Tenetowl LogoTenetowl
High Court of Kerala2021 Decisions

Kerala High Court Judgements (2021)

4,285 Judgments Recorded in 2021•Page 46 of 215
High Court of Kerala
WP(C).No.6510 OF 2021(K)

Joseph Kurian v. The District Collector, The Tahsildar, The Tahsildar (LR) and The Village Officer, Addl. R5 Suo Motu Impleaded as per order in WP(C). No. 6510 of 2021 (K)

This writ petition under Article 226 of the Constitution of India was filed by Joseph Kurian challenging Ext.P7 (proceedings dated 08.03.2021) issued by the Tahsildar (LR) and Ext.P10 (report dated 01.02.2021). The petitioner seeks quashing of Ext.P7 and the accompanying report and prays for mandamus to ensure measurement of his property in Survey No.1074/3 (New No.118/3) in Vellilapilly Village in accordance with directions in the Court’s July 14, 2020 judgment in W.P.(C) No.791 of 2020 (Ext.P6). He also seeks stay of further proceedings until disposal and protection against dispossession pending adjudication. The respondents contend Ext.P7 is appealable under Section 16 of the Kerala Land Conservancy Act, 1957, and that the Courts should not intervene in the face of an efficacious statutory remedy. The court, relying on established doctrine on discretionary jurisdiction under Article 226 and the availability of statutory redress, refuses to interfere with Ext.P7 and directs that the petitioner pursue an appeal before the Revenue Divisional Officer, with stay, expeditiously, while keeping the petitioner’s rights open for challenge before the appellate authority.

High Court of Kerala
ARB.A NO. 38 OF 2020

Navayuga Engineering Company Ltd v. Union of India

This is Arbitration Appeal No. 38 of 2020 from the Kerala High Court (Division Bench) arising out of an arbitral award under the Arbitration and Conciliation Act, 1996. The appellant Navayuga Engineering Company Ltd challenged the district court’s order challenging the arbitral award on several independent claims. The court below had partly set aside and modified the award, raising the core issue whether partial setting aside in a Sec. 34 proceeding constitutes impermissible modification of an award, or whether the principle of severability permits severable claims to survive while others are set aside. The bench canvassed a host of precedents, including the Supreme Court’s Hakeem decision (Project Director, NHAI v. M. Hakeem), and the doctrine of severability as adopted by various High Courts and Supreme Court decisions under the 1996 Act, distinguishing older 1940 Act jurisprudence. The court noted that the arbitral tribunal dealt with 31 separate claims; some were allowed, others rejected, and one claim was partially modified by the arbitrator. The core legal question was whether severability permits partial setting aside where the remaining claims remain enforceable, and whether the remedy can be extended to partial interference without violating the limited nature of Sec. 34. The Kerala High Court ultimately held that partial upholding is permissible where severable, reversed the lower court’s partial setting aside, and restored the arbitral award.

High Court of Kerala
W.P.(C).No.25117/21

V. Sudhakaran v. State Environmental Impact Assessment Authority, State Level Expert Appraisal Committee, and Kerala State Pollution Control Board

This writ petition seeks directions to the respondents to take steps for consideration of the petitioner’s application for Environmental Clearance (EC), without reference to the distance criteria laid down by the National Green Tribunal (NGT) in its July 21, 2020 order in OA 304/2019. The petitioner contends that the EC application was filed in proper form under the Kerala Minor Mineral Concession Rules, 2015, including Rule 40(i) which prescribes distance norms between quarrying activities and nearby residences. The NGT order requires a 200-meter separation; interim directions in W.P.(C) No. 15305 of 2020 had kept status quo for leases existing as on 21.07.2020, while pending/revival applications and fresh quarrying permissions were not to be granted if the distance norms were unmet. The writ petitions were finally heard and allowed by judgment dated 21.12.2020, with the NGT’s order set aside and the NGT directed to dispose of representations afresh after notice. The State of Kerala’s prior judgment was reported as State of Kerala v. Central Pollution Control Board (2021 (1) KLT 1), which was upheld by a Division Bench, and later discussed in light of Supreme Court decisions in Ankita Sinha. The Court observes that ex parte orders and due process principles highlighted by these decisions must guide the present proceedings. The petitioner’s EC application must be considered in accordance with law as it currently stands, with no disregard for due process.

High Court of Kerala
W.P.(C) No.19854 OF 2020(F)

Raveendradas K.R. v State of Kerala and Others

This is a writ petition under Article 226 of the Constitution of India filed by Raveendradas K.R., a licensed document writer attached to the Office of the Sub Registrar, Agali. He challenges Ext. P3 notice dated 01.11.2019 issued by the District Registrar (General) and Ext. P6 show-cause notice dated 11.07.2020 issued by the Deputy Inspector General of Registration (Licensing). The petitioner sought quashing of these notices, and a copy of Investigation Report No. E2-3433/19 dated 02.03.2020, arguing that the Ext. P6 show-cause is illegal, issued without jurisdiction under the Document Writers License Rules, 1960, and without proper basis. He contends that his license (Ext. P1) remains valid until 31.05.2023 and emphasizes the importance of due process, including access to the investigation report. During admission, the court noted that a copy of the report had been provided to the petitioner, and discussed well-established Supreme Court principles governing show-cause notices. The court ultimately concluded that interference at the show-cause stage is generally unwarranted unless jurisdiction or abuse is evident. It disposed of the petition by directing the petitioner to reply to Ext. P6 within one month, followed by a personal hearing and a decision by the respondent within two months, with no costs awarded.

High Court of Kerala
WP(C).No.30886/2015

Babu S v. State of Kerala and Others

This writ petition (WPC No.30886/2015) filed in the Kerala High Court seeks admeasurement of Ext.P1 work completed under a NABARD-assisted RIDF XVIII scheme for Nedinjil Ela Thodu in Kalliyoor Panchayat, and payment of dues, along with permission to participate in proposed re-tendering. The petitioner, a Class-A government contractor, entered into Ext.P1 agreement, deposited security, and undertook 18 items valued at ₹44,79,163. Local resistance led by Nemom Block Member obstructed the project, prompting cessation of work. The petitioner informed respondents 2 and 3 and submitted several representations, yet the department paid part of the bill and ultimately terminated the contract on 20.09.2014, deciding to retender, with forfeiture of security deposits. The petitioner contends the obstruction was the cause of non-performance and that the respondents failed to remove impediments, making the termination at risk and cost unjustified; he also contends that only adjudicated damages can be recovered and the forfeiture was arbitrary. Respondents argue obstruction was confined to a small area; notices were issued; non-resumption occurred despite reminders; termination at risk and cost is a contractual consequence, with re-tendering to follow. The court, after considering the pleadings, finds the obstruction limited in scope and upholds the risk-and-cost termination, while instructing the petitioner to pursue any outstanding amounts through appropriate legal proceedings, ultimately dismissing the petition.

High Court of Kerala
O.P.(RC) No.10 of 2021

Rajesh Radhakrishnan Kartha v. T. A. Leelamma George

This is a constitutional challenge under Article 227 of the Constitution of India by the landlord (petitioner) against an order of the Rent Control Court, Ernakulam, which had refused to forward Ext.A7 (a document sought to be marked) to the District Collector under the Kerala Stamp Act, 1959 for appropriate proceedings under Section 39. The underlying dispute concerns fixation of fair rent under the Kerala Buildings (Lease and Rent Control) Act, 1965, for a petition schedule building. The Rent Control Court had earlier fixed a rent and thereafter, on a remand, the landlord sought to mark Ext.A7 and have it stamped/processed per Sections 33, 34, 37 and 39 of the Stamp Act, including forwarding to the Collector for proper stamping and the issuance of a certificate under Section 39(2). The Rent Control Court’s 12 January 2021 order rejected this request, noting penalties for stamp deficiency and the lack of timely payment. The High Court scrutinizes the procedural sequence under the Stamp Act, emphasizing that Section 37(2) contemplates sending impounded instruments (not admitted in evidence) to the District Collector for penalty under Section 39; it also recalls a constitutional stay in proceedings delivering final disposal within time. The court ultimately allows the petition, setting aside the impugned order and directing a fresh consideration in strict compliance with statutory provisions, with expedited timelines. The bench directs the Rent Control Court to proceed accordingly and appear on 10 September 2021.

High Court of Kerala
OP(C).No.1406 OF 2020

OP(C).No.1406 OF 2020

This is an original petition under Article 227 of the Constitution of India challenging Ext.P3 in O.S. No.15 of 2016, pending before the Subordinate Judge, Muvattupuzha, related to St. John’s Besphage Jacobite Syrian Church, Pulinthanam. The respondents (plaintiffs) seek declarations that the pulpit and parish are part of the Malankara Orthodox Syrian Church and must be governed by the 1934 Constitution, along with accounts and removal of certain office-holders, and prohibitory injunctions to protect church properties and offices. The petitioners/defendants 7 and 8 contend Ext.P3 violated CPC Order XIV, as the trial court purportedly decided that the suit is governed by the K.S. Varghese decision without proper framing of preliminary issues. Ext.P4 ( Supreme Court order) directed trial courts to determine whether cases are covered by K.S. Varghese and decide accordingly, but the trial court nonetheless framed issues and proceeded with trial. The High Court examines whether Ext.P3 precludes evidence and whether the trial court erred procedurally. The court ultimately holds Ext.P3 will not bar the petitioners from leading evidence on issues (i)-(xii) and disposes the petition, directing expeditious trial. The decision emphasizes compliance with Supreme Court guidance while ensuring a fair trial on the merits of the declaratory reliefs under the 1934 Constitution.

High Court of Kerala
WP(C) NO. 4613 OF 2021

Dr. Abdul Haleem P.P. v. State of Kerala and Others

The petitioner, Dr. Abdul Haleem P.P., challenges Ext. P1 notification and the selection of the 5th respondent for the post of Associate Professor at Kannur University, contending that reservation for Other Backward Classes (OBC) and domicile norms under Kerala KS & SSR must be followed, effectively excluding non-Keralites. He argues that Rule 2(14) and List III of KS & SSR designate OBCs in Kerala, limiting reservation to Kerala natives, and that Kannur University must adhere to Part I KS & SSR 14–17A and related provisions. The respondents counter that UGC Regulations 2018 permit All-India advertised merit-based selection and that a Muslim candidate from Karnataka can be considered if the community is recognized as backward in the native state, a principle supported by case law. The court examines the scope of OBC reservation across states, citing M.C.D. v. Veena and Others and later judgments beginning with Pankaj Kumar v. State of Jharkhand, and Constitution Bench rulings (Marri Chandra Shekhar Rao, Action Committee, Bir Singh) establishing that reservation particulars are State-specific and migration may not confer cross-state benefits. The court ultimately upholds the University’s process, finds Ext.P1’s constraints not violated, and dismisses the petition as meritless. The decision reinforces that migrants cannot automatically claim the reservation benefits of another state, while acknowledging the evolving jurisprudence on cross-state OBC rules.

High Court of Kerala
CRL.A.No.402 OF 2011(A)

Sree Gokulam Chit and Finance Company Pvt Ltd v. Reji Joseph

This Kerala High Court appeal arises from an acquittal in a complaint under Section 138 of the Negotiable Instruments Act. The complainant, a public limited company engaged in chit business, alleged that the accused issued Ext. P8 a cheque for Rs. 1,07,430 towards chit arrears. The trial court, in ST No. 681/2008, held that the execution of Ext. P8 was not proven and acquitted the accused in May 2009. On 27 April 2021 the High Court allowed the appeal, reversed the acquittal, and convicted the accused under Section 138 NI Act. The court found PW1, the complainant’s power-of-attorney, credible that the cheque was signed by the accused in his presence and handed over, and that Exts. P2–P7 substantiated the underlying chit transactions and the debt reflected in Ext. P8. The High Court reaffirmed the statutory presumptions under Sections 118(a) and 139 of the NI Act, emphasizing that once the drawer’s signature is admitted, the burden shifts to the accused to rebut the presumption of consideration. It cited several pivotal decisions, including Hiten P. Dalal, Rangappa, Uttam Ram, Kumar Exports, Bir Singh, Kalamani Tex, and Ravi Kapur, to articulate the burden-shifting and standard of proof. The result is a setting aside of the acquittal and a conviction with sentence and compensation to the complainant.

High Court of Kerala
WP(C).No.27637 OF 2020

Susruth K v Union of India & Others

This Kerala High Court writ petition challenges the conduct and arrangements for the Common Admission Test (CAT) 2020, conducted by the Indian Institutes of Management (IIMs). The petitioner, Susruth K., a CAT applicant, could not appear in the 29 November 2020 sessions due to his mother testing COVID-19 positive and his own subsequent infection, and sought directions for an additional test session or other remedial arrangements with proper health protocols. Respondents argued that the CAT is a high-stakes qualifying examination and that the test had already been conducted across three shifts; creating a fresh session would require substantial time for new question paper preparation and normalization of scores, especially given the large candidate pool (about 1.9 lakh). The petitioner relied on a Supreme Court interim order in a related matter directing facilities for COVID-infected or isolated candidates to appear. The court examined whether there was a legal obligation to arrange an additional session and, if so, whether relief could be granted. It noted the expert-driven nature of academic decisions and cited Ran Vijay Singh for the principle that sympathy cannot derail standard examination processes and that one should avoid excluding a suspect or offending question. Ultimately, the petition was dismissed, with the court holding that directing a fresh examination was not warranted.

High Court of Kerala
RFA Nos. 232/2018 and 330/2018

V.A. Sivadasan v. V.P. Muraleedharan

Regular First Appeal Nos. 232/2018 and 330/2018 were heard by the Kerala High Court arising from the judgment and decree dated 24.03.2017 in O.S. No. 224/2012 of the Subordinate Court, Thalassery. The appellants were V.A. Sivadasan (defendant) and the respondents V.P. Muraleedharan (plaintiff). On 10 December 2021 (heard on 10.12.2021 in both RFAs), the court recorded that the parties had amicably settled their dispute by a compromise under Order XXIII Rule 3 CPC, supported by affidavits and signatures including the respondent’s. Although the compromise had not been brought to notice of counsel earlier, the court accepted it and passed a decree in terms of the compromise, disposing of both appeals. The court noted the need to implement the compromise and incorporate its terms in the decree and directed refund of the entire court fee in view of the Apex Court’s position as stated in a Madras High Court decision, 2021 (2) KHC 62 (referred to as High Court authority). Appendices show the original compromise agreements dated 20.11.2021. The judgment thus records that the compromise will form part of the decree and that the matter is settled amicably out of court, with no further contest by the parties.

High Court of Kerala
WP(C).No.6211 OF 2011(B)

Director of Health Services, Thiruvananthapuram (petitioners) and others v. J. Remadevi S.S. Bhavan (respondent)

This writ petition challenges the orders of the Kerala Lok Ayukta directing payment of interest on General Provident Fund (GPF) and pensionary benefits to the respondent, a former Junior Public Health Nurse, in Complaint No.2122/2005. The petitioners—Director of Health Services, the District Medical Officer, and the Medical Officer at Community Centre, Kanyakulangara—argue that pensionary benefits were sanctioned in accordance with retirement, and that the respondent had not validly established entitlement to interest. The factual matrix shows that the respondent claimed unpaid pension and GPF closure amounts, with discussions tracing back to a presumed voluntary retirement around 1995 and a retirement date of 30.06.2000. Several letters from the Accountant General and Internal Audit bodies indicate contested and unclear records: the official order sanctioning voluntary retirement was not received, the GPF closure was processed on the basis of retirement dates, and there were communications about the closure being in 2004. Lok Ayukta’s Exhibits P23 (07/15/2009) and P27 (03/22/2010) granted 9% interest, while the Lok Ayukta later admitted absence of documentary proof of earlier voluntary retirement and reviewed its earlier decision. The High Court held that the Lok Ayukta acted without statutory basis to review its prior orders and quashed the interest direction, declaring the respondent not entitled to interest from 24.12.2008 onward and allowing the writ petition.

High Court of Kerala
CRL.RP NO.1995/2010

SURESH v. STATE OF KEARALA

This is a Kerala High Court Criminal Revision Petition (CRL.RP No.1995/2010) by Suresh challenging the conviction of the second accused under Section 55(a) of the Abkari Act. The trial court, after trial in S.C. No.777/2005, convicted both accused under Section 8(1) and (2) Abkari Act and imposed three months’ simple imprisonment with a Rs.1,00,000 fine each; on appeal, the appellate court set aside the conviction of the first accused and maintained the second accused's conviction. The revision petition contends that the chain of custody and seizure process is vitiated: (i) the seizure mahazar did not contain the sample seal or its description; (ii) no forwarding note was produced; (iii) there was an unexplained ten-day delay in producing the contraband and the sample for analysis. Citing K. Bhaskaran, Gireesh @ Manoj, Hansraj, Ravi and other Kerala-SCC authorities, the High Court held that these defects undermine the integrity of the sample and its analysis and render the prosecution's case doubtful beyond reasonable doubt. The court then invoked its powers under Section 397 r/w 401 Cr.P.C. and allowed the revision, acquitting the petitioner and canceling bail bonds.

High Court of Kerala
W.P.(C) No.8280 OF 2021(H)

ALKEM LABORATORIES LIMITED v STATE OF KERALA & ORS

Alkem Laboratories Limited, a Mumbai-based pharmaceutical company, filed W.P.(C) No.8280 of 2021 under Article 226 seeking a mandamus to ensure adequate police protection and a disturbance-free working environment for its managers and business operations in Thodupuzha, Idukki district. The petition alleges that the Kerala Medical and Sales Representatives Association (KMSRA) and its members obstruct the company’s field visits, threaten managers, and disrupt transfers and terminations of medical representatives. The company sought action on complaints and protection for its property and products, contending that ongoing disputes—some already before the District Labour Officer—risk business operations and staff safety. Respondents include the State of Kerala represented by the Home Secretary, the District Police Chief, and the Station House Officer, whom the petitioner asks to provide timely protection and to intervene against unlawful obstructions. The petition cites the Kerala Police Act, 2011, emphasizing sections 3 and 4 governing police duties and functions, and relies on principles such as due process and police protection of life, liberty and property. It also invokes industrial-relations doctrines on the right to strike as part of collective bargaining. The court disposed the petition with directions: the Station House Officer must ensure no threat to law and order; police protection can be requested if needed; the petitioner must cooperate with conciliation before the District Labour Officer; protests must be democratic and non-obstructive.

High Court of Kerala
WA.No.480 OF 2021

Antony C.J., Joseph Cherian & Peringatt Residents Association v. Corporation of Kochi and Others

This writ appeal challenges the order dated 08.03.2021 in WP(C) No.1744 of 2021, concerning Dream Flower Housing Project Pvt Ltd (4th respondent) and occupancy certification. Appellants, residents of Edappally South, allege violation of Kerala Municipality Building Rules, 1999 (KMBR) in granting a building permit and in moving toward occupancy certification for a multistoried residential complex. They claim the Kochi Municipal Corporation Secretary issued Ext. P1 without complying with mandatory KMBR provisions and that the construction proceeded with insufficient road width, incorrect plan disclosures, and noncompliance with setback and floor-area requirements. The writ petition sought records, quashing Ext. P1, and restraint of occupancy certification, plus appointment of an Advocate Commissioner to inspect the site. The writ court, after preliminary hearing, directed that pendency of the writ petition would not preclude the competent authority from considering the occupancy certificate under law. The appellants contend the order benefits the 4th respondent and denies them opportunity to reply or adduce evidence. They also urge that independent verification is needed to establish factual non-compliance. Respondents defend the process as governed by statute and rules, and emphasize that the remedy lies in law, not in restraining statutory functions. The appeal ultimately contends the court cannot override statutory provisions and the impugned order should be sustained.

High Court of Kerala
WP(C).No.7985 OF 2021(W)

Kamalam v. Special Tahsildar (LR)

Kamalam, a 64-year-old senior citizen, files a writ petition under Article 226 challenging the delay in disposal of suo motu proceedings initiated by the Land Tribunal, Pattambi (S.M. No.155/2021) for assignment of right, title and interest of the landlord vested in the Government under the Kerala Land Reforms Act, 1963 and for issuance of a certificate of purchase under Sections 72 and 72K read with Rule 14. The land in question is 0.0404 hectares of Re.Sy. No.292/5 in Kuthanur-I Village, Palakkad. The petitioner seeks a mandamus to compel expeditious enquiry and disposal within a timeframe to be fixed by the Court. The Land Tribunal’s suo motu initiation relies on Rule 5 of the Kerala Land Reforms (Vesting and Assignment) Rules, 1970 and related provisions. The Court references Narayanan Namboodiri v. Special Tahsildar (Land Reforms) (2018) to emphasize that disposal must follow seniority and that senior-citizen cases should be prioritized, with timelines (six months for senior citizens; up to 18 months for others) and the seniority not to be broken. The judgment also cites G.O. 2018/ RD provisions enabling village officers to furnish reports. The Court ultimately disposes of the petition by directing compliance with Narayanan Namboodiri’s directions, with no costs.

High Court of Kerala
MACA.No.1759 of 2012

MACA.No.1759 of 2012 (Jayalakshmi and others v. Muhammedrafi and others)

This Motor Accident Claims Appeal arises from an award passed by the Motor Accidents Claims Tribunal, Tirur, in O.P.(MV) No.978/2010. The petitioners (the appellants), legal heirs of Surendran who died in a motorcycle accident on 8-9-2010, challenged the Tribunal’s compensation order which totaled Rs.9,27,000/-, plus 7.5% interest, in favour of Surendran’s dependants. The accident involved a goods vehicle driven by the 1st respondent; the vehicle collided with Surendran’s motorbike, resulting in fatal injuries to Surendran and the pillion rider. The appellants contended that the deceased earned Rs.12,377 per month as a mahout for Guruvayur Devaswom and that the Tribunal erred in not accepting Ext.A12 salary certificate; they urged income should be Rs.15,000 with 50% future prospects (per Pranay Sethi) as the deceased held permanent status with the Guruvayur Devaswom Board. Relying on Pranay Sethi, the court recomputed dependency, arriving at Rs.18,00,000, and after deducting the Tribunal’s grant, the enhanced dependency amount stood at Rs.9,00,000. Additional heads were recalculated: funeral Rs.15,000; loss of estate Rs.15,000; parental and spouse consortium Rs.70,000 and Rs.30,000 respectively; bystander expenses Rs.2,600; and loss of consortium for the minor children Rs.40,000 each. The appeal was allowed in part, directing payment of enhanced compensation Rs.10,32,600 with interest at 7.5% p.a. from the date of petition until realization.

High Court of Kerala
CRL.A No. 2335 of 2006

Rajan v. State of Kerala

Rajan, the sole appellant (Accused No.1), was convicted by the Additional Sessions Judge (Adhoc-I), Kottayam, under sections 55(b) and 55(g) of the Kerala Abkari Act for clandestine distillation of illicit arrack at Melamparakara, Thalappalam Village, on 13.03.2005. The prosecution’s case rested on detection of distillation apparatus and several bottles of illicit arrack seized at the scene; the trial court accepted the chain of custody and forwarded samples for chemical analysis, leading to Ext. P6, the chemical analysis certificate, which purportedly linked the seized material to the accused. The defence contended that the prosecution failed to establish that the contraband subjected to analysis originated from the seized quantity, and that crucial seals and forwarding notes were not reliably documented, undermining the integrity of the sample. The appellate bench scrutinized the evidence, noting the absence of evidence regarding the seal details on the bottles, gaps in Ext. P1’s seal description, delays in laboratory analysis, and the lack of testimony proving tamper-proof dispatch of the sample. Citing Bhaskaran and Krishnadas, Kumaran, Rajamma, as well as State of Rajasthan v. Daulat Ram and Vijay Pandey, the court held that the prosecution failed to prove link evidence between the seized sample and the laboratory analysis. Consequently, the conviction cannot stand, and the appellant is acquitted, with the appeal allowed.

High Court of Kerala
W.P.(C).No.24751/21

Crystal Aggregates Private Limited v. The Director, Mining and Geology Department, Civil Station, Kakkanad, Ernakulam; The Geologist, Mining and Geology District Office, Kakkanad, Ernakulam

This writ petition challenges a refusal by the 2nd respondent to finalise Ext.P3, an application for renewal of quarrying permit, on grounds that the project does not meet the 200 metre distance norm from the nearest residence as per the National Green Tribunal’s order dated 21.07.2020 in OA No.304/2019. The petitioner Crystal Aggregates Private Limited had secured a Letter of Intent and all required licences/clearances. It contends that under Rule 33(2) of the Kerala Minor Mineral Concession Rules, 2015, the 1st respondent is duty-bound to execute a quarrying lease once all consents are obtained. The petition recalls earlier orders in W.P(C) No. 15305 of 2020 and interim directions that while renewal applications not yet determined should be treated with the status quo, and that fresh grants or renewals not fulfilling distance norms should not be granted. The judgment notes that the National Green Tribunal’s order was later set aside by this Court and the NGT directed to process representations afresh. The Apex Court decisions in Municipal Corporation of Greater Mumbai v Ankita Sinha, and State of Kerala v CPCB are cited to support that contentions may be raised before the Tribunal, and that ex parte peremptory orders should be effaced. The court ultimately directs consideration of Ext.P3 in accordance with law.

High Court of Kerala
O.P.(KAT) No.113 of 2020

O.P.(KAT) No.113 of 2020

This is a Kerala High Court petition (O.P.(KAT) No.113 of 2020) arising from a Kerala Administrative Tribunal (KAT) order dated 19.12.2018 in OA No.738/2013. The retired Deputy Director of Prosecution, who filed the OA, challenges fixation of a liability of Rs.7,700 deducted from his DCRG and other minor recoveries, and seeks release of the amount along with interest for delayed gratuity payment. He had gratuity fixed at Rs.3,30,000 and later revised to Rs.7,00,000 but withheld due to the liability. The OA prayed to set aside Annexures A3, A4, A22 and A23, declare the liability illegal, arbitrary and unsustainable, and obtain interest on delayed gratuity and 12% interest on the withheld Rs.7,700. The Tribunal found several items (Rs.6,860 and Rs.910) to be unauthorised or inadequately quantified, and directed the 1st petitioner to pay interest on DCRG at 9% per annum from 08.11.2011 and to release Rs.7,700. The State unsuccessfully argued that the liability arose from audit observations and was proper. Citing a chain of Supreme Court decisions directing interest on belated DCRG (rates from 8% to 18%, with 9% chosen here), the High Court dismissed the petition, holding the Tribunal’s order in accordance with law, and denying relief to the petitioner. No costs.