The writ petition, filed by Ayisumma and other legal heirs as petitioners, challenges Ext.P5, an order in the final decree proceedings of O.S.No.107/1977 before the Subordinate Judge of Palakkad, and seeks remittance of the commission report under the Kerala Land Reforms Act. The petitioners argued they are entitled to tenancy rights under Section 106 of the Act, a right crystallized by Ext.P1 (the 2002 revision order) directing the civil court to examine their claim after taking evidence. They contended that the commission report was erroneous or incomplete because it did not consider all relevant tenancy aspects and factors. The respondents opposed remittance, urging that the tenancy question be decided within the final decree proceedings and that the commission report should stand in its present form. The Court observes that Ext.P1 mandated assessing the tenancy claim after evidence and that Ext.P5’s denial of remission should not bar further consideration. It directs the Palakkad court to determine whether the petitioners are entitled to tenancy under Section 106, providing both sides a full opportunity to lead evidence, and to decide expeditiously (within three months). If found in their favor, appropriate orders may be issued regarding remitting the commission report. Govinda Panicker v. Sreedhara Warrier is cited to support that tenancy claims should be decided by the civil court rather than referred to the Land Tribunal.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S.S.SATHEESACHANDRAN
Judgment Date
2009-09-25
Court Decision / Holding
Writ petition disposed of directing the Sub Judge, Palakkad, to adjudicate the petitioners’ entitlement under Section 106 of the Kerala Land Reforms Act after evidence, with a view to determining their tenancy rights and, if favorable, passing appropriate orders remitting the commission report; Ext.P5 not to impede consideration; decision to be rendered within three months from receipt of a copy of the judgment.
Final Disposition
Writ petition disposed of as above; court directs consideration of tenancy claim under Section 106 and potential remittance of the commission report after evidence; three-month time frame for the lower court to decide.

Parties to the Case

Appellants / Petitioners

  • AYISUMMA
  • JAFFER
  • NAZAR
  • ASHARAF
  • AYOOB
  • MAHAMOODA
  • MARIYA
  • NABEESA
  • SEENATH
  • UPPAPPA alias NOWSHAD

Respondents

  • PAZHANIYAPPA PILLAI
  • VELAYUDHAN
  • SIVASUBRAMANYAN
  • RATHNASABHAPATHY
  • BALAKRISHNAN
  • GOPALAKRISHNAN
  • KARUPPANNAN
  • CHAMIYAPPAPILLAI
  • MEEMAMBAL
  • RAHMATH
  • SALIM
  • SHAMEENA
  • ANVAR
  • SAKKEER
  • SAIRABHANU
  • SHANOJ
  • BALKEES
  • MUHAMMED ASHIF
  • MUHAMMED ASHIK
  • NAZEEMA
  • DEVAKI AMMAL
  • VASANTHAKUMARI
  • GURUVAYURAPPAN
  • FATHIMA
  • PANCHALI
  • GEETHA
  • RAMESH
  • SIVASANKARAN
  • K.H.MUHAMMED SANGHAR HOTEL
  • SIVAKAMI AMMAL
  • RAJENDRAN
  • DHANABHAGYAM
  • PRABHU
  • RAMESH
  • DHANALAKSHMI AMMAL
  • MURUKESAN
  • GANESAN
  • RAJAGOPALA UDAYAR

Legal Representation & Advocates

Counsels for Petitioners

  • • V. CHITTAMBARESH
  • • T.C. SURESH MENON
  • • JIBU P THOMAS
  • • P.S. APPU
  • • A.R. NIMOD
  • • C.A. ANOOP

Counsels for Respondents

  • • P.R. VENKETESH
  • • A.R. GANGADAS

Provisions of Law Cited

Section 106 of the Kerala Land Reforms ActArticle 227 of the Constitution of India

Legal Doctrines & Maxims

  • Tenancy claims under Section 106 of the Kerala Land Reforms Act must be examined by the civil court after due evidence, not referred to the Land Tribunal; civil court determination, with possible remittance of commission report, as per Ext.P1 direction.
  • parties_and_doctrines_note”:null},
  • parties

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that Ext.P5 should be set aside and the commission report should be remitted so that the civil court can determine their tenancy rights under Section 106 of the Kerala Land Reforms Act. They rely on Ext.P1’s directive to examine the tenancy claim after taking evidence and on Govinda Panicker v. Sreedhara Warrier to argue that such tenancy issues need not be referred to the Land Tribunal but must be decided by the civil court. They assert that many factors relevant to tenancy were not considered in the commission report and that essential evidence was not elicited before the commission, warranting remittance for a comprehensive inquiry within a structured final decree framework.

Contentions of Respondents

The respondents maintain that the tenancy question should be adjudicated within the final decree proceedings and that Ext.P5’s order should stand. They argue that the Land Tribunal path is not necessary and that the civil court must decide the tenancy issue after evidence; remittance of the commission report is not warranted unless the court finds a legitimate basis in the evidence. They rely on prior orders and the consistent view that tenancy claims be determined in the final decree stage, and that Ext.P1’s directive has to be implemented through a proper appellate-final decree process.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Govinda Panicker v. Sreedhara Warrier2000 (2) KLT 43PositiveCited to support that tenancy claims under Section 106 of the LRA need not be referred to the Land Tribunal but must be decided by the civil court.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,594 words•~8 min read

In The Court Record

W.P.(C).No.22167/2009 (O)

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.S.SATHEESACHANDRAN** **FRIDAY, THE 25TH SEPTEMBER 2009 / 3RD ASWINA 1931** ## **WP(C).No. 22167 of 2009(O)** - **--------------------------** **OS.107/1977 of PRINCIPAL SUB COURT, PALAKKAD** **....................** ## **PETITIONER(S):** - **-------------------------** ## **1. AYISUMMA, WIDOW OF ABDUL KHADER.** **2. JAFFER, S/O. LATE ABDUL KHADER.** **3. NAZAR, S/O. LATE ABDUL KHADER.** **4. ASHARAF, S/O. ABDUL KHADER.** **5. AYOOB, S/O. LATE ABDUL KHADER.** **6. MAHAMOODA, D/O. LATE ABDUL KHADER.** **7. MARIYA, D/O. LATE ABDUL KHADER.** **8. NABEESA, D/O. LATE ABDUL KHADER.** **9. SEENATH, D/O. LATE ABDUL KHADER.** ## **10. UPPAPPA ALIAS NOWSHAD.** ## **ALL ARE RESIDING AT VITHUNNI, YAKKARA, PALAKKAD DISTRICT.** **BY MR.V.CHITAMBARESH, SENIOR ADVOCATE, MR.T.C.SURESH MENON,** - **MR.JIBU P THOMAS,** - **MR.P.S.APPU,** - **MR.A.R.NIMOD,** - **MR.C.A.ANOOP** **..2/-** **Kss** **...2.....** ## **WPC.NO.22167/2009 O** **RESPONDENT(S):** - **----------------------------** ## **1. PAZHANIYAPPA PILLAI,** - **S/O. ARUNACHALAM PILLAI.** **2. VELAYUDHAN, S/O. ARUNACHALAM PILLAI.** ## **3. SIVASUBRAMANYAN, S/O. ARUNACHALAM PILLAI.** **4. RATHNASABHAPATHY, S/O. ARUNACHALAM PILLAI.** **5. BALAKRISHNAN, S/O. ARUNACHALAM PILLAI.** ## **6. GOPALAKRISHNAN, S/O. ARUNACHALAM PILLAI.** **RESPONDENTS 1 TO 6 ARE RESIDING AT VITHUNNI, YAKKARA, PALAKKAD DISTRICT.** **7. KARUPPANNAN, S/O. MARAKATHAMMAL.** **8. CHAMIYAPPAPILLAI, S/O.MARAKATHAMMAL.** **9. MEEMAMBAL, D/O. MARAKATHAMMAL.** **RESPONDENTS 7 TO 9 ARE RESIDING AT R.S.ROAD, KARUR, TRICHY.** ## **10. RAHMATH.** ## **11. SALIM.** **12. SHAMEENA.** ## **13. ANVAR.** ## **14. SAKKEER.** ## **15. SAIRABHANU.** **16. SHANOJ.** **Kss** **...3/-** **...3......** **WPC.NO.22167/2009 O** ## **17. BALKEES,WIDOW OF SHAMSUDDIN.** ## **18. MUHAMMED ASHIF, S/O. LATE SHAMSUDDIN.** ## **19. MUHAMMED ASHIK, S/O.LATE SHAMSUDDIN.** ## **20. NAZEEMA.** **RESPONDENTS 10 TO 20 ARE RESIDING AT VITHUNNI, YAKKARA, PALAKKAD DISTRICT.** ## **21. DEVAKI AMMAL, WIDOW OF NAGAPPAN PILLAI.** ## **22. VASANTHAKUMARI, D/O. LATE NAGAPPAN PILLAI.** ## **23. GURUVAYURAPPAN, S/O. LATE NAGAPPAN PILLAI.** **RESPONDENTS 21 TO 23 ARE RESIDING AT VITHUNNI STREET, NURANI P.O., PALAKKAD DISTRICT.** ## **24. FATHIMA.** ## **25. PANCHALI.** ## **26. GEETHA.** ## **27. RAMESH.** ## **28. SIVASANKARAN, S/O. AMMUNNI AMMA.** **RESPONDENTS 24 TO 28 ARE RESIDING AT VITHUNNI, YAKKARA, PALAKKAD DISTRICT.** ## **29. K.H.MUHAMMED SANGHAR HOTEL, VITHUNNI, PALAKKAD.** ## **30. SIVAKAMI AMMAL.** ## **31. RAJENDRAN.** ## **32. DHANABHAGYAM.** ## **33. PRABHU.** **..4/-** **Kss** **....4.....** ## **WPC.NO.22167/2009 O** ## **34. RAMESH.** ## **35. DHANALAKSHMI AMMAL, D/O. ARUNACHALAM PILLAI.** **36. MURUKESAN, S/O. ARUNACHALAM PILLAI.** ## **37. GANESAN, S/O. ARUNACHALAM PILLAI.** ## **38. RAJAGOPALA UDAYAR.** **ALL ARE RESIDING AT VITHUNNI, YAKKARA, PALAKKAD DISTRICT.** **R1 TO R4 & R6 BY ADVS. MR.P.R.VENKETESH R25 TO R27 BY ADV. MR.A.R.GANGADAS** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 25/09/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** **Kss** ## **WPC.NO.22167/2009 O** ## **APPENDIX** ## **PETITIONER'S EXHIBITS:** - **P1: COPY OF THE ORDER IN C.R.P.NO.2467/1993 ON THE FILE OF THIS HONOURABLE COURT DTD. 20/09/2002.** - **P2: COPY OF THE FINAL REPORT OF THE ADVOCATE COMMISSIONER DTD. 18/10/1973.** - **P3: COPY OF THE INTERLOCUTORY APPLICATION FILED BY THE PETITIONERS DTD. 7/04/2009.** - **P4: COPY OF THE OBJECTION FILED TO THE INTERLOCUTORY APPLICATION DTD. 3/06/2009.** - **P5: COPY OF THE ORDER IN I.A.NOS.3135/08 & 1390/2009 IN I.A.NO.1906/2006 AND I.A.NO.120/1991 IN O.S.NO.107/1977 ON THE FILE OF THE COURT OF THE SUBORDINATE JUDGE OF PALAKKAD DTD.2/07/2009.** ## **RESPONDENT'S EXHIBITS: N I L** ## **/TRUE COPY/** ## **P.A.TO JUDGE** ## **Kss** ## **S.S.SATHEESACHANDRAN, J. -----------------------------------** ## **W.P.(C).No.22167 of 2009 - O --------------------------------Dated this the 25[th] day of September, 2009** ## **J U D G M E N T** The writ petition is filed seeking the following reliefs: _“i) To call for the records leading to the passing of Ext.P5 order and set aside the same._ _ii) To allow I.A.No.1390/2009 in I.A.NO.120/2001 in O.S.No.107/1977 on the file of the Court of the Subordinate Judge of Palakkad._ _iii) To issue a writ in the nature of mandamus directing the court below to consider the plea under Section 106 of the Kerala Land Reforms Act claimed by the petitioners being the legal heirs of the 21[st] defendant.”_ 2. Petitioners are the respondents 17 to 23 in the final decree proceedings, I.A.No.120 of 2001 in O.S.No.107 of 1977 on the file of the Sub Court, Palakkad. The predecessor of the petitioners was the 21[st] defendant in the suit who had passed away during the pendency of the appeal preferred against the preliminary decree passed in the suit. These petitioners were not brought on record during the pendency of the appeal, but, only in **W.P.(C).No.22167 of 2009 - O** 2 the final decree proceedings. In the final decree proceedings, when an application was moved for appointment of a commission for division of the properties by mets and bounds in tune with the preliminary decree, these petitioners had challenged the order of the trial court filing a revision as C.R.P.No.1173 of 2002 before this Court. The challenge was raised on the ground that the decree passed in the suit was not binding on them since they have not been brought in as legal representatives of the 21[st] defendant in the appeal. That was repelled by this Court holding that whether the decree passed in the suit is binding on them on account of their nonimpleadment is to be considered in the final decree proceedings. Anyhow, the challenge canvassed against the appointment of the commission in the final decree proceedings was negatived by dismissal of that revision. Petitioners had also moved an application for reference to the Land Tribunal, the claim raised by them in respect of a building in the plaint property. They claimed of conducting a saw mill in that building and contended they are entitled to the benefits under Section 106 of the Land Reforms Act. The application moved by **W.P.(C).No.22167 of 2009 - O** 3 the petitioners claiming that right was negatived by the learned Sub Judge and the order thereof was challenged by them in C.R.P.No.2467 of 1993. That revision was disposed of by order dated 20.9.2002 by this Court observing that their claim for the benefits under Section 106 of the Land Reforms Act is to be considered in the final decree proceedings after taking evidence. In view of the decision rendered by this Court in _**Govinda Panicker v. Sreedhara Warrier**_ (2000 (2) KLT 43) it was pointed out the claim of tenancy need not be referred to the Land Tribunal but has to be considered by the civil court. Ext.p1 is the copy of the order passed in the revision. Later, petitioners moved an application before the court below for remitting the commission report which had been prepared by the commissioner during the final decree proceedings before Ext.P1 order was passed in their revision contending that very many factors substantiating their claim of tenancy over the building were not taken into account by the commissioner. Since the right of the petitioners for the benefit under Section 106 of the Land Reforms Act got crystalised only by virtue of Ext.P1 order **W.P.(C).No.22167 of 2009 - O** 4 and so much so, at the time of preparation of the commission report which was much earlier those factors could not be brought to the notice of the commissioner, is the submission of the learned counsel to contend that the order passed by the court below dismissing the application for remission of the commission report is not proper and correct. Ext.P5 is the order passed by the learned Sub Judge declining the request of the petitioners for remission of the commission report. Writ petition is filed for setting aside Ext.P5 order directing the court below to pass appropriate orders by the learned Sub Judge, invoking the supervisory jurisdiction vested with this Court under Article 227 of the Constitution of India. 3. I heard the counsel on both sides. 4. Having regard to the facts and circumstances presented and also the submissions made by the learned counsel on both sides, I find the question as to whether the commission report is to be remitted as requested by the petitioners would arise for consideration only on establishing of their entitlement of the claim canvassed under Section 106 of the Land Reforms Act, **W.P.(C).No.22167 of 2009 - O** 5 and by Ext.P1 order this Court had directed the civil court to examine that claim after taking evidence. So much so, the court below has to examine the claim of the petitioner as to whether they are entitled to claim of tenancy under Section 106 of the Land Reforms Act and then proceed with the question whether the report prepared earlier which is challenged by them is liable to be remitted for collecting further details. The fact that the petitioners have not canvassed the claim earlier till filing of this application is of not of much moment when there is already a direction by this Court to examine that question to determine the claim after taking evidence. I direct the court below to consider the claim canvassed by these petitioners under Section 106 of the Land Reforms Act, providing sufficient opportunity to both sides to lead evidence in support of their respective case and enter a finding thereof, as expeditiously as possible, at any rate within a period of three months from the date of receipt of a copy of this judgment. Once such finding is entered into the court below will pass appropriate orders if warranted on their application for remitting the commission report. Ext.P5 will not 6 ## **W.P.(C).No.22167 of 2009 - O** stand in the way of the petitioners to challenge the commission report to the limited extent of the right claimed by them Section 106 of the Land Reforms Act provided a finding in their favour is made by the court after enquiry over the claim. Writ petition is disposed of as above. **S.S.SATHEESACHANDRAN, JUDGE.** bkn/-
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.