Tenetowl LogoTenetowl
Supreme Court of India
Civil Appeal No. 441 of 2001

E.S. Rajaram and Ors. v. Union of India and Ors.

The case concerns pre-1987 Traffic/Commercial Apprentices in Indian Railways who, following a Railway Board memorandum of May 15, 1987, were to be paid on a higher scale (Rs. 1600-2660) for post-cutoff recruitment, while pre-1987 apprentices were kept on the old scale (Rs. 1400-2300). The pre-1987 apprentices challenged the memorandum in various Central Administrative Tribunals; tribunals had issued conflicting views. This Court, in Union of India & Ors. v. M. Bhaskar & Ors. (1996) 4 SCC 416, held the memorandum valid and issued two directions: (i) the Union of India should not recover excess amounts already paid on the basis of tribunal judgments, and (ii) the directive would apply to pre-1987 apprentices who were before this Court or whose tribunal judgments had become final. In pursuance, departments granted fitment in the old scale, not Rs. 1600-2660. The appellants approached the Central Administrative Tribunal (OA No. 1096 of 1996), which dismissed, suggesting the applicants seek clarification from this Court. The matter was referred to a Constitution Bench of three judges, and later to a full bench. The 2001 decision reaffirms Bhaskar’s position, clarifies that full uniformity for all pre-1987 apprentices is not automatic, and emphasizes Article 142 powers to do complete justice while safeguarding statutory rights. It holds that there is no obligation to recover amounts already paid from those affected, and ultimately dismisses the appeals without costs. The judgment underscores the constitutional reach of Article 142 while respecting statutory provisions and natural justice.

Supreme Court of India
Criminal Appeal Nos. 757-58 of 2001

Dhyan Investments and Trading Co. Ltd. v. Central Bureau of Investigation and Others

This Supreme Court appeal concerns the validity and institutional status of the Special Court established under the Special Courts Act, 1992 (Special Court) and the power of the High Court to transfer cases between judges of the Special Court under Section 407 CrPC. One Canbank Financial Services/Canfina dispute led to criminal proceedings before a Special Court having two judges, later expanded to two judges due to workload. The appellants sought a transfer of a case from one Special Court judge to another, arguing that the High Court has administrative and judicial superintendence over the Special Court and that Section 407 CrPC empowers such transfers. The Respondents contended that the Special Court is not subordinate to the High Court; though staffed by High Court judges, it lacks administrative control by the High Court, and Section 407 CrPC cannot apply to transfers between judges of a single Special Court, especially where there is only one Special Court. The Court examined constitutional provisions (Articles 226, 227, 235) and the Special Courts Act provisions (Sections 5, 5-A, 6, 7, 9, 10, 11-A) and concluded that the High Court has no administrative control over the Special Court and that Section 407 CrPC does not apply. While relying on prior constitutional authorities, the Court distinguished, rather than followed, some earlier dicta. Ultimately, the Court dismissed the appeals with no costs, holding that no provision exists to transfer a case between judges of the Special Court and that the Special Court is not subordinate to the High Court for the purposes of transfer under CrPC.

Supreme Court of India
Civil Appeal No. 2488 of 2001

Sri Mohan Wahi v. C.I.T.

This appeal concerns recovery of tax arrears and an auction sale of house property attached under a tax recovery certificate. The key questions were whether the Tax Recovery Officer could confirm the sale when the demands arising from assessments had been reduced to nil (or withdrawn) and what the effect of not serving a notice of demand under Section 156 of the Income‑tax Act, 1961 would be on the validity of recovery proceedings. The Supreme Court held that the term “reduced” in Section 225(3) includes reductions to nil; the Tax Recovery Officer must amend or cancel the certificate, and if such reduction occurs before an order confirming the sale, the officer has no power to confirm the sale. Rule 56 of the Second Schedule requires a conscious order of confirmation; sale becomes absolute only upon such confirmation. If a fact going to the root of the matter arises, the officer may refuse to confirm and may annul the sale. The court also held that service of demand notice under Section 156 is mandatory before initiating recovery; non‑service undermines the validity of recovery proceedings and renders the sale invalid. In this case, the sale was confirmed in 1998 despite demands having ceased to exist, so the High Court’s dismissal was set aside. The Court quashed the sale and sale certificate, ordered refunds to the purchaser (Rs 1,70,000) with interest, and directed equitable relief on interest payments by the government and the assessee for specified periods. The judgment emphasizes both the sanctity of public auctions and the protection of a debtor where the asserted arrears no longer exist.

Supreme Court of India
Civil Appeal No. 6123 of 2001; Civil Appeal No. 6124 of 2001

State of West Bengal v. M.R. Mondal and Anr.

STATE OF WEST BENGAL v. M.R. MONDAL AND ANR. concerns toll collection on the Durgapur Expressway, a stretch of National Highway No.2 now entrusted to the National Highways Authority of India (NHAI). A contract for toll collection was awarded for one year to Mondal after sealed bids; Mondal defaulted repeatedly in depositing the advance bid money and the actual bid money. He sought instalment deposits and concessions to extend or renew the contract beyond the initial year. In response, a Joint Secretary issued a Memorandum granting several concessions and even allowing a 30‑year period for toll collection, and later fresh bids were invited for the period after the one-year term. Mondal filed a suit and interim injunctions were granted; subsequently, the Central Government issued a notification under the National Highways Authority of India Act entrusting the stretch to NHAI, thereby terminating the State’s role as executing agency. The Calcutta High Court, on appeal, appointed an Advocate-Receiver to supervise toll collection, stayed the invitation of fresh bids, and directed the continuation of the Receiver to manage the expressway, toll collection, deposits and expenses. The Supreme Court was called upon to adjudicate, and held that the memorandum cannot ipso facto extend the contract beyond one year and that any extension requires prior Central Government approval and compliance with The Fee Collection Rules, 1997. The Court also held that the 4 February 1999 transfer terminated the State’s executing agency status and set aside the Division Bench’s order, restoring the Trial Court’s decision and discharging the Receiver, directing NHAI to assume collection with supervision. The appeals were allowed, emphasizing strict adherence to statutory rules and central oversight in toll‑collection concessions.

Supreme Court of India
Civil Appeal Nos. 2906-07 of 2001

ANIL RATAN SARKAR AND ORS. v. STATE OF WEST BENGAL AND ORS.

Anil Ratan Sarkar (the appellants) were Graduate Laboratory Assistants in non-government colleges in West Bengal who performed teaching duties and were treated as teaching staff until a Government Order in 1969 re-designated them as non-teaching staff. In August 1983 they were redesignated as Laboratory Instructors, but without conferment of teaching status or a pay scale consistent with teaching posts. Graduate Laboratory Assistants in government colleges were designated as Demonstrators and treated as teaching staff, creating a disparity. The matter returned to this Court earlier, culminating in an order dated 26 July 1994 which upheld mandamus for treating such graduates as teaching staff and paying the Physical Instructor scale. Subsequently, a circular of 26 December 1994 declared these appellants as teachers but granted them a pay scale limited to Group B non-teaching posts (Rs. 1390-2970), which the High Court had quashed, while the State sought relief in this Court. The central issue in the 2001 proceedings was whether there existed two distinct grades of Physical Instructors (qualified and under-qualified). The Court found no documentary basis for two grades, noting the annual Education Department report showing a single grade of Physical Instructor and the inaptitude of aligning Graduate Laboratory Instructors with non-teaching scales. The Court held the appellants are entitled to the higher teaching scale and arrears, as per the 1994 order, and allowed the appeals, quashing the 1994 circular and restoring the mandamus, with entitlement to be effective from August 1, 1987. The decision underscores that administrative circulars cannot override judicial orders and that a teaching status cannot be dissociated from an appropriate teaching pay scale.

Supreme Court of India
Civil Appeal Nos. 5956-5958 of 1999

E. I. D. Parry (I) Ltd. v. G. Omkar Murthy and Ors.

This Supreme Court decision concerns gratuity under the Payment of Gratuity Act, 1972 in relation to the Andhra Pradesh Shops and Establishments Act, 1966. The respondents, who were in the appellant E.I.D. Parry (I) Ltd.'s employment, availed of a voluntary retirement scheme and received gratuity under the Central Act but later claimed the difference between gratuity payable under the Central Act and that payable under the State Act (AP Shops and Establishments Act, 1966, Section 40). The trial court granted relief to the respondents; the appellate authority dismissed; and revision petitions were rejected. On appeal, the appellant contended that the Central Act prevails over the State Act by virtue of Article 254 of the Constitution and that Section 40(3) of the State Act is invalid, arguing the gratuity should be governed by the Central Act. At the relevant time, the respondents’ wages exceeded Rs. 1,000 per month (over Rs. 1,600), so the Central Act definition of “employee” did not include them, rendering the Central Act inapplicable. The Court noted that the Central Act’s scheme would not apply where the State Act is more beneficial, and that both Acts can operate concurrently when the State Act is more advantageous. In that light, the Court held the State Act applicable and that the appellant’s contentions were unsustainable, dismissing the appeals with no costs.

Supreme Court of India
Civil Appeal No. 1309 of 2001

Sanshin Chemicals Industry v. Orientals Carbons and Chemicals Ltd. and Ors.

Sanshin Chemicals Industry (appellant) challenged the Delhi High Court’s ruling that the Joint Arbitration Committee’s decision concerning the venue of arbitration under Clause 8.4 of the Insoluble Sulphur Technical Collaboration Agreement is not an arbitral award and thus not appealable under Section 34 of the Arbitration and Conciliation Act, 1996. The agreement provides that if the place of arbitration is not agreed within 30 days, a Joint Arbitration Committee will determine the venue. The Committee subsequently fixed the venue. The appellant sought to appeal this decision under Section 34, arguing that the venue determination affects substantive rights and the procedural rules governing the arbitration, effectively making it akin to an interim award. The High Court and the trial court found that the venue decision does not decide any claim or dispute and lacks the essential ‘arbitral award’ character, so it is not appealable. The Supreme Court, however, examined whether Section 34 covers interim awards and whether Section 2(6) allows a party to designate a forum to decide such issues. It held that the Section 20 venue decision is not an award; the Joint Arbitration Committee’s conclusion is merely a venue-determination guideline, not a judicial adjudication of rights. Citing Konkan Railway and Modi, the Court rejected the appellant’s broader interpretation and affirmed the dismissal of the appeal.

Supreme Court of India
Civil Appeal No. 4052 of 1996

THE COMMISSIONER v. GRIHA YAJAMANULA SAMKHYA

This batch of writ petitions challenged the assessment of property tax on buildings within the jurisdiction of Municipal Corporations and Municipalities in Andhra Pradesh. The Andhra Pradesh High Court had held that the power to determine rateable value and the overall tax assessment lay with the Commissioner, and that the District Level Advisory Committee constituted by the Government had no binding role; it also restricted the annual rental value to the fair rent determined under the AP Buildings (Lease, Rent and Eviction) Control Act, with certain deductions and considerations. The High Court further held that Rules 3 to 7 of the municipal rules function only as enabling provisions and cannot fetter the Commissioner’s discretion. The Supreme Court, in a batch of appeals, clarified that the Hyderabad Municipal Corporation Act, 1955 and the Municipal Corporation Rules provide a comprehensive code for property tax assessment: the Commissioner determines rateable value based on various criteria, and the District Level Advisory Committee’s recommendations are advisory, not binding. The Court emphasized that determining annual rental value is meant to avoid arbitrariness and to ensure landlord liability, while recognizing that Rent Control Act provisions may be read with municipal statutes but do not mandatorily bind the Commissioner. The appeals were partly allowed; only the High Court’s conclusions on certain points were set aside. The decision underscores that the Act and Rules alone govern assessment, with proper procedure and opportunities for objections, and that the State Government Committee had no statutory binding force.

Supreme Court of India
Civil Appeal Nos. 5760-5761 of 1999; CA Nos. 5910, 6995-96 of 1999; W.P. (C) No. 562 of 1999

K. Duraisamy v. State of Tamil Nadu and Ors.

This Supreme Court decision concerns the validity of Tamil Nadu Government Order GO MS No. 55 (9.2.1999) prescribing a two-source admission pattern for postgraduate medical courses for the 1999-2000 session. The scheme provides 50% of seats in each specialty for in-service candidates on merit, and 50% of seats as an open quota for non-service or private candidates. Within the in-service quota, a further proportion is reserved for service candidates from enumerated categories; the remaining 50% open quota is to be filled by non-service candidates from the merit/waiting list. The Madras High Court’s Single Judge order had held that the 50% non-service reservation must be achieved by selecting from both groups on merit in the first instance and that the in-service seats should be filled by in-service candidates who could not win inclusion on merit, with the open seats going to non-service candidates; the Full Bench disagreed. The Supreme Court held that the Government possesses the right to decide the sources and proportion of admissions and that fixation of a two-source system is permissible, distinct from communal reservations under Articles 15(4) and 16(4). It reasoned that 'reservation' in this context is a classification of sources, not a blanket protective discrimination and that inter se merit governs admission within each category. The appeals and writ petitions are dismissed, sustaining the State’s policy for 1999-2000.

Supreme Court of India
Criminal Miscellaneous Petition No. 862 of 2001; Special Leave Petition (Criminal) No. 223 of 2000; High Court of Gujarat at Ahmadabad, Criminal Misc. Application No. 2898 of 1999

Bipin Shantilal Panchal v. State of Gujarat and Anr.

This Supreme Court judgment addresses the persistent delays in criminal trials, focusing on an NDPS (Narcotic Drugs and Psychotropic Substances) case involving Bipin S. Panchal. The Court details how the trial court’s evidentiary process was hampered by lengthy interlocutory orders and repeated challenges, leading to an undertrial prisoner languishing in jail for years. Panchal’s bail applications, grounded in undue delay and rights to a speedy trial, were rejected by the High Court, while this Court had directed the trial to be closed within six months. When that period expired without resolution, the Directorate of Revenue Intelligence sought a further six months. The bench opposes ad hoc delays and condemns the practice of stalling trials at the evidence-taking stage to challenge admissibility. It endorses a procedural reform: during evidence collection, objections to admissibility may be noted and the objected documents tentatively marked as exhibits (or the relevant oral evidence recorded), with the objections to be decided at the final judgment. Deferring only stamp-duty objections to earlier resolution, this approach aims to prevent wasting trial days and to allow appellate review without remitting to trial. The Court concludes there is no point extending the time and disposes of the petition, urging expeditious completion while preserving bail rights at merit.

Supreme Court of India
Civil Appeal Nos. 5303-5309 of 2001

HIGH COURT OF MADHYA PRADESH THRU. REGISTRAR AND ORS. v. SATYA NARAYAN JHAVAR

This Supreme Court judgment reviews a batch of Civil Appeals challenging the Madhya Pradesh High Court’s decision in LPA No. 215 of 1998, arising from Rule 24 of the Madhya Pradesh Judicial Service Rules, 1955. The core issue is whether a probationer in the Madhya Pradesh Judicial Service can be deemed automatically confirmed on expiry of the maximum probation period (four years) when no formal order of confirmation is passed, and whether the Governor’s power to dispense with services under Rule 24(3) renders such deemed confirmation unnecessary. The High Court had set aside termination orders of several Civil Judges (Trainee) held on officiating terms, finding that continuance beyond the four-year cap could amount to deemed confirmation. The Supreme Court identifies three lines of jurisprudence prior to its decision: (i) a line including Dharam Singh and Samsher Singh that treated deemed confirmation with caution and allowed termination under Rule 24(3); (ii) a line including Dayaram Dayal which suggested deemed confirmation after expiry; and (iii) a line led by Shamsher Singh and related cases allowing broader discretionary action and extension, with the outer limit of probation being directory rather than mandatory. The Court overrules Dayaram Dayal, clarifies that Rule 24 does not provide for deemed automatic confirmation at expiry, and reiterates that confirmation is a positive act requiring an express order (subject to fitness and passing prescribed examinations). Consequently, the appeals are allowed, the High Court’s judgment is set aside, and the writ applications are dismissed, upholding termination orders. The decision emphasizes the primacy of explicit confirmation orders and cautions against implying confirmation merely from continued service beyond the maximum probation period.

Supreme Court of India
Criminal Appeal No. 242 of 2000

Shri Bhagwan v. State of Rajasthan

Shri Bhagwan v. State of Rajasthan is a criminal appeal arising from a Rajasthan High Court verdict that upheld the conviction of the appellant under IPC sections 302, 392 and 397 for the murder of five members of a family and related robbery, and confirmed the death sentence. The prosecution relied on circumstantial evidence: the appellant was seen with one of the deceased before the incident, he reportedly knew the family, and blood-stained weapons and recovered articles linked to him were found shortly after the crime. The Sessions Court had sentenced him to death for the murder and to seven years’ imprisonment plus fines for the robberies; the Rajasthan High Court affirmed. On appeal to the Supreme Court, counsel for the appellant argued that the chain of circumstances was not complete, that PW-17’s testimony might be unreliable due to trauma, and that more than one assailant could be involved; they also contended that the recovered articles and statements were doubtful and that mitigating factors such as the appellant’s youth and mental suffering warranted commutation. The State urged upholding guilt based on the circumstantial chain and the recoveries. The Supreme Court upheld the conviction for the robberies and murder but, emphasizing the heinous nature of the crime, commuted the death sentence to life imprisonment, with a directive that the appellant shall not be released before completing 20 years of imprisonment; the convictions for 392 and 397 were upheld, with no separate sentence for those offences. The appeal was disposed of accordingly.

Supreme Court of India
Civil Appeal No. 7382 of 2001

B. D. Shetty and Ors. v. M/s Ceat Ltd. and Anr.

This Supreme Court decision discusses subsistence allowances under the Industrial Employment (Standing Orders) Act, 1946, focusing on how delays in completing disciplinary proceedings interact with stays ordered by competent courts pending criminal trials. The appellants, employees of M/s Ceat Ltd., challenged a Labour Court/Industrial Tribunal sequence that reduced their subsistence wages from 75% to 50% after 90 days. The core issue is whether a stay of disciplinary proceedings initiated by a court pending criminal trial constitutes a delay “directly attributable to the conduct of the workman” under Section 10-A(1)(b). The Court clarifies that a stay granted to protect the workman’s right to a fair trial cannot be treated as misconduct-related delay by the workman itself; only delays caused directly by the workman’s own conduct qualify for the 75% rate reduction. The judgment emphasizes the beneficial nature of the statute and the need to interpret it in light of legislative intention. It also examines whether the provision allowing “provisions of such other law” (Section 10-A(3)) could permit 100% subsistence under Model Standing Orders (Schedule I) of the Bombay Rules. It concludes that Model Standing Orders are not “other law” under Section 10-A(3) and directs the Industrial Tribunal to decide pending revision applications within two months. The appeal is allowed, restoring 75% subsistence after 90 days.

Supreme Court of India
Civil Appeal Nos. 4803-4808 of 2001

District Mining Officer v. Tata Iron and Steel Co.

This batch of Special Leave Petitions and Civil Appeals concerns the validity and scope of the Cess and Other Taxes on Minerals (Validation) Act, 1992, enacted by Parliament to address judgments striking down state levies on minerals as ultra vires. The central issue is what the Validation Act actually validated: whether it merely preserved taxes already collected under invalid state laws or also conferred a right to levy and realise such taxes up to 4 April 1991, and whether it could authorize any fresh levy or collection after that date. The matter was referred to a three-judge bench to decide on Bihar’s case and to reconsider the two-judge Kannadasan precedent. The bench, comprising G. B. Pattanaik, S. N. Phukan and B. N. Agrawal, held that the Validation Act validly permitted the levy and collection of cesses and taxes on minerals imposed under the invalid state laws only up to 4 April 1991, and did not confer a substantive power to levy or collect after that date. It also held that Section 2(3) provides only a limited saving for refunds of excess payments, not a broad saving for post-1991 collection. The Act is a temporary statute; General Clauses Act saving provisions do not apply to it; Kannadasan’s decision was overruled in this context. The Court directed that the various High Court judgments be guided by this interpretation, and it disposed of the matters with no costs.

Supreme Court of India
Civil Appeal Nos. 1300-1301 G of 1998

Seelan Raj v. Presiding Officer, Ist Addl Labour Court, Chennai and Ors.

This case concerns the closure of a data processing division of a company formed in 1982 to render computer services and software development. The division, set up in 1983, handled data processing tasks such as payroll, financial accounting, and inventory control. Due to a fall in demand from 1989 onward, the division became non-viable and was closed, with 46 employees affected in January 1989 and more later; 71 workers were subsequently terminated after closure of the software division. Disputes were referred to the Labour Court under the Industrial Disputes Act (ID Act), challenging the legality of the closure, the unit’s status, and the requisite protections for workers. The Labour Court initially held that the establishment was a factory and that closure was unjustified, ordering reinstatement with back wages and enforcing Chapter VB protections; the State Government’s and the company’s positions were that the unit was not a factory under Section 2(m) of the Factories Act, nor a covered establishment under the ID Act. The Madras High Court, however, overturned the Labour Court’s view, holding that an electronic data processing unit or computer unit installed in premises would be exempt from Labour laws by virtue of Explanation II and thus not a factory. The Division Bench disagreed with the High Court and recognised that such activities may constitute a manufacturing process but would still fall outside factory status due to Explanation II. The matter then went to the Supreme Court, which framed the issue for larger consideration and referred the matter to a Larger Bench, in line with Tata Consultancy Services. The ultimate disposition is to refer to a Larger Bench for authoritative interpretation on whether data processing and software preparation constitute a manufacturing process under the Act and how Explanation II applies.

Supreme Court of India
Civil Appeal No. 226 of 1997

State Bank of India v. Anjan Sanyal

This is an appeal by the State Bank of India challenging a Calcutta High Court decision that quashed a transfer order of a Probationary Officer in Middle Management Grade II and directed payment of salary for the period of unauthorised absence. The respondent was transferred from Calcutta to the Bank’s Central Office in Mumbai but avoided joining, submitted representations seeking cancellation, and remained absent. A Single Judge of the High Court held the transfer illegal on the ground that the order was not served on the officer and directed salary for the period of absence. The Division Bench affirmed. The Supreme Court, in a two-judge bench, reversed, holding that a transfer is a part of service conditions and should not be lightly interfered with, unless the order is mala fide, there is lack of competence, or service rules prohibit it. In the present case, the Court found the transfer order valid and communicated through correspondence; the officer’s representations and conduct showed awareness and evasion rather than mere non-service. The Court emphasized that payment of salary for the period of unauthorised absence must be decided under the Bank’s own rules (State Bank of India Officers’ Service Rules, Rules 47, 49, 50(1)) and related Hand Book provisions, and set aside the High Court’s salary order. It discussed precedents on wage treatment, notably Bank of India v. T. S. Kelawala and Syndicate Bank v. K. Umesh Nayak, to illustrate the no-work-no-pay principle as applicable under governing rules.

Supreme Court of India
Civil Appeal No. 336 of 1997

V. Pechimuthu v. Gowrammal

This Supreme Court judgment concerns a suit for specific performance under the Specific Relief Act, 1963, arising from a registered sale of immovable property with a subsequent reconveyance agreement. The appellant owner sold property to the respondent in 1973 for Rs 20,000. A separate agreement dated 4 May 1973 provided that the respondent would re-convey the property to the owner after five years for Rs 19,990. The owner claimed specific performance of the reconveyance, asserting readiness and willingness to perform the agreement and having deposited the stipulated sum. The trial court decreed in the appellant’s favor; the first appellate court affirmed, but the High Court reversed, treating the reconveyance as a privilege or concession rather than an ordinary agreement. The High Court held that time would be of the essence and that the purchaser could not enforce the contract without strict performance, on grounds of clean hands under Section 20 of the Specific Relief Act. The Supreme Court, however, held that there is no general principle that every sale-and-repurchase arrangement is a privilege or concession; an option to repurchase is distinct and generally requires strict conditions, but an ordinary agreement to sell is governed by the general contract laws. The Court concluded that the agreement in this case is an ordinary agreement for sale, and the decree for specific performance should stand. The appeal is allowed and the High Court’s reversal is set aside, upholding the First Appellate Court’s decree with no costs.

Supreme Court of India
Civil Appeal No. 3748 of 1999

Landt McNeil Ltd. v. Government of Tamil Nadu

This Supreme Court judgment concerns a notification issued by the Government of Tamil Nadu under Section 10(1) of the Contract Labour (Regulation & Abolition) Act, 1970, prohibiting the employment of contract labour in sweeping and scavenging in establishments/factories employing 50 or more workers. The petitioner, Landt McNeil Ltd., challenged the notification on two principal grounds: (i) there was no effective consultation with the Tamil Nadu State Contract Labour Advisory Board as required by the Act, and (ii) the government relied on materials that were either inadequate or not properly considered. The High Court had dismissed the petition, following an earlier decision (Bharat Heavy Electricals Ltd. v. Government of Tamil Nadu and Ors.). On appeal, the Supreme Court clarified that consultation does not mean concurrence and that Board views are advisory, intended to assist the government in reaching a conclusion. However, the Court found that the records did not reflect effective consultation or consideration of the Section 10(2) factors (a–d) with relevant materials, and that the government’s decision was vitiated for non-consideration of relevant materials. Consequently, the impugned notification was quashed, though the Court noted the government may issue a fresh notification after due legal consideration.

Supreme Court of India
Civil Appeal No. 2720 of 2001

DR. RAJINDER SINGH v. THE STATE OF PUNJAB AND ORS.

Dr. Rajinder Singh v. State of Punjab and ors. is a Supreme Court appellate decision involving the promotion of a health-services officer (Deputy Director) under the Punjab Civil Medical (State Service Class I) Rules, 1972. The appellant challenged the promotion of respondent No.3 on the ground that he did not satisfy the service-qualification prescribed in Rule 9A(c) of the PCMS Class I Rules, as he had not completed ten years of service on the relevant date. The High Court had dismissed the writ petition by relying on a government notification dated 9 April 1989, which purported to treat PCMS Class II as PCMS Class I, without amending the Rules. The Supreme Court held that the statutory Rules, not a government notification, govern eligibility for promotion and that the respondent was ineligible for the post of Deputy Director, Health Services for want of ten years’ service on the relevant date. It further held that the notification cannot substitute the statutory Rules and that amending the Rules by a government order would violate Article 309 of the Constitution and compromise tenure protections. Consequently, the Departmental Promotion Committee’s recommendation and the respondent’s promotion were set aside. The Court directed the State to constitute a fresh DPC to consider all eligible officers strictly under the Rules, ignoring the 9 April 1989 notification. The decision reinforces the supremacy of statutory service rules and the need to adhere to amendments through proper legislative channels."

Supreme Court of India
Civil Appeal Nos. 8530-8540 of 1983

ONGC v. ASSN. OF NATURAL GAS CONSUMING INDS.

This Supreme Court decision concerns whether the Oil and Natural Gas Commission (ONGC) is entitled to interest on delayed payments by gas consumers following a price dispute decision in ONGC’s favor. The parties had written contracts (agreement clauses 5.01–5.02) governing invoicing, payment timelines, and interest on late payment. The contracts ended on 31 March 1979, but the respondents sought to renew at higher prices. The Gujarat High Court, by interim orders, directed ONGC to continue supply at the old rate, and later increased the interim price. The Supreme Court, in 1990, upheld the enhanced price. After disposal, ONGC claimed interest on the delayed payment of the principal amount under clause 5.02. Respondents argued there was no liability since the contracts terminated and the judgment did not direct payment of interest. The Court held that the interim orders effectively continued the contracts “as at present,” so the terms beyond price continued to apply, and ONGC was entitled to interest. The Court also recognized restitution and allowed an instalment plan for payment of interest, with consequences for defaults. It cited several precedents on restitution and the maxim actus curiae neminem gravabit to justify the remedies.