Civil Appeal No. 3072 of 2022 This appeal concerns maintainability of a writ petition under Article 227 challenging an order of the National Consumer Disputes Redressal Commission (NCDRC) in an appeal under Section 58(1)(a)(iii) of the Consumer Protection Act, 2019. The appellant, Ibrat Faizan, challenged the Delhi High Court’s decision to entertain a writ under Article 227 against the NCDRC order dated 9 December 2021. The appellant argued that, since the remedy against such NCDRC orders lies only in Section 67 of the 2019 Act, the writ petition under Article 227 is not maintainable and that the earlier remedy under Section 27A of the 1986 Act should be pursued. The respondent builder argued that, because the challenge arose from an appeal under Section 58(1)(a)(iii) of the 2019 Act, there is no further appeal to the Supreme Court, and a High Court writ under Article 227 would be maintainable. The Court held that the National Commission is a ‘Tribunal’ under Article 227/136; the remedy at the High Court level is appropriate, and the writ petition under Article 227 is maintainable, though invoked within the rigour of Article 227. The appeal is dismissed; there shall be no order as to costs, and the High Court’s decision remains intact.
Civil Appeal No. 1058 of 2022 The respondent, a Conductor, was compulsorily retired on 4 January 2003. He instituted Civil Suit No. 41 of 2010 in 2010, seeking the grant of the first, second and third Selection Grades on completion of 9, 18 and 27 years of service. The trial court partially decreed the suit, directing grant of the first Selection Grade from 25 January 1992 on completion of 9 years and the second from 7 January 2002 on completion of 18 years; the First Appellate Court and the Rajasthan High Court upheld the decree. The core issues were limitation under Article 137 of the Schedule to the Limitation Act, 1963, and whether the grant of Selection Grade is a matter of right, contingent upon a clean service record as per the scheme. The appellant contended the suit was time-barred and that the respondent’s service record was tainted by 19 charge-sheets and penalties, negating eligibility. The respondent argued that the suit arose within the limitation period upon rejection of a representation in January 2010. The Supreme Court held that the suit filed seven years after retirement fell beyond Article 137’s residuary period and, further, that Selection Grade is not a right but depends on meeting conditions, including a clean record. Consequently, the appeal is allowed and the High Court’s judgment is set aside; the suit is dismissed. Pending applications, if any, are disposed of.
Civil Appeal No. 404 of 2022 This Supreme Court appeal concerns the infringement of a registered trademark under the Trade Marks Act, 1999. Renaissance Hotel Holdings Inc. (plaintiff) owned registrations for the mark RE N A I S S A N C E in Class 16 (printed matter) and Class 42 (hotel-related services). The defendants used the name SAI RENAISSANCE in relation to hotels (Kadugodi, Bangalore and Puttaparthi), allegedly resulting in confusion and passing off. The trial court granted injunction against the defendants for using marks deceptively similar to Renaissance; the Karnataka High Court reversed, holding that Renaissance had not established reputation in India and that the defendants’ use was honest and targeted at a different class of customers. The Supreme Court held that where the defendant’s mark is identical to the plaintiff’s registered mark and the goods/services are identical or similar, Section 29(2)(c) read with Section 29(3) creates a presumption of likely confusion; Sections 29(5) and 29(9) further reinforce infringement when the mark is used as a trade name or in spoken form. The Court rejected reliance on partial readings of Sections 29(4) and 30, emphasizing textual and contextual interpretation of the statute as a whole. It held the High Court erred, quashed its order, and restored the trial court’s decree, thereby upholding the injunction against the defendants.”
Civil Appeal No. 6144 of 2010 This civil appeal concerns a refund claim under Section 173L of the Central Excise Act, 1944, arising from the return of manufactured goods by Peacock Industries Ltd. to its factory or other factory for remaking, refining or similar processing. The assessee claimed a refund of excise duty to the extent of the value of returned goods, arguing alternative bases: (i) the value should be the market value of the returned goods as second-hand goods, and (ii) since the goods could be reused as raw material, the value of the raw material should be considered for refund. The Deputy Commissioner, relying on a market survey report, valued the returned goods at Rs. 8–10 per kg, treating them as scrap, and held that the refund claim would be barred when the value is less than the duty originally paid under Section 173L(v). The Tribunal and High Court concurred with this approach, emphasizing that the "value" in Section 173L means the market value of the excisable goods, not the ex-duty value, and that there was no cogent evidence to adopt the raw-material valuation. The Apex Court upheld these concurrent findings, confirming that the returned goods’ value must be determined as market value of the excisable goods, and that the appeal must be dismissed with no order as to costs.
Civil Appeal No. 3795 of 2014 The subject matter of these appeals concerns whether certain trusts/educational societies in Andhra Pradesh qualify for exemption under section 10(23C)(vi) of the Income Tax Act, 1961, by existing solely for educational purposes and not for profit. The Andhra Pradesh High Court had held that such exemption requires genuine educational purpose, and that registration under state charitable laws (AP Charities Act) is a condition precedent for grant of exemption. The Supreme Court overruled the earlier tests that emphasized a ‘predominant object’ approach (as in American Hotel and Queen’s Education Society) and clarified that the term ‘solely’ means exclusively for educational purposes; profits incidental to education are permissible if the activity remains educational in nature and separate books are maintained for such business. It affirmed that the revenue may scrutinize genuineness and past conduct, including audited accounts, at the approval stage, and that compliance with state charitable laws is relevant and not optional. It clarified the monitoring provisions (third proviso) and the role of the prescribed authority in vetting applications. The judgment operates prospectively, and the appeals of the petitioner institutions are dismissed. The decision underscores education’s primacy in charitable exemptions, while underscoring conditions for ‘incidental’ profits and the continuing relevance of state law registrations.
Civil Appeal No. 249 of 2010 This is a Civil Appeal arising from Regular Second Appeal No.160 of 1995 in the High Court of Karnataka, challenging a partition suit O.S. No. 388/77. The trial court had decreed a partition to certain plaintiffs (notably 2 and 3) while denying relief to others (4–8) and ordered the first defendant to render accounts and share profits. The First Appellate Court reversed, but the High Court on remand framed four questions of law to determine entitlement to partition and shares. The High Court ultimately held that all suit schedule properties should be divided among Azgar Barid (appellant) and plaintiffs 3–8, while plaintiffs 1 and 2 (through Rahaman Barid) were not entitled to shares as their progenitor predeceased the propositus. The appellant challenged the decision on the ground that plaintiffs 4–8 could not seek relief in second appeal since their judgments were not appealed, and that the remand questions were improper. The respondents contended that in partition suits, the positions of plaintiffs and defendants are interchangeable and that Order 41 Rules 4 and 33 permit relief to non-appealing plaintiffs to achieve complete justice. The Supreme Court dismissed the appeal, upholding the High Court’s intervention and the remanded disposition, with no costs ordered.
Civil Appeal Nos. 2816 of 2022; 2817 of 2022 Shankarlal Nadani v. Sohanlal Jain concerns a suit for possession of Shop No.4 in Suratgarh, where the premises were let to the appellant since 1982 by the father of the respondent. The suit for possession was filed on 18 April 2013 under the Transfer of Property Act, 1882. During the pendency, the Rajasthan Government notified extension of the Rajasthan Rent Control Act, 2001 to the area with effect from 11 May 2015. The Civil Court decreed possession on 28 May 2015, before the Act’s extension to the area. The Rajasthan High Court dismissed the tenant’s revision; on appeal, the Supreme Court held that the Act came into force in respect of the premises only from 11 May 2015, and the decree could be validly passed and executed. After the Act’s applicability, landlord–tenant disputes must be raised before the Rent Tribunal, but a suit filed before applicability must be decided by the civil court. A decree passed by the civil court remains valid and executable, and the Act does not have retrospective effect. The judgment surveys a lineage of cases on the “rights crystallize on institution of the suit” principle and the interaction of rent Acts across states, including UP, Punjab, Haryana and CP & Berar. The Appeals are dismissed, upholding the civil decree’s validity and execution.
The Supreme Court considers appeals arising from a Madhya Pradesh electricity project under a long-term Power Purchase Agreement (PPA) for 50 MW solar power. The appellant state-owned MP Power Management Company Limited terminated the PPA with Sky Power Southeast Solar India Private Limited for delay in achieving pre-commissioning milestones and alleged non-compliance with conditions subsequent, including land acquisition, CEIG approvals, and grid evacuation arrangements. Sky Power challenged the termination in writ petitions, arguing the contract was not statutory and that the State’s actions post-contract could be scrutinized under Article 14 for arbitrariness, with public interest and essential fairness guiding relief. The High Court initially quashed the termination notice, prompting the current appeals. The Court reviews whether the PPA is a statutory contract, the scope of judicial review in contractual matters, and the reach of Article 14 after contract formation, including the role of arbitration clauses and alternate remedies. It concludes the PPA is not a statutory contract and confirms the evolving public-law scrutiny of State action in contractual contexts, but ultimately dismisses the appeals, upholding the High Court’s approach that the termination was not justified in the circumstances. The decision emphasizes that writs may be available where arbitrariness defeats public-law principles, even in non-statutory contracts, while acknowledging the strong public-interest considerations in large-scale energy projects.
Civil Appeal No. 5841 of 2022 This appeal concerns the allotment of government land in village Baswa, Jhunjhunu district, for Ultratech Cement Ltd.’s proposed cement plant. The land had been recorded as ‘Johad’, a water-harvesting area, though spot inspections by Tehsildar, Nawalgarh, found no natural water body or catchment in the land nor any reservoir. The District Collector had issued a letter of intent facilitating allocation subject to conditions, including creating an alternate Johad in the same village and obtaining NOC/permissions from the High Court. Ultratech approached the High Court with documents supporting the claim that the Johad land did not exist in practice and could be reclassified as Sawai Chak land for mining. The Single Judge dismissed the writ petition in limine; the Division Bench remanded and ultimately allowed the appeal, directing the State to process allotment. The State then relied on a tehsildar’s mid-course communication asserting the existence of a pucca pond on some parts of Baswa, which the Supreme Court refused to give weight to, noting that the communication was not filed earlier and that the Tehsildar reports remained unrebutted. The Court upheld the High Court’s order, finding that the earlier ground realities justified allotment and that the company should undertake time-bound environmental mitigation, including development of an alternate Johad, within a four-week frame.
Civil Appeal No. 4633 of 2021 This is an Insolvency and Bankruptcy Code, 2016 appeal (Civil Appeal No. 4633 of 2021) arising from a dispute about initiation of Corporate Insolvency Resolution Process (CIRP) under section 7 by a financial creditor against a generating company engaged in electricity production. The Supreme Court scrutinizes whether section 7(5)(a) is discretionary or mandatory. The NCLT had admitted the petition after relying on the existence of a default, while NCLAT sustained the stay denial. Vidarbha argues that the Code’s object is time-bound resolution but not at the expense of viability; it points to the Rs. 1,730 crore award in favor of Vidarbha under a past APTEL order and MERC disputes that are pending in higher fora, which should be considered to assess feasibility and overall financial health before admitting CIRP. Axis Bank counters that the Code’s objective is expeditious resolution, and once a default is established and the petition is complete, section 7(5)(a) permits admission (discretionary) or rejection on merits. The Court ultimately holds that section 7(5)(a) is discretionary (not mandatory) and that the Adjudicating Authority must evaluate broader factors including viability, pending regulatory/awards, and the debtor’s financial health. The appeal is allowed; the NCLT is required to reconsider the stay application on merits and in accordance with law.
Civil Appeal Nos. 7939-7940 of 2022; Civil Appeal Nos. 7941-7942 of 2022 This appeal concerns a Central Industrial Security Force (CISF) constable, Subrata Nath, accused of gross negligence resulting in theft of 800 kg of copper wires from Alif Nagar Scrap Yard under CISF protection in the late hours of 7-8 November 2007. Nath, on duty, faced two charges: (1) failing to prevent theft of copper wires and (2) an encumbrance of a character by eight prior punishments in 13 years of service. An Inquiry Officer found both charges proved; the Disciplinary Authority imposed dismissal from service, a decision affirmed by the Appellate and Revisional Authorities. The respondent challenged these orders in the Calcutta High Court, where a Single Judge converted dismissal to compulsory retirement due to non-availability of Beat Book records and the Division Bench subsequently reinstated him with full back wages, directing a fresh punishment order commensurate to negligence. The Supreme Court, however, clarifies that the Disciplinary Authority and Appellate Authority are the exclusive fact-finders; judicial review is not an appellate reappraisal of evidence unless the punishment is shockingly disproportionate or invalid for malafide or violation of procedure. The Court restored the Disciplinary Authority’s findings and the penalty of dismissal, quashing the High Court’s directions and dismissing the respondent’s petitions. The matter is disposed of with the Union of India’s appeals allowed and the private respondent’s petitions dismissed.
Civil Appeal No. 3314 of 2010 The matter concerns backlog vacancies for the post of Superintendent in the Customs and Central Excise Commissionerate and challenges by the Union of India of tribunal and High Court directions to create separate zone of consideration for Scheduled Caste/Scheduled Tribe (SC/ST) candidates for promotion, from Inspector to Superintendent, arguing this would effectively bypass regular DPC-based promotions. The Court traces history of zone of consideration and various Office Memorandums (OMs) governing regular promotions, ad hoc promotions, and special drives to fill backlog vacancies. It notes that OM dated 24.12.1980 allowed a normal zone of five to ten officers depending on vacancies, with an extended five-fold field for SC/ST if adequate candidates were not available, and that ad hoc and backlog promotions operated under different rules than regular promotions. The Tribunal and High Courts were found to have erred by applying yardsticks meant for ad hoc promotions to backlog promotions and by failing to distinguish between a special drive for backlog vacancies and regular promotions. The Court emphasizes the distinction between backlog/special drives and regular promotions through DPC. It ultimately holds that the High Court orders extending the zone of consideration do not arise and sets aside those orders, allowing the appeals, thereby re-affirming the need to apply applicable memo provisions and policy while filling backlog vacancies.
Civil Appeal No.629 of 2022 This judgment addresses the law governing reservation in promotion under Articles 16(4), 16(4-A) and 16(4-B) of the Constitution, and Article 335. It revisits Nagaraj and Jarnail Singh to determine how quantifiable data should establish backwardness and inadequacy of representation of SCs and STs in public employment. The Court emphasizes that concessions in promotions are enabled rather than mandatory; if the State elects to reserve in promotions, it must produce quantifiable data tied to the cadre strength, not the entire service or a broad group. A key issue is the unit of data collection: the cadre, not a broad service or an amalgamated group. The roster for promotions must operate post-specifically, cadre-wise, to avoid exceeding the 50% ceiling and to ensure proper representation. The Court expressly rejects the Group-based data approach approved in B.K. Pavitra II as contrary to Nagaraj and Jarnail Singh, holding cadre-wise data as the correct unit. The decision discusses the prospective operation of Nagaraj, the role of Article 142 to mould relief for complete justice, and the need for periodic review of reservations. It also notes that the yardstick to determine adequacy is context-specific and not fixed, allowing local conditions to influence implementation. The matter is directed to be listed for further hearing on a specified date to determine implementation specifics across states.
Civil Appeal No. 4911 of 2021 This Supreme Court appeal arises from an interim order of the National Company Law Appellate Tribunal (NCLAT) in a matter linked to Corporate Insolvency Resolution Process (CIRP) of Seya Industries Limited. The corporate debtor and its creditors, including Beacon Trusteeship Ltd., engaged in arbitration resulting in an interim award against the corporate debtor. The parties subsequently settled their disputes; NCLAT allowed a publication and permitted a Section 12A application to be pursued before the NCLT, while staying the formation of the Committee of Creditors (CoC). The appellant-director challenged the NCLAT’s interim stance and the broader pending settlement under Section 12A of the IBC. The core issue was whether withdrawal of an admission-drawn CIRP under Section 7 is permissible before CoC is constituted and whether settlement can be advanced without stifling settlement claims from third parties. The Court underscored that Section 12A clearly permits withdrawal of an admitted Section 7 application and that no bar arises before CoC is constituted. It emphasized the object of the IBC to resolve insolvencies efficiently and to protect livelihoods, while upholding the ends of justice through Rule 11 of the NCLT Rules (inherent powers). The matter was disposed of by dismissing the appeal, with directions to the NCLT to take up the settlement application and decide it in light of the observations, thereby enabling settlement to proceed without jeopardizing other creditors.”
Civil Appeal Nos. 7159-7160 of 2008 This appeal concerns inheritance of ancestral property under the Mizo Customary Law in the family of P.S. Dahrawka and Kaithuami. The matter traversed multiple courts: Subordinate District Council Court, Gauhati High Court, and finally the Supreme Court. The key legal issue is whether the District Council Court on remand could distribute the property among female heirs based on equity and the heirs’ duties, despite the general Mizo rule that the youngest son inherits. The District Council Court found that the female heirs’ claims could be recognized when the elder’s care duties are discharged, particularly Thansangi Huha, the youngest daughter who returned to care for her mother Kaithuami after her divorce, and who performed ceremonial duties and occupied the family home, should have her right protected. The court also held that Lalmuanpuii, granddaughter in the male line and unmarried, held a qualified right for the absence of descendants. The Gauhati High Court initially remanded and later reversed. The Supreme Court, however, held that equity and the elder-care responsibilities justified a division between Thansangi Huha and Lalmuanpuii, affirming the District Council Court’s order. It also cites Thansiami v. Lalruatkima (2012) as supportive authority for the ‘care and support’ principle. The result is that the appeals are allowed, the High Court judgment is set aside, and the District Council Court’s order is affirmed, with no costs.
Civil Appeal No. 6272 of 2022 This Civil Appeal concerns the validity of Clause 18 of a Development Agreement (for constructing the Amay Apartments) as an arbitration clause. The appellant terminated the agreement after Respondent No.1 allegedly failed to complete development within the stipulated period, leading to disputes that were referred to arbitration under Clause 18. The High Court of Bombay Aurangabad dismissed the Section 11 application, holding that Clause 18 did not constitute a valid arbitration agreement due to the absence of explicit words like “final and binding.” The Supreme Court allowed the appeal, holding that Clause 18 crystallizes the parties’ intention to arbitrate and to abide by the arbitrator’s decision, even though the specific “final and binding” wording is not present. It emphasized that Section 7 defines an arbitration agreement and that the substance and objective of the clause must prevail over form. Citing Enercon (India) Ltd. v. Enercon Gmbh and Anr., K.K. Modi, Encon Builders, Jagdish Chander, Rukmanibai Gupta, and others, the Court endorsed a pragmatic, business-like interpretation and held that the clause provides a binding mechanism with a Sole Arbitrator, or two arbitrators with a third, and that the governing law is the Arbitration and Conciliation Act, 1996 (or reenactment). The appeal is allowed, the High Court’s order is set aside, and Justice P.V. Hardas is appointed as Sole Arbitrator; merits remain to be determined by the arbitrator.
Civil Appeal No. 4690 of 2022 Utpal Trehan v. DLF Home Developers Ltd concerns a dispute arising from an Apartment Buyers’ Agreement for Unit GBD-153 in New Town Heights, Gurgaon. The allottee, who booked in March 2008, faced delays due to regulatory clearances, leading the builder to modify payment terms from a strictly time-linked schedule to a construction-linked plan. The allottee contended that additional demands amounting to about Rs 9 lakh were illegal, and that a notice dated 29 December 2011 alleging further instalments was not properly served, allegedly depriving him of benefits on possession. The State Consumer Disputes Redressal Commission found deficiencies in service and the National Commission partly allowed the appeal, directing the builder to offer possession afresh, to execute the sale, and to pay delayed compensation along with certain rebates, while holding that maintenance charges were payable to a maintenance agency. The Allottees appealed to this Court, contending that maintenance charges were wrongly directed to a third party and that the delayed compensation claims were misapplied. The apex court examined the definitions of ‘Maintenance Agency’ and held that the maintenance charges could not be collected by the builder if there was no direct principal-agent relationship with the association; The Court accepted certain modifications in the delayed compensation regime but rejected the earlier dates for calculation when there was no valid offer of possession. It ordered fresh possession within eight weeks, conveyance within one month, and directed Rs 10 per sq ft per month delayed compensation from March 2011 to the date of fresh offer, while adjusting the early payment rebate and costs to the allottee. The appeals are disposed of accordingly.
Civil Appeal No. 10671 of 2016 This is a Civil Appeal under Section 23 of the Consumer Protection Act, 1986 by Narsingh Ispat Ltd. challenging a National Consumer Disputes Redressal Commission decision dismissing its complaint for loss suffered at its Jharkhand engineering workshop following a 23 March 2010 incident. The appellant held a Standard Fire and Special Perils Policy with a terrorism exclusion warranty. The insurer repudiated the claim arguing the loss fell within the exclusion for acts of terrorism. The Commission upheld the repudiation. The Supreme Court allowed the appeal, holding that an exclusion clause is to be strictly applied and the insurer must prove that the case falls within its four corners. The policy itself defines acts of terrorism; consequently, the contract’s terms govern the rights and liabilities, and reliance on penal statute definitions of terrorism is misplaced. The Court noted that survey and investigation reports did not establish a terrorist act as defined, while the FIR/Closure Reports did not reference acts of terrorism. Citing Ishar Das Madan Lal and related precedents, it reaffirmed the rule that ambiguity in insurance contracts should be construed in favor of the insured. The appeal was allowed, with the matter remanded to the Commission and directions to deposit Rs. 89 lakh in an interest-bearing account and decide the case within four months, while leaving the quantum open for decision on remand.
Civil Appeal No. 8258 of 2009 This is a Civil Appeal by United Bank of India challenging a Calcutta High Court Division Bench order that set aside the disciplinary and appellate authorities’ decisions dismissing an employee, Biswanath Bhattacharjee, for alleged IRDP subsidy-related misconduct during his tenure as branch manager. The proceedings arose from a charge-sheet dated 23.10.1997 alleging five major charges: (i) non-recording of subsidy in the subsidy register; (ii) deposit of subsidy in the accounts of twelve fictitious persons in connection with the Central Government IRDP project; (iii) misappropriation of loan and subsidy amounts; (iv) removal of relevant papers to conceal misappropriation; and (v) transfer of amounts through three demand drafts. The enquiry officer found the employee guilty on several counts; the disciplinary authority imposed dismissal; the appellate authority dismissed the appeal; and the High Court dismissed the writ petition. The Division Bench of the Calcutta High Court, in overturning, held that the evidence did not establish the primary responsibility of the respondent for the subsidy register or the misappropriation, and that the confession disclosed in a co-accused did not bind the respondent. The Supreme Court, while reaffirming limits of judicial review in disciplinary proceedings, ultimately upholds the Division Bench’s view, holding that there was no material to prove the charges beyond reasonable doubt and that the Bank’s challenge is untenable. The matter is remitted with reinstatement and back benefits directed within three months.
Civil Appeal No. 8196 of 2022 This Civil Appeal concerns the validity of a Delhi High Court ruling declaring that the land acquisition of Khasra No. 156 admeasuring 2 bighas 4 biswas in village Lado Sarai, New Delhi, under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act, 2013) Section 24(2), had deemed to lapse. The High Court relied on Jagjeet Singh and Pune Municipal Corporation line of authority, and held that non-payment of compensation sufficed to deem lapse under Section 24(2) without addressing whether possession had been taken. The Supreme Court (M. R. Shah, J. and M. M. Sundresh, J.) overruled those precedents, clarifying that the 2013 Act’s deeming provision requires both conditions—possession not taken and compensation not paid—for lapse to arise; if one condition is satisfied, lapse does not occur. The Court emphasized the Constitution Bench ruling in Indore Development Authority v. Manoharlal and Ors. (2020) 8 SCC 129, which overruled Pune Municipal Corporation and related decisions, and explained that the proviso to Section 24(2) must be treated as part of Section 24(2). In the present case, possession was taken on 22.09.1986; compensation could not be paid due to inter-se disputes among co-owners; thus there is no lapse. The appeal is allowed and the High Court’s deeming order is quashed, restoring the State’s rights over the land.”