Civil Appeal No. 80 of 2020 Today Merchandise Pvt Ltd & ANOTHER v. Anil Kumar Luthra concerns a consumer protection dispute arising from a holiday voucher scheme advertised online. The appellant offered free gifts to customers who referred friends and associates; the respondent purchased three vouchers for Rs 5,998 each (total Rs 17,994) and sought three free gifts—specifically a laptop, a mobile phone, and a 42-inch LED television—claiming entitlement under the scheme. The District Consumer Redressal Forum, confirmed by the State Forum and then by the National Consumer Disputes Redressal Commission in revision, granted relief, awarding the gifts and additional compensation. The appellant argued that the offer was conditional on referrals and not a guaranteed entitlement, and that the lower forum judgments were contrary to the contract terms and resulted in an absurd outcome by making a purchaser eligible for gifts far exceeding the monetary outlay. The Supreme Court agreed, noting that the scheme explicitly linked the free gifts to the number of referrals and relied on the 18 September 2012 email referencing the referral mechanism. The Court held that the gifts were not due merely by purchasing vouchers and the respondent did not make any referrals; hence, the entitlement to free gifts was not a matter of right. Consequently, the directions of the District Forum were set aside and the complaint dismissed, with no costs.
S.L.P. (C) Nos. 9036-9038 of 2016 Indore Development Authority (IDA) challenged the interpretation of Section 24 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (the Act of 2013) in a five-judge Constitution Bench. The core issue is how Section 24 of the Act operates as a transitional provision after repeal of the Land Acquisition Act, 1894 (LA Act) and how it interacts with the saving provisions in the Act of 2013, the General Clauses Act, and the earlier LA Act provisions. The Court examines whether the words “or” in Section 24(2) are to be read disjunctively or conjunctively, whether the proviso to Section 24(2) is part of Section 24(2) or Section 24(1), and the effect of the five-year window for lapsing. The judgment clarifies that lapse under Section 24(2) requires both negative conditions (possession not taken and compensation not paid) to be fulfilled, and that possession or payment can prevent lapse. It upholds the transitional intent to protect ongoing acquisitions while delivering higher compensation to landowners where deposits were not made in majority holdings. The decision overrules prior lines of authority established by Pune Municipal Corporation and Shree Balaji Nagar Residential Association, and clarifies the meaning of “paid” vs “deposited” and the treatment of interim orders. The judgment also holds that concluded proceedings cannot be reopened under Section 24(2) and that interim orders must be accounted for in computing the period.”
Civil Appeal No. 3498 of 2020 The UP State Warehousing Corporation issued an e-tender for unloading/loading of foodgrains and related transport duties in the Vindhyachal (Mirzapur) region. After cancellations (01.2018 tender cancelled; 04.2018 tender reissued; 26.07.2019 later cancellation), a new tender for four depots/centres was published on 01.06.2018. Sudhir Kumar Singh was declared successful bidder for Bhawanipur-I at 341% ASOR, and an agreement was executed from 13.07.2018. In 2019, two complaints alleged serious financial irregularities in the procurement process; ex parte enquiries led the Managing Director to report that the 01.04.2018 tender cancellation was not justified and that high tender rates in the 01.06.2018 round were unjustified. The Special Secretary directed action and recovery, and on 26.07.2019 the tenders were cancelled. Sudhir Kumar Singh filed a writ petition; Allahabad High Court found that the entire process lacked audi alteram partem and quashed the tender cancellation and related actions, holding that the proceedings were conducted behind the back of the bidder. The Supreme Court, applying a flexible approach to natural justice, held that while there was breach of natural justice, the High Court’s blanket quashing of the MD’s report and the Special Secretary’s order was not fully warranted. The Court partly allowed the appeals, restored the MD’s report and Special Secretary’s order to the extent indicated, and ordered return of earnest money/deposit within eight weeks with further actions to be taken in accordance with law. The matter was disposed of at the appellate level, with consequential reliefs clarified.
Civil Appeal No. 2067 of 2020 This Supreme Court judgment deals with child custody and visitation rights following a habeas corpus petition filed by the appellant-mother for custody of her child. The Allahabad High Court had dismissed the petition but granted visitation rights, directing the mother to meet her daughter for two hours once a month at places to be mutually agreed, or at the Office of the District Legal Services Authority (DLSA) Lucknow if they could not agree. The Supreme Court expresses dissatisfaction with the manner in which visitation was framed, noting that an atmosphere conducive to genuine parent-child bonding cannot be guaranteed in the DLSA office. Citing Yashita Sahu v. State of Rajasthan (2020), the Court affirms that the welfare of the child is paramount and that even if custody is granted to one parent, the other parent must have meaningful visitation to preserve social, physical, and psychological contact. Accordingly, the Court lays down a structured visitation framework: eight weeks of weekend visitation (Saturdays and Sundays) initially, with specific timings, school-day adjustments, festival time, and summer-vacation allowances; later, weekends, and daily communication rights are expanded. The Court also recognizes the mother’s liberty to pursue custody under the Guardians and Wards Act, 1890 if needed and directs school records to reflect the mother’s status for function attendance.
Civil Appeal No. 475 of 2020 Chanabasappa v. Karnataka Neeravari Nigam Ltd. & Anr. is a civil appeal arising from a Land Acquisition Act dispute concerning compensation and interest after the Malprabha Reservoir project submerged lands in 1991, while the acquisition process itself commenced belatedly in 2007. The appellant-claimant challenges the High Court’s reduction to Rs. 3,00,000 per acre and the grant of interest under Section 34 only from the date of the award (23.07.2009), arguing that damages and interest should be payable for the period from 1991 when submergence occurred, up to the date of the Section 4 notification, and thereafter at higher rates if warranted. The Supreme Court reiterates that interest under Section 34/Section 28 generally starts from the date of possession, not before possession or the initiation of proceedings, except in urgent cases under Section 17(1). The Court recognizes disputes about the date of taking possession/submergence and directs the Collector to examine whether the area came under submergence in 1991 and to determine the quantum of damages from 1991 to the Section 4 notification. If submergence is established, the appellant may be entitled to interest under Section 34 from the notification date to the award. The decision builds on precedents like Lila Ghosh, RL Jain, Siddhappa Kuri, and Karigowda to clarify rent/damages and interest when possession precedes notification, and disposes of the appeal with directions for remand on damages.
Civil Appeal No. 196 of 2011 This Supreme Court judgment concerns the alleged illegal requisition and acquisition of land in Dundung Block, Sang, East Sikkim, by the Government’s Agriculture Department in 1980 for a Progeny Orchard Regional Centre. The appellant, originally named Man Bahadur Basnett’s heir, contends that the land was not acquired in accordance with law and that due process under the Sikkim Land (Requisition and Acquisition) Act, 1977 (the Act) was not followed. Notably, the State failed to produce any notification under Section 4 or other declarations, and there are no reliable records of the acquisition proceedings. The State’s defence rests on an alleged consent from the father of the appellant and on compensation payments of Rs. 62,645; however, primary and secondary evidence of such a process, including receipt for compensation and traceable withdrawal of funds, is lacking. The High Court and Trial Court rejected the suit on grounds of limitation and merits, but the Supreme Court held that there is no proof the land was acquired according to the Act’s provisions, particularly Sections 3(1), 4(2), 5(1) and 7(2). The Court emphasized that rights in land, though not fundamental, are protected under Article 300A and must follow due process. The appellant was entitled to possession and damages for illegal occupation for at least three years before service of notice. The Court allowed the appeal, granting three months for the State to decide whether to acquire via proper notification or surrender possession, with mesne profits to be determined by a Court Commissioner. The decision cites Vidya Devi, N. Padmamma, Lao, and other authorities to underscore the inviolability of due process and the constitutional right to property.
Civil Appeal No. 7863 of 2009; 7864 of 2009 This appeal concerns whether sales of imported cigarettes stored in bonded warehouses within West Bengal to masters of foreign-going ships as “ship stores” are taxable under the West Bengal Sales Tax Act, 1954 and the West Bengal Sales Tax Act, 1994, or are exempt as sales in the course of import under the Central Sales Tax Act, 1956 (CST Act). After import, the goods were kept in a bonded warehouse on the land-mass of West Bengal and later sold to shipmasters without payment of customs duty. The Tribunal held these were sales within the State and taxable; the High Court agreed. The appellants urged that the sale itself was in the course of import because the import process was not complete and the sale occasioned the import, asserting a CST Act framework and constitutional guarantees (Article 286). They relied on earlier constitutional/Statutory interpretations (notably J.V. Gokal, Madras Marine and Md. Serajuddin) to argue exemption from sales tax. The respondents contended that the sale did not occasion import, occurred after landing in bonded warehouses, and thus fell within the State’s taxing net. The Supreme Court, applying the test for whether a sale is in the course of import or export, held that the stated sales did not occasion import and occurred beyond the customs port/land customs station area; consequently, they were amenable to sales tax under the Bengal Acts read with CST Act. The appeals were dismissed.
Civil Appeal No. 232 of 2020 North Delhi Municipal Corporation (NDMC) challenged the eligibility criteria for the post of Labour Welfare Superintendent in its services. The advertisement required a degree from a recognized university and a post-graduate degree or diploma in Social Work, Labour Welfare, Industrial Relations, Personnel Management, or an allied subject. The first respondent, who holds an MBA from Maharshi Dayanand University, Rohtak, studied Human Resource Management and Industrial Relations and Labour Legislation in the MBA course. The Central Administrative Tribunal held the candidate eligible, finding that the MBA subjects bore on the prescribed fields. The Delhi High Court affirmed. The appellant argued that merely studying two allied subjects within an MBA could not convert the MBA into a post-graduate degree or diploma in the enumerated disciplines, and that the advertisement did not spell out any equivalence between an MBA and the specified qualifications. It contended that the employer must decide whether a degree is allied to the listed subjects, and that such assessment cannot be perverse. The Supreme Court held that the eligibility requirements were explicit: the candidate must possess a post-graduate degree/diploma specifically in Social Work, Labour Welfare, Industrial Relations, or Personnel Management, or in any allied subject. The Court found that the MBA degree cannot be regarded as allied to these particular disciplines. It noted the absence of a defined equivalence with the advertisement and asserted that the employer's assessment, absent perversity, should prevail. Accordingly, the Tribunal's and High Court's reasoning were erroneous, the appeal was allowed, and the impugned orders were set aside with OA No.1492 of 2013 dismissed, and no costs awarded. It clarifies that the employer's view on allied subjects, when not expressly defined, is binding.
Civil Appeal Nos. 5829-5830 of 2012 This Supreme Court case deals with the status of the Assured Career Progression (ACP) Scheme in the context of a reorganization of the Delhi Fire Service wireless communications cadre. In 1983, a reorganization was approved to create 96 posts of Radio Telephone Operators (RTOs) by redeploying 27 Telephone Operators into higher-paid RTO posts, contingent upon training and a minimum five years of regular service. In 1999, the government introduced the ACP Scheme, providing two financial upgradations after 12 and 24 years of service, as a safety net for stagnation. The question before the Court was whether the redeployment of Telephone Operators as RTOs constituted a promotion, thereby disqualifying ACP benefits, or whether it was a mere reorganization/upgradation that should entitle ACP. The Delhi High Court had interfered with the Tribunal’s order, holding that the conversion to RTOs was a promotion. The Supreme Court reversed, holding that the combined factors—minimum 5 years’ service, a specialized training, and a substantially higher pay scale—shown a promotion-like effect and involved selection, thus disqualifying ACP benefits. The decision relies on Bharat Sanchar Nigam Ltd. v. R. Santhakumari Velusamy and Union of India v. Pushpa Rani to articulate the nuanced distinction between promotion and upgradation. The outcome clarifies that, in this factual matrix, the ACP scheme cannot override the promotion framework.
Criminal Appeal No. 1032 of 2013 This is a Supreme Court appeal arising from an NDPS Act case in which charas weighing 3 kg 100 g was recovered from the backpack of Rajesh Dhiman during a police check in 2002. The trial court acquitted both appellants, holding that the prosecution failed to prove beyond reasonable doubt, partly on the basis of non-examination of independent witnesses and alleged bias due to the informant also being the investigator. The High Court reversed the acquittal, convicting the appellants under Section 20 NDPS and imposing a ten-year rigorous imprisonment plus fines. The appeal before the Supreme Court centers on two core issues: whether the informant investigating the case tainted the trial, and whether failure to examine independent witnesses and the alternate theory (a third, unknown person carrying the contraband) undermines the conviction. The Court revisits the law on biases arising from the informant being the investigator, drawing on Mukesh Singh v. State (Narcotic Branch of Delhi) to hold that mere involvement of the informant does not automatically vitiate the trial; bias must be actual or real likelihood, with no sweeping presumption. It affirms that the alternate-version theory and lack of independent witness testimony do not per se entitle the accused to acquittal. The appeals are dismissed, and the appellants are directed to serve the remainder of their ten-year sentences.
Civil Appeal Nos. 1894-1895 of 2020; Civil Appeal Nos. 1896-1897 of 2020 The matter concerns 88 Indira Vikas Patras (IVPs) of Rs. 5,000 each purchased by the complainant’s father between 1996 and 1998. These bearer instruments were allegedly lost in June 2001, following which a police report was filed. The complainant claimed deficiency in service by the Post Office because it did not pay the maturity value after the IVPs’ due date. The District Forum directed payment of the maturity value, a position adopted by the National Commission; the consumer forum held the IVPs could be replaced or matured; the State Commission and the National Commission subsequently dismissed the appeal, and the matter reached the Supreme Court. The appellant-post office contended that, under the Indira Vikas Patra Rules, 1986, no formal application is necessary to purchase IVPs, but if an IVP is lost or stolen beyond recognition, it will not be replaced. Since the IVPs here were bought in cash, the purchaser’s identity was not recorded, making verification of right to maturity value impossible. The Court clarified that Rule 7(2) forbids replacement of lost/stolen certificates; Rule 6(4) also makes IVPs transferable. Relying on Kulkarni, the Court held there was no deficiency in service and dismissed the appeals, with no costs, reinforcing the statutory scheme’s protections against replacement or maturity payment without verifiable identity.
Writ Petition (C) No. 439 of 2020; Writ Petition (Civil) No. 449 of 2020 This case concerns an intraparty political crisis in Madhya Pradesh arising from purported resignations of 22 INC MLAs and subsequent Governor-directed measures to hold an immediate floor test while the Assembly was in session. The first writ petition, filed by ten MPs including Shivraj Singh Chouhan, challenged the Governor’s communications and the demand for a floor test, arguing such steps intrude on the Speaker’s domain and the constitutional framework that regulates resignations and disqualification under the Tenth Schedule. The second writ petition, by the MP Congress Party, sought diverse reliefs including access to the resigning Members, and questioned the constitutional validity of the Governor’s order and the timing of the floor test. The Supreme Court undertook a comprehensive examination of the Governor’s role under Articles 174, 163(1), and related provisions, reiterating the aid-and-advice principle, the Speaker’s exclusive role in acceptance of resignations and disqualification, and the need to test majority on the floor of the House rather than by subjective gubernatorial satisfaction, save in extraordinary circumstances. It held that the Governor’s power to call for a trust vote in a running Assembly is not outside constitutional bounds when there is objective material indicating a loss of majority, and it directed the reconvening of the Budget Session for a floor test. The Court disposed of the petitions with directions: reconvene on 20 March 2020, test majority on a single agenda, by show of hands, with videography, and conclude by 5 pm on 20 March 2020, ensuring protection of Members’ rights.Implemented directions and disposals: Writ Petition No. 439/2020 disposed; Writ Petition No. 449/2020 dismissed.
Civil Appeal No. 266 of 2020 Shamshher Singh Sandhu, a Deputy Inspector General of the CRPF, challenged the process and outcome of his attempt to obtain substantive promotion to Inspector General (IG) and later to Additional Director General of Police (DGP). He was promoted to IG based on a medical fitness evaluation, but was subsequently reverted to DIG. The reversion occurred without a show-cause notice or hearing. While the matter was before the Jammu and Kashmir High Court, its interim orders kept him as IG, and the Supreme Court later directed maintenance of status quo, allowing him to serve in the IG rank up to his retirement. The core issue was whether Sandhu should be treated as retired in the substantive IG rank for the computation of retiral dues and whether he could be considered for promotion to Additional DGP through a Departmental Promotion Committee (DPC). The Constitution bench invoked Article 142 authority to furnish relief, but eventually rejected the claim for Additional DGP promotion after reviewing the Medical Board data, noting that the final report showed Sandhu did not meet the required SHAPE-I benchmark. The Court ordered that his retiral dues be computed on the basis that he retired as an IG on 31 January 2016 and directed the sealed cover be returned to the respondents. The appeal was disposed of with no order as to costs, and the Court declined to grant further promotion relief, limiting relief to retiral entitlements.
Criminal Appeal Nos. 824-825 of 2020; 826 of 2020 This is a bundled Supreme Court decision involving Criminal Appeal Nos. 824-825 of 2020 (and 826 of 2020) arising from High Court of Madhya Pradesh orders in petitions under Section 482 Cr.P.C. to quash FIRs lodged for offences under IPC Sections 379 and 414 and under the Mines and Minerals (Development & Regulation) Act, 1957 (MMDR Act) Sections 4/21, along with associated MP Rules. The Court examines whether a Magistrate can, under Section 156(3) Cr.P.C., direct the lodge/registration of FIRs for MMDR Act offences, and at what stage Section 22 MMDR Act (cognizance bar) becomes operative. It reiterates the distinction between cognizable offences under MMDR Act and independent offences under the IPC, and clarifies that cognizance under MMDR Act is attracted only upon a written complaint by an authorised officer, with the bar at cognizance stage, not pre-cognizance. The judgment holds that the suo motu order under 156(3) to investigate and register FIRs does not by itself take cognizance under MMDR Act. It also clarifies that compounding under Section 23A(1) (via Rule 53 of 1996 Rules or Rule 18 of 2006 Rules) can bar MMDR prosecutions under Sub-section 2, but does not bar IPC prosecutions for offences like 379/414. In this case, the private appellants’ appeals are partly allowed to quash MMDR Act proceedings (4/21), while the State’s appeal is dismissed; IPC proceedings may proceed. The decision emphasizes the public trust doctrine and the duty to deter illegal mining and ecological damage.
Suo Motu Writ Petition (Civil) No. 7/2020 The Supreme Court’s Suo Motu Writ Petition (Civil) No. 7/2020 addresses lapses in the care of COVID-19 patients in Delhi and other States and the dignified handling of dead bodies in hospitals. The Court underscores the need for continuous supervision, monitoring, and uniform adherence to Union and state guidelines for hospital management during the pandemic. It directs the Union of India to constitute expert committees comprising senior doctors from central government hospitals in Delhi, GNCTD hospitals, AIIMS, and a Health Ministry officer to inspect and supervise government and Covid-dedicated hospitals in the National Capital Territory, ensuring at least weekly visits and allowing surprise inspections. The Court also requires all States to establish parallel expert teams and to ensure timely reporting to the state and central authorities. It approves CCTV surveillance in wards of Delhi’s Covid hospitals (and mandates implementation in other states where lacking), with footage accessible to designated authorities for review. It mandates allowing one attendant per patient in Covid-dedicated hospitals and creating 24x7 helpdesks for patient welfare. The order stresses strict adherence to Union guidelines and the revised discharge policy under the Disaster Management Act, 2005, and calls for uniform rates for Covid-related facilities/tests across private hospitals/labs, while permitting state-specific deviations with notice. The matter is adjourned for July 2020 for further proceedings.
Civil Appeal Nos. 6642-6643 of 2010 This Civil Appeal concerns succession rights of the children of Laxman, who was adopted into Saraswati’s family in 1935. After Laxman’s death in 1987, his adoptive son’s children and his natural children sought shares in the estate. The Bombay High Court had held that sons born before adoption are entitled to succeed to the adoptive father’s property, along with a daughter born after adoption, under the Hindu Succession Act, 1956. The core issue was whether the pre-adoption sons retain inheritance rights when the father is adopted into another family. The Supreme Court held that the Hindu Succession Act overrides all pre-Act texts and interpretations, and that succession in such cases opens post-1987; consequently, all the children of Laxman, regardless of birth timing relative to the adoption, are Class I heirs entitled to inherit as per the Act. The Court examined several authorities, including Kalgavda Tavanappa Patil (not approved) and the Full Bench decision in Martand Jiwajee Patil, among others, and concluded that there is no provision denying rights to the natural born son of an adoptee. The appeals were dismissed, affirming the High Court’s decision that all children have rights under the Act.
Civil Appeal No. 2197 of 2020 This appeal arises from a Jharkhand High Court writ challenging an e-reverse auction conducted by C1 India Pvt Ltd on behalf of Bharat Coking Coal Ltd (BCCL) for hiring heavy earthmoving equipment and transportation of coal. The process, conducted online on 4–5 May 2015 with an auto-closure mechanism, faced connectivity issues. Respondent AMR-Dev Prabha (Respondent 1) bid Rs. 2345 crores at 12:33 PM but was left unanswered for 30 minutes when the auction closed at 1:03 PM. The bidders were informed that the auction would resume at 2:30 PM due to technical faults in the service provider’s network; the resumption was communicated to all bidders, and bidding continued for an extended period, culminating with RK Transport Co obtaining the LOA on a Rs. 2043 crore bid. AMR-Dev Prabha challenged the LOA, and the Jharkhand High Court quashed the LOA and ordered reconduction of the auction.
The Supreme Court overturned the High Court, holding that judicial review in tender matters examines legality, not soundness, of public decisions. It emphasized that the bid process had a uniform extension and that concurrent inquiries (IEMs, CERT-In, CVC) found no collusion; the resumption was in accordance with the NIT and public interest did not warrant awarding the contract to AMR-Dev Prabha. It reiterated that mere private financial loss or better price later discovered does not create a public-law entitlement to an award. Consequently, the appeals are allowed, the Division Bench’s order set aside, and the LOA to RK Transport affirmed; AMR-Dev Prabha’s writ petition is dismissed.
Civil Appeal Nos. 2955 of 2020; 2902 of 2020 This judgment concerns the resolution under the Insolvency and Bankruptcy Code, 2016 (IBC) involving a financial creditor (Karad Urban Cooperative Bank Ltd.) which had filed a Section 7 application against the corporate debtor, Khandoba Prasanna Sakhar Karkhana Limited. After multiple CoC meetings, the CoC approved a Resolution Plan submitted by Sai Agro (India) Chemicals (the SRA). The Director/Promoter of the corporate debtor challenged the approval before NCLAT, which remanded back for reconsideration. The Supreme Court, however, reversed and restored the NCLT’s order, holding that, if all factors necessary to determine viability and feasibility have been put before the CoC and the CoC consciously approves the plan, the adjudicating authority must adopt a “hands-off” approach, giving primacy to the CoC’s commercial wisdom and the corporate debtor’s going concern viability. It rejected the arguments relating to alleged confidentiality breaches, asset ownership disputes (ethanol plant/machinery ostensibly belonging to SARFAESI-referenced SIPL), and the advertisement process under Regulation 36A, noting the period’s unamended regulatory framework. The Court directed that the plan be considered in light of Essar Steel and K. Sashidhar principles, and restored the NCLT approval with no costs, emphasizing limited judicial review in IBC matters.
Civil Appeal No. 1600 of 2020 Popatrao Vyankatrao Patil v. State of Maharashtra & Ors. concerns a sand-block auction on the Krishna river. The appellant was the highest bidder and deposited the entire auction amount for the block but was not granted possession; no excavation occurred. A Panchnama by the Circle Officer and reports by the Tehsildar, Sub-Divisional Officer and Collector show possession was never handed over and no sand was extracted. The file relating to refund was processed but, in transit, was misplaced, resulting in denial of refund. The appellant approached the Bombay High Court under Article 226 challenging the refund denial, but the High Court declined to entertain as involving disputed facts. The Supreme Court allowed the appeal, holding that writ jurisdiction under Article 226 is plenary but exercised with restraint; in appropriate cases, petitions involving disputed facts can be entertained if the facts do not require elaborate evidence and if the State action is arbitrary and violates Article 14. The Court found the State’s refusal to refund arbitrary given non-delivery of possession and non-excavation. It emphasized the State should act as a model litigant and directed refund of the entire amount with 6% interest, setting aside the High Court’s order.
Civil Appeal No. 2175 of 2020 The core issue in this Civil Appeal No. 2175 of 2020 is the period of limitation for filing an execution petition to enforce a decree passed by a foreign court of a reciprocating country in India. The Court examines whether Section 44A of the CPC merely provides a manner of execution or also fixes the period of limitation, and how Articles 136 and 137 of the Limitation Act, 1963 apply to foreign decrees. The Bench (a Division Bench) clarifies that Section 44A is an enabling provision: it enables the District Court to execute a foreign decree as if it had been passed by an Indian court; it prescribes the procedure under Section 47 CPC and Order 21 CPC, but it does not itself lay down any period of limitation. The Court holds that the period of limitation for executing a foreign decree will be the limitation prescribed by the reciprocating country, subject to the decree’s executability under Section 13 CPC. It also explains two situations: (i) if the decree-holder does not take steps to execute in the cause country, limitation runs from the decree date in that country; (ii) if steps-in-aid are taken and the decree is not fully satisfied, an Indian petition can be filed within three years from finalisation of the cause-country proceedings (Article 137). The appeal is dismissed and the lower courts’ orders are upheld.