Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2025Division BenchMiscellaneous Application disposed of.

Jawala Real Estate Pvt Ltd & Anr. v. Haresh

Case / Petition Number:
Miscellaneous Application No. 2426 of 2018 In Civil Appeal No. 3294 of 2018
Neutral Citation:2025 INSC 669

Case Synopsis & Summary

This Supreme Court judgment concerns a long-running allotment dispute between Jawala Real Estate Pvt. Ltd. (the appellant, later amalgamated with Macrotech Developers Ltd.) and Haresh (the respondent). In 2013, Jawala allotted flat 6403, B Wing, Lodha Allura, to Haresh; the respondent paid a substantial advance and sought execution of a registered sale. The appellant cancelled the allotment for non-payment of the balance, prompting a complaint before the National Consumer Disputes Redressal Commission (NCDRC). The NCDRC stayed the creation of third‑party rights and, despite this, the appellant alienated the apartment in 2014. The NCDRC then allowed the complaint in 2016, set aside the cancellation, and directed registration of the sale and payment of dues under the Maharashtra Ownership of Flats Act (MOFA) with interest and penalties. The appellant sought modification of that order to substitute an identical apartment (6503) in place of 6403, but the NCDRC rejected it. In 2018, this Court held that, since no contempt petition had been filed, the NCDRC ought to have allowed modification and that the same amount payable for the original apartment would be payable for the alternate one. Despite this, implementation stalled. In 2024–25, after extensive proceedings, the Court directed Haresh to pay Rs. 1,40,71,000 within eight weeks in lieu of all outstanding dues up to 05.02.2025, with further directions to execute the sale deed and hand over possession, and discharged the stay on structural changes. The Miscellaneous Application (No. 2426 of 2018) was disposed of accordingly, balancing equities and directing settlement of the account to achieve complete justice.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Vikram Nath
  • Prasanna B. Varale
Judgment Date
2025-05-13
Court Decision / Holding
Miscellaneous Application No. 2426 of 2018 disposed of. The Court directed the respondent to pay Rs. 1,40,71,000 to the appellant within eight weeks from receipt of the order, in lieu of clearance of all outstanding dues up to 05.02.2025. The payment is to be followed by execution of the sale deed within two months, and the parties are to permit handover of possession of apartment 6503 to Haresh. The restrictions on structural changes are discharged, and the registry is to release funds accordingly. The decision emphasizes complete justice and adjustments of equities, with ongoing liability for post-handover charges and the sale process to be completed as per MOFA. The Miscellaneous Application stands disposed of.
Final Disposition
Miscellaneous Application disposed of.

Parties to the Case

Appellants / Petitioners

  • Jawala Real Estate Pvt Ltd
  • Macrotech Developers Ltd

Respondents

  • Haresh

Legal Representation & Advocates

Counsels for Petitioners

  • • Siddhartha Dave
  • • Vinayak Bhandari
  • • Arnav Narain
  • • Ms. Alekhya Shastry
  • • Ms. Teesta Mishra
  • • Ms. Juhi Bahirwani

Counsels for Respondents

  • • Ms. V. Mohana
  • • Amol Nirmalkumar Suryawanshi
  • • Ms. Bhavya Pandey
  • • Ms. S. Soorya Gayathry

Provisions of Law Cited

Maharashtra Ownership of Flats Act, 1963Section 4, Maharashtra Ownership of Flats Act, 1963Section 6, Maharashtra Ownership of Flats Act, 1963Maharashtra Ownership of Flats Rules, 1964Rule 5, Maharashtra Ownership of Flats Rules, 1964Clause 6, MOFA Act (as quoted)

Legal Doctrines & Maxims

  • Complete justice
  • Adjustment of equities
  • Contempt of court

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contend that since no contempt petition was filed, the NCDRC should have allowed modification of the 2016 order to substitute the adjacent apartment (6503) and that whatever amount was payable for the original apartment should be payable for the alternate. They emphasize that the two‑week period to execute the agreement was part of the 2018 order and that the respondent has not supplied essential documents (building map, carpet area, NOCs) and has not provided clearances for the universally offered alternate apartment. They assert they have maintained the original flat during proceedings and that equity requires balancing the parties’ interests; finally, they seek either compliance with the order or refund of amounts already paid, with adjustments for delays and costs under MOFA.

Contentions of Respondents

The respondent contends that the appellant failed to provide essential documentation (maps, carpet area, NOCs) and critical clarifications; relying on Sections 4 and 6 of the MOFA, they argue their rights and obligations under MOFA govern the dispute and that the original allotment could not be substituted without proper compliance. They point to the appellant’s alienation of the original apartment during a stay and submit that the MOFA framework, including Rule 5 and other provisions, should govern the settlement. They maintain that the demands for balance payments must be supported by verified documents and that equity should not prejudice their position given the lack of clearances and details.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,850 words•~13 min read

In The Court Record

Jawala Real Estate Pvt Ltd & Anr. v. Haresh

[2025] 6 S.C.R. 193 : 2025 INSC 669 ## **Jawala Real Estate Pvt Ltd & Anr.** **v.** ## **Haresh** (Miscellaneous Application No. 2426 of 2018 In Civil Appeal No. 3294 of 2018) 13 May 2025 **[Vikram Nath* and Prasanna B. Varale, JJ.]** ## **Issue for Consideration** The question arose as regards the determination of the amount due and payable by the respondent-buyer to the appellant-developer for the allotment of flat. ## **Headnotes[†]** **Allotment – Allotment of flat – Determination of the amount due and payable – Allotment of flat by the appellant-developer to the respondent-buyer – Non-payment of the balance amount – Cancellation of the allotment by the developer – Thereagainst, complaint by the buyer – Despite order of the National Commission, the appellant created third-party rights with respect to the said apartment, and alienated the said apartment – National Commission set aside the cancellation order of allotment – Appellant then applied for modification of the order passed by the National Commission to the extent that an identical apartment may be substituted in place of apartment allotted to the respondent – Rejection of the application for modification since the appellant was in contempt – In appeal, this Court held that the application for modification ought to have been allowed by the National Commission as no contempt petition had been filed; and that whatever amount was payable for the original apartment, the same would be payable for the alternate apartment offered – However, the said order not implemented – Appellant then filed Miscellaneous Application for directions to the respondent to comply with the order passed by this Court or, in the alternative, to allow the appellant to refund the entire amount** * Author [2025] 6 S.C.R. 194 ## **Supreme Court Reports** ## **paid by the respondent towards the booking of the original apartment along with interest:** **Held:** Appellant has not provided the relevant documents asked by the respondent relating to the building map, carpet area, relevant NOCs right from the beginning – Appellant, being well aware of the stay order passed by the National Commission, proceeded to alienate the original allotted apartment in gross violation of the same – This alienation created further complication in the proceedings and also caused considerable delay in the matter – Even after the orders passed by this Court, the appellant did not come forward with the specific carpet area of the original allotted apartment and the alternate offered apartment – Respondent could not enjoy the possession of the apartment but the fact also remains that the balance consideration remained with the respondent – During this period, the appellant has been maintaining the said apartment and paying the essential charges to respective bodies/ associations – As such, there needs to be some adjustment of equities between the parties – In order to do complete justice between the parties, the respondent directed to pay the total amount of Rs. 1,40,71,000/- to the appellant within the stipulated period – Said amount is in lieu of clearance of all the outstanding dues of interest/taxes and other charges upon the respondent up to the date on which possession was handed over to the respondent. [Paras 12-14] ## **List of Acts** Maharashtra Ownership of Flats Act, 1963. ## **List of Keywords** Allotment of flat; Non-payment of the balance amount; Cancellation of the allotment; Third-party rights; Application for modification; Contempt; Alternate apartment; Alienate the original allotted apartment; Adjustment of equities; Clearance of all the outstanding dues. ## **Case Arising From** CIVIL APPELLATE JURISDICTION: Miscellaneous Application No. 2426 of 2018 In Civil Appeal No. 3294 of 2018 From the Judgment and Order dated 20.03.2018 of the Supreme Court of India in DY No. 655 of 2017 [2025] 6 S.C.R.  195 **Jawala Real Estate Pvt Ltd & Anr. v. Haresh** ## **Appearances for Parties** ## _Advs. for the Appellant:_ Siddhartha Dave, Sr. Adv., Vinayak Bhandari, Arnav Narain, Ms. Alekhya Shastry, Ms. Teesta Mishra, Ms. Juhi Bahirwani. ## _Advs. for the Respondent:_ Ms. V. Mohana, Sr. Adv., Amol Nirmalkumar Suryawanshi, Ms. Bhavya Pandey, Ms. S. Soorya Gayathry. ## **Judgment / Order of the Supreme Court** ## **Order** ## **Vikram Nath, J.** 1. The appellant– Jawala Real Estate Pvt. Ltd., subsequently amalgamated with Macrotech Developers Ltd., had allotted a three-bed room apartment to the respondent-Haresh sometime in the year 2013. The apartment number allotted to the respondent was flat no. 6403, B Wing, building known as Lodha Allura (Alpha Tower) in their project known as “Lodha Codename Blue Moon” situated at Plot CS No. 464, Pandurang Budhkar Marg, Opp. Hard Rock Café, Worli, Mumbai-400025. The respondent, in 2013 itself, paid Rs. 92,50,744/- being the advance amount out of the total sale consideration of Rs. 4,64,86,145/-, and had been requesting the appellant to provide relevant documents so that the registered agreement could be executed. The appellant, on the other hand, was giving written notices that the balance amount be paid failing which the allotment would be cancelled. 2. The appellant cancelled the allotment _vide_ letter dated 28.06.2013. This resulted into the respondent filing a complaint before the National Consumer Disputes Redressal Commission[1] registered as CC No. 210 of 2013. During the pendency of the proceedings before the NCDRC, the appellant, despite having been granted time, did not file his written submissions and, as such, their right to file the written statement was forfeited on 19.11.2013. By the same order, the NCDRC also provided, as an _ad interim_ measure that 1 NCDRC [2025] 6 S.C.R. 196 ## **Supreme Court Reports** the appellant would not create any third-party rights with respect to the apartment in question i.e. apartment No. 6403. Despite the same, the appellant admits of having alienated the said apartment on 24.11.2014. Additionally, _vide_ application dated 30.11.2015, the delay on part of the appellant herein in filing written statement was condoned conditionally on the payment of cost of Rs. 50,000/-. However, the appellant did not pay the said costs and resultantly, the right to file the written statement stood forfeited. 3. The NCDRC proceeded to allow the complaint, _vide_ order dated 17.02.2016. The operative part of the aforesaid order is reproduced hereunder: - “11. Keeping in view all these facts and circumstances, we hereby set aside the cancellation order of allotment dated 28.6.2013 in respect of the premises in dispute. We hereby direct the opposite parties to execute and register the agreement for sale and agreement in favour of the complainant in respect of said residential flat in conformity with the provisions of MOFA Act as per clause 6 quoted above, within 90 days from today and prepare the scheduled of payment as per the provisions of MOFA Act prescribed under Rule 5, Forum V of MOFA Rules 1964. 12. It is made clear that opposite parties will charge interest @ 9% per annum from the due date till its realisation. Needful be done within 90 days from today otherwise it will carry penalty of Rs.125/- per day till needful is done. The complainant is present in person. He has come from Bombay and has suffered the agony and harassment for the last 3 years. Consequently, we award Rs.1 lakh against the opposite parties. The said amount be paid to the complainant within 90 days otherwise it will carry interest @ 9% per annum till its realisation.” 4. As the appellant had already alienated the apartment in question despite the stay granted by the NCDRC, during the execution proceedings, it applied for modification of the order dated 17.02.2016 to the extent that an identical flat/apartment just above the apartment in question, which would be on the next higher floor being apartment no. 6503, may be substituted in place of apartment no. 6403 in the order dated 17.02.2016. The NCDRC, _vide_ order dated 16.12.2016, [2025] 6 S.C.R.  197 ## **Jawala Real Estate Pvt Ltd & Anr. v. Haresh** rejected the said application for modification. The NCDRC also made a sharp comment on the conduct of the appellant that the order of stay was passed in their presence and, as such, it was incomprehensible as to how they could have alienated the same by mistake as alleged. It observed that as a matter of fact, the appellant was in contempt and, therefore, no modification is required. 5. Aggrieved by the same, the appellant preferred the instant civil appeal before this Court. 6. This Court, by order dated 20.03.2018, was of the view that the application for modification ought to have been allowed by the NCDRC as no contempt petition had been filed and, accordingly, allowed the appeal and set aside the impugned order. This Court further directed that whatever amount was payable for the original apartment, the same would be payable for the alternate apartment offered, and consequently, stipulated a period of two weeks to execute the agreement between the parties within two weeks as directed by the NCDRC in accordance with the Maharashtra Ownership of Flats Act, 1963[2] . 7. The said order of this Court has still not been implemented in its letter and spirit. On behalf of the appellant, it has been contended that the appellant sent repeated letters of demand to the respondent to make the balance payment and get the agreement executed and registered, but the respondent did not pay any heed to these letters. On the other hand, according to the respondent, he had been repeatedly writing to the appellant to provide necessary clearances, the relevant maps and the carpet areas of both the apartments – the original as well as the alternate one offered, but he failed to receive any response from the appellant. 8. The appellant filed the instant Miscellaneous Application for appropriate directions to the respondent to comply with the order dated 20.03.2018 or, in the alternative, to allow the appellant to refund the entire amount paid by the respondent towards the booking of the original apartment along with interest as agreed in the application form. It is this application which has been heard on a number of occasions since 2018. The matter was also referred to mediation as 2 MOFA [2025] 6 S.C.R. 198 ## **Supreme Court Reports** well as Lok Adalat but it could not come to a close. Ultimately, this Court, _vide_ order dated 09.09.2024, after recording the respective contentions raised by the parties regarding the amounts due as per their respective cases, directed the respondent to come ready with the demand draft of the balance sale consideration. The Court also noted that the interest component, taxes, other society charges and other dues would be considered later on. Resultantly, in the order dated 30.09.2024, it was recorded that the respondent has placed a demand draft of Rs. 3,72,35,401/- being the balance sale consideration which was directed to be deposited with the Registry. The matter was adjourned to 08.11.2024 when the aforesaid amount was directed to be placed in a Fixed Deposit Receipt with any Nationalised Bank and the matter was adjourned to 26.11.2024. The parties were directed to file the details of the outstanding amount and the objections to the same. 9. The matter was taken up on 10.12.2024 and, after hearing the parties, this Court reserved the orders, granted time to file the written submissions and further directed that the amount lying in deposit with the registry to be handed over to the appellant. Additionally, it was directed that the appellant would handover peaceful and vacant possession of the apartment i.e. 6503 to the respondent within a week. The respondent, in the meantime, was restrained from making any structural changes in the apartment, however, the interior work was permitted to be carried out. On 20.12.2024, on the request of the appellant, it was provided that the payment be released in favour of Macrotech Developers Ltd. as the appellant company had amalgamated with the said company. It appears that the registry had released the amount in favour of the appellant on 30.01.2025 and, subsequently, the appellant issued a communication to the respondent to take possession on 05.02.2025. The said document has been placed on record on 27.02.2025. A perusal of the possession letter clearly bears an endorsement by the respondent that he has taken possession, subject to order(s) of this Court. 10. The question which now remains for us to determine is the amount due and payable by the respondent to the appellant. We have carefully and thoroughly examined the respective claims of the appellant and the respondent in this regard as submitted by them in their written briefs. The appellant has claimed a total amount of Rs.4,96,52,565/-, the break-up of the said amount under major heads is as follows: [2025] 6 S.C.R.  199 ## **Jawala Real Estate Pvt Ltd & Anr. v. Haresh** - (i). Interest @ 9% per annum on consideration value as well as on other charges: Rs. 3,98,42,426/- - (ii). Other charges [including infrastructure charges, legal charges, utility connection & distribution expenses, club membership charges, charges for formation and registration of society, Building Common Area Maintenance (“CAM”) charges, additional BCAM charges, Federation CAM charges, Additional Federation CAM charges and property tax]: Rs. 65,67,208/- - (iii). Taxes on consideration value: Rs. 23,17,990/- - (iv). Delayed payment admin charges of 2%: Rs. 9,24,941/- 11. On the other hand, the respondent has admitted liability to pay the amount of Rs. 2,15,884/- towards the legal charges, utility connection & distribution charges and charges for formation of society. Further, the respondent has also agreed to pay an additional amount of Rs. 15,37,126/- towards infrastructure charges and club membership charges, if the Court so directs. With respect to the remaining amounts, the respondent has denied its liability placing strong reliance on Sections 4 and 6 of the MOFA. 12. Having considered the submissions, the following facts govern the quantification of amount which we are crystallising in order to put a quietus to this matter: - (i). The appellant has not provided the relevant documents asked by the respondent relating to the building map, carpet area, relevant NOCs right from the beginning. Neither in any of the communications to the respondent nor in the submissions before us, the appellant has ever stated that it actually provided the documents required by the respondent. - (ii). The appellant, being well aware of the stay order dated 19.11.2013 passed by the NCDRC restraining it from creating any third-party rights, in gross violation of the same, proceeded to alienate the original allotted apartment no. 6403 on 24.11.2014 during the pendency of the proceedings before the NCDRC. This alienation has created further complication in the proceedings and has also caused considerable delay in the matter preventing it from attaining finality. [2025] 6 S.C.R. 200 ## **Supreme Court Reports** - (iii). Even after the orders passed by this Court, the appellant has not come forward with the specific carpet area of the original allotted apartment and the alternate offered apartment i.e. 6403 and 6503. - (iv). The respondent undoubtedly could not enjoy the possession of the apartment but the fact also remains that the balance consideration of Rs. 3,72,35,401/- remained with the respondent. Simultaneously, we cannot lose sight of the fact that during this period, the appellant has been maintaining the said apartment and paying the essential charges to respective bodies/ associations. As such, there needs to be some adjustment of equities between the parties. 13. We feel that there is no point in dealing with each and every issue raised by both the parties. However, in order to do complete justice between the parties, in the peculiar facts and circumstances of the case, we direct that the respondent shall pay the following amounts: - i) Admitted amount of Rs. 2,15,884/- - ii) Amount that the respondent is ready to pay on the direction of the Court – Rs. 15,37,126/- - iii) Taxes on consideration value – Rs. 23,17,990/- - iv) Amount of Rs. 1 crore over and above the above-mentioned amounts. 14. As such, the respondent is directed to pay the total amount of Rs. 1,40,71,000/- (Rupees One crore forty lakhs seventy-one thousand only) to the appellant within 8 weeks from the receipt of this order. The payment of above amount is being provided in lieu of clearance of all the outstanding dues of interest/taxes and other charges etc. upon the respondent up to 05.02.2025, i.e. the date on which possession has been handed over to the respondent. We make it clear that whatever charges and dues may accrue with respect to the use and occupation of the apartment post the handover of possession, the respondent would be liable to pay such amounts in addition to the above-decided amount. The parties are further directed to get the agreement to sale/sale deed executed within two months after the aforesaid payment is made. The expenses for the stamp duty, registration etc. would be borne by the respondent in accordance [2025] 6 S.C.R.  201 ## **Jawala Real Estate Pvt Ltd & Anr. v. Haresh** with law. The restriction imposed, _vide_ order dated 10.12.2024, regarding structural changes stands discharged. 15. The Miscellaneous Application No. 2426 of 2018 stands disposed of accordingly. _Result of the case:_ Miscellaneous Application disposed of. - _†Headnotes prepared by:_ Nidhi Jain
End of Judgment Record
Browse All Supreme Court of India (2025) Decisions
2025-01-03

Krishna Devi @ Sabitri Devi (Rani) M/s S.R. Engineering Construction v. Union of India & Ors.

Krishna Devi @ Sabitri Devi (Rani) approaches the Supreme Court seeking pronouncement of judgment in terms of an arbitral award under Section 17 of the Arbitration Act, 1940. The appellant’s husband secured a favourable award on 31 May 2022 in a dispute over a Tezpur work contract. Although the award was not published due to outstanding arbitrator fees, a district court order dated 21 September 2022 directed the respondents to clear the balance and stated that once paid, the award would be furnished. The appellant filed a Section 17 application on 10 November 2022 seeking the court to pronounce judgment in terms of the award. The trial court and the Gauhati High Court held the application premature, because it was filed before the expiry of the 30-day objections window under Article 119(b) of the Limitation Act, calculated from 18 November 2022 (alleged formal notice). The Supreme Court, however, held that the start of limitation is not tied to a formal notice but to awareness of the award’s existence. It relied on earlier decisions establishing that Section 14(2) only requires awareness that an award exists; a court’s order directing payment of fees can constitute such notice. Consequently, the 30-day limitation expired by 20 October 2022, rendering the Section 17 application timely. The appeal is allowed, and directions are issued to dispose of the related matter expeditiously with no costs.

2025-03-04

Saranga Anilkumar Aggarwal v. Bhavesh Dhirajlal Sheth & Ors.

This Civil Appeal concerns whether execution of penalty orders imposed by the National Consumer Disputes Redressal Commission (NCDRC) can be stayed under the interim moratorium provisions of Section 96 of the Insolvency and Bankruptcy Code, 2016 (IBC), while insolvency proceedings are pending under Section 95 of the IBC. The appellant, a real estate developer, sought a stay of 27 penalties levied for deficiency in service and delay in possession of residential units, arguing that an application under Section 95 of the IBC had triggered an interim moratorium. The NCDRC had rejected the stay, holding that consumer-claims and penalties are not “debts” within the moratorium’s ambit. The Supreme Court affirmed that the damages awarded in consumer disputes arise to compensate home-buyers and deter malpractice, and are not ordinary contractual debts susceptible to IBC restructuring; such damages fall within the category of “excluded debts” under Section 79(15) of the IBC, and their enforcement remains unaffected by insolvency proceedings. The Court emphasized the essential distinction between debt-recovery proceedings and regulatory/penal actions under consumer protection laws, rejected reliance on contrary authorities (notably Sheetal Gupta per incuriam), and held that criminal penalties under the CP Act do not automatically fall within the moratorium. The appeal was dismissed; the appellant was directed to comply with the NCDRC penalties within eight weeks.

2025-04-09

Serious Fraud Investigation Office v. Aditya Sarda

This batch of sixteen interconnected criminal appeals arises from SFIO's complaint against multiple respondents including Aditya Sarda for serious economic offences under the Companies Act, 2013 and the IPC. The Special Court at Gurugram took cognizance of the offences and issued bailable warrants to the accused, who allegedly concealed themselves or otherwise obstructed the process. Non‑bailable warrants were issued, and some proclamations under CrPC Section 82 were initiated against certain respondents. The High Court granted anticipatory bail to several respondents, notwithstanding the cognizance, warrant proceedings, and proclamations, leading to a series of challenges before the Supreme Court. The Court emphasises that anticipatory bail is an extraordinary remedy not available as a routine in cases involving serious economic offences, and that the twin mandatory conditions in Section 212(6) of the Companies Act, 2013 must be considered: (i) Public Prosecutor must be given an opportunity to oppose; and (ii) where opposed, the court must be satisfied of reasonable grounds to believe the accused is not guilty and unlikely to commit an offence while on bail. It reasons that respondents who evade process by concealing themselves after cognizance and after non‑bailable warrants were issued should not receive anticipatory bail. Accordingly, the High Court orders granting anticipatory bail are set aside, and the respondents are directed to surrender within one week to the Special Court, with subsequent bail determinations to be made in accordance with law. The judgment reiterates that economic offences require a cautious, exception‑based approach to bail and underscores the importance of ensuring due process and the unobstructed progress of judicial proceedings.

2025-03-04

K.S. Mehta v. M/s Morgan Securities and Credits Pvt. Ltd.

This is a Supreme Court decision under Criminal Appeal No. 1105 of 2025 arising from quashing under Section 482 CrPC of criminal proceedings instituted under Section 138 read with Section 141 of the Negotiable Instruments Act, 1881. The appellants, K.S. Mehta and Basant Kumar Goswami, were non-executive directors of M/s Blue Coast Hotels & Resorts Ltd., chosen to meet SEBI’s governance requirements (Clause 49 of Listing Agreement). They were not present at the 09.09.2002 board meeting that approved an Inter-Corporate Deposit (ICD) of ₹5 crores nor signatories to the ICD agreement or related instruments. Later, two cheques issued to discharge the debt were dishonored, leading to criminal proceedings against the directors. The High Court of Delhi dismissed petitions under Section 482 CrPC seeking quashing. The Supreme Court held that non-executive and independent directors cannot be fastened with vicarious liability under Section 141 NI Act unless the record demonstrates their direct involvement in the company’s affairs at the relevant time. Here, there was no evidence of their involvement, no signatory status, and mere attendance at board meetings cannot establish liability. The Court emphasized the need for specific averments showing the director was in charge of and responsible for the company’s conduct. Consequently, the proceedings against the appellants were quashed and the appeals allowed.