Tenetowl LogoTenetowl
Curated Legal Archive

Landmark Court Judgements & Precedents

Curated collection of high-impact judgments featuring verified legal doctrines, counsel arguments, precedential citations, and full case text.

4,294 Landmark Cases•Page 142 of 215
Supreme Court of India
Civil Appeal No. 10857 of 2016

All Manipur Pensioners Association ... Appellant v. The State of Manipur and others

This Supreme Court appeal concerns the revision of pension under the Central Civil Services (Pension) Rules, 1972 as adopted by Manipur and the State’s 1999 office memorandum and its application to pre- and post-1 January 1996 retirees. The State revised pensions after 1996 at a higher rate than pre-1996 retirees, creating two classes of pensioners based on retirement date. The All Manipur Pensioners Association challenged this bifurcated treatment as arbitrary and violative of Article 14 of the Constitution, arguing all pensioners governed by the same pension rules form a single class and should receive uniform revision. The High Court’s Single Judge had struck down the two-class arrangement as unconstitutional, but the Division Bench reversed, upholding the cut-off date on the ground of financial constraints and the State’s resources. The Supreme Court reversed the Division Bench, emphasized that DS Nakara’s principle requiring rational basis for classification remains applicable, and held that the cut-off date lacks a rational nexus to the objective of pension liberalisation. It restored the Single Judge’s decision, directing that all pensioners, irrespective of retirement date, be entitled to revision on par, with arrears payable within three months and no costs.

Supreme Court of India
Civil Appeal No. 1548 of 2023

Delhi Development Authority v. Surender Singh & Ors.

Delhi Development Authority v. Surender Singh & Ors., along with connected Civil Appeals, concerns the validity of land acquisitions under the Land Acquisition Act, 1894, in light of the 2013 Act's Section 24(2). Notifications under Section 4 and 6 were issued for planned development projects in Delhi, with awards announced in the 1990s–2000s and compensation deposited with the Land Acquisition Collector. A series of writ petitions challenged the lapsing of the acquisitions under Section 24(2) of the 2013 Act on the ground that possession had not been taken or compensation paid to landowners, while the State argued that possession had indeed been taken and the land handed over to the Delhi Development Authority for development. The High Court relied on Pune Municipal Corporation’s decision (2014) and held that the acquisitions had lapsed due to non-payment or disputed title. The Constitution Bench, however, in Indore Development Authority v. Manoharlal and Others (2020) overruled Pune and held that satisfaction of either possession or payment suffices to prevent lapse, and that the word 'or' in Section 24(2) should be read as either 'nor' or 'and' depending on context. It also clarified that deposit of compensation in court does not constitute payment; the proviso to Section 24(2) forms part of the Section. Applying these principles to the present facts, it was found that possession was taken and handed over to the DDA, satisfying one condition. Therefore, the High Court's lapsing findings were set aside, and the appeals were allowed with writ petitions dismissed.

Supreme Court of India
Civil Appeal No. 2796 of 2020; Civil Appeal No. 2797 of 2020

Dr. Aswathy R.S. Karthika & Ors. v. Dr. Archana M. & Ors.

These two Civil Appeals arise from a Kerala Administrative Tribunal order directing the Kerala Public Service Commission to fill a 1% reservation for Hindu Nadar (within the Other Backward Classes) in the rank list for the post of Medical Officer (Homeo) in the Homeopathy Department. The appellants, Hindu Nadar members, secured reservation through amendments to the Kerala State and Subordinate Services Rules, 1958 (retrospective from 21 November 2009) and Explanation II, obliging the shortfall to be adjusted in future vacancies without disturbing earlier advices. The Tribunal held that the Commission must assess the shortfall and advise an equal number of candidates from the supplementary list for vacancies in the future, including appointments arising from the rank list dated 3 August 2015. The Private Respondents contended that Rule 15(a) and the Circular dated 31 August 2010 restrict applicability to rank lists published after 21 November 2009, and that no such post-list existed to fill the alleged shortfall. The High Court reversed the Tribunal, but the Supreme Court allowed the appeals, holding that the shortfall arising from 21 November 2009 must be provided to Hindu Nadar candidates and that vacancies arising after the amendment could be filled under the amended rules; the 3 August 2015 list provides the basis for such fill, within roaster constraints.

Supreme Court of India
Civil Appeal No. 3699 of 2022

MIHAN India Limited v. GMR Airports Limited & Ors.

This Supreme Court decision concerns four Civil Appeals challenging a Nagpur Airport PPP project under the MIHAN framework. MIL (the JVC administrator) sought to enforce a Letter of Award issued to GAL after a public bidding process conducted by MIL under RFQ/RFP terms approved by PMIC/subsequent authorities. GAL’s bid, initially 5.76% revenue share, was negotiated upward to 14.49% after discussions in which GAL pressed for a higher revenue share. MIL accepted the revised bid on 07.03.2019, with GAL signing the duplicate LOA on 12.03.2019, and the process moved toward executing the Concession Agreement. However, as delays persisted, MIL issued a cancellation/annulment of the bidding on 19.03.2020, prompting writ petitions by GAL and GNIAL in the Nagpur bench. The High Court quashed the annulment and directed continuation toward implementing clause (b) of the writ petition. The Supreme Court examined whether the LOA created a concluded contract and whether annulling the bidding after LOA was arbitrary or permissible under RFQ/RFP and Cabinet directions. It analyzed public-law principles, Articles 14, 226 and 136, and relevant contractual clauses (RFP: 1.2.6(b), 2.16, 3.3.1, 3.3.5, 3.3.6). The Court ultimately held that the annulment was arbitrary and that the High Court’s writ jurisdiction was correctly exercised, dismissing all four appeals and upholding the High Court order.

Supreme Court of India
Civil Appeal No. 11843 of 2018 (Arising out of SLP(C) No. 35574 of 2017) and connected matters

Competition Commission of India v Bharti Airtel Limited and Others

This batch of Civil Appeals arises from a Bombay High Court decision that quashed a Competition Commission of India (CCI) order directing an investigation into alleged anti-competitive conduct in the telecom sector. RJIL had filed information under Section 19 of the Competition Act against three incumbent operators—Bharti Airtel, Vodafone Idea (Idea) Cellular Limited, and with COAI—alleging anti-competitive practices, including denial or delay of interconnection points (POIs) and constraints on interconnectivity and number portability to impede RJIL’s entry. The CCI, in majority verdict (3:2) dated 21 April 2017, found prima facie evidence of an anti-competitive agreement under Section 3(3)(b) and directed the Director General to investigate, clubbing similar information across cases. The Bombay High Court quashed this order, holding that telecom regulation lies with TRAI under TRAI Act, and that TRAI must determine jurisdictional questions before the CCI can act; thus, the CCI’s information was premature. The Supreme Court, in turn, addresses the interplay of two regulators — TRAI (sectoral) and CCI (market regulator) — and cautions against premature intrusion by CCI where TRAI’s jurisdiction is implicated. It affirms the principle of regulatory comity, holds that CCI can proceed only after TRAI resolves jurisdictional issues, and dismisses the appeals, thereby preserving regulatory harmony between TRAI and the CCI.

Supreme Court of India
Civil Appeal Nos. 4021 of 2022; 4022 of 2022; 4023 of 2022

Swami Samarth Sugars and Agro Industries Ltd. v. Loknete Marutrao Ghule Patil and Dnyaneshwar Sahakari Sakhar Karkhana Ltd & Ors.

Three writ petitions challenging an Industrial Entrepreneur Memorandum (IEM) dated 08.09.2010 issued under the Sugarcane (Control) Order, 1966, for establishment of a new sugar factory at Warkhed (Ramdoh), Newasa, Ahmednagar, were decided by a common High Court order dated 23.07.2021. Core disputes concerned (i) whether the IEM could be derecognized for failure to take “effective steps” within the time prescribed by clauses 6A–6D of the Control Order, (ii) the radius/distance norm (15 km originally, later allegedly increased to 25 km by Maharashtra’s 2011 directive) and its impact on the viability of the proposed factory, and (iii) extensions of time granted by the Central Government under amended clauses 6C (and their retrospective/operational effect). The Government initially recognized the IEM after certification of aerial distance, with a bank guarantee; but two writ petitions in 2010 and 2011 raised environmental and aerial distance concerns. The High Court held the IEM to be derecognized and treated the 25 km rule as applicable, limiting extensions. The Supreme Court, however, held that the extensions granted by the Central Government under amended Control Orders (2018, 2016, 2011) were proper and that the petitioners were not entitled to equity from the lis, observing that the period spent in the first and second rounds of litigation should be excluded in computing the timeline. The appeals are allowed and writ petitions dismissed, with time spent in subsequent rounds excluded in calculating the period for setting up/producing sugar. The decision reflects a balance between promoting sugar sector reform and protecting farmers’ interests, relying on judicial review standards and policy considerations in the cane sector.

Supreme Court of India
CRL. APPEAL NO(S). 3810 OF 2025

Tarun Sharma v. State of Haryana

The Supreme Court hears Tarun Sharma’s criminal appeal against a conviction for murder (Section 302 IPC) and the concurrent High Court dismissal of the appeal. The trial court had convicted Sharma in 2013, affirmed by the Punjab and Haryana High Court in 2013 and 2024, with life imprisonment and a fine. The central issue is whether the High Court’s approach to the criminal appeal complied with the guaranteed right to a fair trial, especially since, on 18 September 2024, the High Court proceeded to hear the merits on the same day an amicus curiae was appointed due to counsel unavailability, without providing reasonable opportunity for preparation or consultation. The prosecution’s case hinges on a dying declaration (Exh. P-34) attributed to Munish Kumar, and a weapon recovery (Exh. P-6), supported by several witnesses who later turned hostile. The High Court’s approach raised concerns about due process in life-imprisonment cases, as stressed by related precedents emphasizing effective hearings and adequate time for counsel to prepare (Chaluvegowda; Mohd. Sukur Ali; Anokhilal; Imtiyaz Ramzan Khan). The Court scrutinizes the dying declaration’s reliability, noting absence of doctor identity, lack of contemporaneous medical records, no recorded time of recording, and no accompanying medical certification, casting serious doubt on the prosecution’s central evidence. In light of these infirmities and the lack of corroboration for the weapon recovery, the Court holds that the prosecution failed to establish Sharma’s guilt beyond reasonable doubt, sets aside the lower judgments, and acquits Sharma, directing release forthwith.

Supreme Court of India
Criminal Appeal No.152 of 2013

Tofan Singh v. State of Tamil Nadu

This is a consolidated Supreme Court judgment dealing with multiple Criminal Appeals and Special Leave Petitions arising from convictions under the Narcotic Drugs and Psychotropic Substances Act (NDPS Act). The central issue concerns the evidentiary value and admissibility of confessions recorded under Section 67 of the NDPS Act by officers empowered under Sections 41/42 and 53, and the status of such officers as “police officers” for the purposes of Section 25 of the Indian Evidence Act. The Court places constitutional primacy on the right against self-incrimination (Article 20(3)) and the right to privacy (K.S. Puttaswamy), while balancing the NDPS Act’s stringent penal framework. The judgment canvasses a spectrum of pre- and post-constitutional decisions (M.P. Sharma; Nandini Satpathy; Kathi Kalu Oghad; Barkat Ram; Raja Ram Jaiswal; Badku Joti Savant; Romesh Chandra Mehta; Illias; Baldev Singh; Noor Aga; Karwal; Kanhaiyalal; Mukesh Singh; and others) to resolve the contested issue whether NDPS officers designated under Section 53 are to be treated as “police officers” for Section 25 of the Evidence Act. The majority opinion (R.F. Nariman, J.) holds that Section 53 officers are “police officers” for this purpose, thus confessional statements to them are barred under Section 25 and cannot form the basis of conviction, while a separate opinion by Indira Banerjee, J. disagrees on the governance of these provisions. The reference is answered, and the matter is remanded to Division Benches for merits-based disposal, with separate opinions on the scope of Section 67 and the evidentiary status of such statements.

Supreme Court of India
CRIMINAL APPEAL NOS. 657-664 OF 2023

M/s. BLS Infrastructure Limited v. Rajwant Singh & Others

These appeals arise from eight criminal complaints filed under Section 138 of the Negotiable Instruments Act (NI Act), 1881, by M/s. BLS Infrastructure Limited against M/s. Rajwant Singh and others. The complaints were filed in 2011, 2013, and 2017. In three complaints (621742/16, 621743/16, 621744/16), CW‑1's cross‑examination was completed and, on 26.10.2017, the defence counsel stated that CW‑1's cross‑examination in those three cases would be adopted in the remaining complaints. Consequently, CW‑1’s evidence was closed and the matters were listed for recording of defence evidence, with an application under Section 311 CrPC pending to summon additional witnesses. It is alleged that the complainant’s counsel misled the appellant into believing that settlement negotiations were ongoing, resulting in the complainant’s non‑appearance. On 25.01.2019, the Metropolitan Magistrate dismissed the complaints for non‑prosecution. The Delhi High Court dismissed eight connected petitions challenging those orders on 07.11.2019. The core question is whether dismissal for non‑appearance was justified given that the complainant’s statement and some cross‑examination had already occurred and that the case could proceed under the proviso to Section 256 CrPC. The Supreme Court held that non‑appearance does not automatically require acquittal where admissible evidence remains on record and where the matter can be decided on merits, set aside the lower orders, and directed the proceedings to continue from the stage reached.

Supreme Court of India
Civil Appeal No.10837 of 2016

Ananthesh Bhakta (represented by mother Usha A. Bhakta) & ors. v. Nayana S. Bhakta & ors.

This civil appeal concerns a partition/suit for injunction (Original Suit No. 5 of 2014) filed by three plaintiffs against six defendants in the District Court, Mangalore, where an application under Section 8(1) of the Arbitration and Conciliation Act, 1996 (I.A. No. IV) prays for referring the disputes to arbitration based on a retirement deed dated 25.07.2005 and a partnership deed dated 05.04.2006. The District Judge allowed the application, referring the parties to arbitration, and the High Court affirmed, while noting that the parties could pursue an early trial. The appellants challenge this order on several grounds: (i) the application was not accompanied by the original retirement and partnership deeds, (ii) all parties to the suit were not parties to the arbitration agreement, and (iii) a partnership firm that is unregistered cannot be referred to arbitration. The respondents contend that the arbitration agreements exist in both deeds, that all plaintiffs and defendants (1–5) were bound by them (directly or through others), and that the dispute primarily concerns the retirement and partnership arrangements. The Supreme Court ultimately held that the court can refer to arbitration despite timing of document production and that the arbitration clause binds the parties as described, leading to dismissal of the appeal.

Supreme Court of India
Civil Appeal No. 1305 of 2010

RAMNATH AGRAWAL & ORS. v. FOOD CORPORATION OF INDIA & ORS.

This is a Supreme Court Civil Appeal arising from a dispute over rent and damages for six godowns constructed by the appellants under a 1976 contract with the Food Corporation of India (FCI). The parties executed a contract dated 16.12.1976 for constructing six godowns on lands of interested parties, with FCI to take possession after completion and to lease the godowns under a standard FCI lease form once completion certificates were obtained. The contract contemplated that possession of the godowns would be handed over after precise completion, with defects identified by FCI officers to be final. The bank loan was to be repaid by FCI depositing rent with the bank. The appellants claimed arrears of rent for January–April 1978 and additional amounts for security wages, electricity, and interest, alleging that possession of all six godowns and rent were due under the agreement. The Trial Court awarded damages and rent; the High Court reversed, holding the agreement was not a lease but an executory contract, nullifying the rent claim. The Supreme Court held that the 16.12.1976 instrument is not a lease but an agreement to lease, with possession contingent upon completion certificates and satisfactory work; the findings of FCI officers on defects were final; rent was not payable for the unhanded godowns before completion; no rent could be claimed for time before possession; the appeal is dismissed. Decisive authorities distinguishing lease and executory agreement were cited from Hemanta Kumari Debi, Tiruvenibai, and Atur India.

Supreme Court of India
Civil Appeal Nos 2468-2470 of 2019; Special Leave Petition (Civil) Nos. 8769-8771 of 2018; Civil Appeal Nos 2471-2473 of 2019; Special Leave Petition (Civil) Nos. 14041-14043 of 2018; MA Nos 2983-2985 of 2018; Special Leave Petition (Civil) Nos. 33086-33088 of 2017

Sudhakar Baburao Nangnure vs Noreshwar Raghunathrao Shende & Ors

This Supreme Court judgment deals with seniority in the Maharashtra Town Planning cadre and the applicability of the catch‑up rule for reserved‑category promotees in promotional posts. The appellant, Sudhakar Nangnure (open category), challenged the final seniority list of Joint Director of Town Planning (JDTP) as on 1 January 2015, published 15 January 2016, arguing that under the ‘catch‑up’ principle, he should outrank the first respondent, Noreshwar Shende (Scheduled Caste) who was promoted to JDTP on 11 August 2011 under a roster reservation. He contends that the first respondent’s promotion was fortuitous/ad‑hoc, and that consequential seniority should be fixed in favor of the general‑category officer based on the feeder cadre seniority. The respondents rely on the Maharashtra Government Resolution (GR) of 20 March 2003 ensuring consequential seniority for reserved‑category promotees, preserved by the Maharashtra Reservation Act 2004 (Act VIII of 2004), and urge that the first respondent’s JDTP promotion, though ad‑hoc at times, should attract seniority in the higher post. The High Court’s review dismissals were upheld; the Tribunal’s quashing of the final seniority list and direction for fresh calculations were sustained. The Court clarifies the evolving legal position: catch‑up is a practice in service jurisprudence, but validity and applicability depend on enabling provisions and the data/constitutional backdrop established in Nagaraj, Indra Sawhney, Ajit Singh, and subsequent decisions. The appeals are dismissed with no costs, upholding the High Court’s judgment and the consequent seniority framework.

Supreme Court of India
:null

Amro Devi & Ors. v. Julfi Ram (Deceased) Thr. LRs. & Ors.

This appeal arises from a long-running land dispute in Himachal Pradesh involving declaration of ownership and possession of land, with a background of two suits and a contested compromise. In 1983, Mansha Ram and others filed a suit for declaration and permanent injunction claiming ownership in possession of approximately 7 kanals 9 marlas; the Trial Court decreed in their favor. On appeal, the District Judge reversed, noting that the parties had compromised and dismissed the suit. The first appellate court affirmed this, recording oral statements in 1984 that the defendants would own the land. Subsequently, in 1988, Julfi Ram and others filed a fresh suit against Bakshi Ram and others seeking declaration and possession of half the land. The defendants argued there was a valid compromise in 1984 and relied on the sale deed dated 22.08.1983, while the respondents contended that the 1984 compromise lacked a written instrument and was not valid under Order XXIII Rule 3 CPC, and that the sale was subject to the compromise. The Supreme Court ultimately held that the 1984 order was not a valid written compromise, rejected the attempt to bind rights by oral statements, and clarified the application of lis pendens. The appeal was allowed, setting aside lower courts’ decrees and restoring the Trial Court’s dismissal.”

Supreme Court of India
WRIT PETITION(C) NO.26 OF 2020

MANISH KUMAR … PETITIONER(S) VERSUS UNION OF INDIA AND ANOTHER WITH WRIT PETITION (C) NO. 53/2020 (and multiple connected WRIT PETITIONS under WRIT PETITION (C) NO. 28/2020, 47/2020, 27/2020, 73/2020, 328/2020, 210/2020, 191/2020, 164/2020, 163/2020, 166/2020, 173/2020, 182/2020, 176/2020, 177/2020, 257/2020, TRANSFERRED CASE(C) NO. 228/2020, 579/2020, 806/2020, 714/2020, 642/2020, 805/2020, 19/2020, 33/2020, 75/2020, 165/2020, 850/2020, 374/2020, 229/2020, 228/2020, 209/2020)

This petition manifests a constitutional challenge to the Insolvency and Bankruptcy Code (Amendment) Act, 2020, focused on Sections 3, 4 and 10, and the insertion of Section 32A. The Court, led by Justice K.M. Joseph (Single Judge), surveys the legislative design aimed at real estate allottees (homebuyers) who are financial creditors and seek initiation of CIRP under Section 7, while requiring a threshold of either 100 allottees or 10% of the total allottees belonging to the same real estate project. The judgment navigates Articles 14, 19(1)(g), 21 and 300A to test the constitutionality of the amendments, especially the second proviso that creates a collective threshold for class-action initiation by homebuyers. It contrasts with the pre-amendment regime and with other financial creditors, arguing the amendments rationally classify and streamline the time-bound CIRP to avoid abuse and crowding of adjudicating authorities. The opinion enshrines Pioneer Urban v. UoI and Swiss Ribbons as touchstones for balancing the legislature’s economic policy against individual vested rights, ultimately upholding the amendments with Article 142 directions on costs and withdrawal/condonation procedures.

Supreme Court of India
Civil Appeal No.9412 of 2019

Siraj Ahmad vs State of Uttar Pradesh & Anr.

This Civil Appeal arises from a UP promotion dispute. Siraj Ahmad was appointed ad hoc as a Junior Engineer in 1987 under the UP Development Authorities Centralized Services Rules, 1985, after a full selection process and with the Governor’s approval. He later obtained a BE/A.M.I.E. degree and sought promotion to Assistant Engineer (Civil) under Rule 24(3) of the Centralised Services Rules. The State argued that his initial appointment lacked concurrence of the UP Public Service Commission, rendering it illegal; hence his service prior to regularisation could not be counted for promotion. The Allahabad High Court dismissed his writ Petition. The Supreme Court, however, relied on Constitution Bench authorities such as Direct Recruit Class II Engineering Officers Association vs State of Maharashtra and Others, and Kesari, along with judgments on irregular vs illegal appointments and on counting officiating service toward seniority. It held that where an initial appointment was not strictly in accordance with all procedural rules but a person continued in a sanctioned post and was regularised, the period of officiating could be counted toward seniority. The Court concluded that the appellant’s case is squarely covered by the Direct Recruit decision and that non-concurrence with the UPSC at most makes the appointment irregular, not illegal. Consequently, the appeal was allowed, the High Court order set aside, and the appellant was entitled to promotion with backdated consequential benefits from the date his juniors were promoted (18-01-1995).

Supreme Court of India
Civil Appeal No.1743 of 2021; Civil Appeal No.1782 of 2021

Victory Iron Works Ltd. v. Jitendra Lohia & Anr.

These appeals arise from a common order of the National Company Law Appellate Tribunal (NCLAT) that affirmed an Adjudicating Authority order in two CIRP-related proceedings. The dispute centers on land measuring about 10.19 acres at Ramrajatala Station Road, Howrah, West Bengal. Energy Properties Private Limited (ostensible owner) financed the purchase and transferred 40% of its shareholding to the Corporate Debtor, Avani Towers Private Limited, which is undergoing CIRP, with exclusive development rights over the property. Victory Iron Works Ltd. contends possession of the land, partly under a Leave and License Agreement dated 11.08.2011 and an oral understanding. The Resolution Professional sought to protect and include in the Information Memorandum the rights and assets arising from the Corporate Debtor’s development interests; Victory argues the Adjudicating Authority has no jurisdiction to evict a third-party licensee and that the property belongs to Energy Properties, not the Corporate Debtor. The core legal question is whether the Corporate Debtor’s development rights over the land constitute “property” and “assets” under the IBC, and whether the IBC bodies can adjudicate possession disputes involving third parties. The Court analyzes Sections 3, 18, 25 (and their explanations), the nature of “assets” versus “property,” and how a bundle of rights created under MoU, Shareholders Agreement, Development Agreement, and Memoranda Recording Possession qualifies as property and asset. It upholds the protective orders and dismisses the appeals, holding no interference is warranted and clarifying the scope of assets under IBC.

Supreme Court of India
Criminal Appeal Nos. 1584/2021, 1585/2021, 1586/2021

Jasdeep Singh @ Jassu v. State of Punjab

This is a consolidated Supreme Court judgment dealing with three connected Criminal Appeals arising from a common impugned order. Four accused were convicted for murder or culpable homicide following a late-night incident in Jalandhar on 21 April 2011, with one life sentence and additional terms under the Arms Act. The trial court convicted all four under Section 304 Part I IPC (culpable homicide not amounting to murder) along with Arms Act sections; the High Court affirmed. The de facto complainant (victim’s family) in one appeal sought enhancement to Section 302 IPC. The central legal issue is Section 34 IPC (joint liability) and whether shared common intention and participation were proved against the two convicted appellants whose appeals are before the Court. The judgments outline the law on common intention, including the requirement of presence, participation, and acts done in furtherance of the common design, and discuss that common intention can develop on the spur of the moment, not necessarily as a pre-arranged plan. The Court scrutinizes the witnesses’ reliability (notably PW13) and the alleged improvements in statements (e.g., PW6), ultimately concluding that the evidence does not robustly establish shared common intention against A3 and A4. Consequently, Crl A Nos. 1584 and 1585 are allowed (convictions set aside under Section 34 IPC with 304 Part I), while Crl A No. 1586 (de facto complainant) is dismissed. The bench underscores the need for concrete evidence of common intention and its direct link to the charged acts.

Supreme Court of India
Civil Appeal No. 2042 of 2022

Oil and Natural Gas Corporation Ltd. vs Discovery Enterprises Pvt. Ltd. & Anr.

This Civil Appeal concerns ONGC’s challenge to an interim arbitral award and a final award arising from an arbitration under the Arbitration and Conciliation Act, 1996. ONGC claimed that Discovery Enterprises Pvt. Ltd. (DEPL) and Jindal Drilling and Industries Ltd. (JDIL), though distinct entities, formed a single economic unit within the DP Jindal Group, and that the non-signatory JDIL should be bound by the arbitration agreement through the group-of-companies doctrine. The Arbitral Tribunal initially held that JDIL was not a party to the arbitration agreement and struck JDIL from the proceedings, triggering ONGC’s challenge under Section 37. The Bombay High Court upheld the Tribunal’s view, noting that mere common shareholders or common address do not by themselves prove a single economic unit. The Supreme Court undertook a comparative analysis of the evolving group-doctrine jurisprudence, tracing Indowind’s earlier stance and the subsequent evolution through Chloro Controls, Cheran Properties, MTNL and related decisions, including Reckitt Benckiser and Duro Felguera, to emphasize the central test: mutual intent, direct relationship, common subject matter, and composite transaction. It held that Indowind is not good law in light of subsequent decisions and that, in exceptional circumstances, the group doctrine can bind non-signatories where the underlying contract and conduct demonstrate a clear mutual intention to bind all parties. The Court set aside the interim award, remitted the matter for fresh adjudication with a reconstituted Arbitral Tribunal, and directed resolution of discovery/inspection issues with transfer cases remitted to the Bombay High Court for disposition in light of the new proceedings.

Supreme Court of India
Civil Appeal No. 6859 of 2021

Union of India and Ors. v. Mudrika Singh

Union of India and Ors. v. Mudrika Singh is a Supreme Court of India civil appeal arising from a Calcutta High Court decision that quashed BSF disciplinary proceedings against Mudrika Singh, a Head Constable, who was charged under Section 24(a) of the BSF Act 1968 for disgraceful conduct (alleged sodomy). The appeal traces the sequence of events from the 2006 RoE (record of evidence), including an initial RoE and a later additional RoE ordered by the Commandant to clarify the date of the incident amid inconsistent witness statements. The SSFC found the respondent guilty and demoted him to Constable; the Director-General of BSF reduced the sentence in a statutory petition under Section 117, commuting part of the punishment. Mudrika challenged these orders in a writ petition under Article 226; the Calcutta High Court struck down the Commandant’s power to order an additional RoE and held that reasons need not be furnished for SSFC findings under Rule 149. The Supreme Court’s analysis focuses on the Commandant’s jurisdiction to seek clarificatory evidence before the 2011 amendment to Rule 51, the role of Rule 6, and the question of when, if ever, reasons must be recorded for findings under Rule 149. It ultimately allows the appeal, sets aside the High Court judgment, and restores the prior punitive order, with the writ petition dismissed.”

Supreme Court of India
Civil Appeal Nos.1217-1218 of 2017

M/s. Sonell Clocks and Gifts Ltd. v. The New India Assurance Co. Ltd.

The appellant insured its factory and plant at Silvassa under a one-year policy (19 July 2004 to 18 July 2005) with reinstatement value. Torrential rains and floods on 4 August 2004 damaged machinery and raw materials. The loss was reported only on 30 November 2004, about three months later. The insurer appointed a surveyor who reported that the loss was not payable, citing breach of Clause 6 of the policy for failure to give immediate notice and to furnish necessary particulars within the prescribed period. The National Consumer Disputes Redressal Commission dismissed the complaint (10 December 2015). The appellant contended that the insurer’s appointment of a surveyor amounted to waiver of the delay condition, and relied on Galada Power and Telecommunication Ltd. v. United India Insurance Co. Ltd. The Supreme Court examined whether waiver could be inferred from the insurer’s conduct. It held that waiver requires intentional relinquishment of a right and that the factual matrix, including the lapse in immediate notice (04.08.2004 to 30.11.2004) and the surveyor’s report, did not establish waiver. The Court distinguished Galada’s case and emphasized that Clause 6 is the sine qua non for liability. Consequently, the appeals were dismissed with no order as to costs, upholding the Commission’s decision.