Case Synopsis & Summary

This Supreme Court appeal concerns the enforceability of two ex-parte arbitral awards against the State of Uttar Pradesh and a principal of a medical college, where the employee had pursued age of retirement disputes and claimed arbitration. The employee, R.K. Pandey, initiated arbitration proceedings in 2008 relying on an alleged arbitration agreement dated 01.04.1957 between the Municipal Board Kanpur and the Government of Uttar Pradesh. The writ petition challenging retirement age had been pending since 1997 and was later withdrawn; the two ex-parte awards (dated 15.02.2008 and 25.06.2008) were passed by two arbitrators appointed by Pandey himself, without the opposite party appointing any arbitrator, and purportedly against the State and the Principal of GSVM Medical College. The authenticity of the arbitration agreement was disputed by the State and the hospital authorities, and no certified record of the agreement exists in the transfer deed or on record. The trial court and Allahabad High Court rejected objections on limitation and other grounds. The Supreme Court held that an arbitration agreement is sine qua non for arbitration to be valid, and that the alleged agreement was not proven; the awards were thus void ab initio and non-enforceable. The Court relied on Bilkis Yakub Rasool to emphasize that fraud renders arbitration unenforceable and treated the proceedings as a sham.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Sanjiv Khanna
  • Sanjay Kumar
  • R. Mahadevan
Judgment Date
2025-01-09
Court Decision / Holding
Appeal allowed. The two ex parte awards dated 15.02.2008 and 25.06.2008 are to be treated as null and void and non-enforceable in law. The execution proceedings are dismissed, and the appellants are entitled to costs.
Final Disposition
Appeal allowed

Parties to the Case

Appellants / Petitioners

  • State of Uttar Pradesh
  • Another

Respondents

  • R.K. Pandey
  • Principal, GSVM Medical College, Kanpur

Legal Representation & Advocates

Counsels for Petitioners

  • • Ankit Goel
  • • Vikas Bansal
  • • Nikhil Sharma

Counsels for Respondents

  • • Mrs. Deepika Mishra
  • • Abhishek Misra
  • • Ms. Abha Jain
  • • Jaivir Singh

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 – Section 7Arbitration and Conciliation Act, 1996 – Section 11Arbitration and Conciliation Act, 1996 – Section 34Code of Civil Procedure, 1908 – Section 47Limitation Act 1963 – Section 3 (read with Section 43 of the A&C Act)

Legal Doctrines & Maxims

  • Arbitration agreement is sine qua non for arbitration
  • Party autonomy in arbitration
  • Fraud and justice never dwell together
  • Arbitration is quasi-judicial and requires impartial, independent arbitrators
  • Equity applies at the stage of appointment of arbitrators (as per Central Organisation of Railway Electrification v. ECI PIC SMO MCPL (JV))

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants argued that the arbitration agreement relied upon by the respondent did not exist on record and that the purported arbitration proceedings were a sham. They submitted that there is no certified, authenticated copy of the so-called arbitration agreement dated 01.04.1957 and that the transfer deed of 1961 does not reference any arbitration clause. Because arbitration rests on party autonomy, the absence of a valid agreement renders the ex-parte awards unenforceable. They also emphasized that the claims were barred by limitation and that the two awards were obtained by employing unilateral, self-selected arbitrators, violating the agreed arbitration process. They urged that Section 7 of the A&C Act defines the arbitration agreement, and without it there can be no valid award enforceable by law; hence the execution of the awards should be dismissed.

Contentions of Respondents

The respondents contended that an arbitration agreement existed between the Municipal Board Kanpur and the Government, and that the two ex-parte awards were the result of a valid arbitration process. They argued that Pandey had appointed the arbitrators when the opposite party did not, and that the arbitration clause was intended to govern disputes concerning the hospital's transfer and retirement matters. They asserted that the writ petition, though withdrawn, did not extinguish the reference to arbitration, and the awards should be enforceable under the A&C Act. They argued for enforcement of the arbitral awards and maintained that limitations were either misapplied or inapplicable to the proceedings.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Bilkis Yakub Rasool v. Union of India and Others[2024] 1 SCR 743 : (2024) 5 SCC 481PositiveThe Court relies on the principle that fraud and justice cannot coexist; awards obtained through fraud cannot be enforced, supporting the decision to set aside the challenged awards.
Central Organisation of Railway Electrification v. ECI PIC SMO MCPL (JV), a Joint Venture Company2024 INSC 857PositiveCited for the proposition that equity governs the appointment of arbitrators and underscores the importance of proper appointment procedures; reinforces the analysis of lack of jurisdiction when arbitrators are unilaterally appointed.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,744 words•~18 min read

In The Court Record

State of Uttar Pradesh and Another v. R.K. Pandey and Another

[2025] 1 S.C.R. 403 : 2025 INSC 48 # **State of Uttar Pradesh and Another** ## **v.** ## **R.K. Pandey and Another** (Civil Appeal No. 10212 of 2014) 09 January 2025 # **[Sanjiv Khanna,* CJI, Sanjay Kumar and R. Mahadevan, JJ.]** ## **Issue for Consideration** Matter pertains to the enforceability of the ex-parte awards against the employer-State Government and the principal of the medical college, when the employer objected the authenticity of the arbitration agreement relied on by the employee. ## **Headnotes[†]** **Arbitration and Conciliation Act, 1996 – Ex-parte arbitral awards – Enforcement by employee, when denial of the authenticity of the arbitration agreement by employer – Service dispute by the employee against the State Government and the government hospital where he was employed as regards age of superannuation – Writ petition remained pending for 12 years, thereafter was withdrawn – Year before, the employee initiated arbitration proceedings against the State Government and the principal of the medical college – Suit for reference filed which was later withdrawn without any decision on merits with the two sole arbitrators appointed by the employee, suo moto taking up the arbitration proceedings and pronouncing the two awards, for an amount of around Rs.46 lakhs with interest against the State and the Principal of the Medical College – Thereafter, employee sought enforcement of ex-parte awards – Employer objected the authenticity of the arbitration agreement relied on by employee – However, the courts below dismissed the objections – Correctness:** **Held:** Arbitration agreement is sine qua non for arbitration proceedings, as arbitration fundamentally relies on the principle of party autonomy-right of parties to choose arbitration as an alternative to court adjudication – Existence of the arbitration agreement is a prerequisite for an award to be enforceable in the eyes of law – * Author [2025] 1 S.C.R. 404 ## **Digital Supreme Court Reports** On facts, arbitration proceedings were a mere sham and a fraud played by employee, by self-appointing/nominating arbitrators, who have passed ex-parte and invalid awards – Clear case of lack of subject matter jurisdiction – So-called arbitration agreement nowhere available on the records of either the Municipal Corporation or the State – Employee did not file the original agreement since he was not in possession of the same, nor is he a signatory and party to the arbitration agreement – Hospital and the Governor did not endorse any such agreement – Arbitration Agreement is not referred to in the indenture of the transfer executed – No evidence to show the existence of the arbitration agreement, except a piece of paper, which is not even a certified copy or authenticated copy of the official records – Notwithstanding that the claims made by employee were ex-facie and clearly barred by limitation as per s.3 of the Limitation Act 1963 rw s.43 they have been allowed – Thus, ex parte awards set aside and to be treated as null and void and non-enforceable in law – Impugned judgment set aside. [Paras 20-25] ## **Case Law Cited** _Bilkis Yakub Rasool v. Union of India and Others_ **[2024] 1 SCR 743 : (2024) 5 SCC 481;** _Central Organisation of Railway Electrification v. ECI PIC SMO MCPL (JV), a Joint Venture Company,_ **2024 INSC 857 – referred to.** ## **List of Acts** Arbitration and Conciliation Act, 1996; Code of Civil Procedure, 1908; Limitation Act 1963. ## **List of Keywords** Enforceability of ex-parte awards; Authenticity of the arbitration agreement; Ex-parte arbitral awards; Age of superannuation; Arbitration proceedings; Arbitration agreement; Lack of jurisdiction; Certified copy or authenticated copy of official records; Unilateral appointment of arbitrator by employee; Barred by limitation; Jurisdiction; Execution proceedings. ## **Case Arising From** CIVIL APPELLATE JURISDICTION: Civil Appeal No. 10212 of 2014 From the Judgment and Order dated 28.02.2012 of the High court of Judicature at Allahabad in FAFO No. 352 of 2012 [2025] 1 S.C.R.  405 **State of Uttar Pradesh and Another v. R.K. Pandey and Another** ## **Appearances for Parties** Ankit Goel, Vikas Bansal, Nikhil Sharma, Advs. for the Appellants. Mrs. Deepika Mishra, Abhishek Misra, Ms. Abha Jain, Jaivir Singh, Advs. for the Respondents. ## **Judgment / Order of the Supreme Court** ## **Judgment** ## **Sanjiv Khanna, CJI** Delay condoned. 2. This appeal arises from an order dated 28.02.2012 passed by a Division Bench of the High Court of Judicature at Allahabad in First Appeal from Order Defective No. 352/2012. 3. The facts, in brief, are – Respondent no. 1, R.K. Pandey, was appointed as a Lab Assistant/ Technician in the T.B. Section of Dina Nath Parbati Bangla Infectious Disease[1] Hospital located at Kanpur. The Municipal Board of Kanpur set up this hospital on the land given by the Kanpur Improvement Trust in 1944-45. 4. On 17.07.1956, DNPBID Hospital was taken over by the State Government, that is, the Government of Uttar Pradesh, to establish a new medical college at Kanpur pursuant to a Resolution dated 17.07.1956 passed by the Administrator of the Municipal Board of Kanpur and six members of the Board of the hospital. On 29.03.1957, the State Government accepted the proposal dated 17.07.1956. 5. On 20.06.1961, a transfer deed was executed between the Nagar Mahapalika of the City of Kanpur and the Governor of the State of Uttar Pradesh. The said deed has been placed on the record. It states that in terms of the G.O. dated 29.03.1957, the entire municipal staff of the hospital, as per the list attached to the indenture, will stand transferred to the State Government service. The staff will not be unfavourably placed as regards emoluments or other service conditions, nor shall they suffer in the matter of emoluments, leave, age of retirement, and other benefits as compared to the terms of service of the Board. 1 Hereinafter, “DNPBID.” [2025] 1 S.C.R. 406 ## **Digital Supreme Court Reports** 6. After the settlement was executed, the hospital became a unit of Ganesh Shanker Vidayarthi Memorial[2] Medical College, Kanpur. Thereupon, it is apparent that the employees working in DNPBID Hospital opted for service under the State Government and had sent their consent which was accepted. Thereafter, their service records were sent to the State Government. It was agreed that the concessions and privileges enjoyed by the staff before the aforesaid hospital were provincialized and will continue in future and they will not be put to a disadvantage by the take-over. The Board agreed to pay Rs.50,000/- keeping in view the liability of the Municipal Board. 7. _Vide_ letter dated 09.01.1997, the Chief Medical Superintendent of the hospital, now a State Government hospital, informed Respondent No. 1, R.K. Pandey that he would be superannuating on 31.03.1997. He was requested to contact the office along with pension papers and submit the same within one week so that the process can be initiated. 8. In March 1997, Respondent No. 1, R.K. Pandey, filed a writ petition before the High Court of Judicature at Allahabad claiming that he should retire at the age of 60 years instead of 58 years, relying upon the service rules as applicable to the employees of the Municipal Board of Kanpur. 9. Pursuant to the filing of the writ petition, Respondent No.1, R.K. Pandey was directed to make a representation. While a representation was indeed made, it was subsequently rejected observing that the respondent had been in service of the State Government for 42 years and was availing all pay and allowances, as per the State Government rules. 10. The State Government filed an affidavit opposing the writ petition _inter alia,_ stating that Respondent No. 1, R.K. Pandey, having acquired the status of State Government service was bound and governed by the rules and regulations of the State Government. It was also stated that the minimum age for entering the government service is 18 years, and if a government servant retires at the age of 58 years, he would have completed 40 years of service. In the present case, Respondent No. 1, R.K. Pandey had completed service of 42 years of service. In other words, he would be 60 years of age. 2 Hereinafter, “GVSM.” [2025] 1 S.C.R.  407 ## **State of Uttar Pradesh and Another v. R.K. Pandey and Another** 11. No interim order was passed in the writ petition, which remained pending till it was withdrawn by Respondent No. 1, R.K. Pandey on 22.04.2009. Consequently, the prayers made in the writ petition were not granted. 12. Notwithstanding the pendency of the writ petition, on 11.01.2008, Respondent No. 1, R.K. Pandey, filed an arbitration suit before the District Judge, Kanpur Nagar, Kanpur, relying upon an alleged arbitration agreement dated 01.04.1957 between the then Administrator of the DNBPID Hospital and the Governor of Uttar Pradesh. The prayer sought was for the dispute regarding Respondent No. 1, R.K. Pandey’s age of superannuation and the rejection of his representation dated 03.04.1997 by the Principal of GVSM Medical College be referred to arbitration. However, the arbitration agreement was not mentioned either in the writ petition or in the application for its withdrawal. Subsequently, on 15.02.2008, Respondent No. 1, R.K. Pandey, withdrew the suit seeking to refer the disputes to arbitration. 13. On 29.11.2008, Respondent No. 1, R.K. Pandey, filed two execution petitions before the District Judge in Kanpur, seeking to enforce two separate _ex parte_ awards issued on 15.02.2008 and 25.06.2008 by Advocates Pawan Kumar Tewari and Indivar Vajpayee. These proceedings were initiated by Respondent No. 1 against the State Government and the Principal of GSVM Medical College, Kanpur. 14. The first _ex-parte_ award dated 15.02.2008 decreed the claim of Respondent No. 1, R.K. Pandey for an amount of Rs.26,42,116/- with interest at the rate of 18 % per annum from 21.01.2008 against the State of Uttar Pradesh and the Principal GSVM Medical College, Kanpur. The award states that Respondent No. 1, R.K. Pandey had appointed/ nominated the Arbitrator and there was non-appointment by the opposite party and, therefore, Pawan Kumar Tewari, Advocate had acted as the sole Arbitrator. 15. The second _ex parte_ Award dated 25.06.2008 passed by Indivar Vajpayee awarded an amount of Rs.20,00,000/- along with interest at the rate of 9% per annum with effect from 11.02.2008 in favour of Respondent No. 1, R.K. Pandey, and against the opposite party, viz. the State of Uttar Pradesh and the Principal of GSVM Medical College, Kanpur. The Award states that Respondent No. 1 had appointed Indivar Vajpayee as an Arbitrator on 25.06.2008, _albeit_ the opposite party had not appointed an Arbitrator and, hence Indivar Vajpayee acted as the sole Arbitrator. [2025] 1 S.C.R. 408 ## **Digital Supreme Court Reports** 16. The appellant on receiving notice in the execution petition filed _viz._ the Award given by Indivar Vajpayee, filed objections against the two awards under Section 34 of the Arbitration and Conciliation Act, 1996.[3] One of the issues raised before the executing court concerned the existence of the arbitration agreement, purportedly dated 01.04.1957, which Respondent No. 1, R.K. Pandey, relied upon. This agreement was claimed to have been executed and signed on behalf of the Administrator of the Municipal Board and the Additional Secretary of the Government of Uttar Pradesh. 17. The authenticity of this document was denied. Notably, this document or the arbitration agreement is not reflected in the transfer deed executed on 20.06.1961. Furthermore, the purported arbitration agreement was neither mentioned in the writ petition filed by Respondent No. 1, R.K. Pandey, in March 1997, nor referenced in any correspondence or related documents until Respondent No. 1, R.K. Pandey, filed a petition under Section 11 of the A&C Act, for the appointment of an arbitrator on 11.01.2008. By this petition, Respondent No. 1, R.K. Pandey, had prayed for the appointment of an arbitrator. As recorded above, the said petition was dismissed as withdrawn on 15.02.2008, which was also the date on which the first award for Rs.20,00,000/- with interest at the rate of 18 % per annum was passed by Pawan Kumar Tewari, Advocate. The second Award by Indivar Vajpayee dated 25.06.2008 is also pursuant to the appointment of an arbitrator by Respondent No. 1, R.K. Pandey without recourse to court proceedings. 18. The objections filed by the appellants under Section 34 of the A&C Act were dismissed by the trial court on the ground that they were barred by limitation and had been filed beyond the condonable period. Interestingly, during the pendency of the said objections, a query had been raised as to the existence of the arbitration agreement dated 01.04.1957, which was relied upon by Respondent No. 1, R.K. Pandey. In a reply given by the Municipal Corporation/Mahanagar Palika to the Advocate appointed by District Government Counsel (Civil), Kanpur Nagar, it was stated that the photocopy furnished of the agreement was not clear and there was no such agreement available on the record. Hence, it was 3 Hereinafter, “A&C Act.” [2025] 1 S.C.R.  409 ## **State of Uttar Pradesh and Another v. R.K. Pandey and Another** not possible to verify the said document. The purported agreement dated 01.04.1957 is not signed and executed by Respondent No. 1, R.K. Pandey, and a copy of the agreement is not marked to him. The authenticity of the agreement cannot be established as it is not available on the record of the Municipal Board. The State Government, as is evident, has denied the existence of any such agreement. 19. The impugned judgment passed by the Division Bench of the High Court of Judicature at Allahabad dismissed the _intra court_ appeal on the grounds that the objections itself were barred by limitation and beyond the condonable period. 20. We have narrated the facts in detail as they are peculiar, and intervention by this Court is necessary to prevent any attempt to enforce the so-called awards, which are null and void ab initio for several reasons. This Court in its decision in _**Bilkis Yakub Rasool v. Union of India and Others**_ ,[4] observes that fraud and justice never dwell together, and a litigant should not be able to benefit from a fraud practiced with an intention to secure him an illegal benefit. In the present case, the so-called arbitration agreement is nowhere available on the records of either the Municipal Corporation or the State of Uttar Pradesh. Respondent No. 1, R.K. Pandey, did not file the original agreement since he was not in possession of the same, nor is he a signatory and party to the arbitration agreement. An arbitration agreement is _sine qua non_ for arbitration proceedings, as arbitration fundamentally relies on the principle of party autonomy; - the right of parties to choose arbitration as an alternative to court adjudication. In this sense, ‘existence’ of the arbitration agreement is a prerequisite for an award to be enforceable in the eyes of law. No doubt, Section 7 of the A&C Act, which defines the ‘arbitration agreement’, is expansive and includes an exchange of statements of claim and defence in which the existence of the agreement is alleged by one party and not denied by the other party, albeit the existence of the arbitration agreement is not accepted by either the Municipal Corporation or the Appellant, the State of Uttar Pradesh. The Arbitration Agreement is not referred to in the indenture of the transfer executed later 4 [2024] 1 SCR 743 : (2024) 5 SCC 481 [2025] 1 S.C.R. 410 ## **Digital Supreme Court Reports** on 20.06.1961. There is no evidence to show the existence of the arbitration agreement, except a piece of paper, which is not even a certified copy or an authenticated copy of the official records. How and from where RK Pandey, Respondent No. 1, got a copy of the agreement, and that too nearly 10 years after his retirement and filing of a writ petition remains unknown. 21. The arbitration agreement, as propounded, is between the Municipal Corporation and Development Board, Kanpur, and the appellant, the Governor of the State of Uttar Pradesh. For the sake of reference, the arbitration agreement is reproduced: “This Arbitration Agreement made on the First April, One Thousand Nine Hundred Fifty Seven between the Municipal and Development Board Kanpur (hereinafter called the Board) of the one part and the Governor of Uttar Pradesh (hereinafter, called the Government) of the other part. It is mutually agreed by the and between the parties as follows: All disputes or difference whatsoever which shall if any time arise between the parties including the employees of Provincialized DN Bangla I.D. Hospital, Kanpur, hereto touching or concerning the resolution passed by the Managing Committee of the said Hospital at the meeting held on 17.07.1956, which was accepted by the Government, shall be referred to the Arbitrators nominated by the Principal GSVM Medical College, Kanpur and the administrator of the Board or employees of the said provincialized Hospital for arbitration under the Arbitration Act. Any statutory modification of re-enactment thereof and the rules made thereunder for the time being enforced shall apply to the Arbitration proceedings. If one party nominates the arbitrator and refers the dispute to the nominated arbitrator for adjudication in writing notice to the other party and the other party fails to nominate the arbitrator within 10 days then the arbitrator nominated by the First Party shall be final and act as a sole arbitrator. The award of the arbitrators/sole arbitrator shall be final and binding on the parties. [2025] 1 S.C.R.  411 ## **State of Uttar Pradesh and Another v. R.K. Pandey and Another** This agreement signed by the administrator on behalf of the Board and the Additional Secretary of the Government of UP on behalf of the Government. M.A. Quraishi, I.C.C. Administrator Municipal & Development Board Kanpur G.P. Pandey, Addl. Secretary to the Govt. of UP” The agreement postulates that each party, that is, the Municipal and Development Board, Kanpur, and the Governor of Uttar Pradesh, may nominate an arbitrator for adjudication by giving written notice to the other party. In the event the other party fails to nominate an arbitrator within ten days, the arbitrator nominated by the first party shall act as the sole arbitrator. It was not the case of Respondent No. 1, R.K. Pandey that the Municipal and Development Board, Kanpur, or the Governor of Uttar Pradesh has invoked the arbitration clause. The unilateral appointment of the arbitrator by Respondent No. 1, R.K. Pandey is, therefore, contrary to the arbitration clause as propounded by him. 22. Another intriguing aspect is the delay in relying on the arbitration agreement and initiating arbitration proceedings. Respondent No. 1, R.K. Pandey, himself filed the writ petition in 1997 concerning the same dispute. The writ petition had remained pending till 22.04.2009, when it was withdrawn. It is during the pendency of the petition, that the steps for initiation of arbitration were taken on 11.01.2008 by Respondent No.1, R.K. Pandey, by filing a suit for reference in terms of Section 11 of the A&C Act. However, the petition was later withdrawn without any decision on merits with the two sole arbitrators appointed by Respondent No. 1, R.K. Pandey, _suo moto_ taking up the arbitration proceedings and pronouncing the two awards, the first dated 15.02.2008 for an amount of Rs.26,42,116/- with interest at the rate of 18% per annum, and the second dated 25.06.2008 for an amount of Rs.20,00,000/- along with interest at the rate of nine percent per annum with effect from 11.02.2008, against the Appellants, the State of Uttar Pradesh and the Principal of GSVM Medical College, Kanpur. Notwithstanding that the claims made by Respondent No. 1, R.K. Pandey, were _ex-facie_ and clearly barred [2025] 1 S.C.R. 412 ## **Digital Supreme Court Reports** by limitation as per Section 3 of the Limitation Act 1963 read with Section 43 of the A&C Act, they have been allowed. 23. A 5-Judge Constitution Bench of this Court in _**Central Organisation of Railway Electrification v. ECI PIC SMO MCPL (JV), a Joint Venture Company[5]**_ has observed that equity applies at the stage of appointment of arbitrators, though the A&C Act recognizes the autonomy of parties to decide on all aspects of arbitration. The enactment lays down a procedural framework to regulate the composition of the arbitral tribunal and conduct of arbitration proceedings. It is only then that the arbitral tribunals, which have the backing of courts, can act objectively and exercise their discretion in a judicial manner, without caprice and in accordance with the principles of law and rules of natural justice. This is the core of the alternate dispute redressal mechanism, which is also the core of Section 18 of the A&C Act and is a non-derogable and mandatory provision. It is only then the arbitrators are vested with the power to resolve the dispute under the law. This judgment also observed that the unilateral appointment of arbitrators has a direct effect on the conduct of arbitral proceedings. Arbitration, which is _quasi-judicial_ , requires a standard of behaviour of arbitrators, which is impartial and independent, no less stringent than that demanded of judges. In fact, arbitrators are expected to uphold a higher standard, as court decisions are subject to the collective scrutiny of an appeal, while an arbitration award typically enjoys greater acceptability, recognition, and enforceability. 24. We have made our observations in the context of Section 47 of the Code of Civil Procedure, 1908, which even at the stage of execution, permits a party to object to the decree, both on the grounds of fraud, as well as lack of subject matter jurisdiction. It is apparent that the arbitration proceedings were a mere sham and a fraud played by Respondent No.1, R.K. Pandey, by self-appointing/nominating arbitrators, who have passed _ex-parte_ and invalid awards. To reiterate, Respondent No. 1, R.K. Pandey, is not a signatory to the purported arbitration agreement. Moreover, the parties thereto, DNPBID Hospital and the Governor of Uttar Pradesh, do not endorse any 5 2024 INSC 857 [2025] 1 S.C.R.  413 ## **State of Uttar Pradesh and Another v. R.K. Pandey and Another** such agreement. From the cumulative facts and reasons elucidated above, this is a clear case of lack of subject matter jurisdiction. 25. Accordingly, we allow the present appeal and set aside the two _ex parte_ Awards dated 15.02.2008 and 25.06.2008. Both the Awards shall be treated as null and void and non-enforceable in law. Resultantly, the judgment passed, and the subject matter of the appeal shall be treated as set aside. The execution proceedings shall stand dismissed. The appellants will be entitled to costs of the entire proceedings as per the law. _Result of the case:_ Appeal allowed. - _†Headnotes prepared by:_ Nidhi Jain
End of Judgment Record
Browse All Supreme Court of India (2025) Decisions
2025-01-03

Krishna Devi @ Sabitri Devi (Rani) M/s S.R. Engineering Construction v. Union of India & Ors.

Krishna Devi @ Sabitri Devi (Rani) approaches the Supreme Court seeking pronouncement of judgment in terms of an arbitral award under Section 17 of the Arbitration Act, 1940. The appellant’s husband secured a favourable award on 31 May 2022 in a dispute over a Tezpur work contract. Although the award was not published due to outstanding arbitrator fees, a district court order dated 21 September 2022 directed the respondents to clear the balance and stated that once paid, the award would be furnished. The appellant filed a Section 17 application on 10 November 2022 seeking the court to pronounce judgment in terms of the award. The trial court and the Gauhati High Court held the application premature, because it was filed before the expiry of the 30-day objections window under Article 119(b) of the Limitation Act, calculated from 18 November 2022 (alleged formal notice). The Supreme Court, however, held that the start of limitation is not tied to a formal notice but to awareness of the award’s existence. It relied on earlier decisions establishing that Section 14(2) only requires awareness that an award exists; a court’s order directing payment of fees can constitute such notice. Consequently, the 30-day limitation expired by 20 October 2022, rendering the Section 17 application timely. The appeal is allowed, and directions are issued to dispose of the related matter expeditiously with no costs.

2025-03-04

Saranga Anilkumar Aggarwal v. Bhavesh Dhirajlal Sheth & Ors.

This Civil Appeal concerns whether execution of penalty orders imposed by the National Consumer Disputes Redressal Commission (NCDRC) can be stayed under the interim moratorium provisions of Section 96 of the Insolvency and Bankruptcy Code, 2016 (IBC), while insolvency proceedings are pending under Section 95 of the IBC. The appellant, a real estate developer, sought a stay of 27 penalties levied for deficiency in service and delay in possession of residential units, arguing that an application under Section 95 of the IBC had triggered an interim moratorium. The NCDRC had rejected the stay, holding that consumer-claims and penalties are not “debts” within the moratorium’s ambit. The Supreme Court affirmed that the damages awarded in consumer disputes arise to compensate home-buyers and deter malpractice, and are not ordinary contractual debts susceptible to IBC restructuring; such damages fall within the category of “excluded debts” under Section 79(15) of the IBC, and their enforcement remains unaffected by insolvency proceedings. The Court emphasized the essential distinction between debt-recovery proceedings and regulatory/penal actions under consumer protection laws, rejected reliance on contrary authorities (notably Sheetal Gupta per incuriam), and held that criminal penalties under the CP Act do not automatically fall within the moratorium. The appeal was dismissed; the appellant was directed to comply with the NCDRC penalties within eight weeks.

2025-04-09

Serious Fraud Investigation Office v. Aditya Sarda

This batch of sixteen interconnected criminal appeals arises from SFIO's complaint against multiple respondents including Aditya Sarda for serious economic offences under the Companies Act, 2013 and the IPC. The Special Court at Gurugram took cognizance of the offences and issued bailable warrants to the accused, who allegedly concealed themselves or otherwise obstructed the process. Non‑bailable warrants were issued, and some proclamations under CrPC Section 82 were initiated against certain respondents. The High Court granted anticipatory bail to several respondents, notwithstanding the cognizance, warrant proceedings, and proclamations, leading to a series of challenges before the Supreme Court. The Court emphasises that anticipatory bail is an extraordinary remedy not available as a routine in cases involving serious economic offences, and that the twin mandatory conditions in Section 212(6) of the Companies Act, 2013 must be considered: (i) Public Prosecutor must be given an opportunity to oppose; and (ii) where opposed, the court must be satisfied of reasonable grounds to believe the accused is not guilty and unlikely to commit an offence while on bail. It reasons that respondents who evade process by concealing themselves after cognizance and after non‑bailable warrants were issued should not receive anticipatory bail. Accordingly, the High Court orders granting anticipatory bail are set aside, and the respondents are directed to surrender within one week to the Special Court, with subsequent bail determinations to be made in accordance with law. The judgment reiterates that economic offences require a cautious, exception‑based approach to bail and underscores the importance of ensuring due process and the unobstructed progress of judicial proceedings.

2025-03-04

K.S. Mehta v. M/s Morgan Securities and Credits Pvt. Ltd.

This is a Supreme Court decision under Criminal Appeal No. 1105 of 2025 arising from quashing under Section 482 CrPC of criminal proceedings instituted under Section 138 read with Section 141 of the Negotiable Instruments Act, 1881. The appellants, K.S. Mehta and Basant Kumar Goswami, were non-executive directors of M/s Blue Coast Hotels & Resorts Ltd., chosen to meet SEBI’s governance requirements (Clause 49 of Listing Agreement). They were not present at the 09.09.2002 board meeting that approved an Inter-Corporate Deposit (ICD) of ₹5 crores nor signatories to the ICD agreement or related instruments. Later, two cheques issued to discharge the debt were dishonored, leading to criminal proceedings against the directors. The High Court of Delhi dismissed petitions under Section 482 CrPC seeking quashing. The Supreme Court held that non-executive and independent directors cannot be fastened with vicarious liability under Section 141 NI Act unless the record demonstrates their direct involvement in the company’s affairs at the relevant time. Here, there was no evidence of their involvement, no signatory status, and mere attendance at board meetings cannot establish liability. The Court emphasized the need for specific averments showing the director was in charge of and responsible for the company’s conduct. Consequently, the proceedings against the appellants were quashed and the appeals allowed.