Union of India v. J. K. Gas Plant

Case / Petition Number:Civil Appeal No. 1273/70
Neutral Citation:1980 SCR 898

Case Details & Bench

Court
High Court
Hon'ble Judges
  • S. Murtaza Fazal Ali
  • A. D. Koshal
Judgment Date
1980-04-29
Court Decision / Holding
Appeal dismissed
Final Disposition
Dismissed with costs

Parties to the Case

Appellants / Petitioners

  • Union of India

Respondents

  • J.K. Gas Plant Manufacturing Co. Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • P. P. Rao
  • • Subodh Markandey(a)
  • • R. Venkataramani
  • • Miss A. A Subhashini

Counsels for Respondents

  • • S. Sorabjee
  • • Rameshwar Nath

Case Synopsis & Summary

The Union of India supplied steel to J.K. Gas Plant Manufacturing Co. Ltd. for Rampur-based gas plant production. A portion was used as intended; surplus material was directed by the Kanpur Controller to be delivered to the U.P. Registered Stock Holders Association and later to Govan Brothers Ltd. The price for the 135 tons delivered to Govan Brothers amounted to Rs. 43,728-6-6, which remained unpaid despite repeated demands. The plaintiff (J.K. Gas Plant) filed suit for Rs. 46,652-14-6 with interest, after serving a notice under Section 80 CPC. The trial court decreed the claim in full and awarded costs and interest; it held that the Kanpur Controller undertook the liability to pay the price even for the delivery to Govan Brothers, and that liability could not be escaped by invoking Section 65 of the Indian Contract Act or by non-compliance with Section 175(3) of the Government of India Act, 1935. The High Court agreed that Section 17(2) of the Defence of India Act would bar a suit for damages, but held the suit to be recovery of the price of goods (not damages), and consequently upheld the trial court’s decree, noting that the agreement arising from correspondence was valid despite non-fulfilment of Section 175(3). The Supreme Court, hearing an appeal under Article 133(1)(a), dismissed the appeal, affirming the decree for the price and the government’s liability under Section 70 of the Indian Contract Act, with costs.

Provisions of Law Cited

Contract Act, Section 10Contract Act, Section 65Contract Act, Section 70Government of India Act, 1935, Section 175(3)Defence of India Act, Section 17(2)Indian Iron and Steel Control Order, 1941, Clause 5Code of Civil Procedure, Section 80Constitution Article 133(1)(a)

Legal Doctrines & Maxims

  • Three conditions must be satisfied before Section 70 of the Indian Contract Act can be invoked.
  • A direct-benefit doctrine under Section 70: the beneficiary must derive direct benefit from the thing done or delivered (as opposed to an indirect benefit).

Submissions & Arguments

Contentions of Appellants / Petitioners

The Union of India contended that Defence of India Act, 1939, especially Section 17(2), bars suits for damages or compensation. It argued that the transaction arising from the Kanpur Controller’s directions and the approach under the Iron and Steel Control Order 1941 require a ‘written direction’ for disposal of surplus stock; however, the suit here is for payment for goods delivered to Govan Brothers on behalf of the Government. The contract’s formation depended on correspondence creating a binding obligation even if Section 175(3) was not complied with. Section 70 of the Indian Contract Act was cited to support recovery, and it was argued the plaintiff benefited the Government by transferring stock under government control. CPC Section 80 notice and Article 133(1)(a) feasibility were also argued.

Contentions of Respondents

The plaintiff argued the suit sought the price of goods supplied to Govan Brothers on behalf of the Government, not damages. The High Court’s reliance on Section 70 was appropriate, with the Government being liable for the price under the Controller’s scheme, despite non-compliance with Section 175(3). The argument about the mandatory nature of the ‘written’ directive under the Iron and Steel Control Order was not essential to the final outcome, as the Government received the benefit of the goods.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
State of West Bengal v. M. K. Mohta1962 I Supp. SCR 876PositiveUsed to formulate the three conditions required to invoke Section 70 of the Indian Contract Act.
S. I. Railway Co. v. Madura MunicipalityAIR 1964 Madras 427DistinguishedCited for the proposition that benefit must be direct; court distinguished it as the present case involved a full government benefit, not merely indirect.
Debi Prasad Srikrishna Prasad Ltd. v. Secretary of State(I)—Mentioned OnlyCited in discussion but not treated as controlling ground.
New Marine Coal Co. (Bengai) Private Ltd. v. Union of IndiaA.I.R. 1964 S.C. 152Mentioned OnlyCited in the context of Section 70; not the decisive ground.
Governor-General In Council, Represented by the General Manager, South Indian Railway v. Municipal Council, Madura—PositivePrivy Council upholding a related line of authority; supports government-benefit rationale.
A.I.R. 1941 All. 377—Mentioned OnlyFootnoted authority cited in discussion.
A.I.R. 1964 S.C. 152—Mentioned OnlyCited as authority related to the New Marine Coal case.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Union of India v. J. K. Gas Plant and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

893 UNION OF INDIA _v._ J. K. GAS PLANT _April_ 29, 1980 [S. MURTAZA FAZ.AL ALI AND A. D. KosHAL, JJ.J _Contract Act, Section_ _10,_ _Scope_ _of-Conditions_ _to be applied-Government_ _<Jf_ _lndia Act,_ 1935, _Section_ 175(3), _applicability_ _of-Defence_ _of_ _India Act,_ _Section_ 17(2), _scope of._ B ... .( The appellant had supplied some steel to the respondent plaintiff Company for manufacturing gas plants at Rampur. Only a part of the steel so supplied C was utilised for the intended purpose and with regard to the rest, the Regional Deputy Iron & Steel Controiler, U.P. _Circle,_ Kanpur directed the respondents through a letter dated 8th/10th of November, 1944 to deliver the same to the U.P. Registered Stock Holders Associations and to send to the Kanpur office, the bill of costs of the material, handling charges etc. made in the name of Iron & Steel Controller, Calcutta. Since the order contained in that letter could not be implemented on account of lack of transport facilities, the Kanpur Con- D troller, directed the respondent .company to deliver the surplus steel to MfS G. Brothers Ltd., Rampur and to this extent the order dated 8th/10th November 1944 stood modified. Though the surplns material was delivered to Govan Brothers between 11th April 1945• and 30th of April, 1945, the price therefor to the tune of Rs. 43,728-6-6 remained unpaid inspite of repeated demands made by the E respondent. Ultimately, the Iron & Steel Controller informed the respondent to take up the matter with Govan Brothers. As the price of the steel remained unpaid by the Union of India as well as G. Brothers the plaintiff company filed its suit for Rs. 46,652-14-6 which was inclusive of interest on the principal price calculated at the rate of 6 per cent per annum from April, 1945, upto the date of the institution of the suit, after F #### Y' serving the defendant with the requisite notice under section 80 of the Code of ' Civil Procedure. \ The trial Court decreed the claim of the plaintiff company in full and also directed that it would be entitled to the costs of the suit as also interest at the rate of 3 per cent per annum from the date of the institution of the suit to the date of payment. The trial Court held that the Kanpur Controller had undertaken the liability to pay the price of the goods to the plaintiff company even in respect of the delivery to G. Brothers and that the defendant could not escape liability by reason of the contents of section _65_ of the Indian Contract Act even though the provisions of section 175(3) of the Government of India Act, 1935, had not been complied with. The contention raised by the defendant to the effect that section 17(2) of the Defence of India Act was a bar to the suit was negatived. In appeal, the High Court agreed that Se<:tion 17(2) of the Defence of India Act would be a complete bar to the suit if it was one for damages. or G H 894 SUPREME COURl' REPORTS [1980] 3 S.C.R. ~ compensation but held that the suit was not of that nature and, on the other hand, it was for recovery of the price of the goods supplied to G. Brothers as was also found by the trial Court. It further held that even though the provisions of section 17 _5_ ( 3) of tbe Government of India Act were not complied with the agreement resulting from the correspondence which took place between the plaintiff company and the officers of the detendant '\Vas good. Relying on Section 70 of the Indian Contract Act and on the basis thereof, it held the B plaintiff company to be entitled to recover the price of the goods from the defendant even if it was assumed that the provisions of section 175(3) were a bar· to the recognition of the contract envisaged by the correspondence bt:tween the parties. The High Court dismissed the appeal, but granted a certificate under Article 133(1) (a) of the Constitution to the appellant. ##### c D E F G Dismissing the appeal, the Court HELD : 1. The suit is not one for Compensation or damages etc. as contemplated by Section 17 (2) of the Defence of India Act and hence is not barred by .oat section [898 Al. 2. The legality of the matter under which the respondent company transferred its stock to G. Brothers cannot be allowed to be questioned at the appellate stage. The question whether the requirements of clause (5) of the Indian Iron and Steel Control Order, 1941 which postulates only a _written_ _direction_ for disposal of surplus stocks were satisfied or not is a mixed question of fact and law which was never raised in the Courts below. Further tbe plea taken in paragraph ( 4) of the written statements filed by th'e appellant wais categori cally to the effect that "the fresh instructions issued to the plaintiff are contained in the letter in the possession of the plaintiff" runs counter to the factual part of the argument. Besides another question would arise whether the word "vrritten" in clause (5) aforesaid is di.rectory or mandatory. [898 C-D1 3. Three conditions must be satisfied before Section 70 of the Indian Contract Act can be invoked : first, a person should lawfully do something for another person or deliver something to him; second, in doing the said thing or delivering the said thing he must not intend to act gratuitously; and third, the other person for whom something is done or to whom something is delivered must enjoy the benefit thereof. [898 H, 899 A] \ In the instant case, the appellant had enjoyed the full benefit of the delivery or the gooJs to G. Bros. and not merely an. indirect benefit thereof. [901 B] _State of West Bengal_ v. _M/s._ _B._ _K. Monda/_ [1962] 2 Suppl. S.C.R. 876; .. · reiterated, _S. I. Indian Rly. Co._ v. _Madura Municipality,_ A.LR. 1964 l\1adras 427; distinguished. CIVIL APPfl.LA TE JURISDICTION Civil Appeal No. 1273/70. H Appeal by Special leave from the Judgment and Decree dated 28·1-1966 of the Allahabad High Court in First Appeal No. 431 of 1957. UNION _v ._ .) . K. GAS PLANT _(Kasha/,_ _J.)_ 895 _P._ _P. Rao, Subodh Markendeya,_ _R. Venkataramani_ and _Miss A._ A _Subhashini_ for the Appellant. _So/i._ _J._ _Sorabjee_ and _Ramesh war Nath_ for the Respondent. The Jnc1grr.ent of the C [0] urt wos delivered by KOSHAL, J. This appeal by certificate granted under article 133(1)(a) of the Constitution of India by the Allahabad High Court **B** is directed against its judgment dated the 28th of January, 1966, confirming on appeal a decree passed by the Civil Judge, Kanpur, for the ,; recovery of Rs. 46,652-14-6 with interest at the rate of 3 per cent per annum from the date of the institution of the suit till payment in ,.. favour of Mis. J.K. Gas Plant Manufacturing Company Limited against the sole defendant, namely, the Union ofindia. **C** 2. The case of the plaintiff company may be briefly stated thus. The Government of India had supplied some steel to the plaintiff company for manufacturing gas plants at Rampur. Only a part of the steel so supplied was utilized for the intended purpose and with regard to the rest the Regional Deputy Iron and Steel Controller, U.P. Circle, Kanpur (hereinafter reterred to as the Kanpur Controller) directed **D** the plaintiff company through a letter dated the 8th/10th of November, 1944 (exhibit 16) to deliver the same to the U.P. Registered Stock Holders Association Kanpur (for short the Association). Jn relation to the recovery of price of the material the letter statec' : E **F** ' ' "Your bill for cost of the material supported by original receipts from suppliers should be made out in the name ofiron and Steel Controller, Calcutta, and submitted to this office. Please make out a separate bill for handling, storage expenses, etc., and send to this 0ffice supported with original freight and **payee's** **receipt."** The order contained in letter exhibit 16 could not be implemented on ace .i•nt' flack of transport facilities. The Kanpur Controller therefore directed the plaintiff company to deliver the surplus ~tee! to M/s. Govan Brothers Ltd.,,Rampur (hereinafter referred to as G. Brothers) and to this extent the order contained in letter exhibit 16 stood modified. The plaintiff company delivered to G. Brothers the surplus material **G** lying with it between the I Ith April, 1945 and 30th of April, 1945. The deliveries totalled 135 tons, 6 cwts., 1 quarter and 1 pound, the price whereof amonted to Rs. 43,728-6-6 which remained unpaid inspite of repeated demands made by the plaintiff company through letters addressed to the Kanpur Controller to whom the bills bad been forwarded as desired. Ultimately th~ plaintiff company was informed **H** by the Accounts Officer attached to the Iron and Steel Controller, Calcutta, that it should take up the matter with G. Brothers. · 896 SUPREME COURT REPORTS (1980] 3 S.C.R. A As the price of the steel remained unpaid by the Union of India B c D E F G H 4. The trial courtiheld that the Kanpur Controller had undertaken the liability to' pay the price of the goods to the plaintiff company even in respect of the delivery to G. Brothers and that the defendant could nofescape~liability bY'.reason of the contents of section 65 of the Indian Contract Act even though the provisions of section 175(3) of the Government of India Act, 1935, had not been complied with. The contention raised by the defendant to the effect that section 17(2) of the Defence oflndia Act was a bar to the suit was negatived by the trial court. Some other findings were also arrived at which are not relevant for the purposes of this appeal. The trial court therefore decreed the claimlof the plaintiff company in full and also directed that it would be entitled to the costs of the suit as also interest at the rate of 3 per cent per annum from the date of the institution of the suit to the date of payment. 5. When the[first appeal came np for hearing before the High Court the contention based on the provisions of section 17(2) of the Defence of India Act was reiterated on the ground that the suit was one for damages or compensation. Section 17(2) states : "Save as otherwise expressly provided under this Act, no suit or other legal proceeding shall lie against the Crown for as well as G. Brothers the plaintiff company filed its suit for Rs. 46,652-14-6 which was inclusive of interest on the principal price calculated at the rate of 6 per cent per annum from April, 1945, up to the date of the institution of the suit, after serving the defendant with the requisite notice under section 80 of the Code of Civil Procedure. 3. In its written:statement the Union of India admitted the correctness of the order contained in letter exhibit 16. It pleaded however that that order was cancelled _in_ _toto_ and not merely in regard to the party to whom the plaintiff company had to make over the surplus steel. It was specifically denied that the disputed goods had been delivered to G. Brothers at the risk and responsibility of the defendant and that the defendant was liable to pay the price thereof. It was asserted that the defendant was merely controlling the supply and distribution of iron and steel and that the liability to pay the price of any goods dealt with by it in the exercise of its powers of control rested upon the party receiving the goods. Another plea taken· was that the suit was not maintainable in view of the provisions of section 175(3) of the Government of India!Act, 1935,lwhich enjoins that a contract between the Government oflndia and a third party has to be in writing and in a particular form. It was emphasized that G. Brothers alone were liable for the payment demanded by the plaintiff company. ###### .. UNION _v._ J. K. GAS PLANT _(Koshal,_ /.) 897 any damage caused or likely to be caused by anything in good A faith done or intended to be done in pursuance of this_Act or any rules made thereunder or any order issued under any such **rule."** The High Court agreed with the learned counsel for the defendant that this section would be a complete bar to the suit if it was one for damages or compensation but held that the suit was not of that nature and, on the other hand, it was for recovery of the price of the goods supplied to G. Brothers as was also found by the trial court. The contention was therefore rejected as untenable. The High Court then proceeded to examine the true nature of the transaction culminating in the delivery of steel to G. Brothers and held that the defendant had failed to establish that the direction regarding preparation and submission of bills contained in letter exhibit 16 had been cancelled when the plaintiff company was required to deliver the goods to G. Brothers. It was further held that even though the provisions of section 175(3) of the Government of India Act were not complied with the agreement resulting from the correspondence which took place between the plaintiff company and the officers of the defendant was good. In this connection reliance was placed on _Debi Prasad_ _Srikrishna PrasadJLtd._ V- _Secretary of State(I)._ The sheet anchor of the judgment of the High Court however was its reliance on section 70 of the Indian Contract Act and on the basis thereof it held the plaintiff company to be entitled to recover the price of the goods from the defendant even if it was assumed that the provisions of section 175(3) were a bar to the recognition of the contract envisaged by the correspondence between the parties. In this connection reference was made to _New Marine Coal Co. (Bengai) Private Ltd._ v. _Union_ _of_ _Jndia(2)._ It was argued before the High Court that the conditions requisite for the applicability of section 70 of the Indian Contract Act were not available in the present case in as much as the defendant had not been shown to have enjoyed the benefit of the transaction which accrued only to G. Brothers. The High Court however took a contrary view with the observation: "The benefit or advantage that has been derived by the defendants lies in the fact that it has been able to distribute the stock to persons of its choice according to the rules and regulations framed by it." It was in these premises that the High Court dismissed the defendant's appeal with costs. (1) A I. R. 1941 All. 377. (2) A. I. R. 1964 S. C. 152. B ###### c D E F G H A B ###### c D E F G H 898 SUPREME COURT REPORTS (1980] 3 S.C.R. 6. The argument based on section 17(2) of the Defence oflndia Act has been reiterated before us but it has merely to be noticed to be rejected. We are clearly. of the opinion that the suit is not for damages, etc., such as are contemplated by that section. 7. It was seriously argued on behalf of the defendant that throughout the period during which the Kanpur Controller dealt with the matter in dispute he was exercising the powers conferred on him under the Iron and Steel Control Order,1941, that under clause _5_ of that order the plaintiff company could dispose of its stock of steel only in pursuance of a _written direction_ from the Kanpur Controller and that the mandate issued by the Kanpur Controller to the plaintiff company requiring the latter to deliver the goods to G. Brothers having been found to be an oral one, the whole transaction fell outside the ambit of the law so that the Union of India could not be bound by it. The argument as it stands does not lack plausibility although it would be a question whether the word 'written' occurring in clause (5) of the Indian Iron and Steel Control order is directory or mandatory. However we refuse to allow the argument to be raised and tha~ for two reasons. Firstly, it is a mixed question of fact and law which was never raised in the courts below. Secondly, the plea taken in paragraph 4 of the written statement filed by the defendant was categorically to the effect that "the fresh instructions issued to the plaintiff are contained in the letter in the possession of the plain· tiff", which plea runs counter to the factual part of the argument. In this view <·f the matter the legality of the order under which the plaintiff company transferred its stock to G. Brothers cannot be allowed to be questioned at this a stage. 8. The only other ground put forward in support of the appeal was that the provisions of section 70 of the Indian Contract Act were not applicable to the facts of the present case. That section reads: "Where a person lawfully does anything for another person or delivers anything to him, not intending to do so gratuitously, and such other person enjoys the benefit thereof, the latter is bound to make compensation to the former in respect of, or to restore, the thing so done or delivered." As pointed out in _State of West Bengal_ v. _Mis. B.K. Moftdal(_ _[1]_ _),_ three conditions must be satisfied before this section can be invoked: "The first condition is that a person should lawfully do some· thing for another Person or deliver something to him. The second condition is that in doing the said thing or ~delivering, the said (I) [1962] I Supp. S. C. R. 876 #### • UNION \' . .I. K. GAS PLANT _(Koshal,_ _!.)_ 899 thing he must not intend to act gratuitously; and the third is that the other person for whom something is done or to whom something is delivered must enjoy the benefit thereof. When these conditions are satisfied section 70 imposes upon the latter person, the liability to make compensation to the former in respect of or to restore. the thing so done or delivered." On behalf of the defendant the objection raised to the applicability of this section to the transaction in dispute is two-fold. The first contention in this behalf is that the delivery to G. Brothers was unlawful-a contention which we have already turned down. Secondly it is said that no benefit at all was derived from the transaction by the Union of India and that its sole beneficiaries were G. Brothers. This objection has not only been overruled by the High Court but appears to us also to be without substance. In this connection reference may be made to some documentary and oral evidence. To begin with, letter exhibit 16 which directed the plaintiff company to deliver the B ##### c # • [( ] _"·--t_ goods to the Association specificirlly required that the plaintiff com- D pany would make the bills in the name of the Iron and Steel Controller, Calcutta, and send them for payment to the Kanpur Controller, The inference which may reasonably be drawn from the contents of the letter is that the Kanpur Controller was dealing with the goods as if they belonged to the Government of India whose duty it was to pay for them when they changed hands. and that the idrnti;y cf the party to E whom the goods were to be delivered by the plaintill cc111pany under the orders of the Kanpur Contrcllcr was immaterial. Secondly, the Kanpur Controller (Mr.R.R. Chari) in his dcpcsiticn dnt<d the 24th of June, 1946 made before the Second Special, Tribunal, Lahore (Camp Bombay) in Criminal Case No. 3 of 1946, stated thus: "In September. 1944, J.K. Gas Plant Manufacturing Co., Rampur, Ltd., handed over 137 tons of iron and.steel to Messrs . Govan Brothers, Rampur, under instructions from our Dcpa1tment. Messrs Govan Brothers thus held the, materials on behalf of the Government." It has been urged by learned counsel for the defendant that this statement is not admissible in evidence as it was not made at the trial of the case in hand. ButJit is toollate in the day for such an objection to be entertained. The statement was admitted in evidence as exhibit 15 at the trial presumably,without1.objectioRand cannot now be thrown out. According to it G. Brothers held the supply of steel made to them by the plaintiff company not for themselves but on behalf of the Government. Besides, a letter (exhibit 51) which was issued by the G H F 900 SUPREME COURT REPORTS [1980] 3 S.C.R. A .Kanpur Controller to Mr. Siddiq Ali Khan of the Department of Industries and Commerce, Rampur, also states: "In thiS:connection I may mention that the steel is virtually the property of the Government of India, War Transport Department and under no circumstances can the Government loose **B** money in the bargain. I am obtaining the actual cost of the materials plus all incidental charges and I will let you know the amount to be paid by each party alongwith written orders regularising the issue of these materials to the various parties. I have to hold you and you in turn Messrs. Govan Bros. (Rampur) Ltd., responsible for the recovery of the cost of the **C** materials when intimated to you." **D** E F G **H** There is no reason for us _to_ hold, in view of this statement that the steel supplied by the plaintiff company to G. Brothers was not being held by the latter on behalf of the Government of India and if that be so, the Government must be held to have reaped full bene' ## fit of the delivery to G. Brothers and . it is immaterial how the steel supplied to the latter was dealt with later on. 9. Learned counsel for the defendant cited _S._ _I._ _Railway_ _Co._ v. _Madura Municipa,'ity_ (') for the proposition that the benefit to the defendant was in any case an indirect one which would not faUwithin the ambit of the third condition envisaged by the provisions of section 70 of the Indian Contract Act. In that case the South Indian Railway had widened a culvert in compliance with an order passed by the Provincial Government under certain provisions of the Railways Act, 1890. The work was done primarily for the benefit of the private owners of property in the neighbourhood. The Railway Company however sued the Municipal Committee within the territorial limits of whose jurisdiction the culvert lay for the cost of widening it on the ground that the Municipal Committee received a benefit because it recovered taxes from the owners or occupiers of the property. In **turning down the claim of the South Indian Raihvay Company Leach.** C. J., who delivered the judgment of the division Bench consisting of himself and Lakshmana Rao, J., stated: "This is a very indirect benefit, and section 70 can in our opinion only have application where there is direct benefit to the person for whom the work is done. The persons who are eajoying the benefit o! this work are the owners and occupiers of the buildings in the locality. Tt would be doing violence to (!) A. I. R. 1945 Madras 427. UNION _v._ J. K. GAS PLANT _(Koshal,_ _l.)_ 901 the section to say that in these circumstances the work was done A, for the benefit of the municipality." The judgment of the Division Bench was upheld by their Lord ships of the Privy Council in _Governor-General In_ _Council, Represented_ _by the General Manager, South Indian Railway v._ _Municipal Council,_ _Madura,_ _Through its Commissioner_ along with the reasons on which it was based. But then the case is of no help to the defendant who had enjoyed"the fullbenefitof the delivery"of goods to G. Brothers and not merely an indirect benefit thereof. 10. For the reasons stated the appeal fails and is dismissed with costs. S. R. _Appeal dismissed_ B