MACA No.1934 OF 2015(B)

Renjan P. Raju v. Jijy Mathew, Manoj Gopalakrishnan and The Branch Manager, National Insurance Company Limited

This Kerala High Court appeal, MACA No. 1934 of 2015 (B), challenges the Motor Accidents Claims Tribunal, Pathanamthitta award in OP(MV) No.1606 of 2004 (dated 04-08-2012) arising from a road traffic accident on 24-05-2004, in which the claimant Renjan P. Raju sustained injuries while riding a motorcycle KL-4/P-4537 that collided with an autorickshaw driven by the 1st respondent and insured by the 3rd respondent. The Tribunal held the autorickshaw driver negligent, insurer liable to indemnify, and awarded Rs.2,96,630 with 7.5% interest. The appellant contends the compensation is inadequate and seeks enhancement under multiple heads, supported by Supreme Court authorities on just compensation, notional income, and future prospects (Pranay Sethi, Sarla Verma, Santosh Devi, Raj Kumar, Ramachandrappa, Syed Sadiq, Mekala). The insurer argued the accident arose from the claimant’s fault and that liability rested with the insured; it also argued the compensation claimed was excessive. The High Court reaffirms the principle of “just compensation” under Section 168 MV Act, fixes a notional monthly income of Rs.4,000 (instead of Rs.3,000), and allows enhancement in several heads, including permanent disability and loss of amenities, while disallowing future medical care and loss of life prospects. The appeal results in an additional compensation of Rs.1,20,750 with 8% interest, with payment within two months and no costs.

High Court of Kerala
MACA.No.4172 OF 2019

SANNASI and Priya and Keerthi (Minor) v. Manager, National Insurance Co. Ltd.

The appellants—SANNASI, his wife PRIYA, and their minor daughter KEERTHI—filed MACA No. 4172 of 2019 challenging an award under O.P.(MV) No. 377 of 2017 before the Motor Accidents Claims Tribunal, Pala, for the death of Maneesh, a five-year-old child, in a road accident on 29 October 2016 caused by a motorcycle (KL-37/C-8525). The Tribunal held the rider rash and negligent, with the insurer liable to indemnify; it awarded Rs. 2,70,000 under various heads plus 9% interest from the petition date (27.04.2017) and costs. The assailed award was contested as being inadequate, prompting the present Kerala High Court to assess quantum anew in light of broad legal principles governing just compensation under the Motor Vehicles Act, including Sarla Verma and Pranay Sethi, and the evolving body of case law on death of children. The court reviews notional income, multiplier, deduction for personal expenses, and the evolving concept of ‘consortium’ (spousal, parental, filial) and its impact on compensation. By applying the Assainar framework, it fixes a notional income for the child and adopts a 15-year multiplier for dependency, determining a revised dependency of Rs. 9,60,000, with additional sums for funeral, loss of estate, pain and suffering, and filial consortium. The appeal is allowed in part, with enhanced compensation and a revised apportionment, while clarifying limits on the head of loss of love and affection for the non‑filial sibling and directing payment with statutory deductions and deposit arrangements. No costs order is made.

High Court of Kerala
CRL.A.No.1447/2006

Haridas s/o Bhargavan v. State of Kerala

Haridas s/o Bhargavan was convicted under Section 55(a) read with Section 8(2) of the Kerala Abkari Act for possessing 750 ml of arrack in a plastic bottle (MO1) and another contraband item (MO2) on 20.11.2002 near Pangode; the trial court sentenced him to 1 ½ years’ rigorous imprisonment and a fine of Rs. 1,00,000, with default imprisonment of six months. The prosecution relied on PW1–PW4 with Exts P1–P3 and the seized material objects MO1 and MO2 to establish control of contraband for sale. In appeal, the appellant’s counsel argued a lack of independent corroboration, non-marking of the forwarding note (which allegedly tracks the chain from seizure to laboratory analysis), absence of an arrest memo, and absence of a property list, contending these deficiencies entitle the accused to the benefit of doubt. The State argued the evidence was sufficient and that technical lapses should not bar conviction. The Kerala High Court, however, emphasized the forwarding note as a crucial link in the chain of custody in Abkari cases, citing Gireesh @ Manoj, Vijayan, and Prakasan, and held that non-production of the forwarding note is fatal to the prosecution. It also highlighted the importance of the arrest memo and property list per established authorities. Consequently, the court allowed the appeal, set aside the conviction and sentence, and directed the appellant’s release (bail bond, if any, cancelled).

High Court of Kerala
CRL.A.No.948 OF 2005

Mujeeb Rahman S/o Abdulrahiman v. State of Kerala

This is a Kerala High Court criminal appeal (CRL.A. No. 948 of 2005) against an order/judgment in SC 141/2004 of the Additional District Court (Ad hoc), Manjeri. The appellant was convicted under Section 304 Part I of the IPC by the trial court, based on a stabbing incident on 26.11.2002 near Keerthi Theatre, Nilambur, which allegedly left Sajeer dead after peritonitis from abdominal injuries. The prosecution relied on the evidence of witnesses PW1 and PW2 (who were hostile), medical certificates (Exts. P4–P7) and the weapon MO1 recovered with a blood-stain based on Ext. P12, connected to the accused via a confession Ext. P12(a). TheSessions Judge relied on circumstantial factors such as the blood-stained weapon, the recovery under Section 27, the scene mahazar, and the FIR/First Information Statement. The High Court, however, scrutinized the admissibility and sufficiency of such evidence: it rejected reliance on hostile witnesses, the evidentiary value of FIR (especially when the maker did not testify), and the scene mahazar as substantive evidence. It emphasized established principles from Supreme Court precedents (Mohanan, Ramji Dayawala, Narbada Devi Gupta) and noted the blood-on-knife argument under State of Maharashtra v. Dinesh. Consequently, the conviction was set aside and the appellant acquitted, with bail bonds canceled. The decision underscores rigorous application of evidentiary rules in criminal appellate review.

High Court of Kerala
CRL.A.No.1218 OF 2005

K.KUNHAMMED KOYA v. A.V. SAKEER HUSSAIN and STATE OF KERALA

This is a criminal appeal under section 138 of the Negotiable Instruments Act, 1988, heard by a single judge of the Kerala High Court. The complainant, K. Kunhammed Koya, challenged the acquittal of A.V. Sakeer Hussain by the Chief Judicial Magistrate, Kozhikode, in ST No. 68 of 2000. The prosecution alleged that the accused borrowed Rs. 1,00,000 in September 1999 and issued a cheque for the same amount on 15 October 1999, which was dishonoured for insufficiency of funds. A statutory notice was issued, but the notice returned with an endorsement that it was unclaimed. The trial court held that the offence under Section 138 NI Act was not made out, primarily because the source of funds was not proved and the notice was not effectively served. On appeal, the appellant argued that the trial court's findings were perverse, relying on the Supreme Court decision Rohitbhai Jivanlal Patel v. State of Gujarat and another (2019(2) KHC 243) to urge stricter appreciation of evidence, and that the notice was valid. The respondents contended that the trial court properly weighed the evidence and that any other view would still sustain the acquittal. The Kerala High Court, after scrutinising the evidence, upheld the trial court’s conclusions, and dismissed the appeal, confirming the acquittal and the judgment. The court notes the cited Rohitbhai case only as a mentioned authority.

High Court of Kerala
WP(C).No.11935 OF 2020(N)

InfoCom Software Pvt. Ltd. and others v. State of Kerala and Smart City (Kochi) Infrastructure Pvt. Ltd.

This writ petition concerns seven IT companies operating from Smart City Kochi seeking governmental subsidies and privileges under the IT policy regime. The petitioners rely on Ext. P1, clause 5.5, and Ext. P3 (GoR/ITD order dated 27.04.2020) to claim eligibility for financial benefits that were extended to other IT parks. They filed Ext. P5 representations and urged the State to decide in their favor, with Ext. P7-related hearing directions. The 2nd respondent, a private company, contends Ext. P3 is not applicable to it and questions maintainability, arguing the petition is a misuse of discretionary writ jurisdiction. It asserts forum shopping since petitioners have also moved civil courts (with injunctions against eviction) without informing this Court. The Court notes the petition was filed on 16.06.2020 and that Ext. P6 (the judgment in WPC No. 10536 of 2020 dated 28.05.2020) addresses identically situated petitioners, suggesting a pattern the Court should consider. Ultimately, the court finds abuse of process and dismisses the writ petition, while declining costs due to financial hardship. It directs that the civil suits be decided on merits, untrammeled by observations in this judgment. The matter remains, however, without granting the prayed discretionary relief to the petitioners.

High Court of Kerala
WP(C) No.24628/2019

W.P.(C) No.24628 of 2019

This writ petition challenges Exts.P1 and P2 prospectuses and Exts.P3 and P4 clauses that impose a compulsory service obligation on post-graduate super specialty medical students at the Regional Cancer Centre (RCC), Thiruvananthapuram. The petitioners are medical doctors pursuing DM/M.Ch. courses admitted through NEET-SS, who contend that the provision of compulsory service for not less than one year after course, coupled with exorbitant subsidised fees at RCC (Rs 3.5 lakh per annum) compared with lower fees at other government colleges, is illegal and violative of fundamental rights. Clause V(b) of Ext.P3 and Clause VI(b) of Ext.P4 set out liquidated damages of Rs 1 crore and link non-compliance to professional misconduct and cancellation of registration, thereby coercing service and imposing punitive financial consequences. The petition argues that Article 23 of the Constitution prohibiting forced labour, and sections 23 and 27 of the Indian Contract Act, render such bonds invalid. The respondents counter that subsidised education justifies bond requirements; RCC’s training investment is substantial (about Rs 25 lakhs per student per year) and the service obligation is a standard practice nationwide; the petition is dismissed, aligning with the Supreme Court’s view in Association of Medical Super Specialty Aspirants v. Union of India that service bonds do not violate constitutional rights or contract law. The court leaves open the possibility of addressing salary grievances through proper channels.

High Court of Kerala
CRL.A.No.1039 of 2005

Prakash S/o Thankappan v. State of Kerala

The Kerala High Court heard the criminal appeal filed under Section 374(2) CrPC by Prakash S/o Thankappan (Accused No.1) challenging a conviction for offences under Section 8(1) and (2) of the Abkari Act. The trial court (Addl. Sessions Judge, Fast Track Ad hoc-I, Thodupuzha) had convicted the first accused and acquitted accused Nos.2 to 8 in SC No.144/2004. The prosecution case, based on a night-patrol encounter on 10 February 2003, alleged that a jeep transported illicit arrack; two canisters (25 L and 10 L) were seized, and samples were sent for chemical examination. PW6 (the Sub Inspector) testified that the jeep was intercepted, two passengers fled, and the first accused was arrested as the driver from the courtyard where the contraband was found. Most independent witnesses turned hostile, and the evidence rested largely on PW6. The High Court scrutinized critical issues: delay in producing the contraband (produced on 13 February 2003, three days later) without a credible custody explanation; lack of a proper identification parade; identity of the driver contested; and a missing, tamper-proof chain of custody between seizure and laboratory report. Holding that the prosecution failed to prove the nexus beyond reasonable doubt, the court reversed the conviction in favour of the appellant, acquitting him with other accused already acquitted priorly. The bail bond was ordered cancelled and any fines refunded; the appellant was set at liberty.

High Court of Kerala
WP(C).6658 OF 2020(F) & WP(C).6727 OF 2020(M)

W.P.(C) Nos.6658 of 2020 (F) & 6727 of 2020 (M)

The writ petitions challenge non-action by the District Collector regarding conversion of land classified as garden land/purayidom, and seek to correct entries in the Basic Tax Register (BTR) under the Kerala Land Utilization Order, 1967 (KLU Order) and the Kerala Conservation of Paddy Land and Wetland Act, 2008. The petitioners claim their lands were converted prior to 2008 and filed Ext. P1 under Clause 6(2) of the KLU Order (06.03.2017) seeking permission to convert and to use the land for non-agricultural purposes; they contend that earlier directions in W.P.(C) No.13512/2017 directed deletion from the Data Bank and consideration of Ext.P1, which was not promptly acted upon. The court has held that, based on settled authority (Geo Peter; Renjith K. Paul; Salim; Tahsildar v. Renjith George; Kizhakkambalam Grama Panchayat v. Mariumma), where conversion occurred before the 2008 Act and Rule 6(2) applications were filed before 30.12.2017, the added restrictions of the amended Act cannot be pressed against the petitioners. The judgment directs the Additional 5th Respondent to treat Ext.P1 as a valid Clause 6(2) application, conduct inspection with prior notice, grant hearing, and pass orders within a time frame; it also directs deletion of the land from the Data Bank by the LLMC/Tripunithura Municipality and allows filing of fresh Rule 6A applications for re-assessment of the land as garden land/purayidom. Final directions include steps to ensure timely compliance, and that petitioners may pursue reclassification under the Kerala Land Tax Act after Ext.P1 orders.

High Court of Kerala
WP(C).No.33770 of 2018(U)

Ajayan v. The Secretary Local Self Government Department, Thiruvananthapuram; The Executive Engineer, LSGD Division, District Panchayat, Thiruvananthapuram; The District Collector, Thiruvananthapuram

Ajayan, a registered 'C' Class contractor under the Kerala Public Works Department, filed a writ petition under Article 226 seeking a mandamus to compel the respondents to release Rs. 8,39,000 for additional works carried out at the Peroor Vadassery Government U.P. School in Nagaroor Grama Panchayat. The contract originated with an estimated project cost of Rs. 30,00,000, and Ajayan’s bid of Rs. 23,55,263.01 was accepted, with an agreement dated 17.07.2017 for 34 items. During execution, the estimate was revised down to Rs. 23,54,775 and Ajayan accepted a supplementary agreement, receiving Rs. 23,05,000 after statutory deductions. The petitioner claims additional works — side protection wall, steps between walls, and ramp — were undertaken with consent and are not reflected in the original or revised estimates; he seeks payment of Rs. 8,39,000 and relies on Exts P1–P8 showing estimates, sanctions, and valuation. The respondents counter that no valid agreement exists for the claimed works beyond the sanctioned amount; administrative sanctions and district-level orders contemplate execution by other officers, and the petitioner’s claim cannot override the sanctioned scope. The court relied on State of Bihar v. Jain Plastics and Chemicals Ltd. and Jain Plastics to hold that writs are not the proper remedy for contractual disputes; the petition was dismissed, without prejudice to the petitioner pursuing civil remedies.

High Court of Kerala
B.A. No.2400 of 2020

Sreekanth v. State of Kerala

This is a bail application under Section 439 CrPC filed by Sreekanth, the accused in Crime No. 820/2019 of Viyyur Police Station. The charges include offences under IPC Sections 363 and 376(2)(n) and multiple provisions of the POCSO Act (Sections 4, 3A, 5(1), 7, 8, 9). The prosecution alleges that the petitioner, with intention to sexually abuse the victim, outraged her modesty, molested her, and attempted penetrative sexual assault. Arrested on 20 February 2020, the petitioner’s bail application was earlier dismissed by the Additional Sessions Judge, Thrissur on 1 April 2020. He has remained in custody for 64 days. The petitioner’s counsel contends innocence and asserts that the detention is unwarranted, claiming he was in a relationship with the victim. The Public Prosecutor opposed bail. The court cites a line of Supreme Court precedents emphasizing that bail is the rule and jail is the exception, notably Sanjay Chandra v. CBI (2012), Nikesh Tarachand Shah v. Union of India (2018), and P. Chidambaram v. Directorate of Enforcement (2019). In the COVID-19 context, it notes the In Re: Contagion of COVID-19 Virus in Prisons and the Kerala high court Full Bench directives to decongest prisons. Considering the 64 days of custody, near-completion of investigation, and the pandemic context, the judge grants bail subject to conditions including furnishing address and sureties, bond, weekly appearances, non-tampering with evidence, no leaving the state without permission, and possible cancellation on violation.

High Court of Kerala
Bail Appl. No.3385 of 2020

Bail Appl. No.3385 of 2020

This bail petition before the Kerala High Court concerns Balu Vijayaraghavan, an assistant professor, seeking pre-arrest bail in Crime No. 839/2020 of Thrissur West Police Station, registered under IPC Sections 354, 376(1), 376(2)(n) and 506. The de facto complainant, a postgraduate teacher, alleges a long-term intimate relationship starting in 2016–2017 during her studies, with involvement in sexual acts in Bangalore, Bhubaneswar, and elsewhere, based on assurance of marriage. She states that in July 2019 she was invited to Thrissur where she was molested in a car, and that the accused later entered into another marriage. The petitioner’s counsel argues the relationship was consensual; that there was no definite intention to marry; and that delays, lack of material to prove a false promise, and the possibility of the act falling under cheating rather than rape undermine the credibility of the complaint. The Public Prosecutor contends the complaint is credible and that custodial interrogation is warranted. The court, applying the principle that rape cannot be inferred from a consensual relationship and that a false promise to marry may not always amount to rape, concludes custodial interrogation is not necessary and grants pre-arrest bail, with conditions including a potency test under Section 53A Cr.P.C., weekly appearances, and other standard bail conditions.

High Court of Kerala
R.P.998 of 2019 in W.P.(C)No.38888 of 2018

Sivaprasad (Review Petitioner) v. State of Kerala, Uduma Grama Panchayath, Chief Engineer, KSTP, District Collector, Kasaragode, and Muhammed Haseeb.T.K.

This is a review petition filed by Sivaprasad, a resident of Uduma, challenging the High Court of Kerala’s 2019 writ petition order in W.P.(C) No. 38888 of 2018 that directed removal of a bus shelter at Uduma Junction and to construct a central median to ease traffic on KSTP Road. The petition contends the bus shelter lies outside the four-lane road limit and was erected within road puramboke; it asserts the 2019 order was based on extraneous considerations and would deprive the public of a long-standing shelter used by residents. The Respondents (State of Kerala, Uduma Grama Panchayath, KSTP Chief Engineer, District Collector Kasaragod, and Muhammed Haseeb T.K.) argued that the shelter protrudes into the bus bay, obstructs traffic, and compromises safety; the road’s four-lane configuration and bus bays were planned under KSTP with IRC-guided standards; they cite Ext.R3(a) showing the shelter encroaching the bus bay by 1.5 m. They rely on the Kerala Highway Protection Act, 1999, and IRC manuals (IRC SP: 73-2007, SP: 84-2009, and IRC 103-2012) to justify removal and enforcement. The Court underscored pedestrian facilities and road-safety norms, noting the need to enforce standards and the public-rights doctrine while maintaining safety. Ultimately, the review petition was dismissed, with no order as to costs, upholding the earlier judgment and directing ongoing enforcement of road-safety norms and encroachment removal as required. The decision foregrounds the state’s duty to maintain highways for public travel per IRC guidelines and public-trust principles, while limiting remedial review to patent errors in the record.

High Court of Kerala
W.P.(C)No.22050 OF 2020(E)

H.H. Martha Mathews II Training College v. University of Kerala and National Council for Teacher Education

This writ petition challenges the University of Kerala’s refusal to include H.H. Martha Mathews II Training College in Annexure I of Ext.P11 for admission to the B.Ed course for the academic year 2020-22 and to permit admission in 2020-21. The petitioner college, which had NCTE recognition dating back to 2005 for a one-year B.Ed and provisional affiliation from the University since 2005-06, sought inclusion in Annexure I and to operate for the 2020-21 session. It argues that it relied on NCTE Act provisions and the 2014 Regulations, and that lack of revised recognition should not bar its opportunity to admit students. The respondents contend that without valid recognition under the NCTE Regulations, 2014 for a two-year B.Ed with a basic unit of 50 students (or two units), there is no basis to include the college in Ext.P11, and that mandamus cannot direct action contrary to law. The court examines Sections 12–17 of the NCTE Act, the definitions in Section 2, and the NCTE Regulations, noting the need to follow due process for recognition, inspection, and withdrawal. It cites State of U.P. v. Harish Chandra and Bhaskara Rao A.B. v. CBI to emphasize that courts cannot compel compliance with law in contravention of statutory provisions. Ultimately, the petition is disposed of by directing the NCTE Southern Regional Committee to consider Ext.P12 reply and decide in accordance with law after a hearing, expeditiously.

High Court of Kerala
MACA.No.1602 of 2013

Pressy and others v. Pradeesh Kumar and others

This High Court of Kerala, in MACA No.1602 of 2013, heard an appeal by claimants (Pressy and three children of the deceased Sathyajith) challenging a Motor Accidents Claims Tribunal award arising from a vehicular collision on 13.11.2007 that killed the motorcycle rider. The Tribunal held the jeep driver negligent, insured vehicle liable, and awarded Rs.12,77,044 with 7.5% interest. The appellants argued that compensation should be revised upwards using the well‑established just compensation standard under Sarla Verma and later refined by Pranay Sethi, Reshma Kumari, and Santosh Devi. Specifically, they urged (i) addition of future prospects (50% for the deceased aged 30 with a permanent job), (ii) correct deduction for personal living expenses (1/4th rather than 1/3rd) and (iii) adoption of standardised conventional heads and multipliers (loss of estate, loss of consortium, funeral expenses, and love/affection) as clarified by the Constitution Bench in Pranay Sethi and Magma General Insurance. On these lines, the court re‑evaluates the dependency loss, increases funeral expenses to Rs.15,000, grants spousal/filial/parental/filial consortium (Rs.40,000 to the parent and unmarried sister, and Rs.120,000 collectively for other dependants), and awards an overall additional compensation of Rs.10,19,138 with 8% interest, apportioned among the appellants. It directs payment within two months and fixes deposit arrangements for minor claimants. The appeal is disposed of accordingly, no costs ordered.

High Court of Kerala
OP (FC) No. 219 of 2020

Vishnudas H. and Gadha G. v. NIL (OP (FC) No. 219 of 2020, Kerala High Court)

Death of a marriage can be swift when irreconcilable differences arise early. This Kerala High Court division bench considers whether the one-year waiting period under Section 14(1) of the Hindu Marriage Act, 1955 can be waived where the marriage lasted only a few hours, with no consummation or cohabitation, and where continuing the relationship would cause more harm than good. The petitioners, Vishnudas H. and Gadha G., sought permission to file a joint petition for divorce before the lapse of one year, invoking the proviso to Section 14(1) on grounds of exceptional hardship to the petitioner and exceptional depravity on the part of the respondent. The Family Court had refused leave in I.A. No.113 of 2020, holding that the parties had not contemplated dissolution appropriately. The High Court held that the proviso to Section 14(1) empowers courts to grant such leave in exceptional circumstances, and that the test is to be assessed by weighing factors like potential reconciliation, welfare of children, and the parties’ circumstances. Citing Amardeep Singh v. Harveen Kaur and other precedents, the court emphasized that genuine cases of irretrievable breakdown and minimal life together may justify waiving the statutory period. The court accordingly set aside the Family Court order and allowed the petitioners to file a joint divorce petition by waiving the one-year period.

High Court of Kerala
RSA No.1071 of 2016

VIMAL KUMAR E.K. v. VAKKATT SASIDHARAN

This Regular Second Appeal before the Kerala High Court arises from a suit for return of advance sale consideration under an agreement for sale. Ext.A1, dated 30.01.2013, relates to 9.5 cents of property with a house and a total sale consideration of Rs.12 lakhs, of which Rs.6 lakhs is stated to have been paid as advance. The plaintiff contends the property was mortgaged and the defendant undertook to clear that liability with the advance; upon learning the liability remained, the plaintiff issued Exts.A2 and A3 notices and filed suit for the return of the advance. The defendant admitted his signature on Ext.A1 but contested its genuineness, alleging the plaintiff is a moneylender who used earlier signed blank papers to create Ext.A1; Exts.B1–B3 relate to transactions in 2006–2007. The courts below dismissed the suit, holding Ext.A1 not proven. The High Court found anomalies: a 2007 loan closure inconsistent with a 2013 stamp paper, unexplained possession of the 2013 stamp paper, and non-return of signed papers. It held that where both sides adduced evidence, the court should decide on probabilities rather than strict burden of proof, citing Rebti Devi v. Ram Dutt (1997) SCC 714. The result is that the lower decrees are set aside and the plaintiff is granted a decree for realisation of Rs.6 lakh with 6% interest from the date of suit till realization, with costs.

High Court of Kerala
WP(C).No.5717/2020 (M) & WP(C).No.5729/2020 (M)

W.P.(C) Nos. 5717 & 5729 of 2020 (William P. John v. Kaipparambu Grama Panchayath; Chinnamma Michael v. Mulamkunnathukavu Grama Panchayath)

These two writ petitions challenge an Ext.P-1 communication by the Kaipparambu and Mulamkunnathukavu Grama Panchayats insisting that building permits be issued only after obtaining a development permit under Rule 5 of the Kerala Panchayath Building Rules. The petitioners, who own small plots (6.470 cents and 5.5081 cents respectively), contend that their applications for building permits should be considered without the mandatory development permit, particularly since substantial garden land has been subdivided into smaller plots and there is no proposed large-scale development. The court relies on a long line of decisions culminating in Nafeesa v. Chavakkad Municipality (2018 (3) KLT 1) to hold that a development permit is not a precondition for granting a building permit in such circumstances. It notes that Exts.P-2, P-3, P-4 indicate a consistent approach in this Court. Accordingly, the impugned directive is quashed and the matter is remitted to the respective Panchayaths to consider the building permit applications without insisting on a development permit, and to decide within a short time, ideally within three weeks from production of a certified copy of the judgment. The registry is to inform the respondent, ensuring prompt compliance and implementation of this judgment.

High Court of Kerala
WA.No.1657 of 2020

Manu Johnson v. State of Kerala and others

This writ appeal challenges a Kerala High Court decision upholding orders under the Kerala Land Conservancy Act, 1957 that found encroachment by the petitioner, Manu Johnson, on Government Purambokke land (Kayal Puramboke) in Re sy Nos. 75–78, Block 291, Kollam West Village, Kollam. The Division Bench (Chief Justice S. Manikumar and Judge Shaji P. Chaly) reviews a single-judge order that possession and classification of the land as Government Puramboke, and that the petitioner could not be granted assignment or alienation. The authorities under the Land Conservancy Act—LR Tahsildar Kollam (LC 16/16), Sub Divisional Magistrate Kollam, and the District Collector Kollam—conducted inspections, prepared reports, and issued eviction/encroachment orders, culminating in the 2017, 2018, and 2020 orders. The petitioner contends he did not encroach; points to electricity/water connections and decades of possession by previous owners; argues for assignment of land to promote his resort/tourism business, and highlights alleged inequities. The court relies on statutory provisions and prior Supreme Court authority to reject encroachment and emphasize that Puramboke land cannot be allocated to private ownership, even temporarily. The writ petition and the writ appeal are ultimately dismissed as withdrawn, upholding the authorities’ actions and eviction orders.

High Court of Kerala
O.T.Rev.No.171/2015 & 175/2015

State of Kerala v Muziris Softech (P) Ltd.

These two revision petitions, O.T.Rev.No.171/2015 and O.T.Rev.No.175/2015, arise from KVAT assessments for the years 2006‑07 and 2007‑08. The State of Kerala challenged orders of the Kerala Value Added Tax Appellate Tribunal, urging that consultancy charges and amounts received under annual maintenance contracts (AMCs) were not properly included in the assessee’s turnover. The assessee, Muziris Softech (P) Ltd., contends that the software is sold for a price, while customization and consultancy are post‑sale services that do not constitute a sale of goods; it points to cases such as Imagic Creative, TechSmith Software, and ESSAR Gujarat Ltd. to argue that services and licenses cannot be taxed as goods. The Intelligence Officer’s reliance on a clarification regarding composite contracts is disputed as inapplicable to these facts. The first appellate authority and the Tribunal had remanded the matter for fresh consideration after relying on precedents including Gannon Dunkerley and Associated Cement Companies. The Kerala High Court, however, finds that the clarification cited by the Intelligence Officer is not applicable and that the core issue concerns whether the transaction is a sale of customized software (goods) or a post‑sale service contract. It remands the matter back to the Tribunal for fresh fact‑finding, directing examination of documents relied upon by the State. Costs are left to the parties.