This Supreme Court judgment concerns a dispute arising from ONGC’s Expressions of Interest (EOI) process for gas allocation from two ONGC fields and the subsequent bidding and allotment decisions. Three bidders, including Nobel Cera Coat (the writ petitioner), Vaibhavi Enterprise, and Tanish Cerachem Private Limited, participated in the EOI. While one bidder revised its offer to lift gas within 65 days, ONGC re-invited fresh bids on 08.03.2021. Nobel Cera Coat did not submit a fresh bid but petitioned for a mandamus to finalize gas allocation on the basis of its earlier response. The High Court of Gujarat disposed of the writ petition in Nobel’s favor, directing ONGC to finalize the contract with Nobel on the condition that gas be lifted within 65 days, and it did so expeditiously, ex parte and without hearing the other bidders. The appellants, Vaibhavi Enterprise and Tanish Cerachem, challenged this order before the Supreme Court, arguing that the High Court’s approach violated principles of natural justice, ignored the EOI process, and deprived other bidders of an opportunity to participate or object to the modified offer. The Supreme Court found the High Court’s method unsustainable, remitting the matter for fresh decision with directions to implead the other bidders and to decide in accordance with law, preferably within four weeks, and with no costs. The decision ultimately allows the appeals and sets aside the High Court order.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • A. S. Bopanna
Judgment Date
2021-10-21
Court Decision / Holding
Appeals allowed. The impugned High Court order is quashed and set aside. The matter is remitted to the High Court for fresh decision on merits, with directions to implead the other bidders as party respondents (Nos. 4 and 5) and to grant fullest opportunities to all respondents, including ONGC and Union of India, to participate. The High Court is to decide in accordance with law and on merits at the earliest, preferably within four weeks from the date of receipt of this order. There shall be no order as to costs.
Final Disposition
Appeals allowed

Parties to the Case

Appellants / Petitioners

  • Vaibhavi Enterprise
  • Tanish Cerachem Private Limited

Respondents

  • Nobel Cera Coat & ORS
  • ONGC
  • Union of India

Legal Representation & Advocates

Counsels for Petitioners

  • • Devan Parikh, Sr. Adv.
  • • Santosh Krishnan
  • • E. C. Agrawala

Counsels for Respondents

  • • Vikramjit Banerjee, ASG
  • • Som Raj Choudhury
  • • Saransh Kumar
  • • Shrutee Aradhana
  • • Saurav Agrawal
  • • Trinath Tadakamalla
  • • Ishaan Chhaya
  • • Sahil Tagotra

Provisions of Law Cited

Article 226 of the Constitution of India (Constitution of India, Art. 226)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contend that the High Court’s disposal of the writ petition in favour of Nobel Cera Coat was ex parte and allowed modification of the author’s offer under Article 226 without giving other bidders a hearing or an opportunity to adjust their terms. They note that two other bidders had submitted EOIs and one was ready to lift within 65 days; by permitting Nobel to revise its offer, the High Court deprived the other bidders of equality of opportunity and transparency in the bidding process. They argue that neither the Union of India nor the other bidders were properly heard, and the order lacked merit-based justification. They urge a fresh decision by the High Court with full participation by all stakeholders, including impleading the 4th and 5th respondents, and a merits-based evaluation within a short timeframe.

Contentions of Respondents

The respondents emphasize the need to preserve fairness and the integrity of the bidding process. They argue that altering bid terms or finalizing contracts with a particular bidder without giving equal opportunity to all bidders undermines competitive bidding and due process. They contend that the High Court’s disposal of the writ petition lacked sufficient reasoning and that the Union of India and ONGC must be afforded an opportunity to respond. They seek proper adjudication with full hearing, proper impleadment of all stakeholders, and a decision on merits in compliance with the EOI terms and law, ensuring transparency and preventing any prejudice to other bidders.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,972 words•~14 min read

In The Court Record

Vaibhavi Enterprise v. Nobel Cera Coat & ORS.

765 [2021] 8 S.C.R. 765 ## VAIBHAVI ENTERPRISE A v. NOBEL CERA COAT & ORS. (Civil Appeal No. 6289 of 2021) ## OCTOBER 21, 2021 B ## **[M. R. SHAH AND A. S. BOPANNA JJ.]** _Constitution of India: Art.226 – Tender – Bid – Respondent ONGC invited “Expression of Interest” (EOI) for demand assessment for natural gas produced from two fields – Three applicants – ONGC_ C _sought approval of Ministry in terms of EOI for gas allocation – When matter was pending consideration before the Union Government, one of the applicant revised its response, and offered to commence off take of gas within 65 days of allotment – ONGC by letter dated 08.03.2021 re-invited the bids from the three shortlisted applicants to place fresh bid – The other applicant_ D _submitted fresh bid – However, writ applicant did not submit any fresh bid and filed writ petition challenging letter dated 08.03.2021 so far it calls for “expected period of readiness to offtake gas” and also praying for issuance of writ of mandamus to ONGC to proceed with award of gas allocation on the basis of its offer – In the writ_ E _petition, neither the Ministry nor other applicants were impleaded as party respondents – Matter came up before High Court on 19.08.2021 and Union of India was ordered to be arrayed as respondent no.3 – At the time of hearing of writ petition, writ applicant reduced days for lifting gas from 75 days to 65 days – High Court disposed of writ petition by directing ONGC to finalize_ F _the contract with the applicant on condition that the writ applicant shall lift the gas within 65 days from the date of allotment – On appeal by other applicants, held: The procedure adopted by High Court while disposing of writ petition in favour of writ applicant was unsustainable – High Court passed impugned order ex-parte_ G _and without giving any opportunity of being heard to the other applicants – Before the High Court, it was brought on record that there were two other applicants who submitted their EOI and even one of the applicants was ready and willing to lift the gas within 65 days – Till writ petition was filed and matter was heard by High Court on 19.08.2021 and 16.09.2021, the original writ applicant_ H G 765 766 SUPREME COURT REPORTS [2021] 8 S.C.R. - A _offered to lift the gas within 75 days – Only at the time of hearing on 20.09.2021, writ applicant revised its offer and High Court allowed writ applicant to revise its offer and that too in exercise of powers under Art.226 – When High Court allowed the writ applicant to modify its offer, in that case, the opportunity ought to have been given to the other applicants – So the procedure adopted by High_ - B _Court while disposing of writ petition by permitting the original writ applicant to modify its offer and that too in exercise of powers under Art.226 is unsustainable – M_ atter remitted to High Court for its fresh decision. ## **Allowing the appeals and remitting the matter to High Court,** C **the Court** - **HELD: 1. When High Court permitted / allowed the writ** - **applicant to modify its offer, in that case, the opportunity ought to have been given to the other applicants. Either they might have objected to permitting such modification of the offer in exercise** - D **of powers under Article 226 of the Constitution of India or they also could have modified their offer further and reduce number of days for lifting gas. It is not in dispute that neither of the appellants were impleaded as party to the writ petition. Not only that even initially Union of India was also not joined as a party** - E **and for the first time Union of India was directed to be impleaded as respondent no.3 pursuant to the order dated 19.08.2021 and that too not at the instance of the writ applicant but as the High Court felt that presence of the Union of India is required. So the procedure adopted by the High Court while disposing of the writ petition by permitting / allowing the original writ applicant to** - F **modify its offer and that too in exercise of powers under Article 226 of the Constitution of India, is unsustainable and unknown to law. [Para 4.0][770-D-F[** **2. Though the High Court has, as such, directed and issued** **the writ of mandamus directing ONGC to finalize the contract** G **with the writ applicant on the condition that the writ applicant shall lift gas within 65 days from the date of allotment, instead of allowing the writ petition and making the Rule absolute, High Court has used the word writ petition is disposed of. Once the writ of mandamus was issued, instead of disposing of the writ** - H 767 VAIBHAVI ENTERPRISE v. NOBEL CERA COAT & ORS. **petition, the High Court ought to have allowed the writ petition. Even otherwise also, the impugned order passed by the High Court is unsustainable in as such no reasons whatsoever have been assigned by the High Court on merits. Except narrating the prayer clause and two earlier orders passed on 19.08.2021 and 16.09.2021 there is no further discussion by the High Court on merits of the matter. [Paras 4.0, 5.0][770-H; 771-A-C]** **3. The appellants to submit appropriate application for impleading them as party respondent nos. 4 and 5 and same to be allowed by the High court and thereafter the High Court to pass a fresh order in accordance with law and on merits and after giving fullest opportunities to all the respondents including ONGC, Union of India and the appellants herein. In the facts and circumstances of the case and looking to the urgency, we request the High Court to finally decide and dispose of the writ petition in accordance with law and on its own merits at the earliest and preferably within a period of four weeks from the date of receipt of the present order. Either of the parties to place the present order before the High Court forthwith. [Para 6.0][771-D-F]** A B C D CIVIL APPELLATE JURISDICTION: Civil Appeal No.6289 of 2021 From the Judgment and Order dated 20.09.2021 of the High Court of Gujarat at Ahmedabad in SCA No. 5815 of 2021. E With ## C.A. No. 6290 of 2021 Devan Parikh, Sr. Adv., Santosh Krishnan, E.C. Agrawala, Advs. F for the appellant. Vikramjit Banerjee, ASG, Som Raj Choudhury, Saransh Kumar, Shrutee Aradhana, Saurav Agrawal, Trinath Tadakamalla, Ishaan Chhaya, Sahil Tagotra, Advs. for the respondents. The Judgment of the Court was delivered by G ## **M. R. SHAH, J.** 1.0. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Gujarat passed in Special Civil H 768 SUPREME COURT REPORTS [2021] 8 S.C.R. - A Application No.5815 of 2021 preferred by the respondent no.1 hereinoriginal writ petitioner (hereinafter referred to as the “original writ applicant”), by which, the High Court has disposed of the said writ petition by directing the respondent no.2- ONGC to finalize the contract with the original writ applicant on the condition that the writ applicant shall lift the gas within 65 days from the date of allotment instead of 75 days as - B offered by it earlier. 2.0. That the respondent ONGC invited “Expressions of Interest” (EOI) on 22.07.2020 for demand assessment for natural gas produced from the two fields. As per the EOI, the demand assessment for the natural gas in the area was to be undertaken by ONGC and the ultimate C approval for allocation was to come from Ministry of Petroleum and Natural Gas, Government of India. If allotted, the gas supply would operate for a period of five years from the date of award. - It appears from the pleadings that only three applicants were - interested in sourcing the natural gas from two fields advertised by ONGC - D viz. (1) original writ applicant – Nobel Cera Coat, (2) Vaibhavi Enterpriseappellant in Civil Appeal No. 6289 of 2021 and (3) Tanish Cerachem Private Limited – appellant in Civil Appeal No. 6290 of 2021. Nobel Cera Coat submitted their interest in sourcing natural gas from both VAD#3 and VAD#5. Vaibhavi Enterprise submitted their interest for - E VAD#3 and Tanish Cerachem Private Limited submitted their interest for sourcing gas for VAD#5. That thereafter, ONGC sought approval of Ministry for gas allocation. When the matter was pending consideration before the Union Government, in December 2020, one of the applicantTanish Cerachem Private Limited revised its response and offered to commence offtake of gas within 65 days of allotment. At this stage, it is - F required to be noted that the writ applicant offered to lift gas from the field / block situated at a place called Vadtal, District Bhavnagar within a period of 75 days. As per the case of the appellant having regard to the revised offer from Tanish Cerachem Private Limited, the ONGC thought it fit to re-invite the bids from all the three shortlisted applicants and - G accordingly on 08.03.2021, ONGC invited all the three applicants to place fresh bids. As per the case of the appellant, Vaibhavi Enterprise submitted to the fresh tendering process and submitted its bid. However, the writ applicant did not submit any fresh bid. The writ applicant filed a writ petition before the High Court challenging the ONGC letter dated 08.03.2021 so far as it calls for “expected period of readiness to offtake - H 769 VAIBHAVI ENTERPRISE v. NOBEL CERA COAT & ORS. [M. R. SHAH, J.] gas from ONGC’s offer letter”. The writ applicant also prayed for issuance of writ of mandamus directing the ONGC to proceed with the award of gas allocation on the basis of offer received in response to the ONGC/EOI/Vadtal GAS/2020 dated 22.07.2020. At this stage, it is required to be noted that though the Union of India was the ultimate authority to approve the bid / allocation of gas, in the writ petition neither the Ministry nor other applicants viz. Vaibhavi Enterprise and Tanish Cerachem Private Limited were impleaded as party respondents. From the impugned order passed by the High Court, it appears that the matter came up before the Division Bench on 19.08.2021 and Union of India was ordered to be arrayed as respondent no.3 and notice was made returnable on 26.08.2021. Thereafter, matter was heard by the Division Bench on 16.09.2021. Before the High Court, learned ASG appearing on behalf of the Union of India placed on record the communication dated 08.03.2021, which was directed to be taken on record. Thereafter, the matter was kept for further hearing on the very next date i.e. 20.09.2021. At the time of hearing of the writ petition, the writ applicant reduced days for lifting gas from 75 days to 65 days. Having noted the submissions on behalf of the ONGC that the writ applicant has agreed to lift the gas within 75 days, however, in view of the fact that one of the applicant was ready and willing to lift the gas within 65 days and therefore, the offer in favour of the writ applicant was not finalized and therefore, the ONGC was in dilemma. That thereafter by permitting the writ applicant to reduce the days for lifting gas from 75 days to 65 days, thereafter, the High Court by the impugned judgment and order has disposed of the said writ petition by directing the Corporation to finalize the contract with the writ applicant on the condition that the writ applicant shall lift the gas within 65 days from the date of allotment. A B C D E F Feeling aggrieved and dissatisfied with the impugned order passed by the High Court, the other to applicants viz. Tanish Cerachem Private Limited and Vaibhavi Enterprise have preferred present appeals. 3.0. We have heard Shri Santosh Krishnan, learned counsel appearing for the appellant and Shri Saurav Agrawal, learned counsel appearing for the original writ applicant who is on caveat and Shri Vikramjit Banerjee, learned ASG appearing on behalf of the ONGC. 4.0. Having heard the learned counsel for the respective parties and considering the impugned order passed by the High Court, we are of the opinion that the procedure which has been adopted by the High G H 770 SUPREME COURT REPORTS [2021] 8 S.C.R. - A Court while disposing of the writ petition in favour of the writ applicant is unsustainable. The High Court has passed the impugned order exparte and without giving any opportunity of being heard to the other applicants – appellants herein. It is required to be noted that before the High Court it was brought on record that there are two other applicants who submitted their EOI and even one of the applicants was ready and - B willing to lift the gas within 65 days. At this stage, it is required to be noted that it appears that till writ petition was filed and the matter was heard by the Division Bench on 19.08.2021 and 16.09.2021, the original writ applicant offered to lift the gas within 75 days. Only at the time of hearing on 20.09.2021 and / or during the pendency of the petition, the - C original writ applicant revised its offer and unfortunately High Court allowed / permitted the original writ applicant to revise its offer to lift the gas from 75 days to 65 days and that too in exercise of powers under Article 226 of the Constitution of India. When High Court permitted / allowed the writ applicant to modify its offer, in that case, the opportunity ought to have been given to the other applicants. Either they might have - D objected to permitting such modification of the offer in exercise of powers under Article 226 of the Constitution of India or they also could have modified their offer further and reduce number of days for lifting gas. It is not in dispute that neither of the appellants were impleaded as party to the writ petition. Not only that even initially Union of India was also not - E joined as a party and for the first time Union of India was directed to be impleaded as respondent no.3 pursuant to the order dated 19.08.2021 and that too not at the instance of the writ applicant but as the High Court felt that presence of the Union of India is required. So the procedure adopted by the High Court while disposing of the writ petition by permitting / allowing the original writ applicant to modify its offer and - F that too in exercise of powers under Article 226 of the Constitution of India, as observed herein above, is unsustainable and unknown to law. We have our own doubt whether in exercise of powers under Article 226 of the Constitution of India, the High Court could have permitted one of the bidder to revise / modify its offer. Even in the facts and - G circumstances of the case, the High Court felt that instead of inviting fresh bids, the same could be allowed, in that case also, similar opportunity ought to have been given to the other applicants also. - It is also required to be noted that though the High Court has, as - such, directed and issued the writ of mandamus directing ONGC to - H finalize the contract with the writ applicant on the condition that the writ 771 VAIBHAVI ENTERPRISE v. NOBEL CERA COAT & ORS. [M. R. SHAH, J.] applicant shall lift gas within 65 days from the date of allotment, instead A of allowing the writ petition and making the Rule absolute, High Court has used the word writ petition is disposed of. Once the writ of mandamus was issued, instead of disposing of the writ petition, the High Court ought to have allowed the writ petition. 5.0. Even otherwise also, the impugned order passed by the High Court is unsustainable in as such no reasons whatsoever have been assigned by the High Court on merits. Except narrating the prayer clause and two earlier orders passed on 19.08.2021 and 16.09.2021 there is no further discussion by the High Court on merits of the matter. 6.0. In view of the above and for the reasons stated above, impugned order passed by the High Court dated 20.09.2021 in Special Civil Application No.5815 of 2021 is hereby quashed and set aside. The matter is remitted back to the High Court for its fresh decision. Special Civil Application No.5815 of 2021 is ordered to be restored to the file of High Court. The appellants herein to submit appropriate application for impleading them as party respondent nos. 4 and 5 and same to be allowed by the High court and thereafter the High Court to pass a fresh order in accordance with law and on merits and after giving fullest opportunities to all the respondents including ONGC, Union of India and the appellants herein. In the facts and circumstances of the case and looking to the urgency, we request the High Court to finally decide and dispose of the writ petition in accordance with law and on its own merits at the earliest and preferably within a period of four weeks from the date of receipt of the present order. Either of the parties to place the present order before the High Court forthwith. It is made clear that this Court has not expressed anything on merits and the impugned order of the High Court has been set aside for the reasons stated above. Both these appeals succeed and accordingly allowed. However, there shall be no order as to costs. B C D E F G H Devika Gujral Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (2021) Decisions
2021-01-05

HARI OM @ HERO v. STATE OF U.P.

This is a Supreme Court appeal arising from six accused tried in multiple trials for offences under IPC sections 396 and 412, the SC/ST Act (3(2)(v)) and the Arms Act. The Trial Court convicted Hari Om @ Hero of the 396 IPC offence and awarded death, while other accused received varying outcomes. The High Court confirmed Hari Om’s death sentence and upheld some convictions, while acquitting three co-accused. The Supreme Court, in a Division Bench led by Justice Uday Umesh Lalit, allowed the appeals by Hari Om and others, finding serious infirmities in the prosecution case, especially the testimony of PW5, a five-year-old child witness (Ujjwal). The Court held that corroboration of a child witness is a prudential rule rather than a hard requirement and that, given glaring inconsistencies and lack of reliable corroboration, the evidence could not sustain a conviction under Section 396 IPC against Hari Om. It also highlighted ambiguities in fingerprint evidence—its collection, handling, and interpretation—and noted the absence of robust link evidence connecting the accused to the crime. Consequently, Hari Om, Sanjay @ Sonu and Saurabh @ Sanju were acquitted and ordered to be set at liberty, with the Court emphasizing careful, circumspect evaluation of child-witness testimony and forensic evidence.

2021-01-22

INDIAN BANK AND ANOTHER v. MAHAVEER KHARIWAL

This appeal concerns an Indian Bank employee who sought voluntary retirement under the Indian Bank Employees Pension Regulations, 1995 (Regulation 29), including a request for waiver of the three-month notice. The bank rejected the request on the ground that the employee was not eligible under Regulation 29, and initiated departmental proceedings which culminated in penalties. The employee challenged the rejection in a writ petition; the Single Judge dismissed it to the extent challenged here, but the Division Bench quashed the rejection and directed the bank to release retiral dues under the Pension Regulations. The Supreme Court, upholding the employer’s challenge, held that the voluntary retirement application dated 21.01.2004 was absolutely in consonance with Regulation 29 and that the 20.04.2004 rejection was illegal and contrary to Regulation 29. It held that the employee is entitled to all retiral benefits on the basis of voluntary retirement, and that the subsequent departmental enquiry would be non est since there would be no employer–employee relationship after retirement. The Court analyzed Regulation 29, including the three-month notice, the need for acceptance by the appointing authority, and the curtailment mechanism under Sub-Regulation 3, as well as the proviso to Sub-Regulation (1) relating to deputation. The appeal is dismissed with no costs, and the employee’s retiral benefits are secured while any further proceedings are void.

2021-11-29

Hasmat Ali v. Amina Bibi & ORS.

This is a Civil Appeal under Section 100 of the Code of Civil Procedure, 1908, arising from a suit in which the plaintiff sought a declaration that the defendant was a tenant up to 31.03.2003, eviction of the defendant from the suit shop, and other reliefs. The Trial Court partly decreed the suit directing the defendant to vacant possession; the Appellate Court dismissed the appeal, and the High Court, in Regular Second Appeal No. 403 of 2017, dismissed the appeal in limine without giving reasons. The essential issue is whether the High Court could dismiss a second appeal in limine without recording reasons and whether the appeal should be admitted for consideration of substantial questions of law under Section 100(1)–(5). The Supreme Court examines the interplay between Section 100 and Order XLII, clarifying that a second appeal lies only if the High Court formulates a substantial question of law under Section 100(4) and that the appeal must be heard on that question under Section 100(5). It reinforces that a dismissal in limine requires explicit reasons and that “so far as may be” in Order XLII indicates procedural alignment with Order XLI. Applying these principles, the Court sets aside the High Court’s order for lack of reasons, allows the appeal, and remits the matter to the High Court for fresh disposal in accordance with law, with no costs. The decision underscores the mandatory requirement of reasoned orders in second-appeal dismissals.

2021-02-15

Sudipta Chakrobarty & Anr. v. Ranaghat S.D. Hospital & Ors.

This Civil Appeal concerns the practice of delivering a final operative order without accompanying reasons in proceedings before the National Consumer Disputes Redressal Commission (NCDRC) and the consequences of delaying reasons. The National Commission pronounced the operative order in 2019 but took eight months to issue a reasoned judgment, prompting scrutiny under Article 21 of the Constitution. The Supreme Court recalls established authority that the right of aggrieved parties to challenge an order on its merits is prejudiced when reasons are withheld or delayed, and that due process requires timely, reasoned decisions. Citing State of Punjab & Ors. v. Jagdev Singh Talwandi (1984), Anil Rai v. State of Bihar (2001) and Zahira Habibulla M. Sheikh & Ors. v. State of Gujarat (AIR 2004 SC 3467), among others, the Court reiterates that pronouncing the operative portion without reasons undermines the fruits of litigation and defeats subsequent remedies. In the instant case, there was a hiatus of eight months between the operative order dated 26.04.2019 and the accompanying reasons. The Court orders that the President of the National Commission examine the matter and take steps to discontinue this practice, ensuring that reasoned judgments are delivered together with operative orders. The appeal and pending applications are disposed of.