of succession. The order closes with “Appeals allowed” and no costs.

2015-01-28

R.P.S. Yadav v. Central Bureau of Investigation

This is a criminal appeal by R.P.S. Yadav, an MCD employee, challenging his conviction under Sections 7 and 13(2) read with 13(1)(d) of the Prevention of Corruption Act, 1988. The prosecution alleged that during May 1995 the appellant demanded and accepted a bribe of Rs. 1,500 from PW-3 Hamid Khan in exchange for issuing a licence for a tailoring shop. The Central Bureau of Investigation laid a trap with PW-3, the complainant, and PW-6, a shadow witness. The trial court convicted the appellant; a co-accused A2 Janakraj was acquitted. The High Court confirmed the conviction and sentence. On appeal, the Supreme Court scrutinized whether the prosecution could establish the indispensable elements of a corruption offence — a demand, an acceptance and a recovery of the bribe — beyond doubt. It meticulously reviewed the testimony of PW-3, who turned hostile, and PW-6, the shadow witness, noting inconsistencies and the lack of legally acceptable evidence of recovery from the appellant as opposed to the co-accused. The court highlighted the absence of a reliable, corroborated chain tying the appellant to the demand, the receipt of tainted currency, and the subsequent recovery. In light of these deficiencies, the court concluded that the mandatory chronology and the evidence supporting conviction were not proven. Consequently, the appeal succeeds and the impugned judgment is set aside, with the sentence and bail bonds discharged. Thus, the appellant is entitled to acquittal on the charges; the matter ends with the acquittal of the accused. The appellant was on bail; his bail bonds are discharged.