Criminal Appeal No. 524 of 2019 (and connected matters) This Supreme Court judgment consolidates several Special Leave Petitions challenging High Court orders directing interim release of forest vehicles seized during alleged illegal sand extraction at Chambal. The core issue is whether a Magistrate can order interim custody release under Section 451 CrPC when confiscation proceedings under the Indian Forest Act, as amended for Madhya Pradesh by MP Act 25 of 1983, are in motion. The Court traces the statutory framework: seizure of forest produce and related tools (52(1)); initiation of confiscation proceedings by an authorised officer (52(3)); an intimation to the Magistrate and safeguards before confiscation (52(4)); appellate (52-A) and revisional (52-B) avenues; and the bar on jurisdiction (52-C). It contrasts parallel criminal prosecutions with independent confiscation proceedings and endorses the Madhya Pradesh amendments that separate forest-confiscation from CrPC prosecutions, giving primacy to the confiscation machinery to deter wrongdoing and protect forests. Citing earlier cases such as GV Sudhakar Rao, Yaseen, Kunchindammed, Rana, and Kallo Bai, the Court distinguishes or follows them to underscore that, once confiscation is initiated, the criminal court’s jurisdiction to order interim custody under CrPC is ousted. Result: appeals allowed; High Court orders directing release are set aside; the mechanism to preserve forest produce under the Forest Act prevails.
Civil Appeal No. 825 of 2021 (Special Leave Petition (Civil) No.8718 of 2020) This is a Supreme Court Civil Appeal arising from a Section 11(6) petition for appointment of a Sole Arbitrator to adjudicate disputes between Pravin Electricals Pvt. Ltd. (appellant) and Galaxy Infra and Engineering Pvt. Ltd. (respondent) over a supposed Consultancy Agreement dated 7 July 2014 in relation to a tender floated by SBPDCL for strengthening distribution systems in 20 Bihar towns. The Delhi High Court had directed production of the original agreement and ordered an arbitrator after CFSL testing, ultimately adjudging the existence of an arbitration agreement. The appellant denied ever signing the 7 July 2014 document and questioned the existence of a concluded contract, pointing to drafts, emails, invoices addressed to another entity (Process), and inconsistencies in notarization and signatures. The Supreme Court, relying on Vidya Drolia and related precedents, holds that the question of the existence and validity of an arbitration agreement is to be treated under a prima facie standard at the referral stage, with the Arbitral Tribunal having competence-competence to decide non-arbitrability and merits. It sets aside the High Court’s determination of existence but upholds the appointment of Justice G.S. Sistani as Sole Arbitrator, directing him to first decide whether an arbitration agreement exists and then proceed to the merits if established.
Civil Appeal No. 894 of 2020 This batch scales a long, fact-intensive dispute about pension eligibility of former Uttar Pradesh Roadways employees after their absorption into the Uttar Pradesh State Road Transport Corporation (UPSRTC). The core issue is whether appellants—Roadways’ retired personnel—held pensionable posts before or after absorption and thus qualify for pension, given the sequence of government orders (GO) from 1960 and 1972, and Article 350 of the UP Civil Service Regulations, including Note 3 (which excluded certain non-gazetted posts). The Court traces the historical trajectory: Roadways was created in 1947 as a temporary department; 1960 GO reforms laid out service conditions and pension eligibility for permanent staff; 1972 saw the Corporation’s creation and the assurance that absorbed staff would not suffer inferior conditions; 1981 Regulations and 1982 absorption rules structured subsequent entitlements; amendments such as the 1977 Note 3 to Article 350 narrowed pension to specific pensionable posts. The Supreme Court rejects reliance on Allahabad High Court decisions Mirza Athar Beg, Fazil and Narain Pandey as distinguishable on facts, and clarifies that pension is not a universal entitlement but a right only where rules or schemes allow it. It holds that pension is available only to those who opted for the Corporation and were on pensionable posts before 18.06.1981 or under applicable GO provisions; others receive provident fund benefits. Consequently, UPSRTC’s appeals are allowed, and RKSP’s petitions are dismissed. The judgment clarifies the distinction between pension rights and provident fund benefits and marks.exit for many prior claims.
Criminal Appeal No. 1894/2010 This Supreme Court of India decision deals with State of Rajasthan’s appeal challenging the High Court’s reduction of the murder charge against Mehram S/o Chhagna Ram from Section 302 IPC to Section 326 IPC, and the subsequent period of sentence. The trial court had convicted five accused for offences including murder, rioting and assault, with Mehram found guilty of 302 IPC. The High Court partly allowed the appeal of other accused and converted Mehram’s 302 IPC conviction into 326 IPC, concluding that he exceeded his right of private defence, and reduced the sentence to the period already undergone. The State/appellant argued that Mehram’s conviction under 302 IPC should stand (or at least that life imprisonment should be restored) and that the High Court erred in not sustaining the common object and the section 149 findings against all accused. Mehram’s counsel contended that he should be allowed to challenge the conviction under 326/148, citing Chandrakant Patil, Sumer Singh and Ramanand (and CrPC Section 377(3)) and relied on provocation and the exercise of private defence. The Supreme Court, after reviewing evidence, held that the accused were aggressors, but concluded Mehram’s act amounted to 304 Part I IPC with an accompanying conviction under 148 IPC, while allowing the State’s appeal on other counts. It ordered a ten-year sentence for 304 Part I IPC, six months for 148 IPC, with both sentences to run concurrently, credited for time served, along with a Rs.50,000 compensation and other directions (including surrender after lockdown).
Civil Appeal Nos. 5979 of 2019 and 5980 of 2019 The Supreme Court considers whether a civil suit filed by Narendra Kumar Mittal & Ors. for cancellation of a sale deed dated 15 June 2006 and for injunction against the first and second defendants is maintainable under the UP Zamindari Abolition and Land Reforms Act, 1950, amid Section 331’s bar on certain civil court actions concerning agricultural land. The plaintiff purchased the disputed property in 1998 under five sale deeds and later learned of a fraudulent 2006 sale by the first defendant to others. The Civil Judge held the suit maintainable; the Allahabad High Court dismissed the revision. The Court surveys a line of precedents on the ouster of civil court jurisdiction, including Smt. Bismillah v. Janeshwar Prasad and Ors., Indra Dev v. Smt. Ram Piari, Shri Ram & Anr. v. Ist Addl. Distt. Judge & Ors., Ram Padarath v. Second ADDL D.J., Sultanpur & Ors., Ayodhya Prasad (Dr) v. Gangotri Prasad, and Kamla Prasad v. Kishna Kant Pathak. The Court emphasizes that exclusion of civil court jurisdiction must be explicit or clearly implied and should be strictly construed. It holds that a suit for cancellation of a void document grounded on fraud does not automatically lose civil court jurisdiction, and the Revenue Court’s exclusive remit is not triggered merely because the property is agricultural. Applying these principles, it upholds the maintainability of the cancellation suit and dismisses the appeals (Civil Appeal Nos. 5979 and 5980 of 2019). The operative orders dismiss the appeals with no costs.
Transferred Case (Civil) No. 229 of 2020 This Special Leave/Transferred Case concerns the Central Vista redevelopment in Delhi, including change of land use for seven plots in the Central Vista area and the construction/expansion of Parliament, central secretariat, and heritage precincts. The Supreme Court undertook a heightened judicial review to assess the constitutional and statutory legality of the process and the substantive decisions. The core issues include: (i) legality and scope of change in land use under the Delhi Development Act, 1957 (sections 7, 8, 9, 10, 11A, and 44) and related master/zonal plans; (ii) procedural fairness, public consultation standards (Gunning principles) and whether multiple authorities (DDA, MoHUA, L&DO, DUAC, HCC, CVC) acted within their statutory roles; (iii) the environmental clearance process under the Environment Protection Act, 1986 and the 2006 EIA Notification, including EAC/SEAC input and the National Green Tribunal framework; and (iv) the public trust and democratic due process considerations in a project of national importance. The Court upholds some statutory approvals, criticizes procedural missteps, and remits certain environmental/land-use questions back for further, law-based consideration with directions for heightened transparency and further expert scrutiny. The decision emphasizes that policy and development decisions must comply with the statutory process and constitutional values, while recognizing the need for expedited, legitimate development in national interest.
Civil Appeal No. 8945 of 2019; SLP(C) No. 20728 of 2019 Genpact India Private Limited filed a challenge before the Supreme Court against a Section 115QA tax demand arising from buy-backs of shares connected to a High Court‑approved scheme of arrangement under the Companies Act, 1956. Section 115QA, inserted by the Finance Act, 2013, imposes tax on the distributed income on buy-back of shares in unlisted domestic companies. Genpact contended that the buy-back in question was effected pursuant to a scheme of arrangement approved by the Delhi High Court, and therefore not a buy-back within the Section 115QA net; further, it argued that Section 115QA is a separate charging provision and not an “assessment” under Section 143(3), and that there is no statutory remedy by way of appeal against 115QA orders, justifying resort to Article 226. The Delhi High Court had initially refused to entertain the writ and directed consideration by appeal, but ultimately held that the petition should not be entertained while permitting an appeal before the CIT(A) on the 115QA issue. The Supreme Court upheld the High Court’s approach, holding that an appeal under Section 246A against a determination of liability under Section 115QA is available, that writ jurisdiction should not override the statutory remedy, and that the matter should proceed through the appellate route. The Court dismissed the Special Leave Petition, concluding that the appellant can pursue the remedy in law before the appellate authorities.
Civil Appeal Nos. 5536-5538 of 2025 This Supreme Court judgment addresses the enforcement and appeal mechanics under the Consumer Protection Act, 1986 (as amended) and the later 2019 Act, in the context of execution petitions challenging an order of the District Forum directing the builder to execute a deed of conveyance. The Palm Groves housing project, developed by the builder, led to a consumer dispute filed by the flat purchasers (appellants) alleging construction defects and deficiency of service, and later a fight over the conveyance deed and common facilities. The District Forum partially allowed the complaint and ordered conveyance and compensation. Appeals and revisions followed before the State Commission and National Commission, with the National Commission eventually holding the revision petitions to be not maintainable and dismissing the execution petitions as not maintainable. The core legal issue was whether revision petitions seeking enforcement in execution proceedings can be treated as appeals, and how to implement enforcement when final orders are involved, especially given the 2002 amendment to Section 25 of the 1986 Act and the 2019 Act’s enforcement provisions (Sections 71-73). The Court ultimately held that the anomalies surrounding Section 25 must be read in light of purposive interpretation and that Section 25(1) should be read as allowing enforcement of all orders (not merely interim orders) as decrees, aligning with Order XXI CPC as far as applicable. The appeals are disposed with directions to expeditiously dispose pending execution petitions and to align enforcement with the 2019 Act, including the remedy hierarchy (District Forum → State Commission; State Commission → National Commission in execution matters).
Civil Appeal Nos.1645-1647 of 2016; Civil Appeal No.1648 of 2016 These Civil Appeals challenge a Karnataka High Court judgment modifying an award under the Land Acquisition Act for land acquired at Mudhol for establishing a Rehabilitation Centre for displaced persons of Gudadinni Village. Notification under Section 4(1) was issued on 25.01.2003, followed by a Section 6(1) notification, covering about 30.8 guntas across several survey numbers for the Upper Krishna project. The Special Land Acquisition Officer initially valued the lands at Rs. 96,164 per acre. The Reference Court, in 2012, awarded Rs. 6,75,000 per acre (including escalation). The landowners’ appeals in the High Court (2012-2014) led to a partial reversal: the High Court raised compensation to Rs. 13,93,920 per acre (about Rs. 32 per sq ft), applying Ex. P-61 at Rs. 64 per sq ft with a 50% deduction for development charges. The appellants contended that 11 exemplar sale deeds and building potentiality warranted a higher rate, while the respondent argued the sales were not representative for a 30-acre tract. This Court reaffirmed market-value principles under Section 23, considering genuine instances, proximity, and plus/minus factors, and held a fair value of Rs. 60 per sq ft after averaging the deeds and applying appropriate development deductions. The judgment directs re-worked compensation, including statutory benefits, to be paid within three months from the order date.
CIVIL APPEAL NO. 4972 OF 2025 This Civil Appeal arises from a dispute over specific performance of an unregistered Agreement to Sell dated 25 January 2008 for a property allotted by a housing society. The Respondent No.1-buyer paid Rs 2,51,000 in cash and issued three post-dated cheques for Rs 2,50,000 each, with a total sale consideration of Rs 25,00,000. The seller contends that the signatures on the agreement were fraudulently obtained, and subsequently cancelled the agreement by a letter dated 7 February 2008, refunding Rs 2,11,000 via five demand drafts and returning two of the cheques, while one cheque remained unencashed. The buyer proceeded to institute a suit for specific performance; after trial, three issues were framed and a decree was passed in her favour in 2018, which was upheld by the Patna High Court in 2024. The appellant contends the agreement was never valid due to fraud, and that cancellation of the agreement, and encashment of drafts, evidenced repudiation by the buyer; she argues the court should not grant specific performance where no valid contract exists, emphasizing that readiness and willingness must persist from contract to decree. The Court ultimately held that the agreement stood cancelled, the buyer was not ready and willing to perform, and that the suit for specific performance cannot be maintained; accordingly, the appeal is allowed and related decrees set aside with a direction to refund the deposited amount.
Criminal Appeal No. 788 of 2012 Chandan, the appellant, was convicted under Section 302 IPC for the murder of Rakesh, a verdict upheld by the High Court. The incident occurred on 28 May 1993 around 8:15 pm near Ram Bazar, where the deceased and the accused were seen by PW-2, the sister-in-law of the deceased, in a grappling episode before the stabbing. The appellant allegedly stabbed the deceased multiple times with a knife; the victim collapsed, and the assailant fled. The weapon was recovered from the accused the same day, and blood found on the knife matched the deceased’s blood. Post-mortem revealed multiple incised wounds, with certain injuries communicating and ultimately causing death due to shock and haemorrhage. The prosecution relied heavily on the ocular testimony of PW-2, which remained unshaken during cross-examination, and on forensic correlates including the weapon and blood evidence. The defense argued the prosecution failed to establish motive, contending that motive is essential in criminal liability. The apex court reaffirmed the principle that motive is not required when there is credible direct eye-witness testimony, citing several precedents (Shivaji Genu Mohite; Bikau Pandey; Rajagopal Muthupandi; Yogesh Singh). Ultimately, the Court held no ground to interfere with the Trial Court or High Court, dismissed the appeal, vacated the interim bail granted in 2012, and directed the appellant to surrender within four weeks to complete the sentence.
Criminal Appeal No. 2267 of 2025 This Supreme Court criminal appeal arises from a suo motu contempt petition in the Bombay High Court. Vineeta Srinandan, a former Director of Seawoods Estates Ltd., issued a circular dated 29 January 2025 alleging a “dog-feeder mafia” and criticizing the judiciary’s handling of orders related to community animals and street dog management. The High Court held the circular to amount to criminal contempt under Section 2(c) of the Contempt of Courts Act, 1971, and sentenced the appellant-contemnor to one week’s simple imprisonment along with a fine of Rs. 2,000. The appellant tendered an unconditional apology which the High Court rejected as not genuine, stating the apology was perfunctory and not borne of true remorse. The High Court relied on several precedents to conclude that imputing improper motives to the Court cannot constitute fair criticism and that the publication during pendency of litigation interfered with judicial proceedings. The Supreme Court scrutinized these conclusions, noting that the statutory framework under Section 12 of the Contempt Act contemplates not only punishment but also the possibility of discharge or remittance on genuine remorse, and that apologies must be bona fide. It distinguished the cited precedents as factually distinguishable and found the apology bona fide. Consequently, the Court remitted the sentence and allowed the appeal, setting aside the High Court’s sentence to the extent indicated and disposing of pending applications.
Civil Appeal Nos. 1929 of 2020 and 3429 of 2020 These twin Civil Appeals challenge the common judgment of the Appellate Tribunal for Electricity upholding the Cross-in-law relief framework formulated by the Central Electricity Regulatory Commission in Petition No. 79/MP/2013 and Petition No. 105/MP/2017, relating to a 3x350 MW GKEL project supplying GRIDCO (Odisha), Haryana Discoms, and Bihar Utilities. GKEL had firm and tapering coal linkage arrangements (including MCL ramp-up linkages) and entered into long-term PPAs with its purchasers. The petitions sought relief for Change in Law costs arising from coal pricing changes, taxes and duties, and other regulatory shifts during operation, with the CERC directing pro rata allocation of additional costs among the three beneficiaries, and the APTEL affirming that approach. The appellants submitted that the PPA/FSA/L0A framework shows allocations are unit- or PPA-specific, and that only Haryana should bear certain costs; GRIDCO contended on party rights and implementational locus. The Court emphasizes that coal allocation to GKEL is for the plant as a whole, and that ACQ must be in proportion to generation under long-term PPAs, supporting pro rata apportionment among GRIDCO, Haryana, and Bihar. Citing Energy Watchdog, MSEDCL, GMR Kamalanga, and Vivek Narayan Sharma, the Court underscored deference to expert bodies and limited judicial intervention in tariff disputes. The appeals are dismissed, and the concurrent CERC-APTEL orders are upheld, maintaining pro rata allocation and sharing of Change in Law costs among the beneficiaries.
Civil Appeal No. 1 of 2024 (Arising out of SLP (C) No. 12230 of 2023) Vashist Narayan Kumar, a Dalit applicant from a remote Bihar village, challenged the selection outcome for a reserved police constable post on grounds that a DOB discrepancy in his online application did not reflect his true age as per educational certificates. The advertisement mandated DOB accuracy and provided a correction mechanism, but Kumar’s online form recorded 08.12.1997 while his school certificate showed 18.12.1997. He passed the written test and physical eligibility test, but the final result on 11.06.2018 declared him unsuccessful due to the DOB mismatch. The Patna High Court dismissed the writ and the Division Bench affirmed, noting that no relief had been sought to quash the results online. The Supreme Court, noting the non-advantageous nature of the error and the presence of correction provisions, examined whether this was a material omission or a trivial one. Citing Ajay Kumar Mishra and other decisions, the Court emphasized the principle that minor inadvertent errors do not amount to misrepresentation, particularly where the applicant’s right to eligibility remains intact and the final outcome was unaffected. The judgment also discusses the digital divide and the need for humane, proportionate responses to administrative glitches, ultimately invoking Article 142 to do justice. The Court set aside the cancellation and directed the State to treat Kumar as passed with the correct DOB of 18.12.1997 and consider appointment, subject to vacancy.
Writ Petition (Crl) No 130 of 2020 This matter concerns Arnab Goswami, Editor‑in‑Chief of Republic TV and promoter of ARG Outlier Media, challenging a volley of FIRs across Maharashtra, Chhattisgarh, Rajasthan, Madhya Pradesh, Telangana, Jharkhand and a Union Territory arising from broadcasts about the Palghar lynching incident. Goswami argued that the simultaneous lodging of multiple complaints in different States, often on identical or near‑identical allegations linked to the same televised programme, violated his fundamental rights to freedom of speech (Article 19(1)(a)) and subjected him to an abuse of process. The Court acknowledged the constitutional protection for journalistic expression but emphasized that rights are not absolute and must be balanced against due process and public interest. It held that the filing of numerous FIRs on the same incident can undermine the investigative process and contravene the CrPC framework governing multiple cognizable offences. The Court transferred a Nagpur FIR to Mumbai for investigation, stayed other proceedings, and ultimately quashed several other FIRs founded on the same cause of action under TT Antony and related doctrines, while maintaining the transferred investigation as a live matter. It rejected a wholesale transfer to the CBI as an extraordinary remedy, and directed protections for the petitioner and consideration of security measures, while allowing remedies under the CrPC for defamation issues. Overall, the judgment seeks to preserve journalistic space without compromising lawful investigation and due process.
Civil Appeal No. 4696 of 2013 R. Srinivas Kumar v. R. Shametha is a Supreme Court Civil Appeal arising from a Maharashtra? No, Andhra Pradesh/Hyderabad matrimonial dispute where the husband sought a decree of divorce on grounds of cruelty and irretrievable breakdown. Married on 9 May 1993, the couple had a son born in 1995. Cruelty was alleged by the husband, and a divorce petition under Section 13(1)(ia) and (ib) of the Hindu Marriage Act, 1955 was dismissed by the Family Court and the High Court both. The parties reportedly lived separately from 1997 onward; after over two decades, the husband invoked Article 142 of the Constitution to dissolve the marriage in the interest of substantial justice, arguing irretrievable breakdown and long separation rendered reconciliation impossible. He also offered lump-sum permanent alimony to the wife. The respondent-wife opposed dissolution on the ground that irretrievable breakdown is not a standalone ground for divorce without mutual consent and objected to the invocation of Article 142. The Court examined precedents on irretrievable breakdown, including Naveen Kohli and Samar Ghosh, and held that the marriage had irretrievably broken down and could be dissolved under Article 142 with financial protection to the wife. The appeal was allowed; the marriage was dissolved and the husband was ordered to pay Rs. 20,00,000 as permanent alimony within eight weeks, with ongoing maintenance until payment. No costs were awarded.
Civil Appeal Nos. 49-56 of 2017 These Civil Appeals concern whether Section 5 of the Limitation Act, 1963 applies to revision petitions under Section 81 of the Assam Value Added Tax Act, 2003. Patel Brothers, a tea trader, had multiple reassessments and penalties after furnishing allegedly false declarations under the Central Sales Tax Act, 1956. Following orders reducing exemptions and imposing penalties, the appellant filed appeals and, after dismissal of various proceedings by the Appellate Authority and Appellate Tribunal, sought revision under Section 81(1) of the VAT Act. The High Court rejected condonation of delay under Section 5, holding that Section 84 of the VAT Act restricts application to Sections 4 and 12 of the Limitation Act and thus excludes Section 5. The appellant contends that, since Sections 79 and 80 of the VAT Act provide for condonation of delay in appeals and appeals to the Appellate Tribunal, the High Court should analogically apply Section 5 under Section 29(2) of the Limitation Act. The respondents counter that the VAT Act is a complete code, and Section 84 demonstrates legislative intent to exclude the rest of the Limitation Act. The Supreme Court agrees with the respondents, holding that Section 84 excludes Section 5 implicitly, that the VAT Act’s scheme governs timing and finality, and that the High Court’s view was correct. The appeals are dismissed.
Civil Appeal No. 3657 of 2022 Delhi Airport Metro Express Private Limited (DAMEPL) challenged the execution of an arbitral award arising from a Concession Agreement dated 25 August 2008 with DMRC. After termination of the Concession Agreement in 2012, an arbitral award dated 11 May 2017 directed a Termination Payment of Rs 2782.33 crores and interest. DAMEPL paid stamp duty on the award and DMRC challenged the award under Section 34 of the Arbitration and Conciliation Act, 1996. The Delhi High Court proceedings culminated in directions on payment of the Award amount, with Canara Bank and Union Bank of India seeking impleadment; Para 6 of the judgment records a central issue: whether the sum under clause (a) of sub-section (7) of Section 31 of the 1996 Act would include pendente lite interest. The Supreme Court, while acknowledging Hyder Consulting (UK) Ltd. v. Governor, State of Orissa, recognizes the plain reading of Section 31(7) but emphasizes the controlling effect of the contract. It held that where there is a specific agreement (Article 29.8 of the CA) governing interest on termination payments, the interests pre- and post-award must be determined in accordance with the contract, and not by the general rule laid down in Hyder Consulting. Consequently, the appeal is dismissed, and the execution is to be aligned with Article 29.8 of the Concession Agreement, with no costs awarded.
Civil Appeal Nos. 7379-7380 of 2021 This Supreme Court Civil Appeal concerns a road maintenance contract awarded by the State of Haryana to M/s Shiv Shankar Construction Co. for strengthening, upgrading and maintenance of a 31.17 km stretch from Palwal to Hasanpur, Haryana, at a contract value of Rs 5,26,59,688. Traffic along the route surged after the Palwal–Aligarh Road was closed for a railway bridge, increasing from an intended design of 3364 PCU/day to about 24,418 PCU/day, causing accelerated road damage. The contractor claimed additional expenditure due to the heavy traffic and invoked arbitration under clauses 24–25; the High Court appointed an arbitrator in 2007. The sole arbitrator awarded Rs 1,51,95,400 for claims 1 and 8. The State challenged under Sections 34 and 37 of the Arbitration and Conciliation Act, 1996, arguing the award exceeded the claim, exceeded the scope of reference, and rewrote the contract by fixing Rs 45,000 per km per month rather than Rs 1,000 per km per month. The Supreme Court partly allowed the appeals: the award for Rs 45,000 per km per month up to January 2008 was confirmed, while the portion from February 2008 to 31.05.2010 was set aside. The Court noted that the excess beyond January 2008 was impermissible and that cited precedents relied upon by the applicant were not applicable to the facts.
Criminal Appeal No. 698 of 2010 Thangasamy, the appellant, challenges a Madras High Court judgment upholding his conviction for offences under sections 279, 337(3) and 304-A IPC in connection with a road accident on 24 February 2001 near Korampallam on the Tuticorin–Tirunelveli Main Road. The Government bus TN-72-N-0891 allegedly driven rashly struck bystanders, causing four deaths and injuries to three. PW1–PW5, eyewitnesses, described a fast-moving bus that struck people near a booth; one witness identified the appellant as the driver, while the driver reportedly fled the scene. The trial court convicted him after evaluating the evidence; the Sessions Court affirmed, and the Madras High Court dismissed the criminal revision. The appellant contends that there is no direct evidence that he was driving, the driver’s identity is doubtful, and the eyewitnesses’ identification is unreliable due to the driver’s disappearance, hence seeking relief or sentence modification. The State counters that the witnesses’ testimonies coherently establish the appellant as the driver and the rash driving caused death and injuries, leaving no ground to interfere with concurrent findings. The Supreme Court dismisses the appeal, noting the gravitas of the loss of four lives and several injuries, while reaffirming sentencing principles such as deterrence and proportionality and relying on established precedents. The order ends with a direction for the appellant to surrender within four weeks to serve the remaining sentence.