Supreme Court of IndiaSupreme Court · 2001Single JudgeAppeal dismissed.

Sanshin Chemicals Industry v. Orientals Carbons and Chemicals Ltd. and Ors.

Case / Petition Number:
Civil Appeal No. 1309 of 2001
Neutral Citation:[2001] 1 S.C.R.

Case Synopsis & Summary

Sanshin Chemicals Industry (appellant) challenged the Delhi High Court’s ruling that the Joint Arbitration Committee’s decision concerning the venue of arbitration under Clause 8.4 of the Insoluble Sulphur Technical Collaboration Agreement is not an arbitral award and thus not appealable under Section 34 of the Arbitration and Conciliation Act, 1996. The agreement provides that if the place of arbitration is not agreed within 30 days, a Joint Arbitration Committee will determine the venue. The Committee subsequently fixed the venue. The appellant sought to appeal this decision under Section 34, arguing that the venue determination affects substantive rights and the procedural rules governing the arbitration, effectively making it akin to an interim award. The High Court and the trial court found that the venue decision does not decide any claim or dispute and lacks the essential ‘arbitral award’ character, so it is not appealable. The Supreme Court, however, examined whether Section 34 covers interim awards and whether Section 2(6) allows a party to designate a forum to decide such issues. It held that the Section 20 venue decision is not an award; the Joint Arbitration Committee’s conclusion is merely a venue-determination guideline, not a judicial adjudication of rights. Citing Konkan Railway and Modi, the Court rejected the appellant’s broader interpretation and affirmed the dismissal of the appeal.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • G. B. Pattanaik
  • K. G. Balakrishnan
  • B. N. Agrawal
Judgment Date
2001-02-16
Court Decision / Holding
Appeal dismissed.
Final Disposition
Appeal dismissed.

Parties to the Case

Appellants / Petitioners

  • Sanshin Chemicals Industry

Respondents

  • Orientals Carbons and Chemicals Ltd.
  • Other Respondents (Ors.)

Legal Representation & Advocates

Counsels for Petitioners

  • • Ashok H. Desai
  • • J.B. Dadachanji and Co.

Counsels for Respondents

  • • D.A. Dave
  • • Ramesh Singh
  • • Rajesh Kumar

Provisions of Law Cited

Section 20 of the Arbitration and Conciliation Act, 1996Section 34 of the Arbitration and Conciliation Act, 1996Section 28 of the Arbitration and Conciliation Act, 1996Section 2(6) of the Arbitration and Conciliation Act, 1996Section 2(c) of the Arbitration and Conciliation Act, 1996

Legal Doctrines & Maxims

  • Attributes of an arbitration agreement (as laid down in K.K. Modi v. K.N. Modi & Ors., 1998 SCC 573)
  • UNICTRA Model Law alignment and the significance of the seat/place of arbitration

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the Joint Arbitration Committee’s venue determination effectively determines a vital procedural right and the applicable rules of the arbitration, thus constituting an interim award amenable to challenge under Section 34. It argues that Clause 8.4 creates two parallel processes—a merits arbitration and a venue determination—and that the venue decision has the hallmarks of an award, including affecting rights and procedures. It relies on statutory definitions of 'award' (including interim awards) and Sections 2(6) and 20 to support appeal rights. The appellant asserts that denying relief would render Section 34 ineffective.

Contentions of Respondents

The respondents contend that the venue determination by the Joint Arbitration Committee is not a decision on rights under the contract and does not constitute an arbitral award or interim award. It is a procedural step or machinery to decide the place of arbitration, not a substantive adjudication. They rely on the distinction between merits arbitration and venue selection, and on Modi’s test of what constitutes an arbitration agreement, arguing that the venue decision fails to meet that test and thus cannot be appealed under Section 34.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Konkan Railway Corporation Ltd. & Ors. v. Mehul Construction Co.[2000] 7 SCC 201PositiveCited by the Court and relied upon to support the proposition that venue decisions under arbitration context are not awards and not appealable under Section 34.
K.K. Modi v. K.N. Modi & Ors.[1998] 3 SCC 573PositiveUsed to illustrate the attributes of an arbitration agreement; the Court held that the second part of Clause 8.4 does not satisfy Modi’s test, hence not an arbitration agreement or award.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,167 words•~24 min read

In The Court Record

Sanshin Chemicals Industry v. Orientals Carbons and Chemicals Ltd. and Ors.

A # SANSHIN CHEMICALS INDUSTRY _v._ # ORIENTALS CARBONS AND CHEMICALS LTD. AND ORS. FEBRUARY 16, 2001 [G.B. PATTANAIK, K.G. BALAKRISHNAN AND B.N. AGRAWAL, JJ.] B _Arbitration and Conciliation Act, I 996-Sections 20 & 34-Decision on the question of venue of arbitration-As agreed upon by parties under arbitration clause-Whether appealable-Held, no, since the decision is_ C _neither an award not an-Interim award deciding legal rights of the parties under the contract._ Appellant and respondent No. 1 entered into an agreement. Under Clause 8.4 of the agreement it was agreed upon that if the parties were not able to designate a place of arbitration or were unable to agree thereon within 30 D days after the demand of arbitration was made, the same was to be determined by a Joint Arbitration Committee. Respondent No. 1 demanded arbitration. Since the parties did not agree upon the place of arbitration within 30 days of the demand of arbitration, the E Joint Arbitration Committee was formed. The Committee decided the venue for the sittings of the arbitral tribunal. The appellant filed an application before High Court against the order of the Committee, under Section 34 of the Arbitration and Conciliation Act. Single Judge dismissed the application, holding that the decision of Joint F Arbitration Committee, not being award, was not amenable to appeal under Section 34. Division Bench dismissed the appeal of the appellant. In appeal to this Court, the appellant contended that the decision of the Joint Arbitration Committee regarding the venue was an interim award amenable to appeal under Section 34, since the decision of the venue amounts G to vital right of a party as the rules and procedure applicable for resolving the dispute would depend on the decision of the venue; and if it is held that Section 34 is not applicable to the decision in question, the aggrieved party will be left remedyless. Dismissing the appeal, the Court 1101 H 1102 ## SUPREME COURT REPORTS ## [2001] 1 S.C.R. ## A A HELD: I. The decision on the question of venue under Section 20 of the Arbitration and conciliation Act would not come within making of an arbitral award starting from Section 28 and on this view of the matter also, the said decision on the question of venue will not be either an award or an interim award so as to be appealable under Section 34 of the Act The decision B of the Joint Committee on the question of the venue under Clause 8.4 is not a decision, decidi_ng legal rights of the parties under the contract. There is no mutuality and the said Committee is merely a machinery for deciding the question of venue. Such a decision does not have the characteristics of an arbitration award nor even can it be held to be an interim award. The conclusion of the Joint Committee is a conclusion on the guidelines contained in second C part of Clause 8.4 of the agreement and is not a judicial determination and as such the said conclusion would not amount to an award. Ill 09-E-Ff _Konkan Railway Corporation ltd. & Ors._ v. _Mehu/ Construction Company,_ 120001 7 SCC 201, relied on. D _KK. Modi_ v. _KN. Modi & Ors.,_ ll998f 3 SCC 573, referred to. 2. The ultimate arbitral award could be assailed on the grounds indicated in sub-section (2) of Section 34 and an erroneous decision on the question of venue, which ultimately affected the procedure that has been followed in the arbitral p,roceeding could come within the sweep of Section 34 (2) and as E such it cannot be said that an aggrieved party has no remedy at all.(1112-CI CIVIL APPELLATE JURISDICTION: Civil Appeal No. 1309 of 2001. From the Judgment and Order dated 8.8.2000 of the Delhi High Court F in F.A.O. (O.S.) No. 224 of2000. Ashok H. Desai, A.K. Ganguli Gaurav Banerjee, D. Wadhwa and Dinesh Mathur, for _Mis._ J.B. Dadachanji and Co. for the Appellant. D.A. Dave, Ramesh Singh and Rajesh Kumar for the Respondents. ## G The Judgment of the Court was delivered by ## PATTANAIK, J. Leave granted. > This appeal by grant of special leave is directed against the judgment H of Delhi High Court dated 8th of August, 2000. The question for consideration SAN SHIN CHEM. INDUS.'" ORIENTAL CARBONS AND CHEM. LTD. [PATTANAIK, J.] 1103 is whether a decision regarding the venue of the arbitration proceedings A could be assailed in appeal under Section 34 of the Arbitration and Conciliation Act, 1996, The Division Bench of the High Court by the impugned judgment agreed with the conclusion of the learned Single Judge and came to hold on examining the arbitration clause in the agreement that the decision with regard to the venue of the arbitration sitting cannot be held to be an interim award B and as such Section 34 of the Act cannot be invoked. The appellant and respondent No. 1 entered into a technical collaboratioTJ agreement called 'Insoluble Sulphur Technical Collaboration Agreement' on !st of August, 1989. Under the agreement, respondent No. 1 was required to provide technical information for production of insoluble sulphur in India. C Appellant discharged its obligation under the agreement. The said respondent No. I in May, 1996, wrote a letter to the Indian Council of Arbitration, making a claim against the appellant on the basis of certain disputes between the parties. But the Indian Council of Arbitration returned the papers to respondent No. I on 15.5.96. On the very same day, the said respondent No. I filed a statement of claim before respondent No. 2, which was registered as Arbitration D Case No. FTA/137. Said respondent No. 2, by its letter dated 25th of June, 1996 called upon the appellant to appoint an arbitrator. On 9.7.96, the appellant wrote to the respondent No. 2 bringing to its attention clause 8.4 of the agreement and stated that the appellant has hot received any demand for arbitration from OCCL and as such the respondent No. 2 has no jurisdiction E in the matter. Respondent No. 2 however by its order dated 17th of July, 1996, called upon the appellant to submit the agreement regarding the venue of arbitration with reasons within 30 days. Appellant immediately answered the aforesaid letter of the respondent No. 2 by letter dated 22.7.96, questioning the jurisdiction of the respondent No. 2 and also seeking clarification as to whether FICCI had accepted the statement of claim of respondent No. I. At F this point of time, the appellant was assured that respondent No. 2 will not proceed with the matter till the issues regarding the venue are sorted out. On 9.8.1996, respondent No. l's lawyer intimated respondent no. 2 that they had already appointed an arbitrator and it was for the arbitral tribunal to decide the venue under Section 20 of the Arbitration and Conciliation Act, 1996. G Respondent No. 2 was called upon to nomiriate the appellant's arbitrator. Appellant by his letter dated 9th of August, 1996, intimated the respondent No. 2 that the requirement of Article 8.4 not having been complied with, there is no question of nominating arbitrator on behalf of the appellant. Appellant also wrote a letter to the respondent No. I on 6th of September, 1996, indicating therein that the Registrar of FICCI had no jurisdiction and that H 1104 [200 I) I S.C.R. ## SUPREME COURT REPORTS A there had been no proper demand for arbitration. It was also stated that in any event, Japan was the designated place of arbitration. On 16th of October, 1996, respondent No. 2 sent a communication to the Manager, Arbitration Department, Japan Commercial Arbitration Association, stating therein that since parties had not been able to agree on the place of arbitration within 30 B days of the notice calling upon them to submit the agreement, the JCAA may nominate a member on the Joint Arbitration Committee. In that letter it had been stated that respondent No. 2 had already nominated one Umesh Kumar Khaitan as its Member on the Joint Arbitration Committee. Pursuant to the aforesaid letter from respondent No. 2, the JCAA appointed respondent No. 5 as its Member by letter dated 25th of October, 1996. Appellant had made C some correspondence and queries regarding the proceedings of the Joint Arbitration Committee. Mr. Umesh Khaitan resigned as Member of JAC on 12th of January, 1998 and he was, therefore, substituted by respondent No. 3. The aforesaid JAC met in Delhi on 15th of July, 1998 and decided the venue for the sittings of the arbitral tribunal. The appellant filed an application before a learned Single Judge of Delhi High Court, assailing the decision of D the Joint Arbitration Committee dated 15th July, 1998 on various grounds under Section 34 of the Arbitration and Conciliation Act, 1996. The learned Single Judge by his Judgment dated 7th of April, 2000, dismissed the said application of the appellant on a finding that the impugned decision of the Joint Arbitration Committee dated 15th of July, 1998 is not an award and as E such is not amenable to appeal under Section 34 of the Arbitration and Conciliation Act, 1996. Against the said judgment of the learned Single Judge, the appellant preferred an appeal and the Division Bench having dismissed the appeal by its Judgment dated 8th of August, 2000, the present appeals has been preferred to this Court. F Mr. Ashok H. Desai, the learned senior counsel, appearing for the appellant contended that on a plain reading of clause 8.4 of the Technical Collaboration Agreement, would indicate that there is no agreed venue where the arbitral proceedings could be conducted and on the other hand, the procedure in the arbitral proceedings would be governed by the decision of G the venue inasmuch as if it is to be held in India, then it shall be conducted in accordance with the rules applicable in India and if it is to be conducted in Japan, then the rules of Japan Commercial Arbitration Association would apply. According to Mr. Desai, since the procedure and the rules to be applicable for resolving the dispute would depend upon the very decision of the venue, such a decision amounts to a vital right of the party being decided H by the Joint Arbitration Committee and as such the same partakes the character y' SANSHIN CHEM. INDUS. I'. ORIENTAL CARBONS AND CHEM. LTD. [PATTANAIK, J.] J J05 . of an interim award and consequently Section 34 of the Arbitration and A Conciliation Act, 1996 would apply to such a decision and aggrieved party against such decision cannot be held to be remedy-less. Mr. Desai further urged that on an analysis of the agreement, itself would indicate that it contains two arbitration clauses, one nom~nclatured as Joint Arbitration Committee and the other is the Arbitral Tribunal. While the former decides the B dispute in relation to the venue, the latter decides the dispute on merits of the claim. Under such circumstances to hold that the decision of the Joint Arbitration Committee on the dispute relating to the venue even does not amount to an interim award, is un-sustainable in law and the learned Single Judge as well as the Division Bench committed serious error in recording a finding that the said decision does not amount to an award. Mr. Desai also c urged that in case of an International Commercial Arbitration, the seat of the arbitral proceeding is of paramount importance and the parties to the agreement being conscious of the same, provided such an elaborate mechanism for resolution of a dispute in the event no agreement is arrived at on the' question of venue. Adjudged from this stand point, the impugned judgment illegally D excludes such a decision from the purview of a judicial review by way of filing an appeal under Section 34 of the Act and the same must be interfered with. Mr. Desai also urged that in view of the definition of "Award" in the Act in Section 2(c) which includes an interim award, and an award being a final determination of a particular issue or claim in the arbitration and the issue regarding venue being of seminal importance for adjudication of the rights of E the parties, the conclusion is irresistible that such decision by the Joint Committee of Arbitrators, must be held to be an interim award and as such amenable to be reviewed under Section 34 of the Act and consequently, the High Court committed serious error in holding to the contrary. Mr. D.A. Dave, the learned senior counsel, appearing for the respondents on the other hand submitted that though the expression 'award' has been defined to include an interim award under Section 2( c) of the Act, but a decision to become an award must be a final determination of a particular issue or claim in the arbitration. The decision on the question of venue by a forum under the agreement termed as Joint Arbitration Committee, is at an earlier stage of initiation of the proceedings of the arbitral tribunal and, therefore, the same cannot be termed as an interim award. The High Court, therefore, was justified in not entertaining an appeal against the same under Section 34 of the Act. With regard to the different clauses of the agreement, Mr. Dave contends that the parties themselves agreed that the place of arbitration shall be determined by the Joint Arbitration Committee and such _(_ 1106 ## SUPREME COURT REPORTS (2001) I S.C.R. A determination shall be binding and final, whereas the arbitration clause stipulates that any claim or dispute arising out of or relating to the agreement shall be settled by arbitration. The very fact that the parties agreed that the question of venue will be determined by a Joint Arbitration Committee in the event parties do not designate the place of arbitration or are unable to agree B within 30 days of the demand, indicates that the parties never intended the said decision to partake the character of an award to be assailed in appeal and on the other hand the agreement not having authorised the arbitral tribunal to determine the place of arbitration, clearly establishes that such a determination by a separate forum is not an award and, therefore, is not appealable under Section 34 of the Arbitration and Conciliation Act. Mr. Dave C also contended that the argument advanced on behalf of the appellant that the decision with regard to the venue of the arbitral proceeding is an adjudication of a vital right of the parties inasmuch as the procedure to be adopted in the arbitral proceedings would be the law which governs the venue of the proceedings, is devoid of any force in view of Clause 9( l) of the agreement D which categorically indicates that the agreement shall be interpreted in accordance with and governed by the laws of India. According to Mr. Dave, this provision in the arbitration agreement is conclusive of the fact as to which law will govern and consequently, the decision of the Joint Arbitration Committee with regard to the venue looses its significance. It is next contended by the learned senior counsel for the respondents that the arbitration clause E providing resolution of any dispute or claim arising out of the agreement by arbitration can obviously relate to a claim or dispute in relation to the contract and a decision or determination by the Joint Arbitration Committee on the question of venue, which power the Committee gets under the agreement itself, cannot be held to be a decision in course of the arbitral proceedings F nor can it be said to be an adjudication of claim arising out of the agreement and, therefore, is not an award. Mr. Dave also after referring to the different provisions in the Arbitration and Conciliation Act contended that making of an arbitral award and termination of proceedings occurs in Chapter VI and starts from Section 28, whereas place of arbitration occurs in Chapter V G dealing with the conduct of arbitral proceedings. The commencement of arbitral proceedings contemplated under Section 21 is the date when a particular dispute is referred to the arbitration. In this view of the matter a decision on the question of venue will not be an award or interim award against which a party can take recourse to a Court under Section 34 and as such the impugned judgment of the learned Single Judge as well as the Division Bench H remain unassailable. SANSHIN CHEM. INDUS.,. ORIENTAL CARBONS AND CHEM. LTD. [PATT A NAIK, J.] ] ] 07 Before we examine the rival submissions niade, it would be appropriate for us to notice the relevant clauses of the agreement, which ultimately would help us to decide the question as to whether the decisions of the Joint Arbitration Committee dated 15.7.1998 can be held to be an interim award, Clause 8.4 is in fact the most crucial clause that requires consideration, which is quoted herein-below in extenso : _"'Clause 8.4.-Any_ dispute or claim arising out of or relating to this Agreement shall be settled by arbitration. If the arbitration is to be held in India, the dispute shall be submitted to the Arbitration Tribunal of the Federation of Indian Chambers of Commerce and Industry and shall be conducted in accordance with the Rules of that Tribunal. If C the arbitration is to be held in .Japan, it shall be conducted in accordance with the Rules of the Japan Commercial Arbitration Association. In the event that the parties have not designated the place of arbitration or are unable to agree thereon within thirty (30) days after the demand for arbitration has been made, the place of arbitration shall be D determined by a Joint Arbitration Committee of three memb~rs, one to be appointed by the Arbitration sub-committee of the Federation, another by the Japan Commercial Arbitration Association and the third of a nationality other than that of any one of the parties to act as Chairman to be chosen by the other two members. In deciding the E place of arbitration, the Joint Arbitration Committee shall consider among others the principle that, if only the quality of the good is in dispute and/or inspection of the goods is necessary, arbitration of such case shall take place at the place where the merchandise is located. The party demanding arbitration according as it is resident in India or Japan shall give notice to the Arbitration Tribunal of the F Federation or the Japan Commercial Arbitration association, as the case may be. The Arbitration Tribunal of the Federation or the Japan Commercial Arbitration Association, as the case may be, shall request both the parties to submit their agreement and reasons within thirty (30) days for preference regard.ing the place of arbitration. The G determination of the place by the Joint Arbitration Committee shall be final and binding." Clause 9.1 stipulates that the agreement shall be interpreted in accordance with and governed by the laws of India. Clause 9.7 is extracted herein-below in extenso: H [2001) 1 S.C.R. SUPREME COURT REPORTS 1108 A ## B _"9._ 7. The terms and conditions herein contained constitute the entire agreement between the parties and shall supersede all previous communication, either oral or written, between the parties with respect to the subject matter hereof, and no agreement or understanding varying or extending the same shall be binding upon either party unless in writing signed by a duly authorised representative thereof in which writing this Agreement is expressly referred to." Apart from the aforesaid relevant clauses, it would be appropriate to notice a few sections of the Arbitration and Conciliation Act, 1996. Section 2(6) is extracted herein-below in extenso : c _"Sec.2(6)_ : Where this Part, except section 28, leaves the parties free to determine a certain issue, that freedom shall include the right of the parties to authorise any person including an institution, to determine that issue." - D Section 20 is the provision for deciding the place of arbitration, which extracted herein-below in extenso : _"Sec.20 Place of arbitration-_ (I) The parties are free to agree on the place of arbitration. E (2) Failing any agreement referred to in sub-section (I), the place of arbitration shall be determined by the arbitral tribunal having regard to the circumstances of the case, including the convenience of the parties. F (3) Notwithstanding sub-section (I) or sub-section (2), the arbitral tribunal may, unless otherwise agreed by the parties, meet at any place it considers appropriate for consultation among its members, for hearing witnesses, experts or the parties, or for inspection of documents, goods or other property." On a construction of Clause 8.4 of the Agreement, it is apparent that the G parties themselves have maintained a distinction between submission of dispute to the arbitration tribunal and decisions as to the place of arbitration to be determined by a Joint Arbitration Committee of three members. In the first part of the Clause. parties have agreed for referring any dispute or ~!aim arising out of, or relating to the agreement to be s~_!!loo by arbitration of an arbitration tribunal. The second. pJl!(.{}ftlre agreement relates to a decision as H to the venue of arbitration which in the event of lack of agreement between SANSHIN CHEM. INDUS. "·ORIENTAL CARBONS AND CHEM.LTD. [PA TTANAIK, l.) 11 ()9 ..... y "' .. _-#<"_ the parties, is required to be determined by a Joint Arbitration Committee -of A three members. Such decisions of the Committee with regard to the venue is not a decision of a dispute or claim arising out of, or relating to the agreement and, therefore, cannot partake the character of an award or an interim award. Under Section 2(6) of the Arbitration and Conciliation Act, 1996, excepting Section 28, parties are free to detennine certain issues and that freedom would B include the right of the parties to authorised any person including an institution to detennine that issue. Secti~n 20 is the provision which sees that the parties are free to agree on the place of arbitration and failing upon any agreement, then under sub-section (2), it has to be detennined depending upon the circumstances of the case and convenience of the parties. A conjoint reading of Section 2(6) and Section 20, therefore leads to the conclusion that in the c event. parties do not agree with regard to the place of arbitration, though they were free to detenn ine the same, then they had the right to authorise any person including an institution and in the case in hand, the Joint Committee is such an institution for deciding the venue of the arbitration and such decision of the Committee will not partake the character of adjudication of a D dispute arising out of the agreement, so as to clothe it the character of an award. Chapter V of the Act contains Section 18 to 27 and chapter VI deals with making of arbiter award and tenn ination of proceedings which starts with Section 28. The decision on the question of venue under Section 20 would not come within making of an arbitral award starting from Section 28 and on E this view of the matter also, the said decision on the question of venue will not be either an award or an interim award so as to be appealable under Section 34 of the Act. The decision of the Joint Committee on the question of the venue under Clause 8.4 is not a decision, deciding legal rights of the parties under the contract. There is no mutuality and the said Committee is merely a machinery for deciding the question of venue. Such a decision does F not have the characteristics of an arbitration award nor even can it beheld to be an interim award. The conclusion of the Joint Committee is a conclusion on the guidelines contained in second part of Clause 8.4 of the agreement and is not a judicial determination and as such the said conclusion would not amount to an award. In _K.K. Modi_ v. _K.N. Modi & Ors.,_ [1998] SCC 573, this G court considered the question as to whether Clause (9) of the Memorandum of understanding would constitute an arbitration agreement. The Court answered the question in the negative after considering as to what would be the attributes to be present for an agreement to be considered as an arbitration agreement. Paragraph ( 17) of the aforesaid judgment is quoted herein-below in extenso : H H _(_ ## A ## 1110 ## SUPREME COURT REPORTS [200 I] I S.C.R. _"17._ Among the attributes which must be present for an agreement to be considered as an arbitration agreement are : {I) The arbitration agreement must contemplate that the decision of the tribunal will be binding on the parties to the agreement, > (2) that the jurisdiction of the tribunal to decide the right of parties B must derive either from the consent of the parties or from an order of the court or from a statute, the terms of which make it clear that the process is to be an arbitration, ## c (3) the agreement must contemplate that substantive right of parties will be determined by the agreed tribunal, (4) that the tribunal will determine the rights of the parties in an impartial and judicial manner with the tribunal owing an equal obligation of fairness towards both sides, > (5) that the agreement of the parties to refer their disputes to the D decision of the tribunal must be intended to been forceable in-law and lastly, (6) the agreement must contemplate that the tribunal will make a decision upon a dispute which is already formulated at the time when a reference is made to the tribunal." t E The second part of clause 8.4 conferring powers on a Joint committee to decide the question of venue of the arbitration does not satisfy the aforesaid test laid down in _Modi 's_ case and, therefore would not be an arbitration agreement. Necessarily, therefore, the ultimate decision of the said Committee on the question of venue cannot be held to be an award, so as to confer a right of appeal to an aggrieved person under Section 34 of the Act. _Russel_ F _on Arbitration_ in paragraph 2.098 deals with the question of venue of arbitration and the same is quoted herein-below in extenso : _""Ascertaining the seat._ The place of arbitration is often specified in the arbitration agreement, by the selection of a particular place or country in which the arbitration is to be held. If the seat is not agreed G on by the parties, the matter may be resolved by the arbitration institution or person the parties have agreed shou Id have the power to designate the seat, or by the arbitral tribunal if the parties have authorised the tribunal to do so. The rules of various arbitration institutions contain a means of establishing the place of arbitration in H the absence of express agreement by the parties. In all other cases, H SANSHIN CHEM. INDUS. 1•. ORIENTAL CARBONS AND CHEM. LTD. [PATTANAIK, J.] 1111 ' • y -.. ... it is necessary to look at the parties' agreement and· all the relevant A circumstances. A reference to arbitration under the English Arbitration Acts would be construed as implying that English would be the place of arbitration. Similarly, provisions in an arbitration agreement stipulating for arbitration by a local tribunal or institution may indicate the appropriate place of arbitration." B In the present case, the second part of Clause 8.4 of the agreement conceived of the institution of Joint Committee,. which institution had the power to ' decide with regard to the venue and such decision of the said Joint Committee cannot be held to be an award of a arbitral tribunal. In view of our analysis OJI the different provisions of the agreement as well as the provisions of the c Act itself, we are unable to accept Mr. Desai's argument that the agreement conceived of two arbitral proceedings, one in relation to any dispute for the venue and the other in relation to the dispute arising out of the agreement. It would be appropriate for us to notice at this stage that respondent No. 2 had intimated the Manager, Arbitration Department, Japan Commercial D Arbitration Association that the parties had not been able to agree on the place of arbitration within 30 days of the notice, calling upon theni to submit the agreement and, therefore, the said Japan Commercial Arbitration Association could nominate a Member to the Joint Arbitration Committee and pursuant to the said communication from respondent No. 2 the Japan Commercial Arbitration Association, appointed respondent No. 5 as its Member E in the Joint Arbitration Committee by letter dated 25th of October, 1996. The aforesaid conduct of the Japan Commercial Arbitration Association and the unanimous decision of the Joint Arbitration Committee about the venue, is also quite significant in the context of the dispute . E > Besides, bearing in mind the object behind the Arbitration and[F ] Conciliation Act, I 996, as has been indicted by this Court in the case of _Konkan Railway Corpn. Ltd. & Ors. y. Mehual Construction Co.,_ [2000] 7 SCC 201, which is in consonance with the UNClTRA model law, it would not be conducive to interpret the decision of the Joint Arbitration Committee with regard to the venue to be an interim award, conferring a right of challenge G ~[to ][an ][aggrieved person under Section 34 ][of ][the Act. ] Mr. Desai's contention that the question of venue is of utmost importance, since the arbitral proceeding will be conducted in accordance with the rules applicable to the place where the arbitration proceeding is conducted and consequently, denial of a right to appeal against the same is H 1112 [200 I J I S.C.R. ## SUPREME COURT REPORTS - A never contemplated of, requires consideration. It is undoubtedly true that if the arbitration is to be held in India, then the proceeding will be conducted in accordance with the rules applicable in India and if the arbitrations is to be held in Japan, it has to be conducted in accordance with the rules of Japan Commercial Arbitration Association and as such the decision on the question - B of venue is of utmost importance. But the further contention that aggrieved party has no right to assail the same, orice the said decision is not assailed at this stage, does not appear to be correct. The ultimate arbitral award could be assailed on the grounds indicated in sub-section (2) ofSection 34 and an erroneous decision on the question of venue, which ultimately affected .the procedure that has been followed in the arbitral proceeding could come within - C the sweep of Section 34 (2) and as such it cannot be said that an aggrieved party has no remedy at all. This appeal, accordingly fails and is dismissed. K.K.T. Appeal dismissed. t
End of Judgment Record
Browse All Supreme Court of India (2001) Decisions
2001-08-07

Sajan Abraham v. State of Kerala

On 7 August 2001, the Supreme Court rendered its judgment in Sajan Abraham v. State of Kerala arising from a Narcotic Drugs and Psychotropic Substances Act case. The appellant was charged under Section 21 for possession of Buprenorphine and three syringes near Palluruthy, after information from a Head Constable led to seizure by a Special Squad and arrest following an on-site search. The Trial Court acquitted due to inconsistencies; the Kerala High Court, on reappraisal, convicted and sentenced the appellant to ten years’ rigorous imprisonment and a Rs 1 lakh fine. The prosecution contended violations of Sections 42, 50 and 57: failure to record information in writing and communicate it to the immediate superior before arrest; failure to inform the accused in writing of the right to be searched in the presence of a Magistrate or Gazetted Officer; and non-submission of a full report within 48 hours. The Supreme Court adopted a pragmatic approach to mandatory provisions in the NDPS Act, recognizing the stringent nature of the statute but allowing substantial compliance to suffice when it results in no prejudice and promotes timely action to prevent escape. It held that the information was conveyed promptly, the Section 50 right was validly communicated orally, and that copies of FIR and seizure records were sent to the superior, satisfying substantial compliance with Section 57. Citing State of Punjab v Baldev Singh and Balbir Singh, the Court dismissed the appeal, upholding the conviction and sentence.

2001-08-08

P. C. Joshi v. State of U.P. and ORS.

This Supreme Court appeal concerns a judicial officer challenged termination following disciplinary proceedings. The Allahabad High Court had dismissed a writ petition filed by the appellant after the Enquiry Officer held him guilty of several charges, including missteps in bail orders. The central issue was whether initiation of disciplinary action is warranted where an order is faulty or where a different action could have been taken. The Court emphasized that a bona fide erroneous exercise of judicial powers cannot be treated as misconduct and warned against a chilling effect on judicial independence: if every faulty judgment triggered a disciplinary inquiry, subordinate judges would fear writing judgments. It relied on established constitutional principles that safeguard the independence of the judiciary and prevent routine harassment through disciplinary machinery over minor or non-mala fide errors. The Court referred to the tests laid down in Union of India v. A.N. Saxena and Union of India v. K.K. Dhawan for determining when disciplinary action may be initiated. In evaluating the bail-related charges, the Court found that the Enquiry Officer’s conclusions rested on inferences rather than legally tenable evidence, rendering substantial parts of the findings vitiated. Consequently, the judgment of the High Court was set aside and the appellant was reinstated with continuity of service and arrears of salary, with no costs.

2001-04-09

Bank of India v. Secretary, Bank of India Staff Union and Anr.

Bank of India v. Secretary, Bank of India Staff Union and Anr. concerns entitlement to special 'Special Assistant' allowances for staff serving as clearing-house representatives. The Industrial Tribunal-cum-Labour Court at Kanpur held that the concerned workmen were entitled to special assistant allowances for the number of days they worked at various collection centres and clearing-house duties, with payment to be made for the days actually worked from the date of reference. The Bank challenged the award on two fronts: first, that the duties performed by the workers did not require the greater skill and responsibility of a Special Assistant, being largely clerical in nature; and second, that the Special Assistant duties were defined by the Bipartite Settlements (1966 and its modifications, including 1984) and awards (Sastry and Desai). The workers contended that they performed duties as authorised representatives at clearing houses of RBI and State Bank of India and carried out routine bank duties connected with clearing. On appeal, the Supreme Court found that the Tribunal had not adjudicated the precise duties and responsibilities with reference to the parties’ contentions and evidence, and there was no concrete finding that the workers discharged duties warranting Special Assistant status. The Court set aside the Tribunal’s award and remitted the matter for fresh consideration, directing examination of the exact duties in light of the Bipartite Settlements and Sastry/Desai framework.

2001-09-13

KANHAIYALAL AGRAWAL AND ORS. v. THE FACTORY MANAGER, GWALIOR SUGAR CO. LTD.

These cross-appeals arise from termination of employees by the Gwalior Sugar Company. The Labour Court held that three workmen—Kanhaiyalal Agrawal and two others—had contravened prescribed procedures and, on the basis of evidence, found loss of confidence in them, denying reinstatement and awarding half salary with full retirement benefits. The Industrial Court, by contrast, held that the employees had not committed misappropriation of money but were negligent in performing their duties, and directed reinstatement without back wages. A Single Judge of the Madhya Pradesh High Court upheld the Industrial Court’s order. A Division Bench of the High Court dismissed the writ appeals on the ground that they arose under Article 227 (revisional jurisdiction) and were not maintainable. The present appeals before the Supreme Court, by management and workmen, focus on whether loss of confidence can be reversed and whether back wages should be payable. The Supreme Court held that the Industrial Court was correct in reversing the Labour Court’s finding of loss of confidence since such loss must be based on objective facts rather than subjective managerial belief. It affirmed the permissibility of reinstatement without back wages and declined to disturb the earlier orders, dismissing the appeals with no costs.