Supreme Court of IndiaSupreme Court · 1978Single JudgeAppeal allowed; impugned order quashed; no costs.

Vilangandan v. E.E. (P.W.D.) Ernakulam

Case / Petition Number:
Civil Appeal No. 2448 of 1968
Neutral Citation:3 S.C.R. 515

Case Synopsis & Summary

This Supreme Court judgment concerns the validity of a debarring order against a long-standing government contractor (the appellant) for alleged default in starting work under a contract for repairs to Maharaja College at Ernakulam. The contract provided that time was the essence and that the site would be handed over for commencement. The appellant faced delays due to the building not being vacated and subsequent engineers’ strikes; eventually, the Executive Engineer declared the contractor a defaulter and ordered the work to be undertaken through other agencies at the appellant’s risk and loss, effectively blacklisting him from future contracts in the division. The appellant challenged the June 20, 1968 order under Article 226 in the Kerala High Court, arguing that he had not been afforded an opportunity to be heard before such adverse action. The respondents contended that the show-cause notice already apprised him of potential action and that government contracts are within the State’s freedom of contract. The Kerala High Court, by a majority, held that no hearing was required before blacklisting and that the show-cause notice was sufficient. The Supreme Court reversed, holding that fundamentals of fair play and natural justice require an opportunity to represent one’s case before blacklisting; the notice’s wording did not clearly contemplate universal debarment. The Court quashed the debarring order and allowed the appeal, emphasizing the need for a clear declaration of future debarment in such notices and applying Erusian Equipment principles over the Kerala position.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. R. Sarkaria
Judgment Date
1978-03-20
Court Decision / Holding
Appeal allowed; the Kerala High Court’s judgment is set aside and the impugned order debarring the appellant is quashed; there will be no order as to costs.
Final Disposition
Appeal allowed; impugned order quashed; no costs.

Parties to the Case

Appellants / Petitioners

  • Vilangandan

Respondents

  • Executive Engineer, Buildings & Roads (P.W.D.) Division, Ernakulam
  • (and others)

Legal Representation & Advocates

Counsels for Petitioners

  • • Mr. Raghavan

Counsels for Respondents

  • • S. V. Gupte
  • • K. M. K. Nair

Provisions of Law Cited

Article 226 of the Constitution of IndiaArticle 14 of the Constitution of IndiaArticle 19(1)(f) of the Constitution of IndiaArticle 19(1)(g) of the Constitution of India

Legal Doctrines & Maxims

  • Fundamentals of fair play require opportunity to represent one's case before blacklisting
  • Natural justice (right to a hearing)
  • Erusian Equipment & Chemicals Ltd. v. State of West Bengal doctrine on fair hearing before blacklisting

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the impugned order debarring him from taking future contracts is illegal since he was not afforded an opportunity to present his case before the decision to blacklist; the April 17, 1968 show-cause notice did not clearly convey that broad debarment would follow and the response submitted by the appellant showed no consent to universal debarment. He asserts that denying a hearing violates natural justice and Erusian Equipment’s fair-play doctrine.

Contentions of Respondents

The respondents contend that the show-cause notice warned of potential action to arrange work through other agencies after debarring the appellant as a defaulter, which suffices as an opportunity to represent the case; the State has the freedom to contract and to select contractors without discrimination; the impugned order did not infringe Articles 14 or 19 since it concerns a contractual relationship and not a general right to practice a trade.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Erusian Equipment & Chemicals Ltd. v. State of West Bengal[1975] 2 S.C.R. 674PositiveApplied to require a hearing before blacklist/debarment; used to interpret the notice and to uphold fair-play norms.
Thomas v. State of KeralaILR (1968) 2 Kerala 1 (FB)OverruledKerala High Court’s view that no hearing was required before blacklisting was overruled by this Court; Erusian principle governs.
C.K. Achuthan v. State of KeralaATR 1959 S.C. 490Mentioned OnlyCited for observations on non-discrimination in government contracting; used illustratively rather than as controlling precedent.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,999 words•~14 min read

In The Court Record

Vilangandan v. E.E. (P.W.D.) Ernakulam

A B ###### c D E F G H 514 JOSEPH VILANGANDAN _v._ THE EXECUTIVE ENGINEER, BUILDINGS & ROADS (P.W.D.) DIVISION, ERNAULAM & ORS. _March_ 20, 1978 [R. S. SARKARIA AND P. S. KAILASAM, JJ.] _I\Tatural_ _Justice-Black_ _listing_ _of a contractor-Whether opportunity_ _of_ _being_ _heard is necessary-Nature of opportunity._ The appellant was a Go1,'.ernment Contractor of 16 years standing. He has been executing major building contracts. The Executive Engineer, PWD, Ernakulam, invited tenders for executing certain 1epairs to English and Mathe~ matics blocks of Maharaja College at Eril.akulam. The tender given by the appellant was accepted, and a formal agreement was executed. The agreement provided that the work should be completed within a stipulated time and that the time shall be considered as the essence of the contract. The appellant alleged that in spite of his reciuests the building was not handed over to him to enable him to start the work, and that in the meantime, the Engineers' strike supervened in which respondents 1 to 4 participated. 'Ihe Executi\'e Engineer sent a letter to the appellant asking him _to_ show cause why the \\'Ork might not be arranged otherwise at the appellant's risk and Joss through other agencies after debarring the appellant as a defaulter and making good the loss ~hat might accrue to the department from the subsisting contract in the divison. The appellant sent a reply to the show cause notice asserting that he committed no default. The Executive Engineer finally caricelled the contract and informed the appellant; that the work was being arranged at the appellant's risk and loss through other agencies after declaring him a defaulter. The appellant was debarred from taking any contracts in future from the Department in Ernakulam Division. The appellant filed a writ petition under Art. 226 before the High Court. The learned Single Judge dismissed the Writ Petition. An aweal filed to the Division Bench also failed. The appel1ant contended in, appeal by Special Leave, that the order was illegal and void for the reasons that no opportunity was given to the appellant to represent his case before passing the impugned order. 'The respondent con tended that the notice given to the appellant requesting him to show cause why the v;.·ork might not be got done through other agencies after debarring him as a defaulter, afforded him sufficient opportunity to represent his case. Allowing the a_ppeal the Court, HELD (I) The majority judgment of the Kerala Jligh Court in the case ef _Thomas_ v. _State of Kerala_ whicli holds that a person Ts not entitled to a hearing before hei is black-listed must be deemed to have been over-ruled by this Court in the case· of _Erusian Equipment_ _&_ _Chen1icals_ _Ltd._ v. _State_ _of_ _West Bengal,_ where it was held that fundamentals of fairplay require that the person concerned should be a;iven an Qpportunity to represent hi' case before he is put on the black-list. The show cause notice given to the appellant, if construed in the context of the entire para, could be understood as conveying no more than that an action v;ith reference to the contract in question only, was under con templation. There are no words in the notice which could give a clear intimation to the addressee that it was proposed to debar hin1 from taking any. contract whatever in future under the Department. The appellant was thus not afforded adequate opportunity to represent against the impugned action \Vhich must, therefore, be held to be bad in law. [518 E-F, 519 A-B, DJ _Erusian Equipment_ & _Chemicals Ltd._ v. _State_ _of_ _West Bengal_ [1975] 2 S.C.R, explained; _Thomas_ v. _State_ _of_ _Kera/a_ I.L.R. 1968(2) Kerala 1 (F.B.) overruled. CIVIL APPELLATE JURISDICTION : Civil Appe!l) No. 2448 of 1968. ##### • #### \ ### VILANGANDAN _v._ E.E. (P.W.D.) ERNAKULAM _(Sarkaria,_ **J.)** **515** _T._ C. _Raghavan, Sardar Bahadur Saharya_ & _Vishnu_ _Bahadur_ **A** _Saharya_ for the appellant. S. _V. Gupte_ & _K._ _M. K. Nair_ for the Respondents. The Judgment of the Court was delivered by SARKARIA, J.-This appeal by special leave directed against a **B** Division Bench judgment of the Kerala High Court raises a question with regard to the validity of an order dated June 20, 1968 whereby the Executive Engineer debarred the appellant from taking any further contract under the Buildings & Roads Division, Ernakulam. The appellant is ~ Government Contractor of 16 years standing. He has been executing m_ajor building contracts. The Executive Eng- C neer, P.W.D. Ernakulam (Respondent No. 1) invited tenders for executing certain repairs to the English and Mathematics Blocks of the Maharaja College at Ernakulam. The appellant submitted a tender, dated March 8, 1967, for doing this work. In response to a letter from Respondent 1, the appellant sent his consent letter, dated March 27, 1967 (Ex. p-1), agreeing to reduced rates of certain items of the work, on the condition that "as soon as the Selection Notice is **D** issued the building should be got vacated to facilitate the starting of the work". The tender was then accepted by the Executive Engineer and a Selection Notice was issued to the appellant on March 31, 1967 in which it was, _inter alia,_ stated that the "facilities for carrying out the work will be given as soon as you start the work". A formal agreement was executed on April 26, 1967, by the **E** appe'Jlant and the Executive Engineer. Condition No. 4 of the agreement stipulated that "time shall be considered as the essence of the agreement and the contractor hereby agrees to commence the work as soon as the agreement is accepted by the competent authority (Executive Engineer) and the site (or premises) is handed over to him (contractor) as provided for in the conditions and to complete the work within 6 months from the date of such handing over of the **F** site (or premises)". The appellant alleged that inspite of his request, the Executive Engineer and his assistants (Respondents 2 to 4) took no steps to hand over the building in order to enable him to start the work. T~e repair work could commence only after the removal of the electnc wirings, and such removal was not done upto July 10, 1967. **G** In the meantime, the Engineers' strike supervened, in which Respondents 1 to 4 participated. The period of six montns for carrying out the work expired before the Engineers' strike came to an end . On October 27, 1967, the appellant wrote a letter to tlie Executive Engineer (Respondent 1), requesting for release from the contract. He stated : **H** "Due to some unavoidable circumstances the building has not been got vacated so far. The completion period A B 516 SUPREME COURT REPORTS [! 978] 3 S.C.R. as per the tender for the work, i.e., 6 months is over. Now the cost of materials and labour have increased considerably. In th-e above circumstances I request that I may kindly be released from the above agreement of work and the secnrity may be released." On Ap<il 17, J 968, the Executive Engineer sent a Notice (Ex. P-6) to the appellant, which reads as follows : -- "The fulfilment of the undertaking given by the department to give facilities to carry out the work as soon as you start the work was not even necessitated as you have failed even to commence the work as per the terms of the ###### c contract. ... You are, therefore, requested to show cause within seven days from the date of this notice why the work may not be arranged otherwise at your risk and loss; through other agencies _after debarring you as a defaulter_ and making good the loss that may accrue to the department, from your D subsisting contracts in this Division." (Emphasis supplied) E p G The appellant, on May 20, 1968, sent a reply asserting that he committed no default; that he had collected the required wooden materials necessary for starting the work, immediately after the execution of the agreement, and that the delay in starting the work was only due to the delay in handing over the building to him. However, the Executive Engineer finally communicated his order,. dated June 20, 1968 (Ex. P-8), cancelling the contract and informing the appellant that "the work is being arranged at your risk and loss through other agencies after declaring you as a defaulter and de_barring_ _you_ _from taking further_ _contract_ _under_ _the_ _Division."_ (I:!mphasis supplied) To challenge this order of the Executive Engineer, debarring the appellant from taking further contract under the Division, a Writ Petition (O.P. No. 2869 of 1968) under Article 226 of the Constitution was filed by the appellant in the Kcrala High Court. It was contended in the petition that the said Order (Ex. P-8) of the Executive Engineer, was _ultra vires,_ illegal and unconstitutional as it violated the appellant's fundamental rights guaranteed under Article 19(1 )(f) and (g) of the Constitution. He further maintained that Respondent 1 was not right in holding the appellant a defaulter; nor had he any power or jurisdiction to 'black-list' or rebar the appellant from taking further contracts in Ernakulam Division. ## H In the counter-affidavit filed on behalf of Respondent 1, it was stated : (a) The Principal of the College when the work had to VILANGANDAN _v._ E.E. (P.W.D.) ERNAKULAM _(Sark.ll'iU,_ _].)_ 517 be carried out reported that the work may be done **A** **after** **the** **monsoon** **was** **over.** _J_ _I_ ##### .. .... Mr. Raghr.van appearing for the appellant, submits that apart from the competency of .the Executive Engineer to 'black-list' or debar the appellant from faking contracts with **B** & R Department in Ernakulam Division, the impugned order was illegal and void for the reason that no opportunity was given to the Appellant to represent his case before he was pnt on the 'black list'. For this contention, (b) During the period o[ the Engineers' strike from 11-8-67 to 5-10-67 also there was nothing on record to show that the petitioner (Appellant) had approached either the Administrative Officer or Work Superintendent or instructions to start th~ work **and** **as** **soon** **as** **"No** **Work** **.Programme"** **was** **over,** the Assistant Engineer issued a notice by registered post to the appellant on 9-10-67, directing him to start the work on or before 13-10-67. The contractor did not take any steps to commence \_he work, but sent a reply, dated 27-10-67, requesting that he be released from the contract. (e) On November 22, 1967, the Principal of the College, wrote that all arrangements to vacate the building had been made. Respondent 1 thereupon sent one more notice by registered post to the petitioner (appellant) on December 8, 1967, but the latter wilfully refused to accept the same. (d) It was wrong that the appellant had collected any materials at the site to start the work. **B** c **D** (e) On April 20, 1968, a letter was received from the appellant, claiming higher rates to execute the work. In the alternative, he requested that his **E** security might be released at an early date. The appellant however admitted in this letter that the building in question was made available to him for executing the work in October 1967. Respondent 1 found the explanation of the appellant unsatisfactory. After hearing the arguments, a learned single Judge of the High **F** Court _(K.K._ Mathew, Jj, dismissed the petition in these words: "In the light of the majority decision in **I.L.R.** 1968(2) Kerala Page 1, I dismiss the Writ Petition. No costs." Against this judgment, the appellant preferred a Writ Appeal (No. 182 of 1968) before a Division Bench of the High Court. The **G** Bench dismissed the appeal _ill_ _limine._ Hence this appeal, by special leave . **H** **A** **B** ##### c **D** E **F** G **H** 518 SUPREME COURT REPORTS (1978J 3 S.C.R. reliance has been placed on the recent decision of this Court in _Erusian Equipment_ _&_ _Chemicals Ltd._ v. _State_ _of_ _West Bengal.(')_ As against the above, the learned Attorney General has drawn our attention to the fact that a notice, dated April 17, 1968 (Ex. P-6) was given by the Executive Engineer to the appellant requesting the latter to show cause why the \Vork may not be got done through other agencies, at the appellant's risk and loss, after debarring him as a defaulter. It is submitted that this notice did indicate to the appellant that action to debar him from doing further contract work under the department was contemplated, and as such, this case is not hit by the ratio of Eru~irm _Equipment's_ case (ibid). It is further maintained that in _Thomas_ v. _State_ _of_ _Kera la,_ Cl it was rightly observed that the Jaw does not deny to the Government the freedom of contract (carrying with it the freedom not to enter into a contract, it vouchsafes to every person. Reference was also made to the obser. vations of this Court in _C.K. Achuthan_ v. _State_ _of Kera/a(_ _[3]_ _)_ in support of the contention; that the impugned order does not _per_ _se_ offend Articles 14 and 19(a)(g) of the Constitution. Those observations are to the effect : "There is no discrimination, because it is perfectly open to the Government, even as it is to a private party, to choose a person to their liking, to fulfil contracts which they wish to 'be performed. When one person is chosen rather than another, the aggrieved party cannot claim the protection of Article 14, because the choice of the person to fulfil a particular contract must be left to the Government. (Because of the breach or cancellation of his contract, the private person) cannot complain that there has been a deprivation of the right to practise any profession or to carry on any occupation. trade or business, such as is contemplated by Article 19(1)(g)." (Parenthesis, within brackets, added). The majority judgment of the Kerala High Court, inasmuch as it holds that a person is not entitled to a hearing, before he is blacklisted, must be deemed to have been overruled by the decision of this Court in _Erusian Equipment_ (ibid) wherein it was held that "funda mentals of fairplay require that the person concerned should be given an opportunity to· repre•enl his case before he is put on the blacklist." Controversy in the instant case, therefore, narrows down into the issue, whether such an opportunity was given to the appellant. **Ansv,1er** **to this question** **wi11** **turn on** **an** **interpretation** **of** **the** **notice,** dated April 17, 1968 (Ex. P-8) given by the Executive Engineer to the appellant. This notice has been extracted in a foregoing part of this judgment. The material sentence therein is: "You are, therefore, requested to show cause .... why the work may not be arranged otherwise at your risk and loss. through other agencies _after debarring you_ _as a defaulter ._ ........... " The crucial words are those that have been underlined. They take their colour from the context. Construed along with the links of the sentence which precede and succeed them, (1) [1975] 2 S.C.R. 674. (2) ILR (1968) 2 Kerala I (F.B.) (3) A.T.R. 1959 S.C. 490. ###### \ .... '• ### ' Vll.ANGANDAN _v._ E.E. (P.W.D.) ERNAKULAM _(Sarkaria,_ J.) 519 the words "debarring you as a defaulter'', could be nnderstood as conveying no more than that an action with reference to the contract in question, only was under contemplation. There are no words in the notice which could give a clear intimation to the addressee that it was proposed to debar him from ta~ing any contract, whatever, in future under the department. A perusal of the appellant's reply (Ex. P-7), dated May 20, 1968, sent to the Executive Engineer, also appears to show that by the word "debarring" mentioned in the Executive Engineer's letter dated April 17, 1968 (Ex. P-6), he understood as debarring him from executing the contract in question after declaring him a defaulter, and then getting the same work done by other agencies, at bis risk and loss. All that has been said in Ex. P-7 by the appellant is directed to justify that the nonexecution of the contract was not due to his fault, but due to the delay on the part of the deparcment in banding over the building to him for starting the work within the time specified in the agreement, and consequently, if any loss would be incurred by the department - in getting the work done through any other agency, he would not be liable to make good the same. In short, the letter (Ex. P-6) dated April 17, 1968 from the Executive Engineer, did not give any clear notice to the appellant that action to debar him from taking in future any contract, whatever, under the department or its Ernakulam Divi sion was in contemplation. The appellant was thus not afforded adequate opportunity to represent against the impugned action. This being the position, the rule in _Erusian_ _Equipment's_ e<ise (ibid) will be attracted with full force. While conceding that tne State can enter into contract with any person it chooses and no person has a fundamental right to insist that the Government must enter into. a contract with him, this Court observed (in the said case) : "Blacklisting has the effect of preventing a person from the privilege and advantage of entering into lawful relation ship with the Government for purposes of gains. The fact that a disability i~ created by the order of blacklisting indicates that the relevant authority is to have an objective satisfaction. Fupd~mentals of fair play require that the person concerned should be given an opportunity to represent his case before he is put on the black list." The above enunciation squarely covers the case before us. **A** **B** c **D** E **F** _J_ # ... Accordingly, we allow this appeal, set aside the judgment of the G High Court and quash the impugned order. There will be no order as to costs . **P.H.P.** _Appeal allowed._
End of Judgment Record
Browse All Supreme Court of India (1978) Decisions
1978-08-16

State of Maharashtra v. Atma Ram Sadashiv Dongarwar and ors.

This appeal concerns the State’s power to levy water charges for irrigation from Navegaon Bandh Tank under the Central Provinces Irrigation Act, 1931, after vesting of proprietary rights in the State under the Madhya Pradesh Abolition of Proprietary Rights Act, 1950 and the Madhya Pradesh Land Revenue Code, 1954. The five villages around Navegaon Bandh have long depended on tank water for rice and sugarcane, with free irrigation rights recognized and recorded in the Wajib-ul-Arz. The respondents—ex-proprietors and occupancy tenants—challenged the levy, arguing their customary rights to free irrigation persisted despite vesting. The Bombay High Court held that the right to free water was a customary right recognized in the Wajib-ul-Arz and not destroyed by vesting or by the Abolition Act or the MP Code, and that the State had no competence to levy water charges. The Supreme Court, however, undertook a detailed textual and historical interpretation of the Abolition Act (sections 45–47) and the saving provisions in the MP Code (section 239). It held that the occupancy tenants and malik-makbuza acquired rights to irrigation were not merely extinguished but saved, and continued under the Code. The appeal was dismissed with costs, upholding the Court’s operative order that water charges could not be imposed on those rights.

1977-10-14

T. Arivandandam v. T. V. Satyapal & Anr.

This Special Leave Petition arises from an eviction dispute where the petitioner, T. Arivandandam, the son of the 2nd respondent, challenged an eviction order against a partnership occupying premises. The eviction had been confirmed up to the Karnataka High Court, and resisted by the 2nd respondent throughout. The petitioner filed a suit in the Fourth Additional First Class Munsif, Bangalore, seeking a declaration that the eviction order was obtained by fraud and collusion and sought an injunction against execution. During the hearing of a prayer for further time to vacate, the High Court, taking a sympathetic view of the tenant, urged the landlord to grant more time, based on the belief that the suit recently filed would be withdrawn. The petitioner then instituted another suit in a different Munsif’s court, copying the old plaint and obtaining an ex parte injunction later vacated. An appeal and then a High Court revision followed, in which the petitioner again obtained an injunction. The Court then emphasizes a broader policy: the pathologies of vexatious litigation must be curb by incisive judicial action under Order VII, Rule 11 CPC and Section 35A CPC, identifying the need for early scrutiny of parties and deterrence for frivolous actions. The Supreme Court dismisses the Special Leave Petition, condemns the abuse of process, and calls for Bar Council vigilance to uphold judicial integrity.

1978-02-21

BALAI CHANDRA HAZRA v. SHEWDHARI JADAV

This Supreme Court decision deals with the retroactive application of Sub-section 3-A of Section 13 of the West Bengal Premises Tenancy Act, 1956, and the implications for amendments and additional evidence in a Letters Patent appeal under Clause 15. Balai Chandra Hazra, the landlord-plaintiff, obtained a decree for eviction against the tenant Shewdhari Jadav on the ground of reasonably required for owner’s own occupation. The Calcutta High Court’ s decision upheld the verdict, and the matter reached the Supreme Court via special leave on questions arising from amendments and the changed legal framework introduced by amendments in 1969–1970. A central issue was whether retroactive operation of Section 13(3A) breaches Article 19(1)(f) and whether the appellate court hearing a Clause 15 appeal may permit amendments to pleadings and admission of fresh evidence when new questions of fact are raised. The Court held that retroactive application of Section 13(3A) does not offend Article 19(1)(f), aligning with B. Banerjee v. Anita Pan. It also clarified that when amendments are allowed, the appellate bench may grant leave to amend pleadings and permit fresh evidence, though its scope is constrained by the nature of the appeal under Clause 15 and the need to avoid usurping trial or first appellate courts. The Court ultimately remanded the case for proceedings consistent with amended pleadings.

1978-07-28

GANPATWANI v. DHONDUWAGH

Damodar Ganpat Wani and Anr., the appellants, challenged a Bombay High Court ruling in a tenancy dispute under the Bombay Tenancy and Agricultural Lands Act, 1948. The land (11 acres 8 gunthas in Jamner taluka) originally belonged to Damodar Ganpat Wani; his tenant Dhondu Namdeo Wagh faced eviction under Section 34 for personal cultivation. The Tenancy Awai Karkun allowed the application, terminating the tenancy, but subsequent appeals and revisions led to the Maharashtra Revenue Tribunal holding that the respondents were tenants entitled to protection under sections 32 and 34. The landlord’s rights, however, are defined by Section 34(1) to terminate an existing protected tenancy for bona fide personal cultivation, with Section 37(1) regulating restoration if the land is not used for prescribed purposes. Section 34(2A) imposes a limitation that, when terminating, the landlord must leave the tenant half the area of the leased land. Section 88(1A) deprives a protected tenant of the rights under sections 32 and 34 if his landholding crosses specified thresholds, though the Act’s overall scheme recognizes rights and privileges for both landlord and tenant. The Court traced that the landlord took possession in 1960, sold to Pardeshi in 1964, and that the second purchaser’s possession could not be treated as the first’s possession, triggering Section 37(1) and restoration constraints. The Supreme Court ultimately held that the respondents were entitled to possession, and dismissed the appeal with costs.