Supreme Court of IndiaSupreme Court · 1968Single JudgeAppeal dismissed with costs

Union of India v. Mis. Khas Karanapura Colliery Ltd.

Case / Petition Number:
Civil Appeal No. 332 of 1965
Neutral Citation:1968 SCR 786

Case Synopsis & Summary

The Union of India challenged an October 1963 notification issued under section 4(1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957, which proposed to prospect for coal in about 1,200 bighas of leasehold land belonging to Khas Karanpura Colliery Ltd., including user premises such as a railway siding, boiler house, staff quarters and labourers’ housing. The respondent colliery argued that the notification violated the second limb of section 4(4) by including land where coal mining operations and processes ancillary to the getting, dressing or preparation for sale of coal were actually carried on, and thus was invalid. The High Court had quashed the notification on this basis. The central question before the Supreme Court was whether the entire leasehold area could be treated as land where mining operations are actually carried on or whether the lands must be treated as more limited, thereby preventing/limiting notification. The Court held that in the notified land, processes ancillary to obtaining, dressing or preparing coal for sale were being carried on, so the second limb of section 4(4) applied and the notification was invalid. The delay in filing the writ petition was not a bar to relief. In the light of the Act’s purpose and provisions, the appeal was dismissed with costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • R. S. Bachawat
  • K. S. Hegde
Judgment Date
1968-04-15
Court Decision / Holding
Appeal dismissed with costs.
Final Disposition
Appeal dismissed with costs

Parties to the Case

Appellants / Petitioners

  • Union of India

Respondents

  • M/s. Khas Karanpura Colliery Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Syed Mohammed
  • • S. P. Nayar

Counsels for Respondents

  • • A. K. Sen
  • • S. C. Banerjee
  • • A. K. Nag

Provisions of Law Cited

Constitution of India, Article 226Coal Bearing Areas (Acquisition and Development) Act, 1957 - s. 4(1)Coal Bearing Areas (Acquisition and Development) Act, 1957 - s. 4(4) (two limbs)Coal Bearing Areas (Acquisition and Development) Act, 1957 - s. 5Coal Bearing Areas (Acquisition and Development) Act, 1957 - s. 7

Submissions & Arguments

Contentions of Appellants / Petitioners

The Union of India argued that while the Government may notify lands under s.4(1) of the Act, the second limb of s.4(4) requires excluding from that portion of land where coal mining operations are actually carried on or where processes ancillary to the sale of coal are conducted. It contended that the notification dated October 9, 1963 included land (e.g., railway siding, boiler house, labour quarters, offices) where such operations were already or being carried on, and therefore violated the protection afforded by the second limb of s.4(4). The appellants further argued that the High Court’s broad reading of “the land in which mining operations are actually carried on” to cover the entire leasehold area was improper and that the writ petition was not prematurely filed, as the notification suspended activities pending action under s.7. It urged a reading of the Act consistent with its preamble and purpose, and sought relief by quashing the notification.

Contentions of Respondents

The respondents (Khas Karanpura Colliery Ltd.) contended that the notification under s.4(1) aims to prospect for coal in land adjacent to mining operations and that the land to be notified may encompass areas where mining operations and ancillary processes for sale of coal are actually conducted. They argued that the entire leasehold area could be treated as land where mining operations are being carried on, in a practical and economic sense, thereby justifying the notification; they asserted there was no error in avoiding separate pleadings under the second part of s.4(4). They defended the validity of the notification and maintained that the writ petition was timely since the effect of the notification immediately impacted the lessee’s operations. They also cautioned against drawing too narrow a construction that would impede the Government’s mineral-development policy.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Messrs. Burrakur Coal Co. Ltd. v. Union of India[1962] S.C.R. 44Mentioned OnlyCited by the Court but stated to not bear on the issues for decision in this appeal.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,482 words•~12 min read

In The Court Record

Union of India v. Mis. Khas Karanapura Colliery Ltd.

·354 UNION OF INDIA _v._ ###### ·MIS. KHAS KARANAPURA COLLIERY LTD. _April_ 15, 1968 ;.,,_ [R. S. BACHAWAT AND K. S." HEGDll, JJ.] .A B - _'.:_ _9"<_ . _CiiJlstitu:ion_ _of_ _India,_ 1950, _Art. 226--Jurisdiction_ _of_ _court to deal_ _.. With_ _-qU~siign _not_ _specifically raised in writ_ _petition-Land_ _of_ _lesttl_ _for_ _wjnnfog-coo1 notified under_ _s._ 4(1) _of_ _Coal Bearing Areas (Acquisition_ _.ami_ _Development)_ _Act_ (20 _of_ _1957)-lf_ _lessee_ _aggriev.d-Wri•_ _petition_ _filed;ifllltput_ _5 months after issue_ _of_ _notifiCation-lf amounts to_ _/aches._ Tiit'¥espondent was a lessee of 1401 bighas of land and was carrying C -oil ·mining operations on the land for winning coal. On 9th October 1963, the appellant-Government issued a notification under s. 4( 1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957, giving notice of the Government's intention to prospect for coal in f200 bighas .<Jf the leasehold land. These 1200 bighas covered land, on which, house and air shaft premises were situate. amongst other buildings, a railway siding, boiler On roo~s, 23rd March 1964, the office rooois 1 fan D respondent filed a writ petition in the High Court challenging the notification as contravening s. 4( 4) of the Act. and the High Court quashed the notification. In appeal to this Court, HELD : (1) In the premises notified, processes ancillary to the getting, dressing or preparation for sale of coal obtained as a result _di_ the mining operations were being carried on, and therefore the impugned E notification violated the second limb of s. 4( 4) and was invalid. ·[787 D-EJ . (2) Though no specific case under the second part of. s. 4(4) was pleaded in the writ petition, all the facts neces5ary for determining the question were before the Court and the matter was fully argued in the High Court without any objection. Therefore, it could. not he urgood that it was open to this Court to consider that aspect of the case. F [787 F: 788 Al (3) Under s. _5_ of the Act the effect of the notification was to require the respondent to bring to a halt all his operations in the notified area till action was taken under s. 7 or till the period prescribed in that section came to an end. Therefore, the respondent was aggrieved by the ·impugned notification. !787 BJ ( 4) The delay in filing the writ petition was not sufficient to refuse G relief to the respondent [786 Gl ( 5) J.lf the notification was invalid, it is not for this Court to decide whether any other area of the leasehold could have been notified. [788 Bl CIVIL APPELLATE JURISDICTION : Civil Appeal No. 332 of 1965. Appeal from the judgment and decree, dated October 30, 1964 H <Jf the Patna High Court in Misc. Judi. Case No. 643 of 1!164. _Syed Mohammed_ and S. _P._ _Nayar,_ for the appellant. UNION _v._ K: K. COLLIEllY _(Htgde,_ _!,)_ 785 A _A. K. Sen,_ _S._ _C._ _Banerjee_ and _A. K. Nag,_ for the respondent. The Judgment of the Court was delivered by Hegde, J.-In this appeal by certificate the question for decision is whether the Higl]. Court of Patna was-correct in its conclusion that the notification No. S. 0. 29_91 issued by the Union B Government on October 9, 1963 under s. 4(1)* of the Coal Bearing Areas (Acquisition and Development) Act, 1957, (No. 20 of 1957 )-hereinafter called "the Act" is violative of sub-s. (4) of that section. #### ... B E F G **H** The facts of the case fall within a narrow compass. The respondent, Khas Karanpura Colliery Limited, tooT on lease 1401 bighas of land in mouza sale in the district of Hazaribagh as per a registered lease deed of July 8, 1949, for the purpose of winning coal. Thereafter it commenced working the colliery in 1952. Certain seams were opened up. Electric transmission lines were put up, staff quarters, office quarters, houses for labourers, hospital, school etc. were built. _ For the purpose of despatching the ~oal. a separate railway track was constructed and a railway siding 6uilt. These works were completed long before the impugned notification was issued. Under the notification in question 1 ZOO bighas of land were notified with a view to acquisition, which included areas on which the railway siding, staff quarters, boiler house, houses for labourers etc. were constructed. The respondent challenged the validity of the said notification in MJC No. 643 of 1964---'an application unaer _Art. 226 of the Constitution-before the High Court. The main contention taken in the writ petition was that the notification in question contravenes sub-s. ( 4) of s. 4. The High Court accepted that contention and quashed the notification. . The. ~aterial facts are more or less admitted. Along with its wnt petit10n the respondent produced a plan· of the colliery showing therein the railway tr11_ck, the railway siding, labour quarters, office premises and various other buildini:s 'put up on the laad. I~- had ·also sh~wn therein the actual places where mining operations were earned on. The correctness of t!lls plan has not been "4 (!) Wbe_, it appean to the Central Government that coal is likely to he # ~10C4 !' from}aJ'!d in c_my locality, it may, by notification in the Official Gazette, **g1vc notice** **of rts** **1ntcnt1on** **to** **prospect for** **coal** **therein.**,~ (2) ., ............... _ ..... . (3) ...................... .. **(4)** **In** **issuing** **·a** **notificat!on** **under** **this** **section,** **the** **Central** **Government** **shall** **exclude** ~from **that** **portion** **of any** **land** **in** **which** **coal** **mining** **operations** **are** ~ctually **being carried** **on in conformity with the** **provisions of any** **enactment** **rule or** o~. **for tbc. time being in force or any premises on which any process** a~iuarY **to the** ##### ~ d~q <!r prepara!ion for sale of coal obtained as a result of such opera. **tions is bc1nacarricd on are situate."** 786 **SUPUMB** **eotJJ.T** **UPaa'll** **[1968]** 3 s.c.R. ###### disputed. From that plan it is seen tllat in a considerable po_rtion of the land notified under s. 4 ( I) there are prmiiises on wliich processes ancillary to the. getting, diessing or preparation for sale of coal obtained as a result of the mining operation arc· **beiDg** carried on. - There is. also no doubr that if the respondent is deprived of the benefit of those ~ses it would be. difficult, if not impossible for it, to continue to work the colliery. The High Court has come to the conclusion tllat in determining the area in which coal mining operations is being actually carried on, one is not to take into consideration merely those spots where actual digging is going on, but also areas which are sufficient to constitute a commercial or economic urut, and if so viewed, the entire leasehold may be justifiably considered as areas on whidl coal mining operations are actually bci.Jlg carried on. Alternatively, it held that the entire notified area had to be excluded bccalllC in parts of that area mining operations arc actually being carried on ##### and in the remainin~ parts there are j>remises on whfoh procesaes ancillary to the getting, dressing or preparation fot''sale of coal obtained as a result of the mining operations are being carried. In ###### other words the entire area is' exempt from being notified wider s. 4(1) either because it is protected by the first part of s. 4(4) or by its second part. These conclusions were ch8llenged before us.. It was urged on fiehalf of the appellant that the words "any land in which coal mining ·operations are actually carried on" found in the first part of s. 4 ( 4) do not permit of a liberal interpretation so as to bring in the conception of a commercial or economic unit; they merely mean the actual area where mining is talcing place. As regards tlfo alternative conclusion based on the second part of s. 4 ( 4) it wasi urged that on the pleadings. t)l6re was no occasion for the High Court to consider whether the requirements of that part are satisfied. Jn additioo, two other contentions were advanced on behalf of the appellant. They are ' ( i) no relief under Art. 226 should have been given as - the r~ndent was guilty of !aches, and (ii) the writ petition was premature. We are in agreeriient with the High Court that there is no substance in the last twO contentions advanced on behalf of the appellant. As seen earlier, the impugned notification was issued on October 9, 1963 ·and the writ petition was filed on March 23, 1964, well within Six months of the date of the notification. This delay is not sufficient to refuse the relief prayed for. In support of the contention that the petition was premature, Dr. Syed Mohemmad, learned counsel for the appellant, uraed that the respondent has no real grievance yet, as only a notification under s. 4(1) had been issued; further proceedings are yet to take place, and the respondent can be aggrieved only when a notifica **A** **B** ### c **D** E F G H .. UNION _v._ K. K. COLLIERY _(Hegde,_ _l.)_ 787 ##### . tion under section 7t is issued. We think'that ihis contention is misconceived. As soon as the notification under s. 4 ( 1) was issued, in view of s. S:j: the mining lease granted in favour of the respondent ceased to have effect for so long as that notification was in force._ Too effect of thaCiiotificatiOn was to require the respondent to bring to a halt all his operations in the area not!fied till action was taken under s. 7 or till the-period prescribed in that section came to an end. Hence it cannot denied that the respondent was seriously aggrieved by the fmpiigneu notification. · ##### .__ ## _.}_ ###### • A B ___ This takes us to the remaining two conteiiuons noticed earlier. ---It was strenuollsly argued by Dr. Syed Mohammed _-that s. 4(1) empowers the Government to notify al! lands excepting those in #### c which coal mining operations are actually being carried_ on; the notification in question has excluded 201 bighas in which mining was actually carried on; hence there is nothing illegal in that noti fication. He wanted us to construe the words "any land in which coal mining operations are being actulilly carried" strictly. The High Court has rejected this contention after taking into considera**D** tion the purposes of the Act, its preamble and the various provisions therein. But we have not thought it necessary to go into that controversy :is in our opinion the impugned notification definitely _ violates the second limb of s. 4 ( 4) and hence it is invalid. It covers land on. which amongst other ·buildings, railway siding, boiler-rooms, office room, fan house· and air shaft premises are situate. It cannot be denied that in these premises processes ancilE lary to the getting, dressing or preparation for sale of coal obtained as a result of the mining operations are being carried on. This ###### conclusion of ours is resisted· on the _plea that in the writ petition no .specific case is pleaded under the second part of sub-s. ( 4) of s. 4 and therefore it is not open for us to consider that aspect ·of F G **H** ###### the case. We are unable to accept this contention. It is true that **(t)** **..** **7. (1)** **If the Central** **Govemmfnt is** **satisfied that coal** **is obtainable in the** **whole** **or** **any** **part** **of** **the** **land** **notified** **under sub-section (1)** **of** **section** **4,** **it may, within a period of two years from the date of the said notification** **or within such further period not exceeding one year in the aggreate as the Central_** **Government may specify** **in this behalf,** **by** **notification in the Official Gazette,** **give notice of its intention to acquire the** **v,.·hole** **or any part** **of** th~ **1and** **or** **of any** : **rights** ~nor **over such land, as the case may be.** . **(2) If no notice to acquire the land or any rights in or over such land is given under** **sub-section (1) \\i.thin the period allowed thereunder, the notification issued under** **sul:rsection (1)** **of section 4 shall cease to have effect on the expiration of three years** **from the date thereof."** **Ct)** _**"'5.**_ **On the issue of a notific.ition under sub--section (1) of section 4 in respect** **of any land-** **(a) any prospecting licence which authorises any person** **to prospect for coal** **or** **any other mineral in the land shall cease**, **to have effect; and** **(b) any mining lease in so far as it authorises the lessee or any person claiming** **through him to undertake any operation in the land, cease to have effect for so long** **as the notification under that sub-section is in force."** 788 SuPIUIMB COU&T IU!PO&TS [1968] 3 S.C.R. the pleadings on this J,X>int are rath"'r vague; but all the- facts necessary for determimng that question are before the court. That aspect of the case appear& to have been fully argued · before the High Court without any objection. The High Court has considered and decided that question. Hence the appellant cannot now be ##### pennitted to contend that for want of n~essary pleadings . that q_uestion cannot be gone into. If areas in which those premises are situate could not have been notified under s. 4 ( 1 )-as in our judg· ment they could not have been-it is not for us to decide whether any of the other areas included in the lease-hold could have been notified; we cannot make out a new notification for the appellant. One other contention was vaguely touched at the hearing of the appeal, and that was that though there are ten seams m the ###### colliery only four seams are at present worked after obtaining the necessary permission, the remaining sii seams are not yet opened up for the working; hence those seams cannot be said to-have been wiirked on the date of the notification. Mr. A. K. Sen, learned counsel for the _respondent, urged that ~I! the ten seams were being W<>rkoo. in contormity with the provisions . of law: According to him, once permission is obtained for grading the coal in a seam and he says that su~h permission had been obtained in respect -Of ail the seams, in law it means that those seams are being actually worked. . We need not go inio this question in view of our earlier oonclusion~ At the hearing reference was made to the decision of this Court in _Messrs._ _B11rrakur Coal Co. Ltd._ v. _Union of lndia(_ _[1]_ _)._ The·rule laid down in that case does not bear on any of the issues arising for. decision in this appeal. For the reasons mentioned· alY>ve, this appeal fails and is dismissed . with costs. V.P.S. _Appeal_ _dismissed._ (1) (196211 s.c.R. 44. A B #### c D E ### ...
End of Judgment Record
Browse All Supreme Court of India (1968) Decisions
1968-07-30

Standard Motor Union Pvt. Ltd. v. State of Kerala & Ors.

Standard Motor Union Pvt. Ltd. v. State of Kerala & Ors. concerns a nationalisation scheme under Chapter IV A of the Motor Vehicles Act, 1939, for nine routes in Ernakulam and Kottayam. The Kerala State Transport Undertaking prepared draft Form II scheme for partial exclusion of existing private operators. After hearings, the State Government approved the scheme on October 17, 1966 and published it on October 24, 1966. The appellant contends that the impugned scheme is a complete exclusion that should have been in Form I and that, since earlier schemes existed, the new scheme modified them without compliance with Section 68E. The Kerala High Court dismissed the writ petition; on appeal the Supreme Court evaluated whether the scheme constitutes a complete exclusion, whether Form II is permissible, and whether the earlier schemes were validly modified. The Court rejected the appellant’s claim of complete exclusion, noting that there are 33 overlapping routes and common road sectors; the scheme does not extinguish private services on the shared road segments. It held that Form II was appropriate as a partial exclusion, and that modification of earlier schemes occurred pro tanto under Section 68E, which does not require explicit cancellation. The decision clarifies the framework for nationalisation under Sections 68C-68F and the 1960 Rules, and disposes of the appeal with costs.

1968-02-23

West U.P. Electric Power and Supply Co. Ltd. v. State of U.P. & Ors.

This is a constitutional challenge by West U.P. Electric Power and Supply Co. Ltd., a licensee under the Indian Electricity Act, 1910, against a notification directing the Uttar Pradesh State Electricity Board (the Board) to supply electrical energy directly to a consumer (the 3rd respondent) at terms and rates more favorable to that consumer than to licensees. The background is that the Electricity Board was originally restricted from direct supply to consumers but was empowered, by the Uttar Pradesh Amendment Act of 1961, to provide direct supply in public interest or under a scheme. In 1966 the State Government issued a notification directing the Board to supply energy directly to the 3rd respondent, and to charge it lower rates than those charged to licensees, leading to grave concerns about discrimination against the petitioner and other licensees who had entered into licenses under the 1910 Act. The petitioner challenged the notification under Article 32 as violative of the amended section 3(2)(e) and the terms of its licences. The Supreme Court, sitting as a Full Bench, held that the notification could not be sustained as valid because it discriminated between the 3rd respondent and other consumers, and between the 3rd respondent and the petitioner. It also held that the Board could supply directly to consumers only if a public-interest determination and a scheme existed. While not deciding all possible grounds, the Court granted relief to the petitioner, holding the notification invalid and directing the government to pay the petitioner's costs. A separate opinion by Bhargava, J. is noted.

1968-10-15

MAHADEO v. SHANTIBHAI

The appellant Mahadeo challenged his February 1967 election to the Madhya Pradesh Legislative Assembly on the ground that he was disqualified for holding offices of profit under the Government. The election petition contended that he held (i) a seat on the panel of lawyers prepared by the Central and Western Railway Administration, (ii) the post of President-Member of a Tribunal under section 73 of the Madhya Pradesh Town Improvement Trust Act, 1960, and (iii) the office of Professor of Law at Madhav College, Ujjain on a regular salary of Rs. 250 per month. The trial court held that he did hold an office of profit through the Railway panel and the college post, while finding no proof he held the Tribunal post. On appeal, the Supreme Court examined the meaning of “office” and “office of profit.” It held that acceptance of the Railway engagement created a continuing duty to protect Railway interests, with duties to watch cases and to obtain adjournments, thus constituting an office of profit for the duration of the engagement. The court scrutinized the college appointment, noting its deputation and lack of a permanent lien, and expressed doubt about treating it as a government office. Regarding the Tribunal post, the court found insufficient evidence of active involvement or appointment. Ultimately, the appeal was dismissed with costs, upholding disqualification under the Representation of the People Act. The decision relied on established authorities on the meaning of office and office of profit.

1968-04-05

Dhulabhai v. State of Madhya Pradesh

Dhulabhai and others filed four suits in the Madhya Pradesh High Court challenging sales tax levied under the Madhya Bharat Sales Tax Act, 1950, arguing the tax violated Article 301 of the Constitution and was not saved by Article 304(a). The High Court had held the suits incompetent due to Section 17 of the Act, which bars challenges to assessments or orders except as provided in Sections 11 and 12, and because appellate remedies were pending. The Supreme Court, in a Constitution Bench, undertook a comprehensive synthesis of previous Privy Council and Indian decisions on civil court jurisdiction vis-a-vis taxation statutes. It examined seven categories for ouster of civil jurisdiction, including express exclusions, adequacy of statutory remedies, and the genuineness of the statute’s intendment. It held that civil courts retain jurisdiction unless there is express exclusion or clear necessary implication, and that a tax can be challenged in civil court if the statute neither provides an adequate remedy nor finalizes all proceedings in a way that deprives the normal civil remedies. Applying these tests to the Madhya Bharat Act, the Court held the suits maintainable, reversed the High Court, and decreed refunds where tax was illegally collected or constitutionally invalid. The decision affirmed that civil courts may adjudicate constitutional challenges to taxation where the statutory framework does not provide an adequate or exclusive remedy.