V.K. Subhakesan v. Kerala State Electricity Board

Case / Petition Number:
O.P. No. 25691/1998-H

Case Synopsis & Summary

The petitioner, V.K. Subhakesan, owner of an ice factory in Cherthala, challenges a demand for electricity charges, including a short-levied amount and a 24% interest, raised after an inspection revealed a non-sealed CT box and disconnected CT wires. Ext.P6 mahazar indicated the CT box was not sealed, leading to allegations of energy theft. The petitioner contends that, at most, only 1/3 of energy could be unrecorded due to one non-functional CT, implying liability should be limited to about 50% more than recorded consumption, and not the Board’s calculation based on total connected load. He had previously sought relief in related petitions (O.P. 15580/1992; Ext.P7 order; O.P. 6200/1994; Ext.P8 judgment; Ext.P9 order). The Board argues that the petitioner failed to provide a locked metal meter box as required by Regulation 7(c), and therefore the CTs were tampered with; it asserts the proper method is to base charges on probable consumption of the total connected load. The court notes Ext.P6 does not allege a broken seal, only that the box was unsealed, and emphasizes the consumer’s duty to provide sealing facilities. It declines to reduce statutory interest under Article 226, upholds a 24% rate, but quashes the impugned orders and directs recomputation of charges for six months prior to inspection with adjustments for payments already made. The petition is disposed of accordingly.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. Siri Jagan
Judgment Date
2009-12-21
Court Decision / Holding
The impugned orders are quashed. The respondents are directed to recompute the electrical charges for six months prior to the date of inspection in light of the findings and to issue a fresh bill; payments already made shall be adjusted accordingly. The petition is disposed of in terms of this order.
Final Disposition
Original petition disposed of; impugned orders quashed; six-month recomputation ordered; adjustments for payments already made; matter disposed of on terms stated in the order.

Parties to the Case

Appellants / Petitioners

  • V.K. Subhakesan

Respondents

  • Kerala State Electricity Board, Trivandrum represented by its Secretary
  • Assistant Executive Engineer, Electrical Major Section, PattanaKadu
  • Assistant Engineer, Electrical Section, Arthunkal
  • Executive Engineer, Electrical Division, Cherthala

Legal Representation & Advocates

Counsels for Petitioners

  • • Mr. Sebastian Davis

Counsels for Respondents

  • • Mr. C.K. Karunakaran, Senior Counsel, KSEB

Provisions of Law Cited

Regulation 7(c) of the Conditions of Supply of Electrical EnergyRegulation 32(3) of the Regulations governing the supply of electrical energyRegulation 48 of the Conditions of Supply of Electrical EnergyArticle 226 of the Constitution of India

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that the crack in the CT system stems from non-functioning CTs, not theft; there is no basis to hold that one non-functioning CT results in 50% extra liability, and the method of calculating consumption based on total connected load is arbitrary and unfounded. The absence of a sealed metallic meter box, as required by Regulation 7(c), invalidates the board’s demand; the petition seeks quashing Ext.P1 and Ext.P9 and mandamus to restrain recovery and disconnection until proper records and opportunity of hearing are provided. The petitioner argues for a correction based on probable consumption (50% more than recorded) rather than the board’s six-figure estimate, arguing equality and reasonableness under regulatory norms.

Contentions of Respondents

The respondents maintain that the petitioner should have provided a metallic meter box with locking facility as per Regulation 7(c); their duty to secure CTs and seal the box is part of ensuring proper metering and preventing tampering. They argue the correct computation is to estimate probable consumption based on total connected load, given non-functioning CTs and the need to recover dues. They defend the 24% statutory interest under Regulation 32(3) and contend that court intervention to reduce it would undermine statutory provisions. The respondents contend the prior orders (Ext.P1, Ext.P9) were rightly issued and should be restored after a proper computation, with personal hearing and depositions considered.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
K.R. Alloy's Ltd. v. State of Kerala2005 (2) KLT 177DistinguishedThe court acknowledges the decision to reduce statutory interest in those cases but distinguishes on the ground that those decisions did not address whether Article 226 could reduce statutory interest under Regulation 32(3); thus they are not controlling in this specific statutory context.
Abdul Nazer v. K.S.E.B.2006 (1) KLT 811DistinguishedAlso cited for potential reduction of interest, but the present court clarifies that statutory interest cannot be reduced under Article 226, thereby distinguishing these precedents on the same statutory basis.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,822 words•~9 min read

In The Court Record

V.K. Subhakesan v. Kerala State Electricity Board

**IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **THE HONOURABLE MR. JUSTICE S.SIRI JAGAN** ## **MONDAY, THE 21ST DECEMBER 2009 / 30TH AGRAHAYANA 1931** **V.K. SUBHAKESAN, VELLAPPALLIL HOUSE, P.O. KANICHUKULANGARA, CHERTHALA.** ## **BY ADV. MR.SEBASTIAN DAVIS.** ## **1. KERALA STATE ELECTRICITY BOARD, TRIVANDRUM, REPRESENTED BY ITS SECRETARY.** **2. THE ASSISTANT EXECUTIVE ENGINEER, ELECTRICAL MAJOR SECTION, PATTANAKADU.** **3. THE ASSISTANT ENGINEER, ELECTRICAL SECTION, ARTHUNKAL.** **4. EXECUTIVE ENGINEER, ELECTRICAL DIVISION, CHERTHALA.** ## **R1 TO R4 BY MR. C.K. KARUNAKARAN, SC, KSEB.** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 21/12/2009,THE COURT ON THE SAME DAY DELIVERED** ## **O.P. NO. 25691/1998-H:** ## **APPENDIX** ## **PETITIONERS' EXHIBITS:** ## **EXT.P.1: COPY OF THE BILL DTD. 23/11/92 ISSUED BY THE R.2.** **EXT.P.2: COPY OF THE ORDER NO. DB58/APTS/92-93/492 DTD. 23/11/92 ISSUED BY THE R.2.** **EXT.P.3: COPY OF THE MEMORANDUM OF APPEAL FILED BY THE PETITIONER BEFORE THE R.4.** **EXT.P.4: COPY OF THE MOTOR READING AND CONSUMPTION OF CONSUMER NO. 889 SUPPLIED TO THE PETITIONER BY THE R.4.** **EXT.P.5: COPY OF THE METER READING AND CONSUMPTION OF CONSUMER NO. 889 ISSUED BY THE R.3. DT. NIL.** ## **EXT.P.6: COPY OF THE SCENE MAHAZER DTD. 20/11/92.** **EXT.P.7: COPY OF THE ORDER DTD. 09/03/94 ISSUED BY THE R.4.** **EXT.P.8: COPY OF THE JUDGMENT IN O.P. 6200/94 DTD. 12/08/1998.** **EXT.P.9: COPY OF THE ORDER DTD. 09/12/98 ISSUED BY THE R.4.** ## **RESPONDENTS' EXHIBITS:** **EXT.R1.A: COPY OF THE STATEMENT SHOWING THE METER READINGS AND CONSUMPTION OF CONSUMER NO.889 AND 1391 TVZ OF ELECTRICAL SECTION, ARTHUNGAL FROM 1/91 TO 4/93.** **EXT.R1.B: COPY OF THE MAHAZAR PREPARED BY THE SUB ENGINEER, ELECTRICAL SECTION, ARTHUNGAL DTD. 20/11/1992.** **//TRUE COPY//** **P.A. TO JUDGE.** **Prv.** S.SIRI JAGAN, J. ================== ## O.P.No. 25691 of 1998 ================== ## Dated this the 21[st] day of December, 2009 **==> picture [98 x 11] intentionally omitted <==** The petitioner is the owner of an ice factory at Cherthala. In the ice factory, the petitioner consumes electrical energy as per consumer No.889 of Electrical Sub Section, Arthunkal. On 20.11.1992 the Anti Power Theft Squad of the Kerala State Electricity Board conducted an inspection of the petitioner's electrical installation and prepared Ext.P6 mahazar, wherein it was noted that the box, in which the Current Transformers (CTs) were secured, was not sealed and that out of the three CTs in the box, in the middle CT two wires going into the metre were seen disconnected. Considering this as theft of electrical energy, the petitioner was directed to pay a amount of Rs.1,55,892.60 as current charges short levied and penalty. The petitioner challenged the same before this Court by filing in O.P.No.15580/1992, in which, this Court directed the petitioner to file an appeal under Regulation 48 of the Conditions of Supply of Electrical Energy. Pursuant to the same, he filed appeal, which was rejected by Ext.P7 order. The petitioner challenged that order by filing O.P.No.6200/1994, in which, by Ext.P8 judgment this Court quashed the demand and directed reconsideration of the matter after supplying the petitioner with copies of the depositions and affording an opportunity of personal hearing. Pursuant 2 o.p.25691/98 to the same, Ext.P9 order has been passed confirming the demand with 24% interest. The petitioner is challenging the same in this original petition. 2. The petitioner contends that the petitioner is not in any way liable for the disconnection of the wires in the CT and he has not committed any theft of electrical energy. He submits that on account of non-functioning of one CT, there would only be non-recording 1/3[rd] of the electrical energy consumed and, therefore, for the defect pointed out in Ext.P6 mahazar, the petitioner would at the most be liable to pay only 50% more of the recorded consumption of electrical energy. According to the petitioner, instead of demanding charges 50% more of the recorded consumption, the respondents have calculated the total consumption on the basis of the connected load, which cannot be accepted as a method for calculating the nonrecorded consumption of electrical energy. He points out that as is evident from Ext.P9 order, Sri.D.K.Rajagopalan, Assistant Executive Engineer, himself deposed on 27.11.1993 that if, out of the 3 CTs one CT is non-functional, the actual consumption would be 50% more than the consumption recorded. The petitioner, therefore, seeks the following reliefs: - “(a) to call for the records of Exts.P1, P2 and P9 and to quash the same by the issuance of a writ of certiorari or other appropriate writ order or direction; 3 o.p.25691/98 - (b) to issue a writ of mandamus restraining the respondents from recovering the amount covered by Ext.P1 and also from disconnecting the electricity connection having consumer No.889 Thiruvisha (sic)” 3. A counter affidavit has been filed on behalf of respondents 1 to 4 disputing the contentions of the petitioner. According to the respondents, it was the duty of the petitioner to provide metallic box with locking and sealing facility as per Clause 7(c) of the Conditions of Supply of Electrical Energy for securing the CTs, which the petitioner was not willing to provide and, therefore, it is evident that the petitioner had tampered with the CTs by disconnecting the wires from one of the CTs to the meter. According to them, the proper way to calculate the actual consumption is to take the probable energy consumption of the total connected load of the petitioner's electrical installation. 4. I have considered the rival contentions in detail. 5. At the outset, I note that in Ext.P6 mahazar there is no allegation that the petitioner has tampered with the seal of the box, wherein three CTs were placed. All what is stated in Ext.P6 is that the box was not sealed. It does not say that the seal was broken. 6. Regulation 7(c) reads thus: “7. **Fixing the position of Meter Board etc** . xxx xxxx xxx xxx (c ) Where the energy consumption of the consumer can be metered only with the aid of L.T. Current transformers, a metallic meter 4 o.p.25691/98 box of minimum dimension 60 cm x 45 cm x 25 cm shall be provided by the consumer to house the current transformers, cut-out energy meter etc. with provision for locking and sealing.” When the Regulation stipulates for the consumer to provide a metallic meter box to use CTs, it was improper on the part of the respondents to supply electrical energy to the petitioner without the petitioner providing a metallic meter box to use the CTs with a provision for locking and sealing and the Board actually sealing the metal box with the CTs safely secured inside. Unless and until such a metallic box was provided and the CTs were placed inside locked and sealed by the respondents, they should not have, under law, supplied electrical energy to the petitioner. According to me, it is vain for the respondents to allege that the petitioner is guilty of theft of electrical energy without the Board officials doing what they ought to have. Without first insisting on the petitioner providing a metallic box with locking and sealing facility and the respondents sealing that box appropriately, I am of opinion that for the defect pointed out in Ext.P6, the respondents are also equally guilty and the respondents are also liable to be held responsible for the resultant non-recording of electrical energy in the meter. From Ext.P9, I find that for the purpose of arriving at the probable electricity short paid for by the petitioner, they have taken the total average monthly consumption of the petitioner as 10800 units. The respondents themselves have provided 5 o.p.25691/98 the pattern of electrical consumption by the petitioner before and after the defect noted in Ext.P6 mahazar. Ext.P4 is the same. Therein, the maximum consumption is in September 1991, which is only 6770 units and the minimum is in July, 1991, ie. 280. The petitioner points out that the total consumption for six months prior to the inspection was 13219 and the total consumption for six months after the inspection was 16780. Going by the same, the average monthly consumption before the inspection was only 2203 whereas after inspection the average monthly consumption was only 2796 units per month. The respondents have no case that at any point after the petitioner started using electrical energy in 1973, the petitioner had consumed electrical energy anywhere near 10800 units. That itself shows that the method adopted by the respondents is totally faulty. Simply because an irregularity has been noted in the electrical installation for securing which from tampering with, the respondents have not taken adequate precaution, the petitioner cannot be saddled with such a huge liability on the basis of a process of calculating consumption on the basis of total connected load. The calculation of probable consumption should have some connection with reality. From the facts noted above, by any stretch of imagination I cannot accept the calculation of 10800 units as average monthly consumption of the petitioner prior to the date of inspection, for which period the demand 6 o.p.25691/98 has been issued to the petitioner. In the above circumstances, going by the figures noted above, I am of opinion that the probable actual consumption would be 50% more of the recorded consumption. Therefore, the petitioner would be liable to pay only for consumption calculated thus. 7. The petitioner also challenges the demand for 24% interest. According to him, that is clearly excessive as held by this Court in the decisions in _K.R.Alloy's Ltd. v. State of Kerala_ [2005 (2) KLT 177] and _Abdul Nazer v. K.S.E.B._ [2006 (1) KLT 811]. But I find that in Regulation 32(3) it is stipulated that if the dues are not paid on or before the due dates, interest will be levied at 24% per annum. When the statute fixes interest at 24% I do not think that this Court can exercise powers under Article 226 of the Constitution of India to reduce the rate of interest. Although in the two decisions cited by the petitioner, interest had only been reduced, there is no discussion as to whether under law the statutory interest could have been reduced by this Court by exercise of powers under Article 226 of the Constitution of India. I am of opinion that this Court under law cannot reduce the statutory interest. Therefore, I am not inclined to interfere with the demand for interest at the rate of 24%, which is statutory. Accordingly, the impugned orders are quashed. The respondents are directed to recompute the electrical charges of the petitioner for 7 o.p.25691/98 six months prior to the date of inspection in accordance with the above findings and issue a fresh bill accordingly. Needless to say, payments already made by the petitioner towards the demand shall be adjusted as on the date of payment. The original petition is disposed of as above. sdk+ Sd/S.SIRI JAGAN, JUDGE ///True copy/// P.A. to Judge ## S.SIRI JAGAN, J. ================== O.P.No. 25691 of 1998-H ================== J U D G M E N T 21[st] December, 2009
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.