Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2022Division BenchAppeal allowed

The Secretary, The Department of Land and Building v. Anjeet Singh (Dead) Through LRs. and Anr.

Case / Petition Number:
Civil Appeal No. 8196 of 2022
Neutral Citation:[2022] 15 SCR 678

Case Synopsis & Summary

This Civil Appeal concerns the validity of a Delhi High Court ruling declaring that the land acquisition of Khasra No. 156 admeasuring 2 bighas 4 biswas in village Lado Sarai, New Delhi, under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act, 2013) Section 24(2), had deemed to lapse. The High Court relied on Jagjeet Singh and Pune Municipal Corporation line of authority, and held that non-payment of compensation sufficed to deem lapse under Section 24(2) without addressing whether possession had been taken. The Supreme Court (M. R. Shah, J. and M. M. Sundresh, J.) overruled those precedents, clarifying that the 2013 Act’s deeming provision requires both conditions—possession not taken and compensation not paid—for lapse to arise; if one condition is satisfied, lapse does not occur. The Court emphasized the Constitution Bench ruling in Indore Development Authority v. Manoharlal and Ors. (2020) 8 SCC 129, which overruled Pune Municipal Corporation and related decisions, and explained that the proviso to Section 24(2) must be treated as part of Section 24(2). In the present case, possession was taken on 22.09.1986; compensation could not be paid due to inter-se disputes among co-owners; thus there is no lapse. The appeal is allowed and the High Court’s deeming order is quashed, restoring the State’s rights over the land.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • M. M. Sundresh
Judgment Date
2022-11-24
Court Decision / Holding
Appeal allowed. The impugned Delhi High Court judgment declaring that the acquisition is deemed to have lapsed under Section 24(2) is quashed and set aside. The appeal is allowed. No costs. Pending applications, if any, are disposed of.
Final Disposition
Appeal allowed

Parties to the Case

Appellants / Petitioners

  • The Secretary, Department of Land and Building

Respondents

  • Anjeet Singh (dead) through LRs
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ankit Gyan (Assisted by : Aarsh Choudhary, LCRA)

Counsels for Respondents

  • • Ms. Sujeeta Srivastava, Adv. for the Respondents
  • • Rishab Nagar
  • • Raghab Nagar
  • • Gopal Singh Chauhan
  • • Deepak Goel
  • • Rajiv Ghawana
  • • Ms. Akshita Chhatwal
  • • Ranjit Singh
  • • T. V. S. Raghavendra
  • • E Sreyas
  • • Ms. Gayatri Gulati
  • • Siddharth Vasudev
  • • Ms. Sunieta Ojha
  • • Akansh Singh
  • • Ravi Bharuka
  • • Ankit Agarwal
  • • Nitin Mishra
  • • Ishaan Sharma

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(2)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(1)(a)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(1)(b)Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – proviso to s.24(2)Land Acquisition Act, 1894 – s.4Land Acquisition Act, 1894 – s.16Land Acquisition Act, 1894 – s.31(1)Land Acquisition Act, 1894 – s.34

Legal Doctrines & Maxims

  • Two conditions for deemed lapse under Section 24(2) – possession not taken and compensation not paid
  • The word 'or' between possession and compensation in Section 24(2) to be read as 'nor' or 'and' depending on context
  • Proviso to Section 24(2) to be treated as part of Section 24(2)
  • Non-deposit of compensation in court does not by itself cause lapse under Section 24(2)
  • If possession has been taken under the 1894 Act, there is no lapse under Section 24(2)
  • The period of interim court orders must be excluded when computing five years for 24(2) applicability
  • Section 24(2) applies to proceedings pending on 1-1-2014 and does not revive time-barred or concluded proceedings

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants submitted that possession of the land in question was taken on 22.09.1986 and the award was declared the same year; compensation was not paid due to inter-se disputes among co-owners. Relying on Indore Development Authority (Constitution Bench), they argued that mere non-payment cannot trigger lapse unless both conditions are met. They contended Pune Municipal Corporation and Jagjeet Singh were overruled and that Section 24(2) must be read in light of Indore’s reasoning, with the proviso treated as part of Section 24(2). Consequently, the High Court’s declaration of lapse was unsustainable and the appeal should be allowed.

Contentions of Respondents

The respondents contended that non-payment of compensation and non-deposit of funds under 1894 Act constitutes lapse under Section 24(2) of Act 2013; they relied on the earlier line of authority (Pune) and Jagjeet Singh. They argued the decision in Indore Development Authority (Constitution Bench) could be read to support their view that lapse can be triggered where compensation is not paid and possession not timely taken, and that the High Court correctly declared lapse. They further argued that the law is not settled in Jagjeet Singh and Pune and that Indore’s pronouncements should control the outcome.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.(2014) 3 SCC 183 : [2014] 1 SCR 783OverruledConstitution Bench in Indore Development Authority overruled Pune and related decisions regarding deemed lapse under Section 24(2).
Jagjeet Singh & Ors. v. Union of India & Ors.Writ Petition (C) No. 960 of 2015 (Delhi HC)OverruledIndore Development Authority overruled or distinguished the Jagjeet Singh approach and reliance on Pune.
Indore Development Authority v. Manoharlal and Ors.(2020) 8 SCC 129 : [2020] 3 SCR 1PositiveConstitution Bench decision forming the current controlling principle that deemed lapse under Section 24(2) requires both possession not taken and compensation not paid.
Indore Development Authority v. Shailendra(2018) 3 SCC 412OverruledCannot prevail in light of Indore and the Constitution Bench; proviso interpretation updated.
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu(2015) 3 SCC 353OverruledJudicial pronouncement is not good law; overruled.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,110 words•~15 min read

In The Court Record

The Secretary, The Department of Land and Building v. Anjeet Singh (Dead) Through LRs. and Anr.

678 SUPREME COURT REPORTS[2022] 15 S.C.R. 678 [2022] 15 S.C.R. ## A THE SECRETARY, THE DEPARTMENT OF LAND AND BUILDING AND ORS. ## v. ## ANJEET SINGH (DEAD) THROUGH LRS. AND ANR. B (Civil Appeal No. 8196 of 2022) ## NOVEMBER 24, 2022 ## **[M. R. SHAH AND M. M. SUNDRESH, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(2) –_ - C _High Court relied upon its earlier decision in the case of_ Jagjeet Singh & Ors. Vs. Union of India & Ors., _in which it had relied on the decision of Supreme Court in the case of_ Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors. _– High Court without entering into the question of possession, declared that the acquisition_ - D _with respect to land in question is deemed to have lapsed u/s.24(2) of the Act, 2013 as the compensation with respect to the land in question was not paid – Held: The case of_ Pune Municipal corporation _which was relied on by High Court has already been overruled by subsequent Supreme Court decision in_ Indore Development authority v. Manoharlal and Ors. _in which the Constitution Bench held that for_ - E _the purpose of deemed lapse of land acquisition u/s.24(2) of 2013 Act, both the conditions namely the possession has not been taken and compensation not paid are required to be satisfied – In the intant case, as compensation was not paid due to inter se dispute between co- owners therefore respondents cannot make the claim_ - F _of deemed lapse of acquisition – In view of the decision of the Supreme Court in the case of_ Indore Development Authority _, the impugned judgment of High Court unsustainable._ ## **Allowing the appeal, the Court** - **HELD:1. From the judgment and order passed by the High** - G **Court in the case of Jagjeet Singh & Ors. Vs. Union of India & Ors., it appears that the High Court has heavily relied upon the decision of this Court in the case of Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors. reported in (2014) 3 SCC 183. The High Court in the said case, i.e., Jagjeet** H 678 679 THE SECRETARY, THE DEPARTMENT OF LAND AND BUILDING v. ANJEET SINGH (DEAD) THR. **Singh & Ors., without going into the controversy of physical possession had declared that the acquisition with respect to the said land is deemed to have lapsed as the compensation with respect to the land in question has not been tendered to the recorded owner. However, it cannot be disputed that the decision of this Court in the case of Pune Municipal Corporation and Anr. has been subsequently specifically overruled by the Constitution Bench of this Court in the case of Indore Development Authority Vs. Manoharlal and Ors. [Para 3.2][681-E-G]** **2. It was the specific case on behalf of the authority that the possession of the land in question was already taken over on 22.09.1986. However, thereafter without entering into the question of possession, the High Court has declared that the acquisition with respect to land in question is deemed to have lapsed under Section 24(2) of the Act, 2013 as the compensation with respect to the land in question was not paid. As observed and held by this Court in the case of Indore Development Authority for the purpose of deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act, both the conditions namely the possession of land has not been taken over and the compensation not paid are required to be satisfied. As observed and held by this Court in the case of Indore Development Authority, if one of the conditions are not satisfied, there cannot be any lapse of acquisition under Section 24(2) of the Act, 2013. [Para 3.4][682-C-F]** **3. It is required to be noted that in the present case, the compensation was not paid to the landowners in view of the fact that there was ownership dispute between the co-owners with respect to compensation. Therefore, if the compensation has not been paid due to inter se dispute between the co-owners, thereafter, it will not be open for the respondents – landowners to make a grievance that once the compensation was not paid, the acquisition is deemed to have lapsed. In any case, in view of the decision of this Court in the case of Indore Development Authority, the impugned judgment and order passed by the High Court was held to be unsustainable. [Para 3.5 and 3.6][685-A-B; 685-D-E]** A B C D E F G H 680 SUPREME COURT REPORTS [2022] 15 S.C.R. - A _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1 – followed.** _Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014] 1 SCR 783 – referred to.** - B _Jagjeet Singh & Ors. v. Union of India & Ors._ , **(Writ Petition (C) No. 960 of 2015 in the Delhi High Court) – referred to.** ## **Case Law Reference** |C|**[2014]**|**1**|**SCR**|**783**|**referred to**|**Para**|**3.2**| |---|---|---|---|---|---|---|---| ||**[2020]**|**3**|**SCR**|**1**|**followed**|**Para**|**3.2**| CIVIL APPELLATE JURISDICTION: Civil Appeal No. 8196 of 2022. From the Judgment and Order dated 25.04.2017 of the High Court D of Delhi, at New Delhi, in Writ Petition (C) No. 203 of 2015. Ms. Sujeeta Srivastava, Adv. for the Appellants. - Rishab Nagar, Raghab Nagar, Gopal Singh Chauhan, Deepak Goel, - Rajiv Ghawana, Ms. Akshita Chhatwal, Ranjit Singh, T. V. S. Raghavendra - E Sreyas, Ms. Gayatri Gulati, Siddharth Vasudev, Ms. Sunieta Ojha, Akansh Singh, Ravi Bharuka, Ankit Agarwal, Nitin Mishra, Ishaan Sharma, Advs. for the Respondents. The Judgment of the Court was delivered by ## **M. R. SHAH, J.** F 1. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Delhi at New Delhi in Writ Petition (C) No. 203 of 2015 by which the High Court has allowed the said writ petition preferred by the respondent No.1 herein and has declared that the acquisition with respect to the land in question comprised in Khasra G No. 156 admeasuring 2 bighas, 4 biswas in village Lado Sarai, New Delhi, is deemed to have lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as “Act, 2013”), the Department of Land and Building and the Land Acquisition Collector have preferred the present appeal. - H > THE SECRETARY, THE DEPARTMENT OF LAND AND BUILDING v. 681 ANJEET SINGH (DEAD) THR. [M. R. SHAH, J.] 2. We have heard Ms. Sujeeta Srivastava, learned counsel A appearing on behalf of the appellants and Shri Rishab Nagar, learned counsel appearing on behalf of the respondent Nos. 1(i) to 1(iv). 3. At the outset, it is required to be noted that in the present case, the acquisition proceedings commenced in the year 1986. The award under the Land Acquisition Act, 1894 was declared on 14.09.1986. According to the appellants, the possession of the land in question was taken on 22.09.1986. 3.1 From the impugned judgment and order passed by the High Court, it appears that relying upon its earlier decision in the case of **Jagjeet Singh & Ors. Vs. Union of India & Ors., Writ Petition (C) No. 960 of 2015** , which was also with respect to Khasra No. 156 admeasuring 2 bighas, 4 biswas in village Lado Sarai, New Delhi, by which the High Court allowed the said writ petition preferred by the landowners and declared that the acquisition with respect to the said land is deemed to have lapsed under Section 24(2) of the Act, 2013, the High Court has allowed the present Writ Petition (C) No. 203 of 2015 and has disposed of the same in terms of the order passed in Writ Petition (C) No. 960 of 2015. 3.2 However, from the judgment and order passed by the High Court in **Writ Petition (C) No. 960 of 2015** in the case of **Jagjeet Singh & Ors. Vs. Union of India & Ors.** , it appears that the High Court has heavily relied upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors.** reported in **(2014) 3 SCC 183.** The High Court in the said case, i.e., **Jagjeet Singh & Ors. (supra),** without going into the controversy of physical possession had declared that the acquisition with respect to the said land is deemed to have lapsed as the compensation with respect to the land in question has not been tendered to the recorded owner. However, it cannot be disputed that the decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** has been subsequently specifically overruled by the Constitution Bench of this Court in the case of **Indore Development Authority Vs. Manoharlal and Ors.** reported in **(2020) 8 SCC 129.** 3.3 However, it is the case on behalf of the respondent Nos.1(i) to 1(iv) that the Civil Appeal against the decision of the Delhi High Court in the case of **Jagjeet Singh & Ors. (supra)** has been dismissed by this Court by common judgment and order dated 04.05.2017 and even B C D E F G H 682 SUPREME COURT REPORTS [2022] 15 S.C.R. - A the review application has been dismissed and therefore, the impugned judgment and order passed by the High Court may not be interfered with by this Court. However, it is required to be noted that when Civil Appeal No. 6250 of 2017 in the case of **Jagjeet Singh & Ors. (supra)** came to be dismissed, the law was not settled, which has ultimately been settled by the Constitution Bench judgment of this Court in the - B case of **Indore Development Authority (supra)** and therefore, the decision of this Court in the case of **Jagjeet Singh & Ors. (supra)** shall not be of any assistance to the respondents in view of the law laid down by this Court in the case of **Indore Development Authority (supra).** It is required to be noted that the review application has been - C dismissed on the ground of delay and not on merits. 3.4 Now on merits, it was the specific case on behalf of the authority that the possession of the land in question was already taken over on 22.09.1986. However, thereafter without entering into the question of possession, the High Court has declared that the acquisition with respect D to land in question is deemed to have lapsed under Section 24(2) of the Act, 2013 as the compensation with respect to the land in question was not paid. As observed and held by this Court in the case of **Indore Development Authority (supra)** for the purpose of deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act, both the conditions namely the possession of land has not been taken over E and the compensation not paid are required to be satisfied. As observed and held by this Court in the case of **Indore Development Authority (supra)** , if one of the conditions are not satisfied, there cannot be any lapse of acquisition under Section 24(2) of the Act, 2013. In paragraphs 365 and 366, the Constitution Bench of this Court in the case of **Indore** F **Development Authority (supra)** has observed and held as under:- “ **365.** Resultantly, the decision rendered in Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] is hereby overruled and all other decisions in which Pune Municipal Corpn. [Pune Municipal Corpn. v. G Harakchand Misirimal Solanki, (2014) 3 SCC 183] has been followed, are also overruled. The decision in Sree Balaji Nagar Residential Assn. [Sree Balaji Nagar Residential Assn. v. State of T.N., (2015) 3 SCC 353] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In Indore Development Authority v. Shailendra H > THE SECRETARY, THE DEPARTMENT OF LAND AND BUILDING v. 683 ANJEET SINGH (DEAD) THR. [M. R. SHAH, J.] [(2018) 3 SCC 412], the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. A B C D E F **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land G H 684 SUPREME COURT REPORTS [2022] 15 S.C.R. A B C acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). D E F G H **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or > THE SECRETARY, THE DEPARTMENT OF LAND AND BUILDING v. 685 ANJEET SINGH (DEAD) THR. [M. R. SHAH, J.] mode of deposit of compensation in the treasury instead of court A to invalidate acquisition.” 3.5 Even otherwise, it is required to be noted that in the present case, the compensation was not paid to the landowners in view of the fact that there was ownership dispute between the co-owners with respect to compensation. In paragraph 6 (vi), the respondents have B admitted the same, which reads as under:- “…………………….Admittedly, as per the available record, i.e., Naksha Muntazmin, the compensation inclusive of solatium and interest up to 16th Sept 1986 was ordered not to be paid on account of dispute amongst the claimants. And nor was the corpus C deposited in the Reference Court as per the provisions of the Act.” 3.6 Therefore, if the compensation has not been paid due to inter se dispute between the co-owners, thereafter, it will not be open for the respondents – landowners to make a grievance that once the D compensation was not paid, the acquisition is deemed to have lapsed. In any case, in view of the decision of this Court in the case of **Indore Development Authority (supra)** , the impugned judgment and order passed by the High Court is unsustainable. 4. In view of the above and for the reasons stated above, present appeal succeeds. The impugned judgment and order passed by the High Court in Writ Petition (C) No. 203 of 2015 declaring that the acquisition with respect to the land in question is deemed to have lapsed under Section 24(2) of the Act, 2013 is hereby quashed and set aside. Present appeal is accordingly allowed. No costs. E F Pending application, if any, also stands disposed of. Ankit Gyan (Assisted by : Aarsh Choudhary, LCRA) Appeal allowed. G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.