Supreme Court of IndiaSupreme Court · 1976Division BenchAppeal dismissed (with costs)

Union of India v. Steel Stock Syndicate, Poona

Case / Petition Number:
Civil Appeal No. 1237 of 1968
Neutral Citation:(1976) 3 SCR 504

Case Synopsis & Summary

This is a Civil Appeal from the Bombay High Court’s dismissal in limine of the appellant Union of India’s challenge to a trial court decree awarding damages for delay in delivery of iron goods consigned to Poona. The plaintiff stockist contended that the Railways’ diversion of a December 1961 consignment caused inordinate delay, resulting in loss of capital and interest, and sought damages measured by loss of profits or market value as permitted by the Railways Act (as amended in 1961). The Railways Act was argued to govern liability; alternatively, common-law damages might apply if the Act did not bar them. The trial court accepted the plaintiff’s case and awarded damages based on the locked-up capital with interest; the District Judge and High Court dismissed the appeal. The Supreme Court, per Fazal Ali, J., traced the statutory evolution from the old Act to the 1961 amendments, analyzed sections 72, 73, 76 and 78(d) of the Railways Act, and held that the action arose after the new Act came into force, and that the Act increases the railways’ liability. The Court held that the goods did not undergo physical deterioration within s.76, nor was s.78(d) applicable since remote damages were not claimed. It ultimately affirmed the appeal and dismissed the plaintiff’s separate contentions, allowing damages for delay but dismissing the appeal with costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • P. K. Goswami
  • S. Murtaza Fazal Ali
Judgment Date
1976-03-01
Court Decision / Holding
Appeal dismissed. The Supreme Court upheld the High Court’s reasoning that the new Railways Act applies, that the action arose after the Act came into force, and that the railways’ liability is increased as a common carrier. The Court found no basis to defeat the claim under s. 76 or s. 78 since no physical deterioration occurred and no loss of market was proven; the plaintiff was entitled to damages for delay, but the trial court’s form of damages (nominal vs. actual) needed adjustment. The final result: the appeal is dismissed with costs.
Final Disposition
Appeal dismissed (with costs)

Parties to the Case

Appellants / Petitioners

  • Union of India

Respondents

  • Steel Stock Syndicate, Poona

Legal Representation & Advocates

Counsels for Petitioners

  • • Solicitor General for India; S. N. Prasad; Girish Chandra (not present)

Counsels for Respondents

  • • M. N. Phadke; P. C. Bhartari; J. B. Dadachanji; O. C. Wathur; Ravinder Narain (not present)

Provisions of Law Cited

Railways Act, 1890 (as amended in 1961): Sections 72, 73, 76, 78(d)Railways Act, 1890 (Old): Section 72(1) (bailee)Indian Contract Act, 1872: Sections 151, 152, 161Interest Act, 1839

Legal Doctrines & Maxims

  • Ejusdem generis
  • Vis major (force majeure)
  • Common carrier liability doctrine
  • Distinction between physical deterioration and depreciation in market value

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant argued that the action is governed by the Railways Act as amended in 1961; s. 76 covers only physical loss or deterioration, and since the alleged loss was in the form of capital interest rather than physical damage, the remedy may be barred. They contended s. 78(d) excludes indirect or remote damages, and that no contractually specified interest existed to justify damages on that basis; thus the plaintiff’s claim should be defeated either by s. 76 or s. 78, or by lack of an agreement to pay interest.

Contentions of Respondents

The respondent contended that the Railways Act does not bar liability but expands it, and that, even if s. 76 does not apply, the common-law right to damages remains. It was argued that interest can be used as a measure of damages where the railways’ negligence caused delay. The respondent also argued that the contract date (Dec 15, 1961) places the breach after the Act’s enactment, so the new Act governs; the loss of capital due to delay should be compensable; no proof of loss of market or profits was required for nominal damages in this context.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Railway Co. Ltd. v. Piana Mal Guiab SinghAIR 1925 Lah. 255PositiveApproved by the Court as a controlling authority on related questions (physical loss/deterioration).
Guj. P. Railway Co. & Others v. Urial Kishore Mukat, LoiA.I.R. 1930 All. 132Mentioned OnlyReferenced, not approved; used to illustrate divergent views on deterioration scope.
Union of India v. Messrs. Sheobux SatyanarayanA.I.R. 1963 Orissa 68Mentioned OnlyNot approved; cited as contrary authority.
Digbijai Nath v. Tirbeni Nath TewariA.I.R. 1946 All. 12PositiveCourt expresses agreement with the principles laid down.
The Official Receiver, Calcutta High Court and Anr. v. Baneshwar Prasad Singh and Anr.A.L.R. 1962 Pat. 155PositiveApproved; supports the view on interest as damages.
Union of India v. Watkins Mayore & CompanyA.L.R. 1966 S.C. 275DistinguishedRatio not applicable to the facts; distinguished from the present case.
Bengal Nagpur Railway Co. Ltd. v. Ruttanji RamjiA.L.R. 1938 P.C. 67Partly Overruled / LimitedPrivy Council ratio limited to cases where interest on damages is claimed for specific contexts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•8,067 words•~37 min read

In The Court Record

Union of India v. Steel Stock Syndicate, Poona

A B c D F G H 504 UNION dF INDIA _v._ STEEL STOCK HOLDERS' SYNDICATE, POONA _March_ 1. 1976 [P. K. GoswAMI AND s. MuRTAZA FAZAL Au, JJ.J I _Railways Act,_ 1890 (as _amended_ _in_ _1961)-Ss._ 72, 73, 76, _78(d)-Scope_ _of-Delay in_ _deliverv_ _of Roods-Loss of inter:.est_ _on_ _capital-If,_ _could_ _be_ _measure_ _of_ _damaRes-If_ _Railways_ _Act overrides Contract Act._ A consignment of iron 12;oods was booked by the respondent by rail on December 15. 1961. The due date of delivery under the contract or usage of the railways was December 25. 1961. As the goods were diverted, they were actually delivered on July 21, 1962. The respondent filed a suit for damages alleging negligence on the pait of the railway in that, by reason of diverting the consignment. there was inordinate delay in its delivery which resulted in loss to it by way of interest on capital. The trial court decreed the suit but in the matter of damages by way of loss of interest it gave 6% per annum instead of 12 % claimed by the respondent. The District Court dismissed the appellant's appeal, and the High Court dismissed the second appeal _in_ _limine._ On appeal to this Court it was coq.tended for the appellant that (i) since the cause of action was based on del~yed delivery, the case was covered bv the Railway Act, as amended in 196l, that the applicable section is s. 76 and that. since the conditions mentiorj.ed therein had not been fulfilled. th~ respondent was not entitled to a decree: {ii) that the respondent could claim for loss of profit or loss of m~rket as the same was expressly barred by s. 78(<l) oi the new Act; and {iii) that the respondent's claim for damages was not actionable in the absence of any agreement providing interest on capital as a measure of damages. It was contended for the respondent that even if s. 76 barred the remedy, IO$S of profit or market resulting from delayed delivery \\.'ould amount to "deterioration" contemplated by s. 76. Dlc;missing the appeal to this Court,' _HEW_ : In view of the finding of fact arrived at by the courts below, the respondent is entitled to damages. f515 Bl 1. (a) The case is covered by the new Act and not by the old Act as contended by the respondent. There could be no question of liability arising when the goods were booked and the contract was entered into between the resp<'nd ent and the railways. because, there was no presumption that the contract would result in breach. [512B-C] In the instant case, the cause of action arose when the consignment _was_ delivered to the respondent on July 21. 1962, that is, after the neW Act came _into_ force. The reasonable transit period having expired on January 1. 1962 the breach occurred after the new Act came into force. (b) Section 76 of the Act has a very limited scope : it contemplates clearly those cases which fall within the contingencies contemplated bv it. These contingencies refer to certain physical factors. viz : actual and ohysical loss. destruction, damage or deterioration of goods. Where due to dt>lav on the part of the railway there is physical d¢terioration or diminishing of the value of the goods. the plaintiff cannot claim damages by way of loss of profits or loc;s of market plus damages sustaint>d by the actual loc;s or de"tPrioration of the goods. In such a case the plaintiff can claim only the actual loss in the value of the good<I c::iuc;ed by destruction, damage or deterioration and not loss of profit. f512F-H] ( c) The word .. deterioration" is ui:.ed in its ordinarv parlance, so as to include within its ambit the actual phrsicaT act of deterioration. namely, the change for the worse in the thing itself., [514E-F] \ UNION V. STEEL STOCK SYNDICATE 505 _B./. Railway_ _Co._ _Ltd._ v. _Piana_ _Mal Guiab Singh_ A.I.R. 1925 Lah. 255, A approved. _1_ _G./.P. Railway_ _Co._ & _Others_ v. _luRal Kishore_ _Mukat_ _Loi_ _A.l.R._ 1930 All. 132 and _Union_ _of_ _India and others_ v. _Messrs. Sheobux_ _Satya11arayan,_ A.J.R. 1963 Orissa 68, not approved. (d) The words "loss, destruction, damage or deterioration" occurring in s. 76 must be read _ejusdem generis_ to indicate the actual and physical loss or change in the JZ:Oods contemplated by that section. In the instant case, since there was no physical deterioration of the goods at all which were delivered in the same condition in which they were booked. the case of the respondent tloes not fall within the four corners of the section. Nor can the respondent take advantage of s. 76 relying on the word "deterioration" because of the finding of negligence entered by the courts below. [514G] B _H_ s. 76 does not apply then s. 78 would have no application because that section starts with a _non-obstante_ clause. [513E-F] C (2) Section 78(d). which flows out of s. 76, provides that the railway administration shall nOt be responsible for any indirect or consequential damages or for loss of particular market. 1t merely incorporates·the measure of damages ao contemplated by s. 73. [513B] In the instant case as the respondent had not claimed loss of n1arket or remote damages the question of application of s. 78(d) did not aric:e. 3(a) The case of the respondent is clearly taken out_of the ambit of ss. 76 D and 78. Hence its suit for damages could not be defeated on the ground that it was barred by s. 76 or s. 78 of the Act. [515A-B] (b) It is difficult to accept the contention of the appellant th:it, by virtue of ss. 72 and 73. any contract entered into between the parties and the liability of the railway was governed purely by the provisions of the Railway Act and not by the terms of the contract between the parties. [5JOG] E F G \ _i_ The Indian Contract Act provides certain elementary conditions for a binding i;ontract but does not provide any particular form of contract. The fact that where the Government is a party to a contract, the particular form in which the contract is to be executed has been provided for by the Constitution, did not mean that the provisions of the Contract Act stand superseded by the Constitution or in this case by the Railway Act. Section 72 does nothing more than provide for a particular form in which the contract is to be executed and it enioins that such a form will be prescribed by the railway administration and approved by the Central Government. [510H-511-A] (c) Section 73 lays down that the Railway administration shall be respoJ;I~ sible for the loss, destruction, damage, deterioration or non-delivery except in certain cases Which amount to _vis ma;or_ in which case also the Act places responsibility on the railways if it did not prove that it had used reasonable foresight Rnd care in the carriage of goods. The section, while converting the liability of the railway administration from that of a carrier to that of an insurer, has imposed heavier responsibility on the railway administration. [511F-G] 4(a) There is no auestion of s. 73 of the Contract Act over-riding the provisions of the Interest Act because in the instant case the Interest Act has no application at all inasmuch as no interest is,clai_med by the plaintiff; but interest has been used as a measure to determine the compensation which the respondent could seek against the appellant for its negligence in causing inordinate delay in the deliverv of the ~oods. The respandent had only claimed nominal , (b) The courts below rightly found that the railway, was guilty of gross H dama~es for the loss because of the amount of money locked up for more than six months due to late delivery. [5 l 7B] :ae~htence. _As_ a common carrier the railway is resPonsible for breach of contract. There was absolutely no reason for the railway t" ";"ert the consign. men! to a place which did not fall on the route at all. [5170] 506 SUPREME COUR;T REPORTS (1976] 3 S.C.R. **A** **(** **c)** **The trial court** **was** **fully** **entitlecl** **to** **scale down the amount** **of** **jnte\est** from 12% to 6%. [517Fl _**Union**_ _**of**_ _**India**_ **v.** _**Watkins**_ _**Mayore**_ _**&**_ _**Company**_ **A.LR. 1966 S.C. 275** **distinguished.** \ **B** c **D** E **F** G **H** CIVIL APPELLATE JURISDICTION: Civil Appeal No. !237 of 1968. From the Judgment and Order dated the 24th August, 1967 of the High Court of Judicature at Bombay in Second Appeal No. 798 of 1967. _Lal Narain Sinha,_ Solicitor Gen¢ral for India, S. _N._ _Prasad,_ and _Girish Chander,_ (Not present), for the appellant. _M._ _N. Phadke,_ _P._ C. _Bhartari,_ _J._ _B. Dadachanji,_ _0._ C. _:Wathur_ and _Ravinder Narain,_ (Not Present), for the respondent. The Judgment of the Court was delivered by FAZAL ALI, **J** .-This is a defendant's appeal by special leave against the judgment and decree of the High Court of Bombay dismissing its second appeal _in limine_ by its order I dated August 24, 1967. Tue appeal raises important and lnteresting questions of law relating to the interpretation of some of the provisions of the Indian Railways Act pertaining to the liability of the Railways for breach of contract. The plaintiff/respondent brought a suit for recovery of an amount of Rs. 2,378.65 nP being the damages for breach of contract resulting from delayed delivery of the goods consigned by the plaintiff through the defendant Railways to be delivered at Poona. The plaintiff which is a furn carrying on its business dealing in iron goods booked a consignment with the defendant on December 15,, 1961 at Bhillai to be carried to Poona and to be delivered therein to the consignee safely and in good condition. The defendenf Railways accepted the offer under a Railway Receipt dated December 15, 1961. It appears that there was some delay in the delivery of the goods at Poona and on enquiries made by the plaintiff it appeared that till May 9, 1962 the goods had not been delivered at all. Thereafter the plaintiff served a notice of claim and of suit dated May 9, 1962 oh the Railway Administration. Soon after the service of the notice the consignment was delivered on July 21, 1962. According to the plaintiif under the contract or the usage of the Railways the normal period of delivery was ten days and as defendant had committed an inordinate delay in delivering the goods it was liable to pay damages to the plaintiff. Tue plaintiff, however, calculated the damages by way of interest at the rate of 12% per annum on the Jocked up capital of Rs. 27.332-44 which due to rise in prices has swelled to Rs. 35,476-27 nP. The plaintiff further alleged that the delay in the delivery was due to gross negligence of the defendant Railways which instead of sending the g?ocls direct from Bhillai to Poona _**Digbijai Nath**_ **v.** _**Tirbeni Nath Tewari**_ **A.I.R. 1946 All.** **12** **and** _**The Official**_ _**Receiver, Calcutta High Court**_ **&** _**Anr.**_ **v.** _**Baneshwar Prasad Singh**_ **&** _**Anr.**_ **A.LR.** 1962 Pat. 155 approved. _**5.**_ **The present appeal** **was** **concluded** **by** **findings** **<>f** **fact.** **But** **onJhe** **proved** **facts some clear questions** **of** **law** **arose!** **for decision** **and,** **therefore, this** **was** **not a case** **in** **which the High Court should have dismissed the appeal** _**in**_ _**/imine.**_ [507Fl UNION _v._ STEEL STOCK SYNDICATE _(Fazal_ _Ali,!.)_ - 507 diverted them to Aurangabad where the consignment had to be loaded A in a meter-gauge tram and then t0 a broad-gauge lmo and it was _only after tile acrendant received the nonce from the plamtitl that it expedi.ed the delivery of the goods. The derendant Ra1hvuys contested the suit on the ground that there was no inordinate delay, nor there was any contract that the goods were to be delivered within ten <lays. lt is also averred that the plaintiff had led no evidence to show / that there was any loss of profits or rise in the market price. The de- B ' fondant further alleged that the plaintiff was not en.titled to claim interest ### " as damages. The Trial Court accepted the plaintiff's case in toto and <lays. lt is also averred that the plaintiff had led no evidence to show / that there was any loss of profits or rise in the market price. The de- B ' fondant further alleged that the plaintiff was not en.titled to claim interest as damages. The Trial Court accepted the plaintiff's case in toto and - found as damages. The Trial Court accepted the plaintiff's case in toto and found(1) that there was an inordinate delay in the delivery of the goods belonging to the plaintiff at Poona; (2) that the goods were first diverted to Aurangabad, alc though the route from Bhillai to Poona lay via Nagpur and Aurangabad does not fall on the route at all; and (3) that the defendant was guilty of gross negligence and was, therefore, responsible for loss for delay or devialion in carrying the goods. The Trial Court, however, found that the figure of Rs. 27,332-44 the D original amount which was deposited by the plaintiff in the Bank against the goods should be taken as the basis for calculation of damages and after caiculating interest at the rate of 6% per annum the plaintiff was awarded a sum of Rs. 1250/- including the notice charges and passed a decree for this amount in favour of the plaintiff. The defendant then filed an appeal before the District Judge,, Poona E who upheld the finding of the learned Munsiff and dismissed the appeal. A second appeal taken by the defendant to the High Court of Bombay was also dismissed _in limine_ and hence this appeal by special leave. Normally it would appear that the appeal was concluded by findings of fact but we find that on the proved facts some clear questions of law arise for decision and therefore this was not a case in which the High Court should have dismissed the appeal _in limine._ F In support of the appeal the learned Solicitor-General submitted thre~ points before us : ( 1) that as the cause of action of the plaintiff is based on the delayed delivery which arose at the most on January 1, 1962, the c~se of the plaintiff is covered by the provisions of the new Railways Act as amended by Act 39 of 1961, which .G is an exhaustive Code in itself providing a self-contained machinery in order to dete~mine .the Jiability of the Railways and as the cond1t10ns menl!oned m s. 76 of the Railways Act ;. have not been fulfilled the plaintiff is not entitled to any **decree;** ( 2) that at any rate since the plaintiff has claimed interest - as damages, in the absence of any agreement providing for H such an interest, the plaintiff's claim is not actionable at law; and **A** **B** c D E F G **H** 508 SUPREME COURT REPORTS [1976] 3 S.C.R. 1 (3) that the plaintiff cou!d not claim for loss of profit or loss of market as the same is expressly barred by s. 78( d) of the new Railways Act. As an alternative argument it was ! also pleaded that the plaintiff has; not averred in his plainu that t!te~e was any rise in the prices ~ecause the goods belonging to the plamtiff were a controlled commodity an~ could not be sold without a permit. Before claiming loss of profits 1t was the bounden duty of the plaintift to allege that he had been granted the permit to sell the goods. Mr. Phadke appearing for the respondent has repelled the contentions e>f the appellant on the ground that the new Railways Act does not reduce or diminish the liability !of the railway administration for breach of contract but in fact the Act seeks to increase the liability. Secondly it was submitted that even if the case of the plaintiff does not fall within the four corners of s. 76 of the new Railways Act, the common law right of the plaintiff to claim damages against the appellant has not been barred by the Act. Lastly it was submitted that the plaintiff ha; not claimed interest on any specified amount of money but has merely calculated the same as a measure of damages which it suffered due to the breach of contract and gross negligence on the part of the Railways which has been found by the Courts below. Finally it was contended that as the contract was entered into between the parties on Decembe1' 15, 1961, when the goods were booked at Bhillai, the liability for damages arose on that day and the case of the plaintiff would be covered by the provisions of the Railways Act before it was amended by Act 39 of 1961. In order to answer the contentions raised by the parties it may be necessary for us to trace briefly the history of the circumstances in which the Railways Act of 1890 was amended by Act 39 of 1961. We would, for short, refer to the Railways Act of 1890 as the "old Act" and the Act as amended by Act 39 of 1961 as the "new Act". It would appear that under s. 72 of the old Act the responsibjlity of railway administration as a carrier of animals and goods was clearly that of a bailee under ss. 151, 152 and 161 of the Indian Contract Act. Jn other words, the railway administration was impressed with the duty to carry the goods with the same care and caution which a prudent owner would apply in the case of his own goods. If there was any viola•ion or breach of the said care and caution expected of the Railway it would have been liable to damages. Section 72 (1) of the old Act ran thus : " ( 1) The responsibility of a railway administration for the loss, destruction or deterioration of animals or goods delivered to the administration to be carried by railway shall, suhiect to the other provisions of this Act, be that of a bailee unner sections 151, 152 and 161 of the Indian Contract Act, 1872 (9 of 1872)." It may be pertinent to note that su!Hection (3) of s. 72 of the old Act expressly excluded the principles of the common law of En~land or in the Carriers Act of 1865 regarding the responsibility of common carriers. After onr country became free and the Railways entered the commercial field as one of the important wings of the Government, there l ## • " ~ ) .. UNION _v._ STEEL STOCK SYNDICATE _(Fazal Ali,_ _!.)_ 509 appears to be a public dernan~ for making the Railway ~d~i~istration A as a public body to take upon itself more onerous responst?!hues where the nghts of the free citizens were mvolved. Under the Bnttsh Govern_I_ rncnt most of the Railways were owned by private companies whoso ownership was to be extinguished after lapse of a particular period. Soon after the freedom all the Railways were taken over by the Central Governrnent and run by it. In view of the new problems facing the Govern1 rnent and the public demand for a change in the Jaw, the Government B appears to have decided to convert the responsibility of the railway from that of a carrier to that of an insurer. But before doing this, the - Government appointed a Committee called the Railway Freight Struc from that of a carrier to that of an insurer. But before doing this, the Government appointed a Committee called the Railway Freight Struc lure Enquiry Committee (1956-57) which recommended that the responsibility of the Railways in India should be changed to that of a cornman earner instead of a bailee. The Committee which had been asked to cx[1 mine the statutory provisions dealing with the responsibility of c railways as common carriers was of the opinion that the public would derive much satisfaction from a radical change from bailee's responsi bility to that of a common carrier, and that this change was bound to _'f_ tone up the administrative machinery of the railways in respect of effec bility to that of a common carrier, and that this change was bound to tone up the administrative machinery of the railways in respect of effec ili •• tive prevention of transit losses. In view of the recommendations of the said Committee the Government introduced a bill in the ·Lok Sabha for amending some of the provisions of the Railway Act in order to irnplc- D ment those recommendations. From a perusal of the debates of the Lok Sabha when this Bill was introduced it would appear that the Deputy Minister of Railways explaining the objectives of the Bill observed as follows : t "Taking into account all aspe<:ts of the problem, it is proposed that railways should assume the responsibility of a corn- E rnon carrier instead of that of a bailee. As bailees, the rail ways are required to take as much care of the goods entrusted to them for carriage as a man of ordinary prudence would under similar circumstances, take of his own goods of the sarn~ bulk, quality and value. However, closely following the legal position in the F United Kingdom, it is proposed that the basic responsibility of our railways for loss, destruction or deterioration etc. of anirnals or goods be as set out in the proposed section 73. W.hen the railways assume this responsibility, broadly speakmg, they will be liable for loss of or injury to aoods while in transit by rail, arising from any cause whatso.;'ver, unless such loss or injury is proved by the railways to have been G caused by an act of God, or by an act of war, or by an act of l' vice m the thing carried or p_ubli~ enemies or is proved is to attributable to the consignor's be consequence of inherent ; own fault. Even where the loss is proved by the railways to have been - caused by the excepted perils, just referred to by me, the rail- H ways will not be absolved of their responsibility unless they further prove that they had nsed reasonable forethought and care in the carriage of animals or goods. 18-L522SCl/76 ##### I A B c **D** E F 510 SUPREME COURT REPORTS [1976) 3 S.C.R. The result of the changes proposed will be that the railways will be paying claims for compensation in many cases where they are not paid at present, for example, in cases of losses due to running train thefts, damage by wet in transit in spite of bailee's care having been taken etc." This was the clear background against which the new Act was passed. Even the statement of objects and reasons, the relevant parts of which may be extracted as under,, shows the main object of the new Act : "The Railway Freight Structure Enquiry Committee _(_ 1956-57) has recommended that the responsibility of the railways in India as carriers of animals and goods, which is at present that of a bailee, should be changed to that of a common carrier. There is also a public demand for such a change. After a careful and detailed examination of the question, the Government have decided to accept the Committee's recommendation. x x x x (a) The Bill seeks to make it clear that in the case of through booking of consignments over an Indian Railway and a Foreign Railway, the responsibility of the Indian Railway as a common carrier would extend only over that portion of the carriage which is over the Indian Railway; x x x x ( c) Other amendments included in the Bill are intended to rectify certain defects or ambiguities in the existing prcwi sions of the Act which were revealed by experience in its working.·• It appears that the old s. 72 was completely deleted including sub-s. ( 3) which expressly prohibited the principks of the common law of England for determining the liability of the Railways as common carriers. In· stead the new s. 72 laid down the form in which a contract was to be executed between a consignor and the Railway and a risk note was pro· I ··f' vided for by clause (b). It may be necessary to note an argument put forward by the learned Solicitor-General on this point. It was submitted that by virtue of the provisions of ss. 72 and 73 of the new Act the statut·o superseded any contract entered into between the parties and the liability of the Railways was governed purely under the provisions of **the Railways Act and** **not under the** **tcrn1s** **of contract which may have** **G** been entered into between the consignor and the Railway. \V~ are, however, unable to accept this argument. It is well settled that while the Jndian Contract Act merely provides certain elementary conditions under which the contract becomes binding on the parties, it does not _ provide any particular form or condition of a contract. It is, therefore, clear that the parties to the contract may agree to a particular form or condition or of mode in which the contract is to be executed. In case **H** where the Governn1ent enters into a contract with a person or _vice_ _versa_ a particular form in which the contract is to be executed has been provi **G** ded for even by the Constitution and the contract has to be in that form. _**1**_ UNION _v._ STEEL STOCK SYNDICATE _(Fazal Ali,_ _I.)_ 511 This does not mean that the provisions of the Contract Act stand superseded either by the Constitution or by the Railways Act which provide for a particular mode or a fotm in which the contract has to be entered into. Section 72 therefore does nothing more or nothing less than provide for a particular form in which the contract is to be executed and it enjoins that such a form will be prescribed by the railway administraction and approved by the Central Government. The provisions of s. 72 of the new Act run thus : **"72.** **·Any** **person delivering to a railway administration** any animals or goods to be carried by railway shall ( a) if the animals or goods are to be carried by a train intended solely for the carriage of goods, or (b) if the goods are to be carried by any other train and consist of articles of any of the following categories, namely: ( i) articles carried at owner's risk rates. (iil articles ol a perishable nature. execute a note (in this Act referred to as the forwarding note) in such form as may be prescribed by the railway administration and approved by the Central Government, in which the sender or his agent shall give such particulars in respect of the animals or goods so delivered as may be **required".** It is not possible from the provisions of s. 72 to spell out th~ principle that the new Act completely supersedes the provisions of the Contract Act both in respect of the conditions and the liability. Section 73 of the new Act lays down that the railway administration shall be responsible for the loss, destruction, damage, deterioration or non-delivery except in certain cases which amount to _vis major._ But there also the proviso confers responsibility on the Railways for loss etc., if the railway administration does not prove that it has used reasonable foresight and care in the carriage of the goods. The Solicitor-General contended that s. 76 of the new Act is the provision which deals with delay in the delivery and the plaintiff can succeed only if his case falls within the four corners of the section. Be~ore answering this question, it may be necessary to dispose of a pomt on which the counsel for the parties have joined issue. According to the Solicitor-Gene.ral the liability of the Railway would be governed by the new Act masmuch as the cause of action has arisen after coming into force of the new Act. Counsel for the respondent, however, submits that the matter will be governed by A **B** c (iii) articles mentioned in the Second Schedule. **D** (iv) articles in a defective condition or defectively packed. (v) explosives and other dangerous goods. E F G H A B c E F G H 512 SUPREME COURT REPORTS [1976] 3 S.C.R. the old Act because the liability of the Railway. a_rose when ~he. gaod~ were booked in December 1961. In our opm1on, there 1s a very short answer to this question. The plaintiff has clearly and categorically pleaded in paragraph-2 of the plaint that the cause of act10n arose at Poona when the complete consignment was delivered to the plaintiff on July 21, 1962 _i.e._ after the new Act had already come into force. Further more, it is also allegea that the reasonable and normal transit period expired on January 1, 1962. In these circumstances, therefore, according to the plaintiff itself, the breach occurred only after the new Act had come into force-whether it was January I, 1962 or thereafter. There can be no question of the liabilify arising when the goods were booked and the contract was entered into between the plaintiff and the Railway, because ther~ is no presumption that the contract would result in breach. The plaintiff would be entitled to damages only when there was a breach of contract and if the said breach,, even according to the plaintiff itself. occurred on January 1, 1962 or thereafter, then it is manifest that the case -would be covered by the new Act and not by the old Act. The first contention put forward by the Solicitor-General was that the case of the plaintiff does not fall under any of the contingencies contemplated by s. 76 of the new Act. Section 76 runs thus : "76. A railway administration shall be responsible for loss, destruction, damage or deterioration of animals or goods proved by the owner to have been caused by delay or detention in their carriage unless the railway administration proves that the delay or detention arose without negligence or misconduct on the part of the railway administration or of any of its servants." It is submitted that although there was delay in the delivery of the goods on the part of the railway administration, but the railway administration would be responsible only if !he plaintiff further proves that there has beeu loss, destruction, damage or deterioration of the goods by virtue of the delay. It is true that the plaintiff has. not alleged that there was any physical loss, destruction, damage or dete.rioration of the goods, but that, in our opinion, does not put the plaintiff out of court. Section 76 appears to have a wry limited scope : it contemplates clearly those cases which fall within the contingencies contemplated by s. 76. These contingencies refer to certain physical factors, _viz.,_ actual and physical loss, destruction, damage or deterioration of goods. For instance, where the goods worth Rs. 10,000/due to delayed delivery have sustained deterioration as a result of which their value has gone down to Rs. 5,000/- then once this fact is proved the railway administration shall be liable for such a loss or the value of such deterioration. We are of the opinion that s. 73 of the new Act, while converting the liability of the railway administration from that of a carrier to that of an insurer, has imposed heavier responsibility on the railway administration. The history and the object with which the radical provisions of the new Act were introduced bear testimony to change of the nature ·~ UNION _v._ STEEL STOCK SYNDICATE _(Fazal_ _Ali,!.)_ 513 <lf the ·liability of the railway administration. But in order to avoid the payment of double damages, ss. 76 and 78 have been inserted. ' In other words, where due to delay on the part of the Railway there is physical deterioration or diminishing of the value of tiie goods, the plaintiff cannot claim damages by way of loss of profits or loss of market pfos damages sustained by the actual loss or deterioration of the goods. In such a case the plaintiff can claim only the actual Joss in the value of the goods .caused by destruction, damage or deter - ioration and not)oss of profit. Section clearly provides that the rai·lway administration shall not be. respon-78(d) which flows out of s. 76 sible for any indirect or consequential damages or for loss of particular market. The Solicitor-General, therefore, rightly contended that in cases falling squarely within the four corners of s. 7 6 of the new Act, s. 78(d) will apply. In facts. 78(d) merely incorporates the measure of damages as contemplated by s. 73 itself. It is well settled that the liability of an ordinary carrier even in the English _'f_ common law does not extend to a damage which is indirect or remote. Loss of profit or loss of a particular market has been held by a number of decisions to be a remote damage and can be awarded only if it is proved that the party which is guilty o! committing the breach was aware or had knowledge that such a loss would be caused. Section 78 ( d), however, seeks to bar the remedy of this kind of damage. In the instant case, however, as the plaintiff itself has not claimed .Joss of market or remote damages, the question of application of s. 78(d) does not arise. Moreover, in the instant case, it is conceded that there was no physical deterioration of the goods at all which were delivered to the consignee at Poona in the same condition as they were booked from Bhillai by the plaintiff. In these circumstances, the case of the plaintiff does not fall within the four corners of s. 76, nor does it fulfil any of the categories mentioned therein. If s. 76 does not apply to the facts of the present case, then s. 78 _**1**_ **V.·'ill** **also have** **no** **application,, because** **s.** **78** **starts** **with** **a** _**non**_ _**obstru1te**_ olause "Notwithstanding anything contained in the foregoing provisions of this Chapter, a railway administration shall not be responsible". We, therefore, agree with the learned counsel for the respondent that under the new Act th_e liability of the Railway has been increased so as to take upon itself the responsibility of a common **carrier.** Counsel for the respondent submitted that even if s. 76 barred the remedy of the plaintiff, the fact that due to delay in delivery there was loss of profil or loss of market would amount to "deterioration A· **B** c **D** E **F** **G** **H** as ~ontemplated by s. 76 of the new Act. In support of this content10n, the learned counsel relied on a decision of the Allahabad High Court in _G.l.P. Railway Co._ & _others_ v. _Jugul Kishore Mukai_ _Lal(l)_ where Sulaiman, Ag. CJ., as he then was, observed as follows: - "Tt is clear to us that the meaning of the word "deterioration" in s. 161 which imposes the liability **on** **the** rililway company must be the same as in risk-note **form** **B which** lays _I_ (11 \ !. 'l. IJJ l A'l. 112. 514 SUPREME COURT REPORTS [1976] 3 S.C.R. A B c D E down the special conditions under ~hich. the . rai!;-vay co.mpany is protected. In both these detenorallon resultmg from a delay in tendering the good is contemplated: x x. x We therefore accept the view expressed by Mukeri1, J., in the unreported case and hold that the word "deterioration" is wide enough to include depreciation in value on account of a fall in the price of the goods." The same view appears to have been taken by the Orisa High Court _in_ _Unioh_ _of_ _India and orthers_ v. _Messrs. Sheobux Satyanarayan_ (') where Misra, J., as he then was, observed as follows : "Though there was some difference of opinion as to the import of the word "deterioration" used in section 72 of the Indian Railways Act and in section 161 of the Indian Contract Act, the position is now well settled that it is wid0 enough to include depreciation in value on account of a fall in the price of the goods." As against this a Division Bench of the Lahore High Court in _R._ _I._ _Railway_ _Co._ _Ltd._ v. _Diana_ _Ma!_ _Guiab Singh(2)_ observed as follows : "The 'deterioration' of a thing, whether it be in quality or in value, implies in ordinary parlance a change for the worse in the thing itself. If a thing is worth less than it was before only because the market rate has gone down it would be correct to say that it has depreciated in value, but not that it has deteriorated." Having regard to the background and the setting in which the word \ "deterioration" occurs in s. 76 of the new Act it seems to us that the parliament intended that the word should be used in the ordinary parlance and in a restricted sense so as to inculde--within its ambit the actual physic&) act of deterioration, _i.e._ the physical P.art of it, namely, the change for the worse in the thing itself as very aptly F put by Martineau, J., in the Lahore High Court judgment referred to above. We must seek to draw a clear distinction between a physical deterioration of a thing and depreciation in its value according to market price. These are two separate concepts having separate ingredients. The words used in s. 76 of the new Act, namely, "loss, destruction, damage or deterioration" must be read as _ejusdem generis_ so as to indicate the actual and physical loss or change in the goods G contemplated by s. 76. In these circumstances, therefore, with due respect, we are unable to agree with the somewhat broad view taken by the Allahabad High Court and followed by the Orissa High Court in the cases referred to above. We, on the other hand, prefer to adopt the view taken by the Labore High Court in the case referred to above. In this view of the matter, it is clear that the word "deterioration" used in s. 76 refererd to the physical and actual deterioraH tion of the goods which has admittedly not taken place in the present case. The plaintiff cannot take advantage of s. 76 relying on the _(I)_ A.LR. 1963 Orissa 60. (2) A.LR. '1925· Lah. 255. _I_ ###### _1_ #, I UNION _v._ STEEL STOCK SYNDICATE _(Fazal Ali,_ J.) 515 word "deterioration" because of the finding of neglience entered by the Courts below. The case of the plaintiff is clearly taken out of the ambit of ss. 76 and 78 and his suit for damage also cannot be defeated on the ground that it is barred by s. 76 or s. 78 of the new Act. We are, therefore, of the opinion that in view of the finding of fact arrived by the Courts below the plaintiff is undoubtedly entitled to damages. . '.. This brings us to the second contention raised by the SolicitorGeneral, namely, that the plaintiff is not entitled to interest as .da~ages for breach of the contract. It was submitted that what the plamttff has done is to calculate interest at the rate of 12 % which has been reduced to 6% per annum on the amount deposited by him in the Ba~k which remained locked up for more than six months and to claim the same as damages. It was contended that the plaintiff plainly could not do so in view of the Interest Act under which interest can only be charged bdore suit if so stipulated by the parties to the contract. It is common ground that in the present case the contract between the parties does not provide for charging any interest for breach of contract. The Solicitor-General relied on a decision of this Court in _Union_ _of_ _India_ v. _Watkins Mayore_ _&_ _Company_ (') where this Court observed as follows : "Under the Interest Act, 1839, the Court may allow interest of the plaintiff if the amount claimed is a sum certain which is payable at a certain time by virtue of a written instrument. But it is conceded that the amount claimed in this case is not a sum certain but compensation for unliquidated amount. On hehalf of the respondent it was submitted by Mr. Aggarwala that interest may be awarded under the foterest Act which contains a provision that "interest shall be payable in all cases in which it is now payable by law''. But this provision only applies to cases in which the Court of Equity exercises jurisdiction to allow interest. In the above case the plaintiff had brought a suit for damages claiming a particular quantified amount of Rs. 1,07,700/- as compensation for storage of over 600 tons of iron sheets for a particular period. This quantified amount included a sum of Rs. 2,974/2/- as interest on the various sums claimed by the plaintiff as compensation, namely, godown rent, chowkidar's salary, cartage from Railway station to godown etc. The High Court, however, granted a decree only for R,. 27 "o?.5./"o /- including the amount of ir"erest daimed by the plaintiff. Thus this Court in that case was dealing with interest claimed by the plaintiff not as a yardstick for assessing damages but as pure and simple interest on the quant;fied amount of comoensation or damages claimed bv the plaintiff. This Court held that the interest to the extent of Rs. 2,974/2/- as claimed by the plaintiff could not be allowed in the ahsence of there be;ng anv contract iustifving the charging of such interest. This Court was not at all concerned with a case like the present one where the plaintiff has merely claimed damages pure and simple and in order to assess the same had applied the (I) A.LR. 1966 S.C. 275. A B c D E F G H #### t A B c D E F 516 SUPREME COURT REPORTS (1976] 3 S.C.R. yardstick of charging interest at a particular rate on the locked up capital. for a period of more than six months. In these circumstances, therefore the ratio of the aforesaid decision in _Watkins Mayore_ _&_ _Company_ (suprn) is not applicable to the facts of the present case, Similarly in _Bengal Nagpur Railway Co. Ltd._ v. _Ruttanji Ramji(_ [1 ] ) which was relied upon by this Court in _Watkins Mayore_ _&_ _Company_ (supra) the amount claimed by the plaintiff was a specified amount on the basis of which interest was charged which had the effect of increasing the damages sought for. That was a case of a contractor who had brought a suit for recovery of the amount due from the Government Department and had added interest to the total claim made by the plaintiff.. The Privy Council pointed out that as there was no stipulation which authorized the plaintiff to charge interest on the quantified amount of damages, the plaintiff was not entitled to any interest. Thus, in other words, the ratio of the decision in _Ruttanji_ _Ramji's case_ as also in _Watkins Mayore_ _&_ _Company_ (supra) would apply only to such cases where interest by way of damages is claimed for wrongful detention of a debt or where the interest is claimed on a specified amount due or claimed against any debtor. The principle adumbrated in the two cases mentioned above will not apply to cases where the plaintiff does not claim interest on a quantified amount or on damages but where the plaintiff merely calculates interest as a yardstick or measure to assess the damages which he would be entitled to. In the instant case the Courts below have clearly found that the plaintiff had deposited a sum of Rs. 27,332-44 in the Bank scion after booking the consignment with the railway administration. The plaintiff was a stockist and as the money in the Bank remained idle for a period of more than six months due to the delayed delivery made by the Railway on account of its negligence, the plaintiff merely claimed compensation for this delayed delivery on the basis that if the amount was not locked up it would have earned some interest which would yield some profit to the plaintiff. Thus it is clear, therefore, that in the instant case the plaintiff neither claimed interest on any quantified amount, nor did he claim profit due to loss of lnarket. In _Digbijai Nath_ v. _Tirheni Nath_ _Tewari(')_ a Division Bench of the Allahabad High Court, while interpreting the decision of the Privy Council referred to above, observed as follows : "We do not consider that this case is authority for the G proposition that interest cannot be claimed by way of damages for breach of a contract under s. 73, Contract Act. All that was held in it was that interest cannot be allowed by way of damages for wrongful detention of debt. • - The position is different where interest is claimed as part of the damages for breach of a contract. H A similar view was taken by a Division Bench decision of the Patna _High Court_ _in_ _The Official Receiver, Calcutta High Court and another_ (1) A.LR. 1938 P.C. 67. (2) A.1.R. 1~46 All. 12. UNION _v._ STEEL STOCK SYNDICATE _(Fazal Ali,_ _J.)_ 517 v. _Baneshwar Prasad Singh and another_ ('). We find ourselve in A complete agreement with the principles laid down in those cases. _**t**_ For these reasons, therefore, we are of the opinion that the decision of this Court in _Watkins Mayore_ & _Company_ (supra) does not appear to be of any assistance to the ~pJ1ellant, so far as the facts of the present case are concerned. Thus 1t 1s clear tiJat there 1s no q uestion of s. 73 of the Contract Act overriding the provisions of the Interest Act, because in the instant case the Interest Act has no application at all inasmuch as no interest is claimed by the plaintiff at all but interest has been used as a measure to determine the compensation which the plaintiff could seek against the appellant for its negligence in causing inordinate delay in the delivery of the goods. The contention raised by tlie learned Solicitor-General on this point is, therefore, overruled. The plaintiif is not claiming the sum decreed by way of interest but he is claiming the damages calculated on a particular basis. As a common carrier the Railway is undoubtedly responsible for breach of contract. ln the instant case the Railway Receipt shows that the goods were booked to be carried from Bhillai to Poona which is on the Nagpur route. There was absolutely no reason nor any. occasion for the Railway to divert the goods to a different route and for taking the same to a different route and for taking the same to Aurangabad which did not fall on the route to Poona at all. The Courts below, therefore, rightly found that the Railway was guilty of gross negligence. The last question submitted by the learned Solicitor General was ·that the plaintiff was not entitled to loss of profit or loss of market. because the plaintiff has not pleaded anywhere that he had obtained any permit for the go9ds which were a controlled commodity and sustained loss of market. It is true that the plaintiff has not pleaded this fact, but the plaintiff has not at all prayed for any damages on the ground of loss of market or loss of profit. The plaintiff has only claimed nominal damages for the loss which occurred to him because of the amount of money which he had deposited in the Bank and was locked for more than six months due to the delayed delivery. The Trial Court has already scalerl dnll'n the amount from Rs. 2,378-65 to Rs. 1,250/- and we think the Trial Court was fully entitled to do so. In these circumstances, therefore. all the contentions raised bv the Solicitor General fail and we find no merit in this appeal which is accordingly dismissed with costs. **P.B.R.** _Appeal dismissed._ (I) A.LR. 1962 Pat. 155. **c** **D** **E** **F** **G**
End of Judgment Record
Browse All Supreme Court of India (1976) Decisions
1975-12-18

THAKUR PRASAD SAO ETC. v. THE MEMBER. BOARD OF REVENUE & ORS.

These ten appeals arise from writ petitions challenging the licensing regime for outstill shops under the Bihar & Orissa Excise Act, 1915. The licensees, who held licences for manufacturing and retail sale of country liquor in Singhbhum district, argued that what was granted to them was merely a license to retail on their premises and not an exclusive privilege under section 22, nor beyond the reach of section 30. They sought refunds of deposits and damages for loss of anticipated profits, and in the second batch sought reductions of licence fees on grounds of speculative bidding; in the third batch they argued refund of sums charged as consideration for licences to grant exclusive privileges. The State contended that the outstill system confers an exclusive privilege to manufacture and supply country liquor within the area, i.e., a monopoly within the meaning of section 22(1)(d); The High Court had held otherwise. The Supreme Court held that the outstill licences for manufacturing and selling country liquor within the specified area are an exclusive privilege under section 22(1)(d), not a simple retail licence under section 30. It held that the licences continued in force with no right to compensation under Section 44, and that the State could frame rules and collect fees as consideration for the exclusive privilege. The court dismissed all appeals with costs, directing instalment recovery over three years for those able to furnish security.

1975-12-04

Gorelal Dubey v. The State of Madhya Pradesh and Others

This case concerns a dispute over limestone exploitation in Madhya Pradesh under competing mineral classification regimes. Gorelal Dubey (applicant) sought a quarry lease for limestone designated as a minor mineral under the Madhya Pradesh Mineral Rules, 1961, while Ram Chander Badri Prasad Gaur (respondent No. 3) sought a mining lease for limestone as a major mineral under the Central Rules, 1960, with the Central Government initially concluding that the appellant’s application effectively amounted to a major-mineral request. The Madhya Pradesh High Court dismissed related writ petitions, and special leave was granted, leading to two appeals: CA 785/71 and CA 1781/75. The Parliament’s Mines and Minerals Act, 1957 and the Central Rules (1960) are contrasted with the Madhya Pradesh State Rules (1961) and the 1958 and 1961 notifications redefining limestone as a minor mineral. The Court traces the two-notification framework, emphasizing that a lease decision should be based on the quality and partition of limestone in the questioned area, and that when two distinct applications exist, the State Government must consider both and determine whether one should be a minor mineral lease or a major mineral lease. The judgment ultimately resolves the dispute by quashing the central directive and directing fresh consideration by the State, with interim royalty duties allocated per the relevant minor/major rates.

1975-10-10

HIND OVERSEAS PRIVATE LIMITED v. RAGHUNATH PRASAD JHUNJHUNWALLA AND ANR.

This Supreme Court judgment addresses whether a private limited company, formed in 1956 by two family groups for iron and steel business, can be treated as a partnership for the purposes of winding up under Section 433(f) of the Companies Act, 1956. The two groups — RPJ (Raghunath Prasad Jhunjhunwalla) and his family, and the VD J group (V. D. Jhunjhunwalla) along with M.P.J. — held control through a two-family shareholding structure (1875 vs 3125 shares). Allegations arose that, despite formal corporate structure, management and day-to-day control were concentrated in one group, with the other group being ousted from directorship and access to books, ostensibly creating a de facto partnership. The Calcutta High Court dismissed the winding-up petition, but the Division Bench allowed it, holding that the company was in substance a partnership and the just and equitable clause justified winding up. The Supreme Court, however, reverses that view, stressing that the just and equitable remedy is a last resort and must serve the interests of the company and all shareholders, not merely the petitioning party. While English authorities like Yenidje and Ebrahimi are persuasive, Indian conditions require a careful, contextual application. The Court reviews the facts: there was no substratum dissolution, no irreparable mismanagement, and there were procedural remedies within the company’s articles. It concludes that the petition for winding up should not succeed and dismisses the petition, preserving the corporate form and the rights of all shareholders.

1976-02-24

Pandurang Dnyanoba Lad v. Dada Rama Methe & Ors.

Pandurang Dnyanoba Lad v. Dada Rama Methe & Ors concerns whether the abolition of Inams in the merged territories terminated the landlord-tenant relationship and extinguished a tenant's right to purchase land under the Bombay Tenancy and Agricultural Lands Act, 1948. Lad, the appellant, owned land classified as Huzur Sanadi Inam and was challenged by tenants who were declared purchasers under the Tenancy Act. The Bombay Merged Territories Miscellaneous Alienations Abolition Act, 1955 abolished all alienations with effect from an appointed date and provided occupancy rights for erstwhile Inam lands (sections 4–9) and a protection clause (section 28) preserving the operation of the Tenancy Act to the extent not inconsistent. The appellant argued that abolition ended the landlord-tenant relationship and that the tenants lost the right to purchase. The respondents contended that the Tenancy Act rights remained intact; Section 32 of the Tenancy Act grants a right to purchase on the tillers' day, and Section 32G fixes the price; Section 32G(6) ensures the purchase right persists even where land is re-granted under abolition with non-transferability conditions. The Court held that the abolition act did not extinguish the landlord-tenant relationship, and Section 32 remained applicable to pre-existing tenancies; the rights of tenants to purchase were preserved. The appeal was dismissed. The decision clarifies that the abolition act aimed to remove intermediaries, not evict tillers, and that existing tenancy protections remain intact.