WP(C).No. 1624 of 2006 (R) This writ petition under Article 227 challenges Ext. P1, an order passed by the execution court in OS 383/2000, which arose out of a mortgage over a plaint schedule property described as paddy field. The underlying suit was for redemption of mortgage, with two related suits (OS 298/2000 for specific performance and prohibitory injunction) and an OS 299/2000 that was dismissed; ultimately, the mortgagee decree holder was permitted to redeem and recover possession upon deposit of Rs. 13,000. The execution court accepted a commissioner’s report valuing improvements at Rs. 14,419, treating reclamation of the land as an improvement under the Kerala Compensation for Tenants Improvements Act, 1959 (KCTIA), section 3(f). The petitioner contended that improvements were effected in violation of the mortgage terms and applicable law (including the Kerala Land Utilisation Order) and therefore could not be treated as compensable improvements; he also argued that improvements done during the injunction period or without mortgagor’s consent should not be compensated. The respondents urged that the improvements qualify for compensation under the Act, and that depositing mortgage money does not automatically end the mortgagor-mortgagee relationship. The High Court found merit in the petitioner’s submission that improvements effected in violation of an injunction or after deposit should not be compensated, but remitted the matter to the execution court for a fresh enquiry into the timing of improvements vis-à-vis injunction and mortgage money deposit, and to consider settlement before further adjudication.
The petitioner, a consumer ( rice miller ) with consumer no. 1369, challenged the Kerala State Electricity Board’s revised bill of Rs. 39,532, issued after the meter was found faulty from August 2000 to October 2000 and replaced in November 2000 (Exts. P1, P5). The Board calculated consumption by taking the average of the three months following the fault, a method upheld by the Appellate Authority in Ext. P4. The petition contends that clause 31(c) of the Conditions of Supply of Electrical Energy (1990) requires determining the correct energy quantity by taking the average of the previous three months once the meter is declared faulty, with a provision that if the previous three months cannot be taken due to the meter ceasing to record, the average of the succeeding three months should be used; the meter’s earlier faulty period and the relevant allocation (Ext. P2) complicate the calculation. The petitioner further argues that, under Section 26(6) of the Indian Electricity Act, 1910, any assessment must involve the Electrical Inspector, and that without such reference the assessment is unsustainable. The respondents contend the Board followed Clause 31(c) and that there is no finding that the meter remained defective for a year. The High Court, emphasizing the Electrical Inspector’s jurisdiction and the need for compliance with Section 26(6), holds that Exts. P1, P4, P5 cannot stand and quashes them; the petition is allowed. No costs.
This Original Petition (OP 29832/2002) before the Kerala High Court concerns K.S. Dayanandan, a retired lecturer who challenged government pension revisions and related clauses in Ext.P2 and Ext.P3. Dayanandan, who joined service in 1967 and retired on 31 March 1997, argued that his terminal benefits should be fixed under Ext.P2 (1998) and that Ext.P3 (2001) should not curtail his entitlement, since he retired after the period covered by the pre-revision rules. Ext.P2 announced revised pensionary benefits for state pensioners under UGC/AICTE/Medical Education schemes with effect from 01.03.1997; Ext.P3, issued on 17.01.2001, provided limited concessions for those who retired between 01.01.1996 and 28.02.1997, stating that they would not be entitled to commute a portion of their revised pension or to the 15% increase specified in Ext.P2, although some relief in pension terms was granted. Dayanandan contends that, relying on a Full Bench decision Accountant General v. Neelakandan Nair (2003) 3 KLT 525 and its Apex Court affirmation in State of Kerala v. Neelakandan Nair (2005) 3 KLT 717, his service extended to 31.03.1997 should entitle him to Ext.P2 benefits without Ext.P3 restrictions. The Government Pleader counters that the amendments to Rule 60(c) of Part I K.S.R. (SRO 2000 and later 2006) render extended service non-qualifying for pension and that Ext.P3 is a concession, not a right. The court ultimately holds Ext.P2 does not apply to him and that Ext.P3’s restrictions stand; the petition is dismissed with no costs.
WP(C).No.24830 of 2007 (E) The petitioners, three landowners in Elamkulam Village, claim ownership of 90 cents (Survey No.426) and seek a building permit for a multi-storey residential project. They obtained Exts.P1–P3 sale deeds and allege inaction by respondents 3–5 (Regional Town Planner, Town Planning Officer, and Kochi Corporation) since 28-07-2006 in processing their application (KRP2-518/2006). Respondents contend that Elamkulam North Extension Scheme envisages 15-metre and 13-metre wide roads, requiring land surrender and revenue clearances, and that the scheme (sanctioned under Kerala Town Planning Act, Sec. 12(2)) has implications for FAR and permissible construction. The petition relies on G.O. GO(MS) No. 348/04/LSGD (clarifying FAR precedence of KMBR 1999 over structural plans) and later GO(RT) No. 2121/06/LSGD; Ext.P9 (W.P. No. 25478/06) directed reconsideration. The respondents argue that the petitioners must surrender land for road widening and that the Elamkulam East Scheme’s roads justify delay. The court acknowledges long delay (two decades) and cites Francis v. Chalakudy Municipality and Padmini v. State of Kerala to underscore the impracticality of enforcing the scheme against feasible development. It ultimately allows the petition to the extent of granting FAR under KMBR 1999, quashes Exts.P6/P11, and directs fresh orders with an 18-month window for Land Acquisition Act Section 4(1) notifications, maintaining that petitioners should not be forced to surrender land absent compulsion or compensation rights.
AS.No. 237 of 1987 (D) (also cross appeals AS Nos. 250 & 270 of 1987) This is a long-running partition dispute concerning family properties dating from the early 20th century, arising out of O.S. No. 102/1980 in the Sub Court, Badagara. The dispute involves the descendants of Karathotti and Matha and their respective shares in plaint Schedule items 1, 9, 13 and other schedule items. A preliminary decree was passed in 1987 allotting shares among several plaintiffs and defendants (and their legal representatives), with complex allocations across multiple family branches. Three appeals (A.S. Nos. 237, 250 & 270 of 1987) and cross-objections challenged the decree, and the matter was referred to a Division Bench for resolution of important questions of law, including the applicable law of succession (Indian vs French for Mahe) and the coexistence of multiple legal regimes. In response to delay and the volume of issues, the court invoked Section 89 CPC and Order X Rule 1-A to explore ADR: arbitration, conciliation, mediation, or Lok Adalat, directing the parties to opt for a mode of settlement. A mediator-cum-conciliator, Sreelal N. Warriar, helped the parties reach a mediated settlement on issue No. 7 (sharing of property) dated 16-03-2008, which the court then substituted into the decree. The judgment ultimately partly allows the appeals, revises mesne profits, and directs final decree within six months, with no costs awarded.
This Kerala High Court writ petition challenges Section 137 of the Finance Act, 2001, which added service tax on banking and other financial services, including equipment leasing and hire-purchase, by amending the Finance Act, 1994. The petitioners (an association of NBFCs and its members) contend Parliament lacked competence to tax hire-purchase and leasing transactions, which they argue should fall within state sales tax under Entry 54 of List II post-46th Amendment (Article 366(29A)(c)-(d)). They further allege discrimination under Article 14 and violation of Article 19(1)(g). Respondents rely on Parliament’s residuary power to tax services (List I, Entry 97) and post-amendment entries (Entry 92C, Article 268A), plus a 90% exemption for interest income under Notification 4/2006-ST to limit the tax base. The court surveys the relevant provisions of the Finance Act, including 65(12), 65(14), 65(105), and Section 66, and concludes service tax on banking and other financial services is constitutionally permissible, with the incidence effectively on the non-excluded portion of receipts. Distinguishing sale of goods from service, and relying on BSNL v. Union of India and other precedents, the court upholds Parliament’s authority and dismisses the petition, finding no violation of Articles 14 or 19(1)(g).
This is a Kerala High Court criminal appeal under Section 138 of the Negotiable Instruments Act challenging an acquittal by the Judicial First Class Magistrate, Mananthavady, in STC Case No. 2154/2005. The complainant, Baby, lent Rs.65,000 to the first respondent on 25 January 2004. On 20 June 2005 the respondent issued Exhibit P1 for Rs.65,000 drawn on the Mananthavady Co-operative Urban Society Ltd.; the instrument was dishonoured for insufficient funds (Exhibit P2). A notice (Exhibit P3) was served (Exhibit P4), but the respondent did not respond or repay. The magistrate acquitted the respondent under Section 255(1) Cr.P.C. The appellant contends there is corroborated evidence of a debt and that Section 139 of the NI Act creates a presumption that the cheque was issued in discharge of a debt, so the respondent ought to be convicted. The respondent counters that the Rs.65,000 loan is not proven as a fresh debt and that a prior transaction in 2002 involved Rs.61,150, with a signed blank cheque given as security, which the accused allegedly misused to file this complaint. The trial court and the High Court rely on Krishna Janardhan Bhat v. Dattatraya G. Hegde to explain the limits of Section 139 presumption, holding that it cannot prove existence of a debt. Consequently, the appeal is dismissed and the acquittal stands.
This Original Petition concerns the fixation of pay and the consequent deduction from the DCRG of a Kerala High Court employee who retired on 28 February 2002 after 20 years of service. The petitioner, M.R. Mohanachandran Ushus, a Selection Grade Assistant, challenged the withholding of Rs. 88,358 from his DCRG, which the Accountant General had withheld citing an audit objection regarding pay fixation on grant of a higher grade from 1 July 1989. At that time, the petitioner had been placed in the scale 1250-2230, but was fixed in 1220-2150, since he was not eligible for promotion to Senior Grade Assistant due to lack of required account test, though retrospective promotions eventually raised his status in 1993. The court notes that the 20-year higher grade was granted before the 1993 promotion, and that the retrospective promotion caused the later change in eligibility; thus the audit objection was not timely raised and the recovery sought cannot be sustained. The court relies on the ratio in Narayanan v. State of Kerala (2008 (3) KLT 188) that recovery cannot be enforced due to late audit objections. The petition is allowed; the orders Exts.P3, P4, P10 are quashed; the Accountant General is to drop the fixation objection and release the amount within a short period.
The National Insurance Company Ltd. (insurer) has filed MFA (WCC) No. 198 of 2008 challenging the award of interest on the amount of compensation under the Workmen’s Compensation Act, as prescribed by Section 4A(3). The appeal contends that interest should accrue only from the date of adjudication and not from the date of the accident, arguing that the statutory interest is payable only when there is default beyond one month from the due date. The High Court restates that the obligation to pay compensation arises on the date of injury in the course of employment, and that the employer’s liability to pay is not suspended by Section 19 proceedings. It surveys precedents including Pratap Narain Singh Deo v. Shrinivas Sabata and Others (AIR 1976 SC 222), Ved Prakash Garg v. Premi Devi, Maghar Singh v. Jashwant Singh, and K.S.E.B. v. Valsala, to explain that liability and interest must be determined with reference to the date of the accident and the amendments enacted in 1995 (Act No. 30 of 1995) that increased compensation and clarified interest. The court notes that even with delays, the liability to compensate arises promptly, and finally, upholding prior jurisprudence, dismisses the appeal and leaves the compensation/interest framework intact as per the date of accident. The order ends with the appeal being dismissed.
WP(C).No. 23926 of 2008(W) This writ petition arises from three staff nurses’ grievance at Government Hospital, Vaikom, who contend that chronic staff shortages and bed oversubscription compel them to work continuous 14-hour shifts. They pray for mandamus to implement a three-shift duty system in Vaikom Hospital, citing Ext.P1 (a 2000 Single Judge judgment in O.P. No. 1 of 2000) and Seenath Beevi v. State of Kerala (2003) as supporting authority. The petition highlights sanctioned versus actual staffing (Head Nurses: sanctioned 11, only 6 in place; total beds 272 with inpatients exceeding the sanctioned bed strength) and asserts that the existing system compromises patient care and the nurses’ fundamental rights. The State replies that three-shift duty is being phased in due to financial constraints and post-creation requirements, with plans and timelines to implement in Vaikom and other hospitals, including reliance on NRHM posts. The court underscores that the constitutional right to life (Art. 21) requires the state to provide health facilities and that financial stringency cannot excuse non-implementation of a mandated three-shift system. It reiterates Ext.P1 and other precedents, finding the government’s delay unsustainable, and ultimately directs implementation of the three-shift system in Vaikom within three months of receipt of the judgment, with broader compliance to be pursued subsequently.
WP(C).No.17098 of 2007(I) Jasmine Mary Chacko v Government of Kerala and Others concerns a writ petition challenging the denial of approval for Jasmine Mary Chacko’s appointment as Higher Secondary School Teacher (Computer Application) at St. Behanan’s Higher Secondary School, Vennikulam. The school’s Higher Secondary section was sanctioned in 2000-01 with two science batches (Physics, Chemistry, Biology, Mathematics) and one commerce batch (Business Studies, Accountancy, Economics, Mathematics). In 2001-02 the Manager suo motu changed the subject of the commerce batch from Mathematics to Computer Application, and advertised for an HSST (Computer Applications). Jasmine Mary Chacko was appointed to the post on 18 September 2002 (Ext. P1). The petitioner contends that the change of subject was sanctioned by GO (MS) 139/2004/GE (Ext. P5) allowing subject change without additional financial burden. Respondents contend the change occurred without sanction and that it created potential financial liability; Ext. P7 (16.03.2007) and Ext. P8 (18.12.2008) record the rejection of the petition for approval. The court concluded that the appointment was in a non-sanctioned post and that subject change had not been sanctioned at the time, rendering the appointment unauthorised. Consequently, the writ petition was dismissed. The judgment emphasizes that the remedy lies against the Manager for any loss and that government approval cannot retroactively validate an unauthorised appointment.
Crl.Rev.Pet.No. 107 of 2008 This criminal revision petition challenges a concurrent conviction under Section 138 of the Negotiable Instruments Act for issuing a cheque that was dishonoured. The cheque for Rs 1,20,000 bore the date 4.12.2004 and the signature was admitted; the petitioner contends that the cheque was not handed over to discharge any legally enforceable debt but was given as a blank signed security cheque when he borrowed Rs 25,000 from Ummer and his wife. The loan was repaid, but the cheque was not returned, and disputes later arose over interest; Ummer and wife allegedly sought to stake a claim on the instrument. The complainant examined PW1 and produced Exts. P1–P6; the defense examined DW1–DW3. The courts below held that the complainant proved all ingredients of the offence under Sec. 138 NI Act. In revision, the court rejected the implausible defense version (DW2–DW3) and upheld the conviction but exercised its plenary power to modify the sentence. Relying on Anilkumar v. Shammy for sentencing principles and Hari Kishan & State of Haryana Sukhbir Singh and Suganthi Suresh Kumar v. Jagadeesan for the permissibility of a default payment to enforce compensation, the High Court directed: imprisonment till rising of the court and compensation of Rs 1,35,000 under Cr.P.C. 357(3), with a three-month default period if unpaid. Time to pay by 29.2.2008; appearance and sureties by 1.3.2008.
This Original Petition (OP No. 9004 of 1998) filed by the Divisional Personnel Officer, Southern Railway Palghat challenges an Industrial Tribunal award (I.D. No. 71/96) concerning the date of birth and consequent superannuation of Smt. P. Kasu. The railway management claimed the worker’s age was recorded as 40 years on entry in 1976, and that the service records did not substantiate a birth date of 16-12-1952, thereby justifying retirement on 30-04-1994. The Tribunal, however, did not accept affidavits alone as conclusive proof and relied on Ext. P7 (CAT order) which, according to the petitioner, quashed Ext. P6 and compelled acceptance of notarised affidavits declaring age. The petitioner contended that, in light of Rule 225 of the Railway Establishment Code and the Railway Ministry’s decision, age corrections require reliable documentary evidence and should not be entertained at the fag end of service. The High Court, applying the standard that interference in certiorari jurisdiction is permissible only for patent or perverse errors, scrutinised the Tribunal’s findings, especially the second finding on the CAT order. It concluded that Ext. P18 was perverse on that point and remanded the matter for fresh adjudication with medical examination via a Medical Board, directing a four-month window for a fresh award while preserving industrial peace.
This matrimonial appeal arises from a petition by Thampi seeking a decree of divorce on the ground of adultery against his wife Rajamma and contends that Ravi, her alleged lover, is a co-respondent. The Family Court, Thiruvananthapuram, dismissed Original Petition No. 692 of 2001 after a prior petition (OP 73 of 1988) had been dismissed in Attingal; the appellate MF A No. 306 of 1991 also failed. The marriage, solemnised on 10 April 1975, produced three children. The couple separated in 1984 and have lived apart for about 24 years by the time of the present petition. The petitioner contends that Rajamma has continued adulterous relations and has refused to file a joint petition. The wife denies the adultery and argues that the second petition on the same ground is not maintainable, and challenges the maintainability of proceedings set up by res judicata. The Family Court’s conclusion that the earlier petition bars the current one is set aside by the High Court, which treats the cause of action as having arisen after the earlier petition. Relying on Supreme Court precedents on irretrievable breakdown of marriage, the Court holds that dissolution by decree of divorce is appropriate. The appeal is allowed; the judgment and decree under appeal are set aside; the marriage is dissolved with effect from today, and there is no order as to costs.
CRL.Rev.Pet.No. 319 of 2002(B) Raman, S/o Kelappan, the revision petitioner, was convicted under Section 58 of the Abkari Act for possession of illicit arrack and sentenced to six months’ simple imprisonment and a fine of Rs. 50,000. The revision challenges the reliability of the evidence of PW1 (preventive officer) and PW2 (accompanist) regarding seizure of contraband and contends that Raman was not proven to be in conscious possession. The case records seizure of about 10 litres of illicit arrack on 8 November 1996 from a plastic can (MO1) near the house of Poovanmalayil Devi, with Ext. P1 (mahazar), and testimony of PW3 (independent witness) who did not support the prosecution. Exts. P2–P4 relate to the investigation and chemical examination showing 19.40% ethyl alcohol. While PW3 corroboration is lacking, the courts below relied on the testimony of PWs 1 and 2 and the documentary Ext. P1 to hold possession by Raman. The petitioner argued that pre-1997 amendment to the Abkari Act did not create the presumption under Section 58 and that proof of conscious possession was required. The High Court, noting the evidence and concurrent findings, held that the petitioner did possess the contraband and did not accept the lack of conscious possession. It upheld the conviction but modified the substantive sentence to simple imprisonment till rising of the court, while the fine was confirmed. The bail bond was cancelled and Raman was directed to surrender on 16.1.2009.
WP(C).No. 26799 of 2003(M) This writ petition concerns the termination and potential regularization of N.R. Vijayan, who was appointed as an Electrician on a provisional basis at the E.S.I. Hospital, Olarikkara, Thrissur. His engagement began with a short-term appointment (89 days) and was repeatedly extended, until his services were terminated on attaining the age of superannuation. The petitioner had challenged earlier terminations in O.P.2499 of 1981, leading to a 1982 decision in Umayammal v. State of Kerala (1982 KLT 829) which held that termination of provisional employees should occur under the Industrial Disputes Act, with replacement by a regular hand. Subsequently, the Kerala Government amended the Kerala Public Services Act, 1968 (Section 4) to subordinate all public service appointments to the KPSA and its rules, effectively limiting the earlier jurisdiction of Ext.P1. In 1995, Ext.P2 circular proposed provisional continuance for certain long-serving employees; in 1998 Ext.P4 and Ext.P5 communications sought details and continued provisional service until a final decision. The petitioner sought regularization under Rule 39 of Part II KS&SSR for pension benefits, relying on Ext.P9 (a high court decision directing consideration of regularization for pensionary benefits) and the Umadevi doctrine from the Supreme Court. The respondents argued that GO 39/2002/P&ARD denies regularization. The court ultimately quashed Ext.P12 and directed fresh consideration with a hearing, applying the Umadevi principle and the Ext.P9 directive, within three months, with pension options if regularization is granted.
Regular Second Appeal RSA No.1137 of 2008 arises from a suit titled O.S. 320/2006 in the Additional Munsiff’s Court-I, Kozhikode, concerning a small iron bunk (8x8 feet) installed in the front of a commercial building named City Gate. The plaintiffs (owners) granted the defendant a license to use the bunk for a year in Ext. A1 (1.10.2000) and then Ext. A3 (1.10.2001) with a monthly licence fee and a substantial security deposit. The defendant furnished a bulb and even procured electricity in his name, allegedly with the help of officials, allegedly in violation of the licence terms. The lease/licence dispute centers on whether the arrangement constitutes a lease or a licence; the trial court held the documents are licences, operating within the Kerala Building (Lease and Rent Control) Act, 1965; the defendant challenged, arguing a lease with exclusive possession, investment in furnishing, and electricity connection, and invoked Rent Control protections. On appeal, both courts below affirmed the licence conclusion and dismissed the challenge. The High Court, in this judgment, agrees that Exts. A1–A3 are licence agreements, not a lease. It rejects the appellant’s reliance on C.M. Beena v. P.N. Ramachandra Rao to treat the transaction as a camouflage, noting the lack of pleadings and the explicit licence terms. It also rejects invoking Section 60(b) of the Easements Act. The appeal is dismissed; the appellant is given time to vacate the bunk and pay damages of Rs. 1,000 per month, with specified undertakings.
CRL.M.C. Nos. 543, 544, 545, 553 of 2008 & Crl.R.P. No. 304/2008 These petitions arise from the seizure of mini lorries by the Tahsildar under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 (Sand Act) for allegedly transporting river sand illegally. The petitioners sought interim custody of their vehicles under Cr.P.C. sections 451 and 457, arguing that no cognizable offence had been registered and that the Sand Act’s provisions do not provide a workable, standalone mechanism for immediate custody or confiscation. The Respondents contended that the Sand Act and the Sand Rules (2002) create a self-contained code, with confiscation to follow after a prosecution under the Act and that interim custody is unwarranted. The Magistrates had refused to entertain or register interim custody applications in several petitions. The court examined whether the Sand Act requires prosecution for confiscation (Section 23) and whether Rule 27-28 of the Sand Rules provide a complete framework, or whether ordinary Cr.P.C. remedies apply to interim custody. The judge acknowledged conflicting precedent (Alavi/Moosakoya) but noted that Alavi’s ratio was stayed by the Supreme Court, allowing fresh consideration. Relying on Sunderbhai Ambalal Desai, State of Haryana v. Bhajan Lal, and related Kerala authorities, the court held interim custody could be granted to prevent deterioration of vehicles and to avoid unnecessary court/display issues, subject to conditions. Interim custody is allowed on deposit of Rs.25,000 and a bond for Rs.5 lakhs with two sureties, with the petitioners undertaking to not misuse the vehicles and to produce them as directed, subject to final orders on confiscation.
Crl.Rev.Pet.No.861 of 1995 This is a criminal revision petition filed by P. Ramachandran Nair challenging a conviction under Section 138 of the Negotiable Instruments Act. The 2nd respondent alleged that the petitioner borrowed Rs.75,000 on 01-10-1989 and issued Ext. P1 cheque dated 26-10-89, which was dishonoured for insufficient funds. The learned Magistrate convicted the petitioner under Section 138 after evaluating the evidence of PW1 (2nd respondent) and PW3 (her husband) and the bank managers. The defense contended there was no loan and no cheque issued by the petitioner; they asserted the cheque had been forged and the cheque book used fraudulently. The civil suit OS 55/91 was dismissed by the Sub Judge after finding that Ext.P1 was fraudulently created (Ext. D4), though that decision was not binding on the criminal court. The Sessions Court dismissed the appeal, and the revision petition argued that due execution of Ext.P1 was not proved; Ext.P1 is typewritten, the cheque leaf predates the transaction, and signature/handwriting was contested. The High Court considered the burden of proving due execution, the role of handwriting comparison, and relevant case law (Shanti Kumar v. Shakuntala Devi and Premshanker v. I.G. of Police). Ultimately, it acquitted the petitioner, holding there was insufficient material to prove due execution and reversing the conviction and sentence under Section 138.”
WP(C).No. 10903 of 2004 (S) The petitioner challenges Exts.P6 and P9, the orders rejecting his claim for appointment on compassionate grounds under the dying in harness scheme. Facts reveal that after his mother’s death in a road accident (1991) the family pension of Rs. 1,800 was paid; the father remarried in 1993, and the petitioner (aged about 20 in 2001) and his younger brother were financially stable, with other benefits including compensation and pension. The petitioner applied in 2001 for compassionate appointment. Ext.P6 (28.3.2003) refused the claim, and Ext.P9 (the CAT’s dismissal) upheld that decision. The petitioner contends that paragraph 10(a) of Ext.P7 permits compassionate appointment even if an earning member exists, and that receipt of pension/terminal benefits cannot automatically bar relief. He relies on Balbir Kaur and Govind Prakash Verma to challenge the grounds for denial. The respondents maintain that the claim was carefully weighed against multiple factors, including the family’s financial position and the lapse of years since the mother’s death, and that the dying in harness scheme is to provide immediate relief, not to create a backdoor for regular appointment. The High Court agrees with the tribunals’ reasoning, holding that there is no compelling circumstance to grant relief. The writ petition is dismissed; Exts.P6 and P9 stand.