Supreme Court of IndiaSupreme Court · 2014Division BenchAppeal dismissed; no costs.

Union of India v. PAM Development Pvt. Ltd.

Case / Petition Number:
Civil Appeal No. 5618 of 2006
Neutral Citation:[2014] 1 S.C.R. 1069

Case Synopsis & Summary

Union of India challenged a Calcutta High Court order appointing a sole arbitrator under Section 11(6) of the Arbitration and Conciliation Act, 1996, in a contract dispute for construction of an industrial loco shed. The arbitration agreement, Clause 64 of the General Conditions of Contract, originally contemplated a two-arbitrator plus umpire panel for disputes exceeding Rs. 5 lakhs and a sole arbitrator for smaller claims. After the enactment of the 1996 Act, the old 1940 Act’s scheme for two arbitrators and an umpire became redundant, and the respondent insisted on appointing a sole arbitrator. The arbitrator, Justice Satyabrata Mitra, was appointed by the Calcutta High Court in 1998; the arbitration proceeded with full participation by the Union, which ultimately resulted in an award of Rs. 1,29,89,768 in favour of PAM Development Pvt. Ltd. The Union challenged the award under Section 34; High Court and then Division Bench dismissed the challenge. The Supreme Court held that the arbitration agreement’s multi-arbitrator mechanism had become redundant due to repeal; the appellant’s lack of objection to the arbitrator’s jurisdiction during proceedings amounted to waiver under Section 4 read with Section 16; the appellant’s counter-claim did not revive the jurisdictional issue. Accordingly, there is no merit in the appeal and it is dismissed with no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Surinder Singh Nijjar
  • Ranjana Prakash Desai
Judgment Date
2014-02-18
Court Decision / Holding
Appeal dismissed. No costs.
Final Disposition
Appeal dismissed; no costs.

Parties to the Case

Appellants / Petitioners

  • Union of India

Respondents

  • PAM Development Pvt. Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • P.P. Malhotra, ASG
  • • Syed Tanweer Ahmad
  • • Sonia Malhotra
  • • Shreekant N. Terdal
  • • Yasir Rauf

Counsels for Respondents

  • • Pranab Kumar Mullick
  • • Soma Mullick

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 – Section 11(6)Arbitration and Conciliation Act, 1996 – Section 16Arbitration and Conciliation Act, 1996 – Section 4Arbitration and Conciliation Act, 1996 – Section 34Arbitration Act, 1940 (repealed)

Legal Doctrines & Maxims

  • kompetenz-kompetenz
  • Waiver by conduct under Section 4 of the Arbitration Act, 1996

Submissions & Arguments

Contentions of Appellants / Petitioners

Union of India contends that the High Court erred by appointing a former High Court judge as sole arbitrator, arguing the arbitration clause contemplated a multi-member tribunal and the appointment violated contractual conditions. It further submits that the Arbitral Tribunal lacked jurisdiction to adjudicate certain claims/excluded matters, and that the 1940 Act’s two-arbitrator/umpire scheme became redundant after the 1996 Act’s enactment. The appellant asserts that lack of objection should have been raised promptly under Section 16, and that participation and a counter-claim signified waiver under Section 4. It emphasizes that the jurisdictional challenge was not properly taken and that the award should be set aside only if jurisdiction is lacking. The core position is to read the arbitration clause in light of the 1996 Act and challenge any jurisdictional defect accordingly.

Contentions of Respondents

Pam Development Pvt. Ltd. argues that Union of India, having participated in the arbitration and filed a defence with a counter-claim, cannot now raise jurisdictional objections. It relies on Section 16 to empower the Arbitral Tribunal to rule on its own jurisdiction and invokes kompetenz-kompetenz. It contends that objections should have been raised at the defence stage; waiver under Section 4 applies since no timely objection was made. It asserts that all claims were decided on merits and that the appellant’s lack of timely objection should bar any challenge. The respondent maintains that the proceedings were properly conducted, the tribunal possessed jurisdiction, and the High Court correctly concluded that objections were not timely raised and are thus waived.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Bharat Sanchar Nigam Limited and another v. Motorola India Private Limited2009 (2) SCC 337PositiveCourt relied on this decision to reinforce kompetenz-kompetenz and the waiver principle under Section 4 of the Arbitration Act, 1996, upholding that failure to raise timely objections to arbitration results in waiver.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,594 words•~12 min read

In The Court Record

Union of India v. PAM Development Pvt. Ltd.

[2014] 1 S.C.R. 1069 ## UNION OF INDIA _v._ MIS PAM DEVELOPMENT PVT. LTD. (Civil Appeal No. 5618 of 2006) ## FEBRUARY 18, 2014. ## **[SURINDER SINGH NIJJAR AND RANJANA PRAKASH DESAI, JJ.]** _Arbitration and Conciliation Act, 1996: s. 11 (6)_ - - _Jurisdiction of arbitrator to entertain the dispute Agreement_ C - - _for construction of Loco shed Termination of contract Arbitration application uls. 11 (6) by respondent_ - _Appointment_ - - _of former judge as arbitrator Full participation of appellant_ - _Award by arbitrator s.34 application by appellant for setting aside of award_ - _Dismissed by High Court_ - _On appeal, held:_ D _Although in the instant case, arbitration agreement provided for appointment of two arbitrators and an Umpire, however, in view of repeal of Arbitration Act, 1940 by Arbitration Act, 1996, the provision in the arbitration agreement for appointment of two arbitrators and an Umpire had become redundant_ - E _Appointment of former judge as arbitrator was not challenged by the appellant and, therefore, the same became final and_ - _binding This apart, appellant failed to raise objection regarding lack of jurisdiction of the Arbitral Tribunal before the_ - _arbitrator Appellant not only filed the statement of defence but also raised_ a _counter claim against the respondent and,, therefore, objection is deemed to have been waived in view of the provisions contained in s.4 rlw s. 16 of the Arbitration_ - _Act, 1996 s.16 provides that the Arbitral Tribunal may rule on its own jurisdiction and clearly recognizes the principle of kompetenz-kompetenz_ - _s. 16(2) mandates that_ a _plea that the Arbitral Tribunal does not have jurisdiction shall be raised not later than the submission of the statement of defence_ - _s. 4_ D E F 1069 [2014] 1 S.C.R. ## 1070 SUPREME COURT REPORTS A _provides that a parly who knows that any requirement under the arbitration agreement has not been complied with and yet proceeds with the arbitration without stating his objection to such non-compliance without undue delay shall be deemed to have waived his right to so object_ - _High Courl rightly held_ B _that the appellant having failed to raise the plea of jurisdiction before the Arbitral Tribunal cannot be permitted to raise the_ - - _plea before it for the first time Doctrine/Principle Principle of kompetenz-kompetenz._ _Bharat Sanchar Nigam Limited and another versus_ C _Motorola India Private Limited_ **(2009) 2 SCC 337: 2008 (13) SCR 445 - relied on.** ## **Case Law Reference:** ## **D 2008 (13) SCR 445Relied on Para 18** CIVIL APPELLATE JURISDICTION : Civil Appeal No. 5618 of 2006. From the Judgment and Order dated 15.06.2005 of the E High Court of Calcutta in APOT No. 643 of 2003. P.P. Malhotra, ASG, Syed Tanweer Ahmad, Sonia Malhotra, Shreekant N. Terdal, Yasir Rauf for the Appellant. Pranab Kumar Mullick, Soma Mullick for the Respondent. F The following Order of the Court was delivered ## **ORDER** 1. This appeal has been filed by the Union of India G challenging the judgment and order of the Calcutta High Court dated 15th June, 2005 rendered in APOT N0.643 of 2003. 2. We may notice here the bare essential facts, which would have a bearing on the legal controversy involved in the H appeal. UNION OF INDIA _v._ PAM DEVELOPMENT PVT. LTD.1071 3. On 19th October, 1992, the appellant entered into an A agreement with the respondent for construction of Industrial Covered Electrical Loco Shed. Subsequently, according to the appellant, the agreement was terminated in terms of clause 64 of the General Conditions of Contract by which ~he agreement between the parties was governed. The twin reasons for B termination of the contract were that the respondent initially delayed the commencement of the work and subsequently executed the work which was of inferior quality. Therefore, the appellant had to get the balance work completed from another contractor. c c 4. On 24th July, 1996, the respondent raised certain claims against the appellant. · 5. On 30th September, 1996, the respondent demanded that the disputes be referred to arbitration. D 6. Since the disputes were not referred to arbitration, the respondent approached the High Court of Calcutta under Section 11 (6) of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as "the Arbitration Act, 1996") for the appointment of a sole arbitrator. The High Court by its order dated 10th July, 1998 appointed Mr. Justice Satyabrat Mitra as the sole arbitrator. The learned arbitrator duly commenced the arbitration proceedings, in which the appellant fully participated. The appellant filed statement of defence. Upon completion of the arbitration proceedings, the learned arbitrator made the award on 25th January, 2002. The claims of the respondent were accepted and the award was rendered in favour of the contractor in the sum of Rs.1,29,89, 768/-. E F 7. Aggrieved by the aforesaid award, the appellant filed an application under Section 34 of the Arbitration Act, 1996 before the High Court for setting aside the award. The lear.ned single judge of the High court dismissed the aforesaid application of the appellant on 2~th October, 2003. G H 1072 SUPREME COURT REPORTS [2014] 1 S.C.R. A 8. Aggrieved by the aforesaid order, the appellant filed Intra-Court appeal before the Division Bench of the High court, which has also been dismissed by the impugned judgment dated 15th June, 2005. 8 9. The present appeal arises out of Special Leave Petition (Civil) No.20316 of 2005. 10. We have heard the learned counsel for the parties at length. c c 11. Mr. P.P. Malhotra, learned Additional Solicitor General, appearing for the Union of India, submitted that the High Court committed an error of jurisdiction by appointing a former judge of the High court as the sole arbitrator. The appointment of the sole arbitrator was against the contractual conditions which 0[cannot be ignored. Therefore, the reference was before a ] Arbitral Tribunal which had not been properly constituted. He also submitted that the arbitrator had no jurisdiction to entertain the claims with regard to certain excepted matters. 12. On the other hand, the learned counsel for the E respondent has submitted that the appellant having participated in the proceedings before the learned arbitrator without any demur or objection cannot now be permitted to raise the objection with regard to the jurisdiction of the arbitrator at this belated stage. Learned counsel further submitted that in view - F of express provision contained in Section 16 of the Arbitration Act, 1996, the Arbitral Tribunal is competent to rule on its own jurisdiction. He submits that pleas with regard to lack of jurisdiction of the learned arbitrator ought to have been raised not later than the submission of the statement of defence. - G Learned counsel pointed out that no plea of lack of jurisdiction of the learned arbitrator was taken by the appellant in the statement of defence. Furthermore, the appellant also led evidence in defence. He also pointed out that the appellant, in fact, categorically accepted the jurisdiction of the learned - H arbitrator by filing a counter claim in the proceedings. He ## UNION OF INDIA _v._ PAM DEVELOPMENT PVT. LTD. 1073 submits that, in such circumstances, the appellant had clearly A waived its right to object to the constitution of the Arbitral Tribunal. Similarly, the plea of excepted matters was also never raised by the appellant during the entire arbitration proceedings. All claims have been decided on merits. B > 13. We have considered the submissions made by the learned counsel for the parties. 14. The arbitration agreement contained in clause 64 of the General Conditions of Contract is as under: c "64(3)(a) ARBITRATION: Matters in question, dispute or difference to be arbitrated upon shall be referred for decision to 3(a)(i) A Sole Arbitrator who shall be the General Manager or a Gazetted Railway Officer nominated by him in that behalf in cases where the claim in question is below Rs.5,00,000/- (Rupees five lakhs) and in cases where the issues involved are not of complicated nature. The General Manager shall be the sole Judge to decide whether or not the issues involved are of a complicated nature. 0 E 3(a)(ii) Two Arbitrators who shall be Gazetted Railway Officers of equal status to be appointed in the manner laid in Clause 64(3)(b) or all claims of Rs.5,00,000/- (Rupees five Lakhs) and above, and for all claims irrespective of the amount of value of such claims if the issues involved are of a complicated nature the General Manager shall be the sole Judge to decide whether the issues involved are of a complicated nature or not. In the event of the two Arbitrators being divided in their opinions the matter under disputes will be referred to an Umpire to be appointed in the manner laid down in Clause 3(b) for his decision. F G 3(a)(iii) It is a term of this contract that no person other than a Gazetted Railway Officer, should act as an Arbitrator/ H [2014] 1 S.C.R. ## 1074 SUPREME COURT REPORTS - A Umpire and if for any reason, that is no possible, the matter is not to be referred to Arbitration at all. 3(a)(iv) In cases where the claim is up to Rs.5,00,000/- (Rupees five lakh), the Arbitrator(s) compare so appointed, as the case may be, shall give the award on all matters referred to arbitration - B indicating therein break-up of the sums awarded separately on each individual item of disputes. In cases where the claim is more than Rs.5,00,000/- (Rupees five lakh), the Arbitrator(s)/Umpire so appointed, as the case may be, shall give intelligible award (i.e. the reasoning - c leading to the award should be stated) with the sums awarded separately on each individual item of dispute referred to arbitration. - 3(b) For the purpose of appointing two arbitrators as referred to in sub-clause (a)(ii) above, the Railway will send - D a panel of more than three names of Gazetted Railway Officers of one of more departments of the Railway to the contractor who will be asked to suggest to the General Manager one name out the list for appointment as the contractor's nominee. The General Manager, while so - E appointment the contractor's nominee, will also appoint a second arbitrator as the Railway's nominee either from the panel or from outside the panel, ensuring that one the two arbitrators so nominated is invariably from the Accounts Department. Before entering upon the reference the two - F arbitrators shall nominate an Umpire who shall be a Gazetted Railway Officer to whom the case will be referred to in the event of any difference between the two arbitrators Officers of the Junior Administrative grade of the Accounts Department of the Railways shall be considered as of - G equal status to the Officers in the intermediate administrative grade of other departments of the Railway for the purpose of appointment as arbitrators." - H 15. A persual of clause 64 would show that in case of claims which are below Rs.5,00,000/- (Rupees five lakh), the UNION OF INDIA _v._ PAM DEVELOPMENT PVT. LT0.1075 General Manager or a Gazetted Railway Officer nominated by him shall be the sole arbitrator. In case of claims of Rs.5,00,000/ - (Rupees five lakh) and above, the Arbitral Tribunal shall consist of three arbitrators to be appointed in terms of clause 64(3)(b). Under clause 64(3)(b), the Railways will send a panel of more than three names of Gazetted Railway Officers from whom the contractor will be asked to suggest one name. The General Manager will appoint the second arbitrator on behalf of the Railways. The clause also provided that two arbitrators shall nominate an Umpire who shall be a Gazetted Railway Officer. 16. Since the Arbitration Act, 1940 had been repealed by the Arbitration Act, 1996 the provision in the arbitration agreement for appointment of two arbitrators and an Umpire had become redundant. Accordingly, the respondent requested the Railways to appoint the sole arbitrator. Since the Railways failed to appoint the arbitrator within 30 days of the receipt of the letter dated 30th September, 1996, the respondent moved the application under Section 11 (6) of the Arbitration Act, 1996 for appointment of a sole arbitrator on 3rd January, 1997 before the High Court As noticed above, by order dated 10th July, 1998, the High Court appointed Mr. Justice Satyabrata Mitra as the sole arbitrator. It is important to notice that this order dated 10th July, 1998 was not challenged by the appellant and, therefore, the same became final and binding. This apart, the appellant failed to raise any objection to the lack of jurisdiction of the Arbitral Tribunal before the learned arbitrator. As noticed above, the appellant not only filed the statement of defence but also rasied a counter claim against the respondent. Since the appellant has not raised the objection with regard to competence/jurisdiction of the Arbitral Tribunal before the learned arbitrator, the same is deemed to have been waived in view of the provisions contained in Section 4 read with Section 16 of the Arbitration Act, 1996. A 8 C D E F G 17. Section 16 of the Arbitration Act, 1996 provides that the Arbitral Tribunal may rule on its own jurisdiction. Section 16 H ## 1076 SUPREME COURT REPORTS [2014) 1 S.C.R. - A clearly recognizes the principle of kompetenz-kompetenz. Section 16(2) mandates that a plea that the Arbitral Tribunal does not have jurisdiction shall be raised not later than the submission of the statement of defence. Section 4 provides that a party who knows that any requirement under the arbitration agreement has not been complied with and yet proceeds with - 8 the arbitration without stating his objection to such noncompliance without undue delay shall be deemed to have waived his right to so object. 18. In our opinion, the High Court has correctly come to C the conclusion that the appellant having failed to raise the plea of jurisdiction before the Arbitral Tribunal cannot be permitted to raise for the first time in the Court. Earlier also, this Court had occasion to consider a similar objection in _Bharat Sanchar Nigam Limited and another versus Motorola India Private_ D _Limited_ ((2009) 2 SCC 337]. Upon consideration of the provisions contained in Section 4 of the Arbitration Act, 1996, it has been held as follows: 39. Pursuant to section 4 of the Arbitration and Conciliation Act, 1996, a party which knows that a requirement under E the arbitration agreement has not been complied with and still proceeds with the arbitration without raising an objection, as soon as possible, waives their right to object. The High Court had appointed an arbitrator in response to the petition filed by the appellants (sic respondent). At F this point, the matter was closed unless further objections were to be raised. If further objections were to be made after this order, they should have been made prior to the first arbitration hearing. But the appellants had not raised any such objections. The appellants therefore had clearly G failed to meet the stated requirement to object to arbitration without delay. As such their right to object is deemed to be waived. 19. In our opinion, the obligations are fully applicable to the - H UNION OF INDIA _v._ PAM DEVELOPMENT PVT. LTD. 1077 facts of this case. The appellant is deemed to have waived the A right to object with regard to the lack of the jurisdiction of the Arbitral Tribunal. 20. We, therefore, see no merit in the appeal and the same is hereby dismissed. B No costs. D.G. Appeal.dismissed.
End of Judgment Record
Browse All Supreme Court of India (2014) Decisions
2014-07-01

Duryodhan Rout v. State of Orissa

These appeals challenge a common judgment convicting Duryodhan Rout of rape and murder of a 10-year-old girl, Subhasini Bhoi. The trial court convicted him under IPC sections 376(f), 302, and 201 and sentenced him to death; on reference, the High Court remitted the death sentence for the 302 offence to life imprisonment while keeping the other sentences unchanged. The prosecution's case rested solely on circumstantial evidence. PW-1 and PW-2 saw the accused with the victim on a bicycle around 4 p.m. and returning alone about an hour later; PW-5 (father) and PW-6 (mother) testified that the child was taken on the pretext of talking on the phone. In custody, the accused confessed before PW-3 and PW-4, and under Section 27 of the Evidence Act the recovery of the body and the underwear was recorded; the autopsy by PW-9 indicated throttling and injuries consistent with rape. The chain of circumstances — last-seen with the victim, recovery of the corpse in the jungle, and the forensic findings — formed a robust basis for conviction. The central legal issue was whether sentences for multiple offences should run consecutively. The Court held that life imprisonment is the remainder of a convict's natural life, and the proviso to Section 31(2) Cr.P.C. prevents aggregation beyond fourteen years, thus consecutive sentences cannot be imposed where life imprisonment is one of the terms. Consequently, all IPC sentences should run concurrently; the death sentence for the 302 offence was replaced by life imprisonment, and the appeal was allowed in part.

2014-12-16

Nand Kishore v. State of Madhya Pradesh

This is a criminal original jurisdiction writ petition under Article 32 challenging the continued incarceration of a convict under Section 302 IPC, with the petitioner contending entitlement to the Juvenile Justice (Care and Protection of Children) Act, 2000 (JJC Act) protections on the ground that he was a juvenile at the time of the offence (born 14 April 1980; incident on 18 June 1997). The Court scrutinized documentary and oral evidence from the Juvenile Justice Board indicating the petitioner’s true date of birth and concluded that on the date of occurrence he was 17 years 2 months 4 days old, thereby satisfying the juvenile criteria. The judgment clarifies a central legal question: whether the protections and benefits under the JJC Act, enacted in 2000, can be extended to those convicted before its coming into force if they were juveniles at the time of the offence. Relying on earlier decisions such as Hariram v. State of Rajasthan and Ajay Kumar v. State of Madhya Pradesh (and others), the Court held that a person who had not completed 18 years on the date of offence is entitled to the Act’s benefits as if the provisions had always existed, effectively retroactively applying the protective regime. The petition was allowed; the petitioner is to be released forthwith, with bail bonds and sureties discharged, reflecting the Court’s protective stance for juveniles in criminal proceedings.

2014-04-24

Vishal Goyal & Ors. v. State of Karnataka & Ors.

This batch of writ petitions under Article 32 concerns admissions to Post Graduate Medical and Dental courses in government medical/dental colleges and the state quota in private colleges in Karnataka for the 2014-2015 academic year. The petitioners, who completed MBBS/BDS in Karnataka, challenged sub-clause (a) of clause 2.1 of two National Board of Examinations Information Bulletins (PGET-2014) which defined “Karnataka Origin” to permit admission only to those who satisfy certain criteria, effectively excluding many who studied in Karnataka institutions. They argued this violates Article 14 (equality before law and equal protection of laws) and undermines merit-based selection for postgraduate courses. They invoked Dr. Pradeep Jain & Others v. Union of India (1984) to contend that institutional preference may be permissible but must conform to equality; Magan Mehrotra v. Union of India (2003), Saurabh Chaudhri v. Union of India (2003), and Nikhil Himthani v. State of Uttarakhand (2013) were cited to support the continuing emphasis on merit and equality. The State countered that Article 371J allows reservation for the Hyderabad-Karnataka region and argued that the Pradeep Jain framework applies only to government or state-instrumentality institutions and not to private colleges. The Court held sub-clause (a) ultra vires Article 14, directed fresh Information Bulletins, and ordered admissions in accordance with the law on the basis of existing entrance test results, with the general counselling schedule from Dr. Fraz Naseem & Ors. not applying for 2014-2015 Karnataka admissions.

2014-08-21

SINGH RAM (D) THR. L.Rs. v. SHEO RAM & ORS.

This is a Supreme Court of India decision on the limit of time within which a usufructuary mortgagee can seek relief, and the corresponding equity of redemption for the mortgagor. The appellants challenged the Punjab and Haryana High Court Full Bench’s view that there is no fixed time for redemption in a usufructuary mortgage and that the right to seek redemption arises on payment/deposit of mortgage money, irrespective of the mortgage date. The HP High Court’s decision was later reversed by a larger bench of this Court in the context of reconciling conflicting precedents such as Sampuran Singh, Prabhakaran and Jayasingh Dhyanu Mhoprekar, Parichhan Mistry and Harbans etc., emphasizing that Section 62 of the Transfer of Property Act confers a special right on the usufructuary mortgagor to recover possession, which begins only when the mortgage money is paid out of rents and profits or when paid/deposited by the mortgagor. Article 61 of the Limitation Act governs the period for redeeming or recovering possession (30 years from accrual of the right, unless restricted). The Court reaffirms the principle ‘once a mortgage, always redeemable’ and rejects a blanket 30-year extinguishment rule for usufructuary mortgages, upholding the Full Bench view of the Punjab and Haryana High Court and dismissing the appeals. The decision emphasizes equity, statutory recognition under Section 62, and the distinctive treatment of usufructuary mortgages.