Meenakumari C., an H.S.A. (Mathematics) at P.P.T.M.Y Higher Secondary School, Cherur, challenged orders Exts. P5, P13 and P14 and sought other consequential reliefs. The school was upgraded to a Higher Secondary School in 2000, with sanction for two batches. Following Government orders dated 21.08.2017, five HSST Junior posts and one HSST post were created. The petitioner claimed appointment to HSST Junior (Maths) under the 25% by-transfer quota, arguing that the cadre strength as on 21.08.2017 was only five, not 17 as stated in Ext. P5. She asserts Ext. P6 circular provides that, for five posts, 25% equals 1.25 and should be treated as two by-transfer posts, making the second vacancy by-transfer, with the remaining posts by direct recruitment. Ext. P7 allegedly conflicts with Ext. P6. The petitioner filed W.P.(C) No.1814/2019 and then a revision petition; Ext. P13 rejected the revision and Ext. P14 approved the appointment of the sixth respondent. The respondents counter that Exts. P5 and P13 comply with statutory provisions, noting that as of 21.08.2017 the cadre was five HSST Junior posts, with one by-transfer and four direct recruitment posts. They contend that granting two by-transfer posts would breach the 25% quota. The court ultimately upheld Exts. P5, P13 and P14, dismissing the petition, and held the actions in accordance with law, applying the vacancy-rounding principle from case law to fractional quotas.
PGCCPL & Aryacon Consortium v. Kerala State Electricity Board Limited & Others concerns a tender for the Upper Sengulam Hydro Electric Project where pre-qualification of bidders and the lowest bid (L1) by the third respondent consortium were challenged. The writ petitioners argued that the third respondent did not satisfy mandatory pre-qualification requirements in Exhibit P1, notably clauses 3.1.6 (lead bidder turnover not less than 30% of the Probable Amount for the last three financial years), 27.1 and 27.2 (turnover and consolidated assessment rules for a consortium’s lead member), and 26.2.1(c) (lead bidder’s tunnel-driving experience). They also contended that Exhibit P8 dated 01.04.2022, which documented an Asset and Business Transfer Agreement between Dr. Sasi Eloor (proprietor) and Anchor Structurals, merged past and present assets to inflate turnover for the three-year period 2019–2022. The learned single Judge dismissed the writ petition, accepting the Board’s reckoning that turnover was met by the merged entity. The Division Bench allowed the appeal, ruling that the lead bidder must have 30% turnover of the Probable Amount for the last three years and that post-notice mergers cannot retrospectively satisfy that requirement; the tender terms cannot be bypassed. The court cited Silpi Constructions Contractors v Union of India, Tata Cellular v Union of India and related precedents to emphasize strict adherence to tender norms and limited judicial interference, while distinguishing contrary authorities. It remanded with a directive to process the appellants’ proposals in accordance with law within three weeks of the judgment date.
This Regular Second Appeal (RSA No. 615 of 2023) challenges judgments in O.S. No. 206/2012 before the Munsiff Court, Perumbavoor and in A.S. No. 33/2022 before the Sub Court, Perumbavoor. The plaintiff, Sathyabhama, filed suit seeking declaration of title to A schedule property (71 cents), recovery of possession of B schedule property (4 cents) and a permanent injunction. The defendant, Jayan, claimed title to the B schedule property based on partition deed Nos. 2119/2010 and 829/1/87, contending that B schedule is part of his property and that A schedule boundaries should be protected. The trial court recorded evidence (PW1; Exts. A1–A6; DW1; Exts. B1–B3; CW1, CW2; Exts. C1, C1(a)) and decreed the suit in favor of the plaintiff, directing surrender of B schedule to the plaintiff, restraining alteration of A schedule boundaries, and including Ext. C1/C1(a) in the decree, with costs to the plaintiff. The appellate court dismissed the appeal. The High Court, while examining admission for the second appeal under Section 100 CPC and Order XLII, held that no substantial question of law was formulated, citing Nazir Mohamed, Kondiba Kadam, Santosh Hazari, Government Kerala v. Joseph and Biswanath Ghosh. Consequently, the second appeal was dismissed as meritless without admission, upholding the lower courts’ findings on title and boundaries.
This writ petition, filed in the Kerala High Court, is by Mohanadas A.S. and 103 other petitioners challenging their treatment under the Employees’ Provident Fund Organization (EPFO) Pension Scheme, 1995 and seeking pensionary benefits. The petition seeks mandamus to retain the petitioners in the 1995 Scheme and to confer pensionary benefits under both the pre-amended paragraph 11(3) and the amended paragraph 11, with pensionable salary calculated on the average monthly pay drawn during the contributory period in the sixty months preceding exit from the Pension Fund, including piece-rate earnings. The petition also seeks interest at 12% per annum on arrears of pension from retirement to payment, costs, and other incidental relief. Respondents include the Union of India (Ministry of Labour and Employment), the Employees’ Provident Fund Organisation (EPFO), the Regional Provident Fund Commissioner (Ernakulam), and the Kerala State Financial Enterprises Limited. The court notes that the question raised is settled by the Supreme Court in EPF Organisation v. Sunil Kumar B. (2022) and directs the respondents to reconsider the petitioners’ claims in light of that dictum within nine months from the date of the judgment. Exhibits include a circular, and prior judgments, with the petition disposed of in terms of the Supreme Court’s directions.
This is a Motor Accident Claims Appeal (MACA No. 2279 of 2009) heard by the Kerala High Court arising from an award of the Motor Accidents Claims Tribunal, Irinjalakkuda, in OP(MV) No.1390/2004. The appellant, Sojan, sustained injuries as a pillion rider when a motorcycle collided with a lorry. The Tribunal held both drivers negligent and awarded Rs.1,13,500 out of a claimed Rs.2,82,800. The appellant contends that the compensation is inadequate and that the minimum notional income for 2004 should be Rs.3,000 per month; relying on Ramachandrappa v. Manager, Royal Sundaram Alliance Insurance Co. Ltd., he argues that Rs.4,500 would have been the floor in the absence of an ascertainable income. Ext.A13 certifies 12% disability, but the Tribunal converted it to 4.5% as a whole-body disability using a one-third rule, which he asserts is not universally applicable. He points to prolonged hospitalization (about 30 days) and over a year of follow-up, seeking higher loss of earnings. The respondents challenge the appeal, arguing that the Tribunal’s negligence findings are sound and the award is not excessive; the insurer contends it is liable only under an Act-only policy. The High Court allows the appeal, revising disability to 10% and notional income to Rs.3,000/month, increasing loss of earnings to Rs.18,000, and directing recovery of the enhanced amount from vehicle owners with rights to recover from the other, with 7% interest and costs.
Mejo Jose v. State of Kerala concerns a challenge under Section 482 CrPC to an order of the Additional Chief Judicial Magistrate (Economic Offences), Ernakulam, cancelling bail granted to the petitioner in Crime No. 1105/2022 after he allegedly committed Crime No. 1547/2022 while on bail. The bail order imposed a general condition that the accused shall not commit any offense. The prosecution argued that the petitioner’s involvement in a subsequent offense, in addition to his five prior crimes, demonstrated misuse of liberty and justified cancellation. The petitioner contended that the mere registration of a new crime cannot per se be a supervening event; the de facto complainants differed across cases, and the subsequent offense should be weighed with attendant circumstances. Relying on Godson v. State of Kerala and Renjith v. State of Kerala, the defense urged that bail ought not to be cancelled for mere request. The State countered by invoking Supreme Court precedents that outline the circumstances under which bail can be revoked, including misuses of liberty. The Kerala High Court recognized the long line of authority distinguishing cancellation of bail from setting aside an unjustified order and reaffirmed that misusing the liberty granted to a bail recipient constitutes a valid ground to cancel bail under Section 439 CrPC, where supervening circumstances warrant such intervention. Consequently, the petition is dismissed and the bail cancellation stands.
This petition challenges Ext P5, an interim attachment order issued by the Commercial Court, Ernakulam under Sec. 9 of the Arbitration and Conciliation Act, 1996, in CMA (Arb) No. 533/2022. Carnival Facility Services Private Limited (the petitioner) contends that the Commercial Court lacks territorial jurisdiction to entertain Ext P1 petition since the agreement (Ext P2) fixes the seat of arbitration in Mumbai. Ext P1 seeks attachment of petitioner’s immovable property; the petitioner filed IA No.1/2022 (Ext P3) challenging maintainability, arguing the seat clause should restrict local jurisdiction, while Ext P4 opposed it. The Commercial Court passed a conditional order of attachment and proceeded to consider Ext P3, ultimately rendering Ext P5 in favor of exercise of jurisdiction. The petitioner appealed in CMA 3/2022, but the District Court’s judgment (Ext P6) held Ext P5 to be interim and not a Sec.9 order, casting doubt on the jurisdictional challenge. The High Court finds the court’s approach flawed, stressing that the Act’s scheme requires a Sec.9 petition to be adjudicated on its merits rather than piecemeal territorial issues. Relying on Bhavan Constructions v. Sardar Sarovar Narmada Nigam Ltd and Deep Industries Ltd, the court holds that the case falls under “exceptional rarity” and interferes under Article 227. The petition is allowed in part, Ext P5 is set aside, and CMA (Arb) 533/2022 must be disposed of expeditiously, with the interim order kept in force.
The petitioner, Aparna Sasi Menon, owner of 68.78 ares of land in Pullut Village, seeks to exclude her property from the Data Bank maintained under the Kerala Conservation of Paddy Land and Wetland Act, 2008. The Data Bank, intended to contain cultivable paddy land and wetland within the jurisdiction of the Local Level Monitoring Committee (LLMC), was formed to regulate reclamation and conversion. The petitioner filed Form-5 under Rule 4(4D) to remove the land, but the Revenue Divisional Officer (RDO) rejected Ext. P6 via Ext. P7 dated 05.01.2023, based on a report of 03.01.2023 by the Agricultural Officer (LLMC Convenor) following a site inspection. The LLMC minutes (Ext. P2) note features such as 60 coconut trees, water chals, and that the land was converted before 2008, and conclude that excluding the land would adversely affect nearby paddy cultivation. The petitioner contends the order is illegal for lack of personal inspection, and that the land, though described as paddy land in revenue records, was converted before 2008 and should be assessed under the Act’s framework; she asserts that denial would violate Article 300A and her property rights. Respondents argue the LLMC report supports retaining the land in the Data Bank to protect paddy cultivation. The court surveys Kerala Act 2008 provisions and several precedents (Salim C.K., Lalu P.S., Joy K.K., Arthasasthra Ventures) to hold that data-bank inclusion hinges on the land’s status as of 2008 and its fitness for paddy cultivation, and that the RDO’s order was illegal and unsustainable. Ext. P7 is set aside; the RDO is to reconsider the Form-5 application afresh with proper evidence within two months.
This petition challenges the Central Administrative Tribunal order dated 25 January 2016 in OA No.257/2012, which rejected the petitioner’s claim for pay parity/upgradation. The petitioner, P. Vijayakumar, a Deputy Director (Implementation) in the Department of Official Language, contends that Research Officer (Implementation) posts in Regional Implementation Offices share historical parity with Assistant Directors (OL), Hindi Officers, and similar cadres across central offices, and that a corresponding upgrade in pay scales is warranted to preserve equal treatment under Articles 14 and 16 of the Constitution. He relies on Annexure A1 to show duties and qualifications align with other posts and argues that the existing pay structure discriminates against a similarly placed cadre. The respondents dispute parity as a policy matter, arguing that ROS has long been grouped with other regional language posts and that the pay scales were rationalized through various CPC recommendations and DoE notes, culminating in a position where ROS receive GP Rs.4600 in PB-2 while ADS receive GP Rs.5400 in PB-3 and DDS Rs.6600 in PB-3. The High Court, upholding the Tribunal, notes that equal pay for equal work depends on expert assessment and that the VII CPC Anomaly Committee should consider merit-based parity; the petition is dismissed, though the petitioner is invited to pursue anomaly-resolution avenues.
W.P.(C) No. 12643 of 2023 The petitioner, a contractor engaged by the State Public Works Department for the Special Package Non Plan works 2020-21—Improvements (BM & BC) to Vypin-Pallipuram Parallel Road, Ch. 11/000 to 17/000, challenges Exhibit P26, the termination order dated 15.03.2023 issued by the Superintending Engineer, PWD Roads Division, Central Circle, Aluva. The core dispute centers on termination at the petitioner’s risk and cost after a prolonged sequence of delays attributed to public obstruction, Covid-19, shortages of materials, monsoon and floods, and a shift in instructions requiring reporting of intermediate levels after laying the GSB layer. The petitioner contends that intermediate levels were not approved timely due to non-cooperation, and that pandemic-related constraints and material unavailability hindered progress; the petitioner relies on Sections 56 and 55 of the Indian Contract Act, 1872 and on Supreme Court judgments to argue that the State and its instrumentalities must observe constitutional guarantees, especially Article 14. The respondents contend that despite extensions the project did not progress; termination was legal under the contract terms. The court reviews whether there is arbitrariness in Exhibit P26, finds that despite opportunities, progress remained lacking and that extensions were granted; thus, the writ petition is dismissed and the termination stands. The decision underscores that contract terms bind the parties and writ court interference is unwarranted where there is no demonstrated illegality in termination.
WP(C) Nos.40434/2022, 34357/2022, 41975/2022 Three writ petitions (WP(C) Nos. 40434/2022, 34357/2022 and 41975/2022) from residents of Thrissur seeking renewal of arms licenses were heard together. The District Magistrate had rejected renewals based on a report indicating no threat to the petitioners’ lives. Appeals before the Land Revenue Commissioner were also dismissed, echoing the same rationale. The petitioners challenged these orders in this common judgment of the Kerala High Court, arguing that renewals must be governed by the factual and statutory framework of the Arms Act, 1959, particularly Sections 13, 14 and 15, and the interpretation given in earlier judgments that grant/refusal of licenses should be grounded on specified grounds. The court referred to Ext. P3 (the Division Bench’s reference judgment) and analyzed the relationships among Sections 13, 14 and 15. It held that for consideration of licences under 14 and 15, the provisions of Section 13(3)(b) can be invoked to determine any “good reason,” except in two specific circumstances under Section 13(3)(a)(i) and (ii) related to citizens’ high-category licenses and rifle-club licenses. The impugned orders were set aside, and the authorities were directed to reconsider all applications, providing an opportunity of hearing within three months (two months for certain orders) and in light of the above observations. The petitions were disposed of accordingly.
This writ petition, filed by Dhanlaxmi Bank Ltd, challenges SEBI’s attempt to recover money from KHFL-linked investors by attaching and selling the mortgaged property pledged by the fourth respondent. The bank had extended a housing loan to the fourth respondent and secured it by mortgage of a residential property, with registration under CERSAI in 2012. When KHFL’s money mobilisation came under SEBI scrutiny, SEBI issued final orders and, after exploitation of enforcement mechanisms, attached the property as part of its recovery process. The bank contends that the mortgage created in February 2011 constitutes a secured asset under the SARFAESI Act, conferring priority to the secured creditor over SEBI’s recovery actions, even in the face of SEBI’s proceedings under the SEBI Act, 1992. The respondents argue that SARFAESI and SEBI Acts operate in different spheres and that, despite non-obstante provisions, SEBI’s recovery measures are designed to protect investors and are not subject to secured creditor’s first charges under SARFAESI. The judge reviews interplay among the SARFAESI Act (Sections 26E, 28A, 28A(3), 35, 37), the SEBI Act, and other statutes, citing Supreme Court precedents, including Kotak Mahindra Bank Ltd v Girnar Corrugators (2023). Ultimately the court holds that SEBI’s recovery measures are not subordinate to 26E priority and, finding no overriding conflict, dismisses the petition and allows SEBI’s sale to proceed. The decision is rendered by a Single Judge of the Kerala High Court.
This is a Kerala High Court criminal miscellaneous petition under Section 482 CrPC, filed by Mohammed Shafil TV, the 1st accused in CC 478/2018 of the Judicial Magistrate of the First Class, Perinthalmanna, arising from Crime No. 632/2017 of Perinthalmanna Police Station. The offences alleged are under Sections 341, 323, 324 and 506 r/w 34 IPC. The 2nd and 3rd accused were juveniles and were referred to the Juvenile Justice Board; the petitioner’s case remains pending as CC 478/2018. The petitioner contends that the parties have amicably settled their disputes and do not wish to pursue the prosecution; Annexure A4 is filed to substantiate this claim. The investigating officer was directed to verify the settlement and report on any impediments, including the petitioner’s criminal antecedents. The Public Prosecutor raised reservations about quashing solely on the basis of a settlement, urging caution under the inherent powers of Section 482. The court then invokes the Supreme Court’s settled law, citing State of M.P. v. Laxmi Narayan and a line of decisions led by Gian Singh, Narinder Singh, and Parbatbhai Aahir, among others, to emphasize that quashing may be appropriate for non‑compoundable, private offences where disputes are settled and the settlement is genuine. After weighing factors—nature of allegations, gravity, injuries, antecedents, and the amicable relation between the parties—the court concludes quashing will not harm public interest and will serve ends of justice. Result: Annexure A2 final report and all further proceedings in CC 478/2018 are quashed.
Mat.Appeal No. 578 of 2015 This matrimonial appeal arises from a divorce petition filed by the husband (appellant) seeking dissolution of marriage on grounds of cruelty. The marriage was solemnized on 29.01.2002 and two children were born, who are now major. The appellant, who was employed in Muscat, returned to India and sought a divorce alleging sustained cruelty by the respondent wife, including financial exploitation, misutilization of remittances for construction, and an alleged illicit relationship with the husband of the wife’s sister. He also pointed to family strife, notably a dispute with the sister’s widow, as contributing to discord. The respondent denied cruelty and the marriage remained strained for over a decade of attempts at settlement, with mutual consent for divorce failing and the couple continuing to live under the same roof. The Family Court dismissed the petition. On appeal, the Kerala High Court held that mutual consent alone could not salvage a failing marriage and that the circumstances—including long separation, mental cruelty, and irretrievable breakdown—justify dissolution. Relying on Beena M.S v. Shino G. Babu, K. Srinivas Rao, Samar Ghosh, Naveen Kohli and other precedents, the Court concluded that irretrievable breakdown and cruelty may warrant divorce even in the absence of fault. The appeal was allowed, directing dissolution of the marriage along with permanent alimony of Rs. 10 lakhs and transfer of 10 cents of land to the respondent, with steps to effect conveyance and land sketching.
The petitioner, a devotee of Mullakkal Sree Rajarajeswari Temple under the Travancore Devaswom Board, challenged the election of the Temple Advisory Committee (TAC) members 5 to 17 conducted for Mullakkal Sree Rajarajeswari Temple on 30 August 2022. He sought a mandamus to nullify those elections and to direct the Board to conduct a fresh election strictly in terms of Ext.P1 Rules for TAC formation. The 4th respondent, Sub Group Officer, conducted the 30.08.2022 election, while the 3rd respondent Assistant Commissioner was not the convenor; the 3rd respondent had authorised the 4th respondent due to the latter’s other duties. The Devaswom Commissioner later approved the TAC list by Ext.R1(a) on 05.09.2022. The court examined Ext.P1 Rules under Section 31A of the Travancore-Cochin Hindu Religious Institutions Act, 1950, noting that Clause (3) restricts membership to devotees within prescribed criteria and Clause (5) mandates notice and a general meeting for elections, to be conducted under proper authorisation. Citing Chandu K. v. Travancore Devaswom Board and Santharam Roy T.S., the court held that procedural compliance is essential, and the expressio unius maxim (and related authorities) supports strict adherence to the prescribed mode. Consequently, the election of 5–17 is void ab initio, Ext.R1(a) is set aside, and a fresh election must be held within one month; temple accounts must be audited within three weeks. This writ petition is disposed of accordingly.
This is a criminal revision petition filed under CRL.R.P. No. 2335 of 2009 before the Kerala High Court by two accused, Shibu Jacob and Johnson Mathew, challenging an order/judgment in CRA 81/2003 arising from CC 243/1997 before the Judicial Magistrate of First Class, Thalassery. The prosecution alleged offences under Rule 6 of the Kerala Rectified Spirit Rules r/w Section 55(a) of the Kerala Abkari Act for storing rectified spirit in 20 plastic barrels and 4 plastic cans at House AP II 557(A) Maniyur desom on 12.08.1996. The trial court convicted the accused to two years’ simple imprisonment and imposed a fine of Rs.25,000 each with default imprisonment. The Sessions Court dismissing the appeal upheld the conviction. In revision, the petitioners argued multiple procedural lapses: unexplained two-day delay in producing Ext. P1 (the seized contraband) before the court, absence of specimen seals, non-production/marking of the forwarding note, and that the investigation was conducted by an Assistant Sub-Inspector (not empowered under the Goverment Order/Abkari provisions). They relied on SRO 321/96 and decisions including Sabu v. State of Kerala. The court emphasized strict compliance with Abkari formalities, noted that unexplained delay and missing seals undermine chain-of-custody and the linkage between seized material and laboratory analysis, and ultimately acquitted the petitioners, setting aside lower courts’ verdicts. The bail bonds were cancelled and the accused were set at liberty.
Mathew C.R., a former teacher at St. Antony’s Higher Secondary School, challenged the denial of retroactive appointment as Principal and related pay benefits. He joined service in 1990, advanced to High School Assistant in 1998, became Headmaster in 2010, and was transferred as Principal of St. Antony’s Higher Secondary School on 14.12.2011. His appointment as Principal was not approved and he continued drawing the pay of a High School Assistant, while juniors promoted as Headmasters earned higher salaries. He sought notional fixation of pay under Ext P6, seniority benefits as on 1.6.2013 and Headmaster scale as on 1.6.2014 with increments that would have accrued had he remained Headmaster, and urgent approval of the transfer-based promotion. After amendment, he challenged Exts P7 and P8 in light of Thomas K.L. v. State of Kerala. The Government argued Exts P7 and P8 were proper and that pay scales and approvals followed statutory rules. The court relied on Thomas K.L. and later decisions (including a 2023 judgment in W.P.(C.) No. 20757/2022) to hold that financial liability cannot govern interpretation of statutory rules and notifications conferring benefits. The court quashed Exts P7 and P8, directed the 3rd respondent to approve the appointment w.e.f. 14.12.2011 within two months, and ordered payment of consequential benefits within two more months, effectively allowing the petition.
WP(C) Nos. 6698/2013 & 16502/2014 This is a Kerala High Court decision disposing of two writ petitions challenging an award by the Ombudsman under the Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS). The petitioner, M.C. Varkey, challenged the Ombudsman’s orders dated 4.2.2013 (WP(C)6698/2013) and 13.3.2013 (WP(C)16502/2014) directing refunds for alleged misrepresentation of land ownership and job-card particulars. The petitioner claimed lack of authority to award monetary relief under the NREGA framework, relying on Padmakshi v. Secretary, Arattupuzha Grama Panchayath, among others, and argued that the Ombudsman’s role is limited to redressal directions rather than monetary compensation. The respondents argued that the applicant was given benefits under the scheme when eligible and that any later finding of ineligibility due to affluence should not undermine the legality of the award. The court examines the Ombudsman’s Chapter III powers (sections 8, 9, 10, 13), the NREGA Act provisions (Sections 4(1), 4(3), and Section 27(1)), and Schedule I clauses on grievance redressal, including Paragraph 13.14.5 of the 2013 Operational Guidelines. Ultimately, the court holds that the Ombudsman may inquire and issue directions but cannot award compensation like a court; hence the awards are set aside and writ petitions are allowed, emphasizing the need for speaking orders and adherence to justice principles.
CRL.REV.PET NO. 3051 OF 2010 This is a criminal revision petition filed by the 3rd accused, Shiby Poly, challenging a conviction under Section 138 of the Negotiable Instruments Act. The Trial Court convicted the 3rd accused after finding that the cheques (Exts.P2 and P4) issued by the 1st accused company and signed by the 2nd and 3rd accused were in discharge of the company’s liability; the cheques were dishonoured for insufficient funds. Because the 1st accused company did not appear and the 2nd accused was reportedly in a comatose state, the Trial Court proceeded against the 3rd accused alone. The Appellate Court affirmed the conviction. The High Court, exercising revisional jurisdiction under Sections 397-401 CrPC, analyzes the scope of criminal revision, the principle of restraint in interference, and the reverse-onus doctrine applicable to Section 138 NI Act cases. It relies on a line of precedents to articulate the evidentiary burden on the accused to rebut the presumptions under Sections 118 and 139 NI Act and to show that the accused were in charge of the company’s affairs. The Court ultimately upholds the concurrent findings, holding that the 2nd and 3rd accused were in charge and responsible, and that the complainant’s case meets the essentials of Section 141 NI Act. The revision petition is dismissed and the conviction and sentence remain valid, with the execution of the sentence deferred to a date certain.
Dr. Jeeji Palocaren and her co-petitioners petitioned under parens patriae to appoint a guardian for the first petitioner’s husband, who, following an accident on 09.02.2023, has been in a vegetative, non-communicative state and utterly dependent on others for daily functioning. They argued that the husband is incapable of taking any decision, and therefore there is a need for a legally recognized guardian to manage his personal and medical affairs. Relying on the Division Bench decision in Shobha Gopalakrishnan v. State of Kerala (2019), they pressed for urgent adjudication by this Court. An interim order on 28.11.2023 directed the government to obtain instructions and for the 4th respondent to constitute a Medical Board to evaluate the patient, with the patient to be brought to the General Hospital for examination on 05.12.2023, and a report to be submitted on the next posting date. On 08.12.2023, the Medical Board certificate was placed on record by the Government Pleader, confirming that the husband remains non-responsive, with only spontaneous eye-opening and primitive reflexes, and with muscular wasting, rendering him incapable of decision‑making. Relying on this certificate and the earlier precedent, the Court allowed the petition and declared the first petitioner as guardian for all purposes. The order thus safeguards the patient’s welfare under a legally recognized guardian.