## `IN THE HIGH COURT OF KERALA AT ERNAKULAM`
## `PRESENT`
```
THE HONOURABLE MR. JUSTICE DEVAN RAMACHANDRAN
```
```
THURSDAY, THE 25[TH] DAY OF JANUARY 2024 / 5TH MAGHA, 1945
```
```
WP(C) NO. 25233 OF 2022
```
```
PETITIONER:
```
```
VARGHESE SCARIA,
S/O P.T. SCARIA, AGED 30 YEARS, RESIDING AT PAZHUKKANIYIL
HOUSE, PUTHUPARIYARAM.P.O, THODUPUZHA, IDUKKI DISTRICT,
PIN-685 608.
BY ADVS.
C.H.ABDUL RASAC
ABDUL RAOOF PALLIPATH
K.R.AVINASH
```
## `RESPONDENTS:`
```
1THE STATE OF KERALA
REPRESENTED BY THE CHIEF SECRETARY, GOVERNMENT
SECRETARIAT, THIRUVANATHAPURAM, PIN-695014.
2THE PUBLIC WORKS DEPARTMENT
REPRESENTED BY ITS SECRETARY, GOVERNMENT SECRETARIAT,
THIRUVANANTHAPURAM- 695001.
3THE CHIEF ENGINEER
PUBLIC WORKS DEPARTMENT, 3RD FLOOR, REVENUE COMPLEX,
PUBLIC OFFICE BUILDING, THIRUVANATHAPURAM. 695014.
4THE FINANCE DEPARTMENT
(INDUSTRIES AND PUBLIC WORKS- B) REPRESENTED BY ITS
SECRETARY, GOVERNMENT SECRETARIAT, THIRUVANANTHAPURAM-
695001.
5THE SENIOR FINANCE OFFICER
OFFICE OF THE CHIEF ENGINEER, PUBLIC WORKS DEPARTMENT
(ROADS & BRIDGES), THYCADU, THIRUVANATHAPURAM, PIN -
695014
```
```
SMT. VIDYA KURIAKOSE, GP
```
```
THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON
25.01.2024, ALONG WITH WP(C).32096/2022, 32568/2023, THE COURT ON THE
SAME DAY DELIVERED THE FOLLOWING:
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
2
# `IN THE HIGH COURT OF KERALA AT ERNAKULAM`
## `PRESENT`
```
THE HONOURABLE MR. JUSTICE DEVAN RAMACHANDRAN
THURSDAY, THE 25[TH] DAY OF JANUARY 2024 / 5TH MAGHA, 1945
```
## `WP(C) NO. 32096 OF 2022`
## `PETITIONER:`
```
WILSON V, AGED 54 YEARS
S/O.VIJAYAN, RESIDING AT PUTHENPURACKAL, AYIRAMTHENGU,
ALUMPEDIKA P.O., OCHIRA, PIN - 690 547.
BY ADVS.
R.LAKSHMI NARAYAN
R.RANJANIE
PARVATI M. PAI
NEVIL ZACHARIA MATHEW
RESPONDENTS:
1THE STATE OF KERALA
REPRESENTED BY ITS SECRETARY, FINANCE (INDUSTRIES AND
PUBLIC WORKS - B DEPARTMENT), SECRETARIAT, CENTRAL
STADIUM, MAHATMA GANDHI ROAD, PALAYAM, THIRUVANANTHAPURAM
- 695 001.
2THE CHIEF ENGINEER
HARBOUR ENGINEER DEPARTMENT, TRIVANDRUM VIZHINJAM ROAD,
KAMALESHWARAM, THIRUVANANTHAPURAM - 695 009.
3THE EXECUTIVE ENGINEER
ALAPUZHA HARBOUR ENGINEERING DIVISION OFFICE, MUNICIPAL
SATHRAM BUILDING, DISTRICT COURT ROAD, ALAPPUZHA - 688
013.
4THE ASSISTANT EXECUTIVE ENGINEER
HARBOUR ENGINEER SUB DIVISION, KARUNGAPPALLY, KOLLAM -
690 518.
5THE ASSISTANT ENGINEER
HARBOUR ENGINEER AZHEEKKAL SECTION - 1, KARUNGAPPALLY,
KOLLAM - 690 518.
SRI. SUNIL K.KURIAKOSE, GP
THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON
25.01.2024, ALONG WITH WP(C).25233/2022 AND CONNECTED CASES, THE
COURT ON THE SAME DAY DELIVERED THE FOLLOWING:
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
3
## `IN THE HIGH COURT OF KERALA AT ERNAKULAM`
## `PRESENT`
```
THE HONOURABLE MR. JUSTICE DEVAN RAMACHANDRAN
THURSDAY, THE 25[TH] DAY OF JANUARY 2024 / 5TH MAGHA, 1945
```
## `WP(C) NO. 32568 OF 2023`
```
PETITIONER:
PRABHAKARAN
AGED 65 YEARS
S/O GOVINDAN, GEE PRABHA, OORUTTUKALA,
NEYYATTINKARA.P.O., THIRUVANANTHAPURAM, PIN - 695121
BY ADVS.
R.T.PRADEEP
P.BIJIMON
M.BINDUDAS
RESPONDENTS:
1PRINCIPAL SECRETARY TO GOVERNMENT
DEPARTMENT OF FINANCE, SECRETARIAT, THIRUVANANTHAPURAM,
PIN - 695001
2SECRETARY TO GOVERNMENT
PUBLIC WORKS DEPARTMENT, SECRETARIAT, THIRUVANANTHAPURAM,
PIN - 695001
3SUPERINTENDING ENGINEER PWD ROADS
SOUTH CIRCLE, PMG, THIRUVANANTHAPURAM,, PIN - 695033
4EXECUTIVE ENGINEER
ROADS DIVISION KOLLAM, CHINNAKKADA BEACH ROAD, KOLLAM,
PIN - 691001
5ADDL.R5 NABARD
REPRESENTED BY DISTRICT DEVELOPMENT MANAGER, KERALA
REGIONAL OFFICE, PUNNEN ROAD, STATUE, THIRUVANATHAPURAM,
KERALA. (ADDL.R5 IS IMPLEADED AS PER ORDER DATED
25.01.2024 IN I.A.NO.1/2023)
THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON
25.01.2024, ALONG WITH WP(C).25233/2022 AND CONNECTED CASES, THE
COURT ON THE SAME DAY DELIVERED THE FOLLOWING:
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
4
## `C.R`
## `JUDGMENT`
```
The petitioners in these cases are
```
```
contractors who have entered into contracts with
```
```
the Public Works Department (PWD)of the
Government of Kerala,qua road work involving
bitumen.
```
```
2.The petitioners assert that as per four
Government Orders, namely, the ones dated
13.11.2018,17.04.2020,25.09.2020and
```
```
30.04.2021, certain specific benefits were given
to all the contractors, which enabled them to
```
```
claim the difference of the cost of bitumen
```
```
between the date of the Agreement and the date of
invoice; and that though the Authorities had
granted such benefits to various others, they
have been singled out and discriminated, in being
denied it.
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
5
```
–
3.Smt.R.Ranjanie learnedcounsel
appearingforthepetitioners in
```
```
WP(C)No.32096/2022, assertively argued that the
flow of benefit from the afore four Government
Orders clearly was available to her client -
whose Agreement was entered into on 17.11.2022,
which is evident from Exts.P8, P13, P15 and P16 -
but that it has not been afforded to him, though;
through the subsequent Government Order dated
26.08.2022, the Government made it clear that the
payment of the price difference, as ordered in
the aforementioned four Government Orders, would
stand withdrawn with retrospective effect, but
for all future tenders alone. She, therefore
argued that her client is entitled to claim the
benefits, as admitted in Ext.P8; and thus, prayed
that the respondents be directed to disburse the
amount mentioned therein without any avoidable
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
6
```
delay.
```
```
4.Sri.R.T.Pradeep, Sri.Abdul Rasac and
```
```
the learned counsel appearing for petitioners in
WP(C)Nos.32568/2023 and 25233/2022 also made
analogous assertions, contending that their
clients are also entitled to the benefit of the
difference of cost of bitumen, under the
aforementioned four Government Orders. They also,
therefore, prayed that the reliefs sought for in
their respective writ petition be granted.
```
```
5.However, in response, Sri.K.V.Manojkumar
```
```
– learned Government Pleader, submitted that the
petitioners cannot impel any claim, as has been
done in these cases at this time because, in the
judgment delivered in M/s Malabar Tech v. State
of Kerala [WP(C)No.22964/2021], a learned Judge
of this Court has made it indubitably limpid that
the benefits of the aforementioned Government
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
7
```
Orders are intended only for those contractors
who were continuing with their work as on
01.11.2018. He submitted that, when the said
declaration remains without modification, or
without challenge, it would not be available to
the petitioners to argue to the contrary and to
claim such benefit, even when they admit
unequivocally that none of their works contracted
were continuing as on 01.11.2018; especially
when, even the tendering processes, based on
which such contracts were given, were much after
that date. He, therefore, prayed that these writ
petitions be dismissed.
```
```
6.Though I have been parsimonious to some
extent in recording the pleaded factual details
and the submissions made on behalf of the
parties, I have indited the essential aspects
projected in these cases.
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
8
```
7.As noticed, the controversy in these
```
```
cases has its genesis in an admitted price
```
```
escalation of bitumen, which was noticed by the
Government in the year, 2018, which lead them to
issue the aforementioned order, one after the
other.
```
```
8.For the sake of convenience, except
```
```
otherwise specified, exhibits will be referred to
inthejudgmentastheyappear in
WP(C)NO.25233/2022.
```
```
9.When one examines the first of the
```
```
Government Orders referred to and relied upon by
```
```
the petitioners, namely that dated 13.11.2018 –
```
```
produced as Ext.P1 - the Government allowed the
benefit therein to the contractors because, the
price of bitumen, as on April, 2018 was found to
have increased by 33% and therefore, it was
clarified that the price difference of bitumen on
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
9
```
the date of closing of the tenders and the date
of invoice – specifying such invoice date to be
on or after 01.11.2018 – will be paid to the
contractor, on production of the original
invoice, for the actual quantity consumed.
```
```
10. Subsequently, the Managing Director of a
```
```
Labour Contract Society appears to have moved the
Government, seeking a clarification of the afore
order, to the effect whether the payment as afore
can be reckoned as being the period between the
date of Agreement and the period of invoice; and
this was acceded to by it, through the subsequent
```
```
Government Order dated 17.04.2020 - namely
```
```
Ext.P2. It is pertinent herein that while the
```
```
Government modified Clause No.1 of Ext.P1
```
```
Government Order, only to the extent that the
price difference of bitumen as on the date of
Agreement and the date of invoice – still
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
10
```
specifying that, if it on or after 01.11.2018 -
```
```
can be paid to or from the contractor - as the
```
```
case may be; but without altering the category of
```
```
the contractors, to whom such benefits would
```
```
flow.
```
```
11.That being so, the Chairman of the
```
```
“Builders Association of India”, then transpires
```
```
to have approached the Government, seeking a
```
```
further clarification whether, for open bidders,
the price difference of bitumen, as on the date
```
```
of closing of the tenders and the date of invoice
```
```
(on or after 01.11.2018), will become payable.
```
```
The Government seen to have acceded to this
```
```
request; and thus issued the 3[rd] Government Order
```
```
dated 25.09.2020, namely Ext.P3, virtually
restoring the original clause of Ext.P1, saying
that the price difference as on the date of
closing of tenders and the date of invoice –
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
11
```
provided it is on or after 01.11.2018 - will be
payable.
```
```
12. Here again, the category of contractors
```
```
to which the benefit was to flow was not altered,
namely those whose works were ongoing as on
```
```
01.11.2018.
```
```
13.The matter did not end here.
```
```
14.A further representation appears to have
```
```
been preferred made by the “All Kerala
```
```
Contractors Association” and the “Builders
```
```
Association of India”, to the Government, seeking
clarification as to the rate while calculating
the allowable price difference and if Ext.P3
order would be applicable to the Agreement
```
```
executed after 01.11.2018. The Government,
```
```
thereupon, issued the fourth order dated
30.04.2021, namely Ext.P4, specifying the rates
(with which we are not concerned about in these
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
12
```
cases) and clarifying that the said Government
Order will apply for all ongoing works “and works
for which Agreements are executed after
```
```
01.11.2018” (sic) (emphasis applied).
```
`15. Interestingly, it is the emphasised`
```
portion of Ext.P4, which is now being relied upon
by the petitioners, to claim that they would be
entitled to the price difference of bitumen, as
mentioned in the afore four Government Orders,
even for contracts, the bid process of which was
```
```
much after 01.11.2018; and axiomatically,
```
```
Agreements and closure of tender, being also
after that date.
```
```
16.To get a grip of the controversy in
```
```
question, one must certainly closely analyse the
```
```
impact of the four Government Orders mentioned
above.
```
```
17.As I have already said earlier, the
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
13
```
modifications through Exts.P2, P3 and P4 were
exclusively to the rates and the manner of
calculation of difference of bitumen as
```
```
originally specified in Ext.P1 Government Order,
```
```
which was issued on 13.11.2018; and at no point
```
```
of time – which is virtually without contest –
```
```
were the category of contractors entitled to the
benefit thereunder, modified or altered - it
```
```
continuing to be only those whose works were
continuing as on 01.11.2018.
```
```
18.In such perspective, when one examines
```
```
Ext.P4 with some care, it will be discernible
```
```
that, while clarifying that the said order will
```
```
apply to works, for which the Agreements are
```
```
executed after 01.11.2018, it indubitably took
into its fold, the prescriptions in Ex.P3
Government Order dated 17.04.2020.
19.In other words, only those works, of
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
14
```
which the date of closing of tenders was
```
```
completed before 01.11.2018, would obtain the
```
```
benefit of the price difference of bitumen, until
```
```
such time as the invoice was issued, provided it
```
```
was done after 01.11.2018; and it is this that
```
```
has been made applicable even to contracts that
were entered into after 01.11.2018, through
Ext.P4.
```
```
20.To paraphrase, Ext.P4 clarifies that
```
```
contracts for which the tender was closed prior
```
```
to 01.11.2018, but the Agreements qua which had
```
```
not been entered until that date or thereafter,
```
```
would still inure to the contractors the original
benefit under Ext.P1 Government Order, modified
```
```
subsequently through Exts.P2, P3 and P4; but not
in any other scenario.
```
```
21.Obviously, therefore, for the petitioners
```
```
to now receive any benefit, they must establish
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
15
```
that the contracts which they have entered into,
were the ones with respect to which the tenders
were closed prior to 01.11.2018, but the
Agreements for which were entered into after that
the said date.
```
```
22.However, it is without dispute that each
of the contracts involved in these cases had even
its parturition after 01.11.2018; and that the
tender processes and Agreements began and were
entered into much later – even years thereafter.
```
```
23.That being said, I am obligated to
```
```
consider the further argument of Smt.R.Renjanie,
that the Government Order subsequent to the afore
orders, namely the one dated 26.08.2022 – a copy
which has been produced by her as Ext.P11 along
with her writ petition, namely WP(C)No.32096/2022
- would render the position luculent that, even
though contracts which were entered into after
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
16
```
01.11.2018 would get the benefit of the
aforementioned Exts.P1, P2 P3 and P4 Government
Orders.
```
```
24.In this regard, when one examines the
aforesaid Government Order, closely, it gets
rendered limpid, that the said order was issued
based on the objections raised by the Controller
and Auditor General, who recommended that, since
contractors who entered into contract later were
bound to quote their rates after proper study of
the fluctuation of market rates, they cannot be
given any further benefit. This propelled the
additional Chief Secretary (Finance), to issue
the aforesaid Government Order, clarifying that
the“price difference/recovery of Price
reduction of bitumen ordered by Government order
dated as first to fourth, discontinued with
prospectiveeffect,forallfuture
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
17
```
tenders”(sic).
```
```
25.It is thus ineluctable that, even when
the aforesaid Government Order was issued, the
Government was only referring to the earlier
Orders mentioned therein, namely Exts.P1 to P4.
```
```
26.As has been already been assessed above,
Exts.P1 to P4 Government Orders never extended
any benefit, as mentioned therein, to any
category of contractors, other than those whose
works were continuing as on 01.11.2018; and whose
tenders were closed prior to that date, though
Agreements were entered into subsequent to it. As
long as this classification remained without
change in all the Government Orders – with only
the nature of the benefits being modified from
time to time, as also the rates - any contractor
who did not fall within that species surely
cannot obtain any benefit under its ambit.
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
18
```
However, it reflects from the pleadings on record
```
```
in some of these writ petitions and in particular
```
```
(WC)No.32096/2022, that, without being aware of
```
```
this, some of the officers continued to offer
such benefits to ineligible contractors,
```
```
including the petitioners herein; and this is
illustratively manifested from Ext.P8, produced
along with WP(C)No.32096/2022.
```
```
27.That being so, the acme question here is
```
```
whether the recommendations/observations made by
```
```
the officers would entitle benefit to
```
```
contractors, even when they are forensically not
entitled to it, going by the Government Orders
which they rely upon, for seeking such.
```
```
28.The answer to this can certainly be only
```
```
to the negative because, the entitlement of a
person squarely would depend upon the
```
```
prescriptions in law; and if it is proscribed, it
```
`[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]` 19
```
cannot be granted, even if it is recommended by
any Authority, either being oblivious to its
```
```
sweep, or for other reasons.
```
```
29.In the afore backdrop, it becomes
without any doubt that, it was unnecessary for
the Government to have issued the Government
Order dated 26.08.2022 (produced as Ext.P11 in
WP(C)No.32096/2022) because, what was sought to
be taken away through that Order - prospectively
or otherwise - were benefits that were never
available to any class of contractors, except
those who are covered by Exts.P1 to P4. As far as
```
```
the latter class, namely, those covered by
Exts.P1 to P4, is concerned, the aforesaid
Government Order dated 26.08.2022 can certainly
```
```
not apply because, their rights have already
been crystallized and vested, for the singular
reason that their works were ongoing as on
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
20
```
01.11.2018.
```
```
30.No doubt, in such perspective, the view
adopted by a learned Judge of this Court in M/s
Malabar Tech (supra), certainly travels on the
same lines as my observations above; and am in
affirmation of the same. In fact, in paragraph 22
of the said judgment, the learned Judge concluded
on this issue as under;
```
```
“The benefit or advantage conferred under
Ext.P8 Government Order is intended only for
those projects of the contractors which were
ongoing projects as on 01.11.2018. The
modifications effected by Exts.P8, P9 and
P10 orders would obviously apply only to
those ongoing contract works as on
01.11.2018, as contemplated by Ext.P8
Government Order. As Exts.P8 to P10
Government Orders are intended to apply only
to ongoing contract works as on 01.11.2018,
those orders cannot be made applicable to
the works undertaken by the petitioners,
subsequently, which were not ongoing works
as on 01.11.2018.”
```
```
[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]
```
21
```
31. This Court is also aware that in Mohammed
Ahnas.B v. State of Kerala [WPC 19474/2022],
another learned Judge of this Court took the same
view, concluding as under in paragraph 21
```
```
thereof.
```
```
“Moreover, I do not think that the
contention raised by the petitioner on
account of Exhibit P4 Government Order
dated 30.04.2021 revising the Government
Order dated 13.11.2018 that he is entitled
to get the benefit of the said Government
Order, cannot be sustained, since the
original Government Order for payment of
the price escalation of the bitumen dated
13.11.2018 was issued by the Government to
tackle the situation of an unprecedented
increase of bitumen that has happened in
the year 2018 consequent to the enhanced
price of petroleum products and thus,
increasing the price of bitumen by 33%. All
the subsequent revision made by the
Government and relied upon by the
petitioner is only the revision of the
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
22
```
GovernmentOrderdated13.11.2018.
Therefore, I am of the view that the said
Government Orders would not enure to the
benefit of the petitioner who has entered
into the contract on 21.12.2020 with
definite terms and conditions.”
```
```
In the afore circumstances, these writ
```
```
petitions are dismissed, without any further
orders.
```
```
Sd/-
```
```
DEVAN RAMACHANDRAN
JUDGE
```
```
SAS
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
23
## `APPENDIX OF WP(C) 32096/2022`
```
PETITIONER’S EXHIBITS:
```
|`Exhibit P1`|`THE TRUE COPY OF THE ORDER NO.D6/2793/21/EEHED`|
|---|---|
||`(A) DATED 1/11/2021, ISSUED BY THE 3RD`|
||`RESPONDENT TO THE PETITIONER.`|
|`Exhibit P2`|`THE TRUE COPY OF THE SELECTION NOTICE DATED`|
||`1/11/2021 SENT BY THE 3RD RESPONDENT IN FAVOUR`|
||`OF THE PETITIONER.`|
|`Exhibit P3`|`THE TRUE COPY OF THE AGREEMENT DATED`|
||`17/11/2021, EXECUTED BETWEEN THE PETITIONER`|
||`AND THE 3RD RESPONDENT.`|
|`Exhibit P4`|`THE TRUE COPY OF GOVERNMENT ORDER (RT)`|
||`NO.3815/21/FIN. DATED 30/4/2021.`|
|`Exhibit P5`|`THE TRUE COPY OF THE RELEVANT PAGES OF`|
||`MEASUREMENT BOOK (M BOOK), IN RESPECT OF THE`|
||`WORK DONE BY THE PETITIONER.`|
|`Exhibit P6`|`THE TRUE COPY OF THE COMPLETION REPORT DATED`|
||`NIL, COUNTERSIGNED BY RESPONDENT 3 TO 5.`|
|`Exhibit P7`|`THE TRUE COPY OF THE TAX INVOICE DATED`|
||`27/4/2022, ISSUED BY THE KERALA SMALL`|
||`INDUSTRIES DEVELOPMENT CORPORATION LIMITED.`|
|`Exhibit P8`|`THE TRUE COPY OF THE HAND RECEIPT NO.1/2022-`|
||`2023/AE-I DATED 13/5/2022 ISSUED BY THE 5TH`|
||`RESPONDENT.`|
|`Exhibit P9`|`THE TRUE COPY OF THE REPRESENTATION DATED`|
||`16/6/2022 SUBMITTED BY THE PETITIONER TO THE`|
||`2ND RESPONDENT.`|
|`Exhibit P10`|`THE TRUE COPY OF THE REPRESENTATION DATED`|
||`31/5/2022 SUBMITTED BY THE PETITIONER TO THE`|
||`3RD RESPONDENT.`|
|`Exhibit P11`|`THE TRUE COPY OF GOVERNMENT ORDER DATED`|
||`26/8/2022 BEARING NO.G.O.(P) NO.96/2022/FIN.`|
|`Exhibit P12`|`THE TRUE COPY OF THE NEWS REPORT IN`|
||`MATHRUBHUMI DAILY DATED 5/9/2022.`|
|`Exhibit P -13`|`THE TRUE COPY OF THE COMMUNICATION DATED`|
||`29.11.2022 ISSUED BY THE SECOND RESPONDENT TO`|
||`THE THIRD RESPONDENT`|
|`Exhibit P-14`|`THE TRUE COPY OF THE GOVERNMENT ORDER DATED`|
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
24
```
Exhibit P-15
```
```
17.4.2020 ISSUED PRIOR TO EXT.P4 BEARING NO.
G.O.(RT) NO.2816/2020./FIN. DATED 17.4.2020
THE TRUE COPY OF THE COMMUNICATION DATED
1.3.2023 ISSUED BY THE 2ND RESPONDENT TO THE
ADDITIONAL CHIEF SECRETARY, FINANCE (WCD)
DEPARTMENT, GOVERNMENT SECRETARIAT, DATED
1.3.2023
```
```
Exhibit P-16THE TRUE COPY OF THE LETTER DATED 18.04.2023,
ISSUED BY THE ADDITIONAL CHIEF
SECRETARY(FINANCE) TO THE 2ND RESPONDENT
```
```
Exhibit P - 17
```
```
RESPONDENT EXHIBITS
Exhibit R3(a)
```
```
THE TRUE COPY OF THE GOVERNMENT ORDER DATED
13.11.2018 BEARING NO. GO.(RT)NO. 9386/2018
FIN
```
```
A TRUE COPY OF THE JUDGMENT OF THIS HONOURABLE
COURT DATED 11.11.2021 IN WRIT PETITION
(CIVIL) NO.22964/2021 AND CONNECTED CASES
```
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
25
## `APPENDIX OF WP(C) 32568/2023`
|`PETITIONER EXHIBITS`||
|---|---|
|`Exhibit P1`|`TRUE COPY OF G.O. (RT) NO.9386/2018/FIN DATED`|
||`13.11.2018 BY THE FINANCE DEPARTMENT`|
|`Exhibit P2`|`TRUE COPY OF G.O. (RT) NO.3815/2021/FIN DATED`|
||`30.4.2021 BY FINANCE DEPARTMENT`|
|`Exhibit P3`|`TRUE COPY OF G.O. (P) NO.96/2022/FIN DATED`|
||`26.8.2022`|
|`Exhibit P4`|`TRUE COPY OF THE BILL DATED 26.3.2022 TO A`|
||`TUNE OF RS.4203587/- FOR THE DIFFERENTIAL`|
||`PRICE OF BITUMEN AND EMULSION WITH RESPECT TO`|
||`THE WORK OF PETITIONER WHICH WAS SUBMITTED`|
||`BEFORE 4TH RESPONDENT BY THE ASST. EXECUTIVE`|
||`ENGINEER, PWD ROADS SUB DIVISION, PUNALUR WITH`|
||`THE INVOICES OF PURCHASE`|
|`Exhibit P5`|`TRUE COPY OF G.O. (P) NO.63/2023/FIN DATED`|
||`26.6.2023 BY FINANCE DEPARTMENT`|
|`Exhibit P6`|`TRUE COPY OF REPRESENTATION DATED 11.9.2023`|
||`BEFORE 1ST AND 2ND RESPONDENTS BY PETITIONER`|
## `[WP(C) Nos.25233/2022, 32096/2022, 32568/2023]`
26
## `APPENDIX OF WP(C) 25233/2022`
```
PETITIONER’S EXHIBITS:
```
```
Exhibit P1TRUE COPY OF THE G.O.(RT)NO.9386/2018/FIN
DATED 13.11.2018 .
Exhibit P2TRUE COPY OF THE GO NO. 2816/2020 DATED
17.04.2020
Exhibit P3TRUE COPY OF THE GO NO. 550/2020 DATED
25.09.2020
Exhibit P4TRUE COPY OF THE ORDER NO. GO 3815/2021 DATED
30.04.2021
Exhibit P5TRUE COPY OF THE INFORMATION RECEIVED THROUGH
THE RIGHT TO INFORMATION DATED 08.04.2022
ISSUED BY THE 3RD RESPONDENT
Exhibit P6TRUE COPY OF THE INFORMATION DATED 28.03.2022
OBTAINED THROUGH THE RIGHT TO INFORMATION ACT
FROM THE 3RD RESPONDENT
Exhibit P7TRUE COPY OF THE REPRESENTATION DATED
11.08.2022 FILED BEFORE 3RD RESPONDENT
```