Workers of the Industry Colliery, Dhanbad v. Management of the Industry Colliery

Case / Petition Number:
Civil Appeal No. 133 of 1951

Case Synopsis & Summary

This is an industrial dispute concerning a one-day strike by the workers of the Industry Colliery, Dhanbad, on 7 November 1949. The workers had given notice under section 22(1) of the Industrial Disputes Act, 1947, bearing a demand on the expiry of 6 November 1949, and issued the strike notice in accordance with Rule 85 of the rules framed thereunder. Conciliation proceedings were initiated by the Regional Labour Commissioner (Central) at Dhanbad on 22 October 1949, but the workers declined to participate, believing the proceedings would yield nothing. The Regional Labour Commissioner sent his report to the Chief Labour Commissioner, New Delhi, on 22 October 1949, with the Ministry of Labour receiving a copy only on 17 November 1949. The question before the Court was whether the strike was illegal under section 24(1) read with section 22(1)(d) because it occurred during the pendency of conciliation proceedings. The statute provides that a conciliation proceeding shall be deemed to have concluded, if no settlement is reached, when the report is received by the appropriate Government (a legal fiction under section 20(2)(b)); the seven-day consideration period begins after that receipt. The Court held that the conciliation proceedings effectively concluded only when the report was received by the Government, which occurred after the strike, making the 7 November 1949 strike illegal. The Chief Labour Commissioner’s handling of the report was criticized, and the Court emphasized that time is of the essence in the Act. The appeal was dismissed; no costs order was made against either side. The decision underscores that delays in transmitting conciliation reports can have significant legal consequences for industrial action.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • DAS J.
Judgment Date
1952-12-12
Court Decision / Holding
Appeal dismissed; no order as to costs. The strike was illegal as it occurred during the pendency of conciliation proceedings, which only concluded on actual receipt of the report by the appropriate Government.
Final Disposition
Appeal dismissed; no costs order against either party.

Parties to the Case

Appellants / Petitioners

  • Workers of the Industry Colliery, Dhanbad

Respondents

  • Management of the Industry Colliery

Legal Representation & Advocates

Counsels for Petitioners

  • • Gobind Saran Singh

Counsels for Respondents

  • • P. K. Chatterjee

Provisions of Law Cited

Industrial Disputes Act, 1947, ss. 20(2)(b), 22(1)(d), 24(1)Industrial Disputes Act, 1947, ss. 20(1), 12(4), 12(6)Coal Mines Provident Fund and Bonus Scheme Act, 1948, s. 8(2)

Legal Doctrines & Maxims

  • Time is of the essence of the Act.
  • The public officer should act promptly and fairly; government delays cannot punish workers for actions beyond their control.
  • The government cannot take advantage of its own wrong.
  • A conciliation proceeding is deemed to have concluded when the report is received by the appropriate Government (via s. 20(2)(b)).

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants argued that the conciliation process had not concluded until the Central Government actually received the conciliation report, and that the Chief Labour Commissioner should not be treated as the Central Government’s agent for receiving the report. They contended that the period of seven days after receipt should run from actual receipt; and that delays due to administrative procedures should not penalize the workers.

Contentions of Respondents

The respondents contended that the law contemplates an eventual conclusion of conciliation only upon actual receipt by the appropriate Government and that the strike during the pendency was illegal under section 22(1)(d) read with 24(1). They argued the public utility nature of the service and the need to maintain order in industrial relations.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Tara Singh's case—PositiveCited to support the proposition that an error or irregularity not in compliance with section 342 does not necessarily vitiate a trial; the court relies on this principle to reject quashing the conviction for procedural irregularities.
Rani Lal v. Secretary of State for India—Mentioned OnlyReferenced in the discussion about the authority to receive the conciliation report; used as background rather than as a controlling authority in the decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,984 words•~19 min read

In The Court Record

Workers of the Industry Colliery, Dhanbad v. Management of the Industry Colliery

; _1962_ _**Ajtnsr Singh**_ v. _The State of_ _**Punjab.**_ _**Mahajan**_ _**J.**_ _1962_ _**Dee. 12**_ 428 SUPREME COURT REPORTS [1953] enmity. He stuck to that reply in the Court of Session after fully understanding what he was asked. It is wejl settled that every error or omission not in com pliance with the provisions of section 342 does not necessarily vitiate a trial. Errors of this type fall within the category of curable irregularities, and, as held in _Tara Singh's_ case('), the question, whether $he trial is vitiated, in each case depends upon the degree of the error and upon whether prejudice has been or is likely to have been caused to the accused. We are of the opinion that the disregard of the provisions of section 342 in this case is not so gross as would justify our quashing the conviction and ordering a retrial. The result is that we uphold the judgment of the High Court and dismiss the appeal. _Appeal dismissed._ Agent for the appellant: _R. S._ _Gheba._ Agent for the respondent : _G._ _H._ _Ra}adhyaksha._ WORKERS OF THE INDUS'l'RY COLLIERY, DHANBAD _'V._ MANAGEMEN'l' OF 'l'HE INDUSTRY COLLIERY. [MEHR CHAND MAHAJAN, DAS and BHAGWATI JJ.] _Ind1<strial Disputes Act, 1947,_ _ss._ _20_ _(2) (b),_ _22_ _( 1) ( d),_ _24-_ _Gonciliation proceedings-Withdrawal_ _of_ _workers-Strike_ _after_ _**Conciliation Officer has made his report but befo1·e**_ _**it is**_ _**received**_ _**by**_ _**Governnient-:::Legality**_ _**of**_ _**strike-Chief**_ Labo~ir _**Oo1n1nissioner**_ _whether agent_ _of Government._ _**A**_ **conciliation proceeding cannot be deemed** **to** **have concluded** under s. 20 (2) (b) of the Industrial Disputes Act, 1947, in a case **where no settlement has been arrived at,** **as** **Soon** **as** **the Concilia-** tion Officer sends his report. It can be deemed to have concluded only when the report is actually received by the appropriate **Governme:nt.** (1) (1951) S.C.R. 729. ;, #### . _1962_ _Workers_ _of tlte_ _Industry_ _Colliery,_ _Dhanbad_ v. _Managerne11t_ _of_ _the_ _Industry_ _Colliery._ ###### - .. S.C.R. SUPREME COURT REPORTS 429 The Chief Labour Commissioner, New Delhi, is not, in the absence of any express delegation of powers by the Central Government, the agent of the latter for the purpose of receiving the report of a Conciliation Officer. The appellants who had sent notice of their intention to strike declined to parti'cipate in conciliation proceedings which were initiated by the Regional Labonr Commissioner, and the latter sent his report to the Chief Labour Commissioner, New Delhi, on October 22, 1949. The report was received by the Chief Labour Commissioner on October 25, but a copy of the report was sent by the Chief Labour Commissioner, and received by the Ministry of Labour, only on November 17. Meanwhile the appellants went on strike on November 7: _Held,_ confirming the decision of the Industrial Tribunal, that under s. 20 (2) (b) of tbe Act the conciliation proceeding held by the Regional Labour Commissioner concluded only on November 17 when his report was received by the Central Government, and as the appellants went on strike before that date, it was a strike during the pendency of conciliation proceedings and therefore illegal under s. 22 (1) (d) of the Act, The provisions of several sections of the Industrial Disputes Act, 194 7, show that time is of the essence of the Act and the requirements of its relevant provisions must be pnnctually obeyed and carried out, if the Act is to operate harmoniously. CrvrL APPELLATE JURISDICTION: Civil Appeal No. 133 of 1951. Appeal by special leave granted by the Supreme Court on the 1st December, 1950, from the Judgment dated the 24th April, 1950, of the Central Government Industrial Tribunal, Dhanbad, in Appeal No. 1 of 1950, arising out of Order dated the 2nd February, 1950, of the Regional Labour Commissioner (Central), Dhanbad. _N. 0. Chatterjee (S._ _L._ _Ohhibber,_ with him) for the appellants. _S. P._ _Sinha (S. N. Mukherjee,_ with him) for the respondent. 195'J. December 12. The Judgment of the Court was delivered by DAS J.-This appeal by special leave is directed ll.gll.in'tit thB dBcision dated April 24, 1950, of the Central Government Industrial Tribunal at Dhanbad confirming the decision dated February 2, 1950, _of_ 430 SUPREME COURT REPORTS [1953] _J95i_ the Regional Labour Commissioner (Central), Dhanbad, which had declared the one-day strike by the _**ll'"orket'S**_ _**of the**_ _Industry_ appellants that took place on November 7, 1949, to _·Colliery,_ be an illegal strike. 'rhe relevant facts are as fol_Dhanbad_ lows: _Mana;;mcnt of_ On October 13, \949, the appell~nts through the _the_ _Industry_ Secretary of their llmou gave a notwe to the respond _Ool!iery._ ents, nnder section 22(1) of the Industrial Disputes Act, 1947, that they proposed to call a one-day strike _Dos_ J. on the expiry of November 6, 1949, for the fulfilment of demands, 16 in number, noted therein. This strike notice was, in accordance with rule 85 of the rules framed under the Industrial Disputes Act. 1947, sent to (1) the Conciliation Officer (Central), Dhanbad, (2) the Regional r~abour Commissioner (Central), Dhanbad, (3) the Chief Labour Commissioner, Department of Labour, Government of India, New Delhi, (4) Secretary, Ministry of Labour, Government of India, New Delhi, and (5) A.D.C., Dhanbad. This notice was received at the office of the Regional Labour Commissioner' (Central), Dhanbad, on October 15, 1949. The Regional Labour Commissioner. (Central) held conciliation proceedings at Dhanbad OJ;J. October 22, 1949, but the appellants, by their letter of the same date, declined to participate in the proceedings alleg. ing that they were convinced that nothii:ig 'ivould come out of the same and that the proceedings should, therefore, be considered "to be ceased." On the same day the Regional !Jabour Commissioner (Central), Dhanbad, addressed letter No. RLC/CON 5 ('roken) 7910to the Chief Labour Commissioner, New Delhi, stating that after receipt of thil notice of strike he had issued notice to the parties for conciliation, that the employers' representatives were ready to discuss the demands but the Union's representative filed a petition in writing saying that they did not want to . participate in the proceedings and that no fresh material had been placed before him to change his view and that he was not in favour of recommending a reference of the demand to the Industrial Tribunal. '.!'he letter ended with a request that the Government ' S.O.R. SUPREME COURT REPORTS 431 may be informed of the situation. It appears that _1952_ this report was received in the office of the Chief N ew Delhi, on 0 ### ... _Wo1·kers_ _of the_ Labour Commissioner, N ew Delhi, on 0 c~ober 25, _industry_ 1949. Although the Chief Labour Commissioner, •in _Colliery,_ his letter of November 17, 1949, to the Regional _Dhanbad_ Labour Commissioner (Central), Dhanbad, states that v. the contents of the latter's report had already been _Managem ..._ _t_ _[0]_ _f_ commumca . t e d t o th e _1_ M' . mis ry o t f L b a our,. a copy - f _the Colliery. industry_ the report was actually sent to and received by the Ministry of Labour only on that day. In the mean- _Das_ J. time on November 7, 1949, the appellants about 700 in number, went on one-day strike as per their strike notice. Apparently the respondents contended that the strike was illegal and they made an application, under section 8 (2) of the Coal Mines Provident Fund and Bonus Scheme Act, 1948, to the Regional Labour Commissioner (Central), Dhanbad, for a decision on the question whether the strike was legal or illegal. By his order dated February 2, 1950, the Regional Labour Commissioner (Central), Dhanbad, declared that the strike was illegal. Being aggrieved by the aforesaid decision the appellants, under section 8 ( 4) of the last mentioned Act, preferred an appeal to the Central Government Industrial Tribunal at Dhanbad which, however, also held that the strike was illegal and that the conclusions arrived at by the Regional Labour Commissioner (Central) were correct and accordingly dismissed the appeal. The appellants thereafter applied for and obtained special leave to appeal to this Court . The only question raised on this appeal is whether the strike was illegal. Section 24 (1) of the Act 'pro vides, _inter alia,_ that a strike shall be illegal if it is commenced or declared in contravention of section 22 or section 23 of the Act. Section 22 (1) provides as follows: " 22. (1) No person employed in a public utility service shall go on strike in breach of contract(a) without giving to the employer notice of strike, as hereinafter provided, within six wee)rs before E1triking; or _5ii_ ##### .. 432 SUPREME COURT REPORTS [1953] _**1952**_ (b) within fourteen days of giving such notice; or _**·rvorkers**_ _**of the**_ _Industry_ (c) ·before the expiry of the date of strike speci. _Colliery,_ fi&d in any such notice as aforesaid; or _Dhanbad_ (d) during the pendency of any conciliation pro'f v. _t_ ceedings before a conciliation officer and seven days **lt** anage1ne1~ _**o**_ _1_ f h l . f h d.,, 111 [, ] _[Industry ]_ [a ter t e cone ] [us10n ] [o sue procee mgs. ] _·Colliery._ Notice of strike having been given in terms of clause (a) and 14 days havingelapsedafterthegiving _·Das J._ - of such notice as required by clause (b) and the. actual strike having taken place after· November 6, 1949, being the date specified in the strike notice, the only other question for consideration is whether the strike took place during the pendency of any conciliation proceedings before a Conciliation Officer, and seven days after the conclusion of such proceedings. _j_ Under section '20(1) a conciliation proceeding shall be deemed to have commenced on the date on which a notice of strike under section '2'2 is received by the Conciliation Officer. In this case the strike notice was received by the Regional Labour Commissioner (Central) who is the Conciliation Officer, on October 15, 1949, and the conciliation proceedings, therefore, commenced on that date under section '20(1). 'rhe relevant portion of sub-section ('2) of that section runs as follows: " ('2) A conciliation proceeding shall be deemed to have concluded(a) ................................ ., (b) where no settlement is arrived at, when the report of the Conciliation Officer is received by the appropriate Government or when the report of the Board is published under section 17, as the case may be, or (c) ................................. " The Regional I.Jabour Commissioner ( Centra 1), who is the Conciliation Officer in this dispute, is required by section l '2 to hold conciliation proceedings in the prescribed manner and, without delay, investi$ate the dispute anq to do all such thin~s as S.C.R. SUPREME COUR'r REPORTS 433 he thinks fit for the purpose of inducing the parties to come to a fair and amicable settlement of the dispute. In this case the Regional Labour Commissioner (Central) held conciliation proceedings tin October 22, 1949, but no settlement could be arrived at as the appellants declined to take part in the proceedings on the ground that they were convinced that nothing would come out of it. That being the position, under section 12 ( 4) it became the duty of the Regional Labour Commissioner (Central) to "as soon as practicable after the close of the investigation, send to the appropriate Government a full report setting forth the steps taken by him for ascertaining the facts and circumstances relating to the dispute and for bringing about a settlement thereof together with a full statement of such facts and circumstances and the reasons on account of which, in this case, a settlement could not be arrived at". Subsection (6) of this section requires that the report shall be submitted within fourteen days of the commencement of the conciliation proceedings or within such shorter period as may be fixed by the appropriate Government. As already stated, the conciliation proceedings commenced on October 15, 1949. The report, therefore, was to be submitted within fourteen days from that date. In point of fact the report was sent by the Regional Labour Commis. sioner (Central) to the Chief Labour Commissioner, New Delhi, on October 22, 1949 (which was well within 14 days from the commencement of the conciliation proceedings), with the request that the Government may be informed of the situation. Under sub-section ( 4) the report has to be sent to the " appropriate Government " which according to the definition under section 2 (a) means, in relation to an industrial dispute concerning a mine, the Central Government. The Regional Labour Commissioner (Central) did not send the report direct to Central Government but sent it to the Chief Labour Commissioner, New Delhi, in accordance with what has been called the usual course and routine of _Workers_ _of the_ _Industry_ _Colliery,_ _Dha11bad_ v. _if!anageine1tt_ _of_ _the Industry_ _Colliery._ _Das_ _J,_ 434 SUPREME COUR'l' REPOR'l'S [1953] _196•_ official busiuess. The report, however, was received by the Central Government on or about November _**Workers**_ _**of the**_ _Industry_ **17,** 1949, and it is only on such receipt th~,t the con_Golliery._ cniation proceedings are to be deemed to have con_Dhonbad_ eluded according to the provisions of section 20(2) (b). v_ _Prima. facie,_ therefore, the strike which took place _Management_ _of_ on November 7 1949 was during the pendency of the _the Industr·y_ **·1·** t• ' d·' h Id b h h •t• _Colliery._ conm 1a 10n procee mgs as e y t e aut on 1es below. _Das_ _J._ Shri N. C. Chatterjee, however, argues that in point of fact the conciliation proceedings came to an end when the appellants had withdrawn from the proceedings and the Regional Labour Commissioner (Central) had sent his report. It is by a legal fiction, introduced by section 20 (2) (b), that the conciliation proceedings are prolonged until the actual receipt of the report by the appropriate Government. According to Shri N. C. Chatterjee the conciliation proceedings should be held to terminate when the Regional Labour Commissioner (Central) sent his report within fourteen days of the commencement of the conciliation proceedings. The difficulty in accepting this argument is that while the word "send" is used in section 12 (4) and the word" submitted" in section 12(6), the word used in section 20 (2) (b) is" received". That word obviously implies the actual receipt of the report. To say that the conciliation proceedings shall be deemed to have concluded when the report should, in the ordinary cour.se of business, have been received by the appropriate Government would introduce an element of uncertainty, for the provisions of section 22 (1) (d) clearly contemplate that the appropriate Government should have a clear seven days' time after the conclusion of the conciliation proceedings to make up its mind as to the further steps it should take. It is, therefore, necessary that the beginning of the seven days' time should be fixed so thatJ there would be certainty as to when the seven days' time would expire. It is, therefore, provided in section 20 (2) (h) ~. ###### .. # ## ·~ that the proceedings shall be deemed to have s.c.:R. SUPREME COURT REPORTS 435 concluded, where no settlement is arrived at, when _1952_ the report is actu.ally received b.y the appropriate _Work;;;of the_ Government. Shn N. C. Chatteriee on the other _Industry_ hand strongly urges, and not without some force, Collier~. that on that construction it may be possible for the _Dhanbad_ Government or its officers to withhold the report v. designedly or the report may be lost in course of _Mthanagedmentt_ _of_ _1_ transit · or may e b actua 11 y receive · d a er ft th e expiry · _e n Colliery. us ry_ of the date fixed for the strike in the notice under section 22 (1). Shri N. _0._ Chatterjee also points out _Das_ _J._ that it will not be possible for the workers to know when the report is actually received and their right to strike may thus be taken away from them. Shri N. O. Chatterjee contends that the Ql-overnment cannot take advantage of its own wrong. While we feel considerable force in Shri N. C. Chatterjee's argument based on hardship we are bound to assume that the public officers concerned would act fairly and properly. Further, it is not a case of the Government taking advantage of its own wrong a.s suggested by Shri N. C. Chatterjee, for here we are concerned with a dispute between the employers and the employees and there is no material before us to justify our attributing the misdeeds, if any, of the Regional Labour Commissioner (Central) or of the Chief Labour Commissioner, to the respondents, the employers who are entitled to take their stand on the language of the law. The Court can only construe the statute as it finds it and if there is any defect in the law it is for other authority than this Court to rectify the same. Shri N. C. Chatterjee also urges that the Regional Labour Commissioner (Central) should have, under section 12, sent his report to the appropriate Government, which in this case means the Central Government, and he should not have sent the report to the Chief Labour Commissioner. Assuming that that is the position then the fact will still remain that the Central Government did not receive the report and, therefore, the conciliation proceedings did not come to an end when the strike took place. Shri . 436 SUPREME COURT REPORTS [1953] _1952_ N. C. Chatterjee also suggests that the Chief Labour Commissioner should have returned the report to the _**Workers**_ _**of the**_ _1952_ _fodustry_ Regional Labour Commissioner (Central) because _Colliery,_ urfder the law the report should not have been made _Dha,.bad_ to him. He, however, did not return the same to the v. Regional Commissioner but took upon himself to for_Ma .. agcment of_ ward the same to the Labour Ministry. In the cir _the Industi·y_ Sh . N C Ch . h _CoU-e_, cumstances, 1 n . . atterJee urges, ou t e _'ry._ authority of _Ohattirbhuj Rani Lal_ v. _Secretary of State_ _Da•_ _J._ _for Indin_ ('),that the Chief Labour Commissioner must be deemed to be the agent of the Central Government for the purpose of receiving the report. We adjourned this case in order to enable Shri N. C. Chatterjee to ascertain whether there was any delegation of authority in this behalf by the Central Government to the 'Chief Labour Commissioner. Shri N. C. Chatterjee has not been able to discover any such delegation of authority. It seems obvious to us that the Chief I"abonr Commissioner cannot possibly be regarded for this purpose as the Central Government. In point of fact by a notification in the Gazette of India dated April 5, 1947, the Chief Dabour Commissioner has heen appointed as a Conciliation Officer and, therefore, in conciliation pro ceedings conducted by· him he has to submit his reporb to the Central Government. It follows, therefore, that the Chief Labour Commissioner must be an authority separate from the Central Government. According to rule 85 to which reference has been made the strike notice has to be sent, amongst others, to the Chief r~abour Commissioner as well as to the Department of Labour of the Government of India, which again indicates that the two are different entities. 'l'he Chief J1abour Commissioner is, therefore, only the channel or post office through which correspondence between the Regional Labour Commissioner (Central) and the Central Government is to pass and he cannot possibly be regarded as an agent of the Central Government for the purpose of receiving the report. The Chief Labour Commissioner _.:;._ . ' ## being the official channel the ruling relied upon by _1962_ Shri N. C. Chatterjee can have no application to the facts crf this case. _Woi·kers_ _of the_ _J,,dustry_ For reasons stated above we are of opinion that _Colliery,_ the conclusions arrived at by the authorities below _Dhanbad'_ on this point are correct and that this appeal must v. . d I th l. - t f h _Management_ _of_ b de ism1sse . [. ] n e yecu11ar ctrcums ances o t e _the_ _Industry_ case, however, we think that there should be no . _Colliery._ order as to costs and the parties should bear their own costs. . _Dai J._ Before concluding we must draw the attention of the authorities concerned to the slack and unbusinesslike manner in which the matter was dealt with in the office of the Chief Labour Commissioner. The Act requires that the Conciliation Officer must submit his report within 14 days from the commencement of conciliation proceedings and then on receipt of the report by the appropriate Government the conciliation proceedings are to be deemed to have concluded. Although factually the conciliation proceedings terminate when a settlement is arrived at before the Conciliation Officer or when it is found that no settlement can be arrived at, the Act, by a legal fiction, prolongs the conciliation proceedings until the actual receipt of the report by the appropriate Government and goes on to provide that the appropriate Government must have seven days' time to consider what further steps it would take under the Act. Up to the expiry of this period of 7 days the Act permits no strike but after that period is over the employees are left free to resort to collective· action by way of a strike. Indeed, it is on the basis of these provisions that the date of strike has to be carefully selected and specified in the notice of strike to be given by the employees under section 22 (1) of the Act. Thus, even a cursory perusal of the Act makes it clear that time is of the essence of the Act and that the requirements of its relevant provisions must be punctually obeyed and carried out if the Act is to operate harmoniously at all. In this case the 9onciliation officer subiµitted his re~ort on OctobEH S.C.R. SUPREME COUR'r REPORTS 437 438 SUPREME COURT REPORTS [1953) _1952_ 22, 1949, _i.e.,_ well within 14 days from the commencement of the conciliation proceedings as required by _**Worker.s**_ _**of the**_ l f h A Th _Industry_ section 2 (6) - t e ct. e report was sent _Colliery,_ tlirough what has been called the routine official - _Dhanbad_ channel. Admittedly, it was received in the office of v. the Chief Labour Commissioner at New Delhi on _Management_ _of_ October 25, 1949, but surprisingly.it was not passed _'"_ on to the Ministry of Labour, which is also in New _0' flnldustry_ **o** _**isry.**_ . . Delhi, until about November 17, 1949. 'The em_Das_ _J._ ployees had no means of knowing when the report was actually received by the Central Government which is the appropriate Government in this case or when the period of 7 days after such receipt expired. But in the belief, entertained, we think, quite legitimately, that the official business had been conducted regularly and promptly the employees went on strike on November 7, 1949, as previously notified. ·It now transpires that the report had not been actually received by the Central Government and, therefore, on the letter of the law, the strike must be held to be illegal and the employees must face and bear the consequences of an illegal strike and may even be deprived of benefits to which they would otherwise have been entitled. This hardship has been thrown upon the employees for no· fault of their own but simply because of the callous indifference or utter inefficiency and slackness apparently prevailing in the office of the Chief Labour Commissioner which cannot be too strongly deprecated. It is to be hoped that public officers would, in the discharge of their official duties in future, show a greater sense of responsibility than what they have done in the case before us. _Appeal dismissed._ Agent for the appellants: _Gobind Saran Singh._ Agent for the respondent: _P._ _K., Chatterjee._ -. .-. -. _--:-=_ ' '
End of Judgment Record
Browse All Supreme Court of India (1953) Decisions
1953-05-15

Dalip Singh and Others v. State of Punjab

Dalip Singh and Others v. State of Punjab concerns a June 1951 double murder in a Punjabi village where seven men from the same faction assaulted two brothers, Rattan Singh and Bawa Singh. The Sessions Judge convicted all seven under Section 302 read with Section 149 IPC, sentencing four to death and others to transportation for life; the High Court at Simla acquitted three and enhanced the others to death. The Supreme Court, in a judgment delivered by Bose J. for a Division Bench comprising Mehr Chand Mahajan, Vivian Bose and Jagannadha Das, scrutinized the application of Section 149 IPC which requires that at least five persons share a common object and that a certainty of their presence be established. It found that the High Court’s conclusion, based on two female eyewitnesses (Mst. Punnan and Mst. Charni) and corroboration from blood-stained clothes and recovered weapons, was subject to uncertainty since three of the seven might not have participated. Nonetheless, after careful re-examination, the Court accepted that at least five were present and upheld the conviction of four appellants under Section 302 read with Section 149, while the others were acquitted. On sentence, it held that the death penalty should be used sparingly and reduced the sentences to transportation for life for the four appellants, with the acquittals standing. The appeal as to sentence was partly allowed and the appeal as to conviction was maintained for those four.

1952-11-07

Ganesh Lal v. Joti Pershad

This judgment deals with a partition and redemption dispute among co-mortgagors in a Punjab setting where the Transfer of Property Act, 1882 is not in force. The plaintiffs, Joti Pershad, sought partition and possession of their two-fifths shares, while Ganesh Lal, who redeemed the mortgage in 1920 by paying Rs. 5,800, claimed the right to be reimbursed for the sum he paid and to secure his share in the mortgage debt. The trial court and the Punjab High Court found that the mortgage was a joint family obligation and that Ganesh Lal’s redemption was on his own account, entitling him to contribution from co-mortgagors only for the excess of his payment over his own share, after adjusting for amounts already received and taxes. The Supreme Court affirmed these conclusions, rejecting the appellant’s broad claim for the entire Rs. 11,200 debt under section 92 of the Transfer of Property Act. It held that subrogation is an equitable doctrine, allowing reimbursement only to the extent necessary to cover the excess actually paid by the redeemer, with due regard to fairness among co-mortgagors. While recognizing the concept of substitution in the mortgagee’s place, the Court emphasized that equity requires proportionate contribution and refuses to allow preference to the redeemer over other co-mortgagors. The matter was remanded to effect partition and delivery of possession according to shares."

1953-01-30

Keshav Mills Ltd. v. Commissioner of Income-tax, Bombay

Keshav Mills Ltd., a non-resident, manufactured textile goods in Baroda State and sold them ex-mills, with Jagmohandas Ramanlal & Co. guarantees for sale price. The dealer handled receipts: Rs. 12,68,480 through Jagmohandas Ramanlal & Co., Rs. 4,40,878 via British-Indian banks/shroffs, and Rs. 6,71,735 by cheques/hundies. Books were kept on mercantile basis. The core issue was whether these sums were sale proceeds of goods sold to merchants in British India and whether they were received in British India, so as to be taxable under section 4(1)(a) of the Income-tax Act, 1922. The Appellate Tribunal held items (a) and (c) exempt and (b) taxable; the Bombay High Court held that Rs. 12,68,480 and Rs. 4,40,878 were received in British India and thus taxable. The Supreme Court, by Bhagwati J. (majority with Mehr Chand Mahajan and S. R. Das), held that the two sums were indeed sale proceeds, received in British India through Jagmohandas Ramanlal & Co. and the banks/shroffs, and therefore liable under section 4(1)(a). Bose J. dissented, arguing for taxation on accrual/arising under mercantile accounting and section 4(1)(c) for non-residents. The Court reaffirmed mercantile accounting principles as they apply to non-residents and the distinction between receipt and accrual, ultimately dismissing the appeal with costs.

1952-12-10

Ajmer Singh v. The State of Punjab

Ajmer Singh, a young man about 22, was tried for the murder of his first cousin Bagher Singh and was acquitted by the Sessions Judge in May 1950. The State Government appealed, and the High Court of Punjab reversed the acquittal, convicting him under section 304 of the Indian Penal Code and sentencing him to ten years’ rigorous imprisonment. This is an appeal by special leave challenging that reversal. The central issue is whether faults in the trial, particularly the examination under section 342 CrPC, could justify overturning an acquittal, or whether such defects are curable irregularities that do not automatically vitiate the trial. The Court cites Tara Singh v. The State to emphasize that the object of section 342 is to provide a fair opportunity for the accused to explain circumstances appearing against him, and that errors in compliance must be weighed for prejudice rather than treated as automatic grounds to discard proceedings. It finds the Sessions Judge’s examination defective in form but not so prejudicial as to vitiate the case, given the simple nature of the issue and the credibility of witnesses. The High Court’s conclusions regarding the credibility of witnesses and the identity of the assailant are affirmed. Consequently, the appeal is dismissed and the High Court’s conviction stands, with the sentence intact. The judgment cautions against hypercritical reading of minor discrepancies in the evidence where the defendant had a fair opportunity to explain the circumstances.