This is a Motor Accident Claims Appeal from the Kerala High Court challenging the MACT, Manjeri award in OPMV 1084/2007 dated 24-02-2011. The claimant, Muhammed Siyad Babu, sustained injuries in a head-on collision on 22-03-2007 involving a car driven by him and a lorry. The Motor Accidents Claims Tribunal held equal negligence by both drivers (50-50) and awarded 50% of the compensation to the claimant. The appellant challenged the negligence finding and the quantum of compensation, arguing FIR and charge sheet pointed to the lorry driver’s negligence and that the tribunal’s assessment undervalued several heads of loss. The insurer contended there was no illegality in the Tribunal’s findings and that the burden lay on the claimant to prove negligence in a collision. On hearing, the Kerala High Court re-evaluated the negligence, suggesting 75% negligence by the lorry driver and 25% by the claimant, and notional income was fixed at Rs. 5,000 per month, relying on the Ramachandrappa principle. The court then recalculated losses (earning, hospital stay, pain and suffering, and other heads), culminating in an enhanced award with two components: (i) 33,525 as additional compensation (75% of 44,700) payable by the insurer within two months at 8% interest; and (ii) 30,663 as an additional amount (25% of original compensation) to be paid as per Tribunal orders. No costs were awarded.
OP(C).No. 1250 of 2016 (O) OP(C) No.1250 of 2016 arises from a dispute over a compromise decree in O.S. 432/2007, pending in the Munsiff Court at Alappuzha. The decree holders, V. Joseph and Simon Varghese, allege that the respondents — Valsamma Varghese and Marykutty Varghese — did not vacate the scheduled property, which includes an old dilapidated building in the middle of the plot. The parties settled by a compromise whereby the respondents agreed to vacate the property upon payment of 5 cents of land and Rs 1 lakh; Ext. P2 records this compromise decree and Ext. P3 is the compromise agreement incorporated into the decree. The petitioners claim to have paid Rs 1 lakh on 19.03.2011, yet the respondents did not vacate as required. Execution proceedings (E.P.173/11) were filed; a Commission Report (Ext. P4) and subsequently a revised plan (Ext. P5) were submitted to the court, but the petitioners later withdrew the execution petition. In 2015 they sought to enforce the remaining terms via IA 1718/2015 in OS 432/2007; the Munsiff dismissed, holding the court functus officio. The High Court examined whether post‑decree enforcement can be had, concluding that although the decree contained a clause enabling enforcement, the trial court cannot confer or exercise such jurisdiction post‑decree, and the clause is void under the Indian Contract Act. The petition is dismissed.
This is a Criminal Misc. Case (Crl.M.C. No. 6481 of 2016) filed under Section 482 CrPC in the High Court of Kerala at Ernakulam by ten accused challenging CC 1904/2010 pending before the Judicial First Class Magistrate Court-I, Aluva, arising out of Crime No. 2728/2010 of the Aluva Police Station. The petition seeks quashing of the final report and proceedings, arguing that the incident occurred on 2 October 2010 during a college student election and arose from minor disputes between UC College students; the accused and respondents are students. The allegations describe an unlawful assembly and assault with weapons, carrying sections 143, 147, 148, 341, 323, 324 read with Section 149 IPC. The petition asserts that the disputes between the parties have since been amicably resolved and there is no ongoing acrimony; continuing with prosecution would cause injustice and unnecessary reputational harm. The Public Prosecutor initially reserved reservations about quashing, while the respondents' counsel emphasized the dispute is personal and the settlement should be encouraged to preserve peace. The High Court, citing Gian Singh v. State of Punjab and Narinder Singh v. State of Punjab, held that in appropriate cases the extraordinary power under Section 482 CrPC can be invoked to quash if settlement serves ends of justice and prevents abuse of process. Finding the offence not grave and that quashing would promote peace, the court allowed the petition and quashed the final report and proceedings.
WP(C).No.16764 of 2015 (U) George Kunnapuzha Kunnapuzha, President of the 1st respondent society, sought a declaration that he continued to be a member of the Board of Directors of the 3rd respondent bank and a direction that notices of all Board meetings be issued to him. He had been nominated as the 1st respondent society’s delegate to the 3rd respondent District Co-Operative Bank and thus became a Director Board member of the 3rd respondent. The term of the previous committee expired on 19.3.2015. Amid political upset, a harthal was declared on 14.3.2015, and the Returning Officer adjourned the election. The court had earlier directed emergent steps to conduct polling; the petition led to Ext.P5, directing the Co-operative Election Commission to fix polling before 18.4.2015. Polling was conducted on 17.4.2015, electing a new committee including the petitioner as President and as delegate to the 3rd respondent. Despite this, the petitioner claims he was not informed of Board meetings and argues he retains his delegate rights. The 2nd respondent counters that the petitioner’s delegation ceased when the 1st respondent’s term expired, and that Rule 46(f) terminates delegate status if the represented committee ends. It is argued that the 1st respondent’s administration and Election Commission actions were proper under Rule 44A, and that Ext.P9 is valid. The court held there was no illegality in Ext.P9 and dismissed the petition.
WP(C).No. 18024 of 2013 (C) This writ petition challenges an order directing payment of current market value for reconveyance of land bought by the State under Section 50 of the Revenue Recovery Act. The petitioner’s land, 3 acres 73 cents in Survey No. 108/1 and 109/1 at Varanagad (Vandanmedu) Village, was auctioned and purchased by the State on 27.6.1985 after defaulting on tax; the petitioner later remitted the entire amount due on 18.12.2003. The District Collector then directed payment of market value as per Government Order MS No.196/96 RD 22/91. In W.P.(C) 34407/2003 this Court directed remittance of 50%, and the petitioner withdrew with liberty. The core issue is whether reconveyance can be granted without payment of the current market value. The Government Order applies only to reconveyance under its terms; it does not contemplate a debtor who has discharged liability by alternative means. The court considers equity, noting that occasional estoppel doctrines may apply when a party’s conduct induces reliance. It discusses promissory/estoppel and proprietary estoppel, referencing Ramsden v. Dyson and AP Transco v. Sai Renewable Power. The court concludes the petitioner’s payment was encouraged by the Government and that equity requires reconveyance, directing that the land be reconveyed at the petitioner’s expense within three months. The writ petition is allowed on equitable grounds.
WP(C).No. 20100 of 2014 (J) These petitions challenge a perceived vacuum in the service conditions of employees of the Kerala State Electricity Board after vesting in a government company under the Electricity Act, 2003. The petitioners, led by K.S. Balachandran, contend there is no regulatory framework post-reorganisation to govern service conditions, and press for extending the retirement age from 56 to 60 years. The Standing Orders Act, 1946 and the Kerala Service Rules ostensibly fix retirement at 56, while the Board argues that the transfer schemes, Memorandum of Understanding, Articles of Association, and Tripartite Agreement preserve existing terms, with no obligation to adopt Model Standing Orders. The petition relies on Sections 131 and 133 of the Electricity Act, claiming that the transfer scheme and re-vesting should determine service conditions, and that a vacuum requires continuance of the employees until age 60. The respondents maintain that no fresh regulations are necessary, and that the Standing Orders, KSR and the agreement framework govern. The court analyzes authorities including UP State Electricity Board v. Hari Shankar Jain; Harwindra Kumar; M/s British Paints; and U.P. State Electricity Board v Labour Court, concluding that Standing Orders Act is a special regime that can override general regulations in appropriate circumstances, but in the present vacuum, the Government policy to retain 56 remains unassailable. The petitions are dismissed with costs.
This High Court of Kerala, in MACA No. 2472 of 2010, heard an appeal by the claimant (C. Dilshad) against an award in OP(MV) 210/2008 of the Motor Accidents Claims Tribunal, Vatakara, arising from a motor-vehicle accident on 3 February 2007 in which the claimant, aged 19, suffered head injuries including skull fractures. The Tribunal found negligence on the part of the second respondent’s driver and directed the insurer (third respondent) to pay compensation of ₹1,21,470, with interest and costs. On appeal, the Court examined whether the heads of loss and the total compensation were just. The appellant argued the income evidence was inadequate and that disability evidence supported greater compensation; however Annexure-A was not deemed credible regarding salary. The Court noted the accident occurred in 2007 and fixed a notional income of ₹4,000/month for a young, able-bodied person, and calculated loss of earning using a 25% whole-body disability derived from later Medical Board findings (50% permanent and 50% occupational disability, though particulars were unclear). The Court enhanced several heads: loss of earning ₹2,16,000; medical expenses unchanged; pain and suffering, bystander expenses, and loss of amenities adjusted (overall increased by ₹2,51,000). Interest was fixed at 9% from the date of petition; insurer was ordered to deposit the enhanced amount within a month. The appeal was disposed of accordingly, by a Division Bench including Justices P.R. Ramachandra Menon and Anil K. Narendran.
This is a criminal revision petition filed by Martins, S/o Jose, challenging the judgment in Criminal Appeal No.420/2005 of the Additional Sessions Judge (Adhoc-I), Ernakulam, arising from C.C. No.1388/1999 of the Judicial First Class Magistrate Court, Perumbavoor. The accused was convicted under Sections 353 and 323 IPC for allegedly assaulting and deterring public servants while they were performing a court-ordered measurement in O.S. No.159 of 1997. The Sessions Court dismissed the appeal, and the revision petition seeks relief from that order. The prosecution relied on PW1 (Commissioner appointed by the Munsiff Court) and PW2 (Taluk Surveyor) who testified that the accused assaulted them in the property being measured. The defense argued there was no obstruction of PW1 and PW2 in discharging their official duties and questioned the appointment of PW1 and PW2 as public servants. The High Court examined the elements of Section 353 IPC: a public servant, acting in discharge of his duty, and an assault intended to deter or arising from the lawful discharge of duty. The court found lack of documentary proof of PW1 and PW2’s appointment, setting aside the Section 353 conviction, and convicting the accused only under Section 323 IPC, with a sentence of imprisonment till rising and a fine of Rs. 1,000. The revision petition is disposed of accordingly, guided by precedents on ‘public servant’ and ‘execution of duty.’
WP(C).No. 32188 of 2009 (P) This writ petition challenges orders canceling the petitioner’s managership of the Aided Lower Primary School, Kinavallur. The school was jointly owned by M.V. Narayanankutty and M.V. Sasikumar. The petitioner, N. Sarada, was appointed Manager under Ext. P1 (30.07.1996) and her appointment was approved by Ext. P2 (02.12.1996). By Ext. P3 (31.08.1996) Sasikumar’s share was assigned to her. Ext. P4 (30.07.1996) is an agreement for sale; Narayanankutty later cancelled her appointment and assumed charge as Manager from 01.04.2006; Ext. P5 (04.05.2006) is the AEO’s order upholding the cancellation and replacement. The Director of Public Instruction, via Ext. P6, held that transferring Sasikumar’s share to the petitioner without Department permission violated Section 6 of the Kerala Education Act and declared the petitioner cannot continue when Narayanankutty returns. The petitioner filed Ext. P7 revision and Ext. P8 order, which government orders largely upheld. The core issue is whether, in a jointly owned school, permission from educational authorities is necessary for any transfer of property, especially where management was not to be permanently altered. The court held that Section 6 requires prior written permission from an officer not below the rank of District Educational Officer for any transfer of school property; the petitioner possessed only half ownership and could not claim entitlement to continued management. Consequently, the writ petition was dismissed.
WP(C).No. 27526 of 2015 (M) / WP(C).No. 28069 of 2015 (M) This is a Kerala High Court writ petition challenging a common judgment of the Co-operative Tribunal, Thiruvananthapuram, and related Arbitration Court order in a disciplinary case against SMT. K. Smitha, a junior clerk of the Irinjalakuda Co-operativ e Bank. The initial intra‑departmental enquiry had held the employee guilty of fraud and misappropriation for allegedly stealing two bank cheque leaves and encashing one for Rs. 1,00,000. The Arbitration Court reversed the enquiry findings, directing reinstatement of the employee without back wages. The Bank challenged this before the Co‑operative Tribunal; the Tribunal largely affirmed the adverse findings but remitted the matter to determine back wages/compensation, indicating that the employee could not be forced back without award of compensation. The Bank then filed these writ petitions, contending that when an enquiry is found vitiated, the proper course is to refer the matter back to the disciplinary authority for a fresh inquiry (relying on a line of authorities including LIC v Masilamani). The employee’s counsel argued that concurrent findings should not be disturbed. The High Court, after reviewing the record and noting the divergences between domestic enquiry and criminal proceedings, held that the Tribunal’s arrangements and the Arbitration Court’s conclusions did not justify interference. Ultimately, the Court dismissed the writ petitions, leaving the Tribunal’s remand for compensation and the reinstatement issue unresolved in favour of the employer’s position.
WA Nos. 977 of 2016; WA No. 1327 of 2016 These writ appeals arise from a land acquisition for setting up the Coconut Industrial Park on the Manimala Estate in Velom Village, Kozhikode. The Kerala State Industrial Development Corporation Limited (KSIDC) appeals against a single-judge order directing the Acquisitioning Authority to pass awards under Section 11(1) of the Land Acquisition Act, 1894 and to pay compensation according to draft Ext.P13, Ext.P9–P11 notices, and related norms. WA 977/2016 is filed by KSIDC; WA 1327/2016 is filed by the State of Kerala, the District Collector, Kozhikode, and the Special Tahsildar (LA). The landowners initially negotiated a consensus to fix land value at Rs. 10,750 per cent, with additional compensation for improvements under Government Order G.O(Rt.) No.331/2004/RD and GO(Ms) No.235/11/1D, and with 80% advance payments to liquidate bank liabilities and settle workers’ claims. The landowners contended that no Form 10(a) agreement was executed, and that consent awards were improperly drafted under Section 11(2). The Division Bench holds a consensus ad idem existed, finds substantial compliance with Rule 12(4)/(5) of the 1990 Rules, and directs rectification of Ext.P13 awards to reflect correct improvement valuation and payment of 12% interest on unpaid sums, setting aside the single-judge judgment.
WP(C).No. 26327 of 2015 (M) Petitioner Suresh Kumar, S/o Surendran, the proprietor of Pave Rich Amal Interlocking Cobbles at Elampalloor, Kundara, Kollam, challenges Ext.P4, a stop notice issued by the Elampalloor Grama Panchayath alleging pollution in the locality. He contends that the Panchayath lacks authority to issue such a notice and that the Kerala State Pollution Control Board (KPCB), not the Panchayath, issues and monitors a consent to operate, as evidenced by Ext.P2. The petitioner relies on Section 233 of the Kerala Panchayat Raj Act, 1994, which authorizes the Panchayat to grant D&O licences for industries within its jurisdiction and to obtain reports from authorities such as the KPCB. He argues that while the Panchayat may inspect, the technical aspects of pollution are within the purview of experts who issued the consent to operate. The Panchayat argues it has supervisory authority for environmental concerns and that it can enforce licence conditions. The court, noting KPCB’s inspection on 18.09.2015 revealed several deficiencies (inadequate enclosure, lack of sprinkling facility, missing waste-water treatment, partial shed enclosure, and lack of a signboard), directed KPCB to inspect within two weeks with Panchayat involvement and to report. Although the petitioner disputed some aspects, the court treated non-compliances as a basis for continued supervisory action, and provided that Ext.P4 would be withdrawn upon compliance, else it would stand. The writ petition is disposed of with no costs.
WP(C).No. 3048 of 2016 (E) Petitioners are agriculturists who had entered into agreements with the Electricity Board, whereby the Agricultural Department of the State undertook to pay their electricity charges. Allegations that the Agricultural Department failed to meet these payments led to a writ petition seeking relief from disconnection and a stay of the higher charges. The Government contends that there has been a tariff change from agricultural to industrial tariff pursuant to orders of the Regulatory Commission; with higher tariffs, there is no obligation on the State to pay unless the tariff is restored or modified by law. The Electricity Board asserts that the petitioners and the State had executed written guaranties to pay the charges, and that the responsibility to pay lies with the parties, given the tariff change. The petitioners rely on a prior decision (M.K. Saidalavi) suggesting that once an arrangement with the Board is made, the scheme should continue. The court observes that the present case involves a tariff change notified by the Regulatory Commission, and hence all consumers are bound by the new tariff unless properly modified. It rules that a resolution of liability between petitioners and the Agricultural Department is necessary and that the Board may continue to recover the amount under the changed tariff. Ultimately, the court directs payment in installments and leaves the dispute between the petitioners and the Agricultural Department to be resolved by appropriate means, without directing the Board to suspend collection.
Crl.M.C. No. 3594 of 2016 Mercy Thomas, the 1st accused, has approached this High Court under section 482 CrPC seeking to quash Crime No.351/2010 of Peringome Police Station, Kannur, which charges offences under sections 419, 420, 467, 468 and 471 read with section 34 IPC. The petitioner’s case is that the entire matter is civil in nature and the complaint is a malafide attempt to derail civil obligations arising from a land transaction. The dispute concerns sale of 1.25 acres in R.S.No.119/1 of Pulingome amsom, with an advance paid and later adjustments, measurement showing a shortfall of 28 cents, and a sequence of civil dealings including a sale agreement (18.5.1998) and a revised agreement (17.9.2004). A civil suit (O.S. No.104 of 2007) in Payyannur was filed by the petitioner to realise a sum; an attachment was obtained and later withdrawn by accord. After withdrawal, the second respondent lodged a private complaint based on alleged forged documents, leading to the FIR (Crime No.351/2010) alleging fabrication of an agreement and steps to institute a suit with attached property. The court notes the allegations involve disputed questions of fact; it is not proper to resolve such disputes at the stage of quashing. Relying on State of A.P. v. Vangaveeti Nagaiah and Haryana v. Bhajan Lal, the judge emphasizes that High Court’s inherent powers should not stifle legitimate prosecution and should read the FIR as a whole. Consequently, the petition is dismissed, with a direction that the Investigating Officer may summon the petitioner if required for investigation.
The second plaintiff company, Fertilizers and Chemicals Travancore Ltd., entrusted caprolactum to the defendant carrier for transportation from Udyogamandal, Kerala to Gwalior, Madhya Pradesh. On delivery, the goods were found damaged on inspection by an approved surveyor as per reports dated 29 August 1994 and earlier inspection dates of 25 February 1994 and 1 March 1994. The loss/negligence led to a claim by the insured and insurer; the insurer, United India Insurance Co. Ltd., satisfied part of the claim to ₹1,36,021 and, on the strength of a subrogation letter dated 31 January 1995, the insurer and insured filed a suit against the carrier. The trial court held that the suit was barred by limitation, applying Article 10 of the Limitation Act and holding that the period runs from the knowledge of loss, i.e., delivery or inspection. It also considered Section 64UM(2) of the Insurance Act, 1938 which requires a report from an approved surveyor for settlements above ₹20,000. The appellants relied on Section 10 (notice within six months of knowledge) and argued that the suit is timely, especially since a survey report was obtained and the claim filed within the three-year window from the loss. The High Court reversed the trial court, clarified that limitation runs from the date of the survey report (not knowledge), distinguished the earlier Associated Transport decision, and cited Veljan Hydrair to support notice purposes. The appeal is allowed and remanded for de novo merits. The court also directed refund of court fees and a timeline for disposal by 2017 summer recess.
This is a Kerala High Court criminal appeal (CRL.A. No. 205 of 2011) arising from S.C. No. 441 of 2009 of the Additional District and Sessions Court Fast Track (Adhoc-1), Kozhikode. The appellants, Sivan and Ravi, were convicted under Section 55(a) of the Abkari Act for possessing liquor during a vehicle check in a bus (Reg. KL-11/R-6489) on 1.4.2005, with a total seized quantity of 11.25 litres of Indian Made Foreign Liquor (IMFL). The prosecution relied on PW1 (Preventive Officer) and PW2 (Excise Guard) testimony, the seizure mahazar (Ext. P3) and a chemical analysis (Ext. P9) showing 41.97% ethyl alcohol in the samples, leading to a finding of 7.5 litres for the first appellant and 3.75 litres for the second. The trial court held them guilty under 55(a). The High Court examined the scope of Section 55(a), citing and applying Surendran v. Excise Inspector and Mohanan v. State of Kerala to hold that 55(a) applies only to illegal import/export or possession during illegal import, and that the case lacked any allegation of illegal import/export. Since the permissible quantity then was 4.5 litres, the court held the proper conviction could be under Section 63 of the Abkari Act. The appeal was allowed in part, with conviction changed to Section 63 and a sentence including a monetary fine and a term of detention, plus a direction to surrender on 21.3.2016.
WA No. 1705 of 2016 / WP(C).37604/2015 Raju M. Michael, a Cable TV operator with networks in Pookkottumpadam and Kalikavu in Malappuram, challenges a Kerala State Electricity Board (KSEB) order demanding pole rental for cables allegedly drawn since March 2011. In WP(C).37604/2015, he sought a writ to quash Ext.P4 and to declare that KSEB had no right to demand pole rental from 1.4.2011, contending that charges could be demanded only for the actual period during which cables were drawn. The Single Judge treated cable installation through electric posts as an arrangement rather than a statutory contract and noted that the petitioners had drawn cables without Board permission, directing the Board to recover arrears and to enter into an agreement, with four weeks’ time, while reserving the petitioners’ right to approach civil court on disputed facts. On appeal, the Division Bench confirmed that Ext.P1, dated 1.12.2006, governs a non-statutory contract and that unauthorised pole usage beyond Ext.P1 is admitted. It declined to decide merits in writ jurisdiction and upheld the directives: the petitioner must enter into an appropriate agreement and remit the demanded charges within four weeks; if not, the Board may dismantle the cables drawn through unauthorised poles. The appellant’s right to seek civil adjudication on any disputed facts remains reserved.
WP(C).No. 28047 of 2010 (S) The petitions arise from OA 900/2009 before the Central Administrative Tribunal Ernakulam, concerning non‑empanelment of the applicant for promotion to Chief Engineer in the Military Engineer Services. The Writ Petition (WP(C).No.28047/2010) challenges the CAT's operative orderExt.P5, which directed a review DPC to ignore ACRs below the benchmark and promote the applicant if found otherwise suitable, with effect from the date his junior was promoted. The petitioners, Union of India and the Engineer-in-Chief MES, contend that non‑empanelment and reliance on uncommunicated gradings violate Articles 14 and 16 of the Constitution, and that the MERIT/CR scheme and communications should follow established law. The respondents (K.M. Nambiar, A.K. Saxena, Deepak Agarwal) oppose on the grounds that the communication of merit ratings and ACRs is central to a fair selection process; they rely on Supreme Court rulings such as Dev Dutt v. UOI and Abhijit Ghosh Dastidar v. UOI to justify the Tribunal’s approach. The judgment traces the evolution through Dev Dutt and Abhijit, and, following Sukhdev Singh v. UOI (2013) 9 SCC 566, upholds that Dev Dutt’s dictum remains valid. The Kerala High Court ultimately dismisses the challenge, holds that the Tribunal’s directions are sustainable, and leaves the awarding of consequential relief to be implemented by the department without further delay, with no costs.
CRL.A.No.1706 of 2004 (C) This Criminal Appeal arises from a conviction under the Abkari Act against the appellants Ashokan and Jagadevan for possession of seven litres of arrack in Parippally, Kollam. They were convicted under Section 55(i) of the Abkari Act by the Additional District & Sessions Judge (Adhoc)-II, Kollam, and sentenced to rigorous imprisonment for three years and fines of ₹1 lakh each. The prosecution relied on MO1 (the contraband) and accompanying documents Exts P1–P4, including a mahazar and a chemical analysis (Ext P4). The appellants challenge the conviction on grounds that there was no proper seizure chain, no forwarding note, and no tamper-proof packaging or witness signatures, with no evidence that the seized articles were produced before court in a sealed, tamper-proof condition. They argued that mere arrest with MO1 does not prove possession, and the Excise Manual Rule 33 procedures were not complied with. The Public Prosecutor did not object to these contentions. The High Court, citing Rajamma, Ravi and other authorities, reiterated that possession must be proved beyond reasonable doubt and that proper chain-of-custody and sealed samples are essential for relying on chemical analysis. Finding deficiencies in procedure and evidence, the court acquitted the appellants and set aside the conviction: the Crl.Appeal is allowed, and the acquittal is ordered with liberty.
This Criminal Miscellaneous Case (Crl.MC No.2104 of 2016) was heard by Justice Raja Vijayaraghavan V of the Kerala High Court. The petition, under Section 482 Cr.P.C., seeks to quash Crime No.390/2014 registered at Edacherry Police Station for offences under IPC sections 143, 147, 148, 341, 323, 324, 506(ii) and 308 read with 149. Six petitioners (accused Nos.1–6) are named; the 6th accused was a juvenile at the time of the alleged offence, with his case referred to the Juvenile Justice Board. After investigation, a final report was filed and, except for the juvenile, the case remained pending before the Judicial First Class Magistrate, Vadakara (CP No.68/15). The petitioners contend that the dispute has been amicably resolved with the defacto complainants (Respondents 3 and 4), who have appeared through counsel and filed affidavits stating they do not intend to pursue the criminal proceedings. The Public Prosecutor indicates no serious objection to acting on those affidavits in the interest of peace. The Court recognizes established precedents (Gian Singh; Narinder Singh; Yogendra Yadav) holding that inherent power to quash can be exercised in appropriate private-dispute cases to secure ends of justice and prevent abuse of process, while safeguarding public interest in heinous offences. After considering the affidavits and submissions, the court deems continued proceedings unjust and an abuse of process and consequently quashes all proceedings and acquits the petitioners.