Case Synopsis & Summary

This is a Civil Appeal arising from a land acquisition dispute concerning 101 acres at Jagitial Municipality, Karimnagar (AP), acquired for laying a broad‑gauge railway line (Karimnagar–Jagitial Phase II). The Land Acquisition Officer awarded compensation (Rs 1,30,000/acre for wet land; Rs 1,24,000/acre for dry land) with separate awards for structures. Claimants sought reference under Section 18; the Reference Court fixed Rs 21,29,600/acre after deducting 50% developmental charges. The High Court in AP upheld the Reference Court’s market value but reduced the deduction to 25%, resulting in compensation of Rs 15,97,200/acre. The Railways challenged this in the Supreme Court. The Union of India argued the High Court erred in further enhancing compensation beyond the Reference Court’s value and that 50% deduction, as in the exemplar sale, was justified given the large, undeveloped land and its distinguishing features; the landowners argued for retaining or increasing compensation and supported a higher deduction. The Supreme Court relied on established principles from landmark precedents, including the Chimanlal Hargovinddas framework, and balanced the facts, ultimately restoring the Reference Court’s market value of Rs 21,29,600/acre and directing a 50% deduction for development charges. The appeals are allowed, the High Court’s judgment is set aside, and the Reference Court’s award is restored.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Abhay Manohar Sapre
  • Uday Umesh Lalit
Judgment Date
2018-07-25
Court Decision / Holding
Appeals allowed; Impugned judgment set aside; Reference Court’s award dated 23.07.2010 in OP No.27/2007 is restored. The market value is Rs 21,29,600 per acre, with a 50% deduction towards developmental charges, consistent with the principles laid down in the cited authorities. The final order thus restores the Reference Court’s calculation rather than the High Court’s modified figure or deduction.
Final Disposition
Appeals allowed; High Court judgment set aside; Reference Court’s award restored (Rs 21,29,600 per acre with 50% development deduction).

Parties to the Case

Appellants / Petitioners

  • Union of India

Respondents

  • Dyagala Devamma
  • Others (landowners)

Legal Representation & Advocates

Counsels for Petitioners

  • • Vikramjit Banerjee (Additional Solicitor General)

Counsels for Respondents

  • • B. Adinarayana Rao (Senior Counsel)

Provisions of Law Cited

Land Acquisition Act, 1894Section 4Section 6Section 9Section 11Section 18Section 23

Legal Doctrines & Maxims

  • Market value to be determined as on the crucial date of notification under Section 4 of the Land Acquisition Act; dates under Sections 6 and 9 are irrelevant.
  • Hypothetical purchaser principle.
  • Most comparable instances and adjustments for plus and minus factors.
  • Balance of equities and use of common sense in evaluating land value.
  • Deduction for development charges (variable percentage depending on facts).
  • Guesswork to balance equities in determining fair market value.

Submissions & Arguments

Contentions of Appellants / Petitioners

The Union of India contends that the High Court incorrectly enhanced the compensation beyond the Reference Court’s determined value of Rs 10,64,800 per acre and erred in reducing the deduction for developmental charges from 50% to 25%. It relies on Exemplar Sale Deed Ex.P-18 and the general principle that large, undeveloped parcels may justify higher deductions for development. It submits that the three distinguishing features of Ex.P-18 justify retaining a 50% deduction and that the market value should align with the Reference Court’s Rs 21,29,600 per acre given the land’s size and undeveloped status, and the absence of suitable exemplars for large tracts.

Contentions of Respondents

The respondents (landowners) press for maintaining or increasing compensation and contend that the High Court’s reduction of the deduction to 25% did not properly reflect the development costs or the peculiarities of Ex.P-18. They emphasize the large acreage, non-development status, proximity to roads, and potential uplift, arguing for higher compensation in line with the Reference Court’s figure or higher, supported by exemplar comparisons and the lack of large-piece exemplars. They rely on long‑standing precedents endorsing substantial deductions in certain contexts and the need to balance competing equities.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Chimanlal Hargovinddas vs Special Land Acquisition Officer, Poona & Anr.1988 (3) SCC 751PositiveLays down 17 principles for determining market value, including the date of notification and the method of instance-based valuation with plus/minus factors.
Union of India v. Raj Kumar Baghal Singh (Dead) Through Legal Representatives & Ors.2014 (10) SCC 422PositiveCited to support general principles for determining market value; reinforces framework for valuation in acquisition cases.
Trishala Jain & Anr. v. State of Uttaranchal & Anr.2011 (6) SCC 47PositiveHeld that percentage deductions depend on facts of each case, used to justify considering 50% deduction in appropriate circumstances.
Vithal Rao & Anr. v. Special Land Acquisition Officer2017 (8) SCC 558PositiveRecognizes the permissible use of guesswork to balance equities and determine fair market value under Section 23.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,697 words•~13 min read

In The Court Record

Union of India v. Dyagala Devamma & Ors.

## **REPORTABLE** # **IN THE SUPREME COURT OF INDIA** ## **CIVIL APPELLATE JURISDICTION** **­ CIVIL APPEAL NOs. 6986 6987 OF 2018 (Arising out of S.L.P.(C) No.10358­10359 of 2015)** Union of India ….Appellant(s) VERSUS Dyagala Devamma & Ors. - ….Respondent(s) ## **J U D G M E N T** ## **Abhay Manohar Sapre, J.** - 1) Leave granted. 2) These appeals are filed against the final judgment and order dated 08.08.2014 passed by > Signature Not VerifiedDigitally signed by the High Court of Judicature at Hyderabad for the ANITA MALHOTRA Date: 2018.07.25 17:07:07 IST Reason: 1 State of Telangana and the State of Andhra Pradesh in LAAS No.762 of 2010 and CO(SR) No.373 of 2011 whereby the High Court dismissed the appeal filed by the appellant herein and partly allowed the cross objections filed by the respondents herein and enhanced the compensation as mentioned in detail _infra_ . 3) We herein set out the facts, in brief, to appreciate the issues involved in these appeals. 4) 0n 12.11.2003, the State of Andhra Pradesh issued a notification under Section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as “the Act”) and acquired the land measuring about 101­ 00 acres (SY No.398/3 and other connected survey numbers) situated at Jagitial Municipality, District Karimnagar (AP). The acquisition of land was for a public purpose, namely, " _laying new broad gauge_ 2 _single railway line from Karimnagar to Jagitial Phase_ _–II by the appellant­Railways_ ". This was followed by issuance of notification under Section 6 of the Act and then possession on 02.12.2003. 5) The Land Acquisition Officer (LAO) started proceedings under Section 11 of the Act for determination of the compensation payable to the landowners for their lands. By award No.26/2006 dated 14.07.2006, the LAO determined the market value of the acquired land at the rate of " _Rs.1,30,000/­ per acre for wet lands_ " and " _Rs.1,24,000/­ per acre for dry lands_ ". The LAO also awarded compensation for structures, wells etc. to some landowners. 6) The claimants (landowners) felt aggrieved and sought reference under Section 18 of the Act to the Civil Court in OP No.27/2007. By award dated 23.07.2010, the Civil Court (Sr. Civil Judge, 3 Jagitial) re­determined the market value of the land in question. The Reference Court determined the market value of the acquired land at Rs.21,29,600/­ per acre uniformly. However, having regard to the totality of facts of the case, the Reference Court considered it just and proper to deduct 50% towards developmental charges and accordingly worked out the market value of the land at " _Rs.10,64,800/­ per acre_ " for being paid to the landowners. 7) The appellant­Railways felt aggrieved and filed appeal before the High Court of Andhra Pradesh whereas the landowners also felt aggrieved and filed cross objections claiming enhancement of the market value determined by the Reference Court. 8) By impugned judgment, the High Court dismissed the appeal filed by the appellant­Railways and partly allowed the cross objections filed by the 4 landowners and enhanced the compensation to Rs.15,97,200/­ per acre. The High Court, upheld the market value determined by the Reference Court i.e. Rs.21,29,600/­ per acre but reduced the deduction towards developmental charges from 50% to 25% and accordingly worked out the compensation “ _at the rate of Rs.15,97,200/­ per acre”_ . It is against this judgment, the appellant­ Railways felt aggrieved and filed the present appeals by way of special leave before this Court. 9) Heard Mr. Vikramjit Banerjee, learned Additional Solicitor General for the appellant­UOI and Mr. B. Adinarayana Rao, learned senior counsel for the respondents. 10) Mr. Vikramjit Banerjee, learned Additional Solicitor General appearing for the appellant while assailing the legality and correctness of the 5 impugned judgment essentially made two submissions. 11) In the first place, learned ASG contended that the High Court erred in further enhancing the compensation at Rs.15,97,200/­ per acre. 12) According to him the compensation determined by the Reference Court payable at the rate of Rs.10,64,800/­ per acre was just, legal and proper and, therefore, it did not call for any further enhancement. 13) In the second place, learned ASG urged that having placed reliance on exemplar Sale Deed (Ex­ P­18) for determining the market value, the Reference Court rightly deducted 50% towards development charges, whereas the High Court erred in deducting 25% towards developmental charges. 14) According to learned ASG, the High Court ought to have appreciated that there were three 6 distinguishing factors appearing from the exemplar sale deed (Ex.P­18). Due to these three factors, deduction of 50% towards developmental charges from the market value was called for. These factors are, First, Sale Deed (Ex.P­18) was for a very small piece of land (19 Guntas=1/2 acre); Second, the land which was the subject matter of Ex­P­18 had a peculiar site because it was situated facing two roads ­ one on the east side and other on the north side; and Third, it was a developed land. 15) It was, therefore, urged that so far as the land in question is concerned, the same did not have these factors and, therefore, the Reference Court rightly considered it proper to deduct 50% towards developmental charges from the market value which was worked out on the basis of Sale Deed (Ex.P­18). It was urged that the High Court without assigning any reasons much less cogent reasons erred in 7 reducing developmental charges from 50% to 25% from the market value. Learned ASG, therefore, prayed for restoration of the award of the Reference Court in place of impugned judgment of the High Court. 16) Per contra, learned senior counsel for the respondents (landowners) supported the impugned judgment and contended that it does not call for any interference and hence the appeals deserve to be dismissed. 17) The question arises for consideration in these appeals is whether the High Court was justified in deducting 25% towards developmental charges from the market value of the land in question against 50% deduction made by the Reference Court. In other words, having regard to the facts and circumstances of the case, whether the Reference Court was justified in deducting 50% from the 8 market value of the land or whether the High Court was justified in deducting 25%. 18) Before we examine the facts of this case, it is necessary to take note of general principles of law on the subject in question which are laid down by this Court in several cases and some of which were also cited at the Bar by the learned counsel for the parties. Indeed, if we may say so, law on the several issues urged herein by the learned counsel for the parties is already settled by this Court and what has varied in its application depends on the facts of each case. 19) In **Chimanlal Hargovinddas vs Special Land Acquisition Officer, Poona & Anr.** (1988) 3 SCC 751, this Court dealt with the question as to how the Court should determine the valuation of the lands under acquisition and what broad principle of law relating to acquisition of land under the Act should be kept in 9 consideration to determine the proper market value of the acquired land. 20) In Para 4 of the judgment, this Court laid down as many as 17 principles, which are reproduced below for perusal: “ **(1) to (4)………………………………….** **(5) The market value of land under acquisition has to be determined as on the crucial date of publication of the notification under Section 4 of the Land Acquisition Act (dates of notifications under Sections 6 and 9 are irrelevant).** **(6) The determination has to be made standing on the date line of valuation (date of publication of notification under Section 4) as if the valuer is a hypothetical purchaser willing to purchase land from the open market and is prepared to pay a reasonable price as on that day. It has also to be assumed that the vendor is willing to sell the land at a reasonable price.** **(7) In doing so by the instances method, the court has to correlate the market value reflected in the most comparable instance which provides the index of market value.** **(8) Only genuine instances have to be taken into account. (Sometimes instances are rigged up in anticipation of acquisition of land.)** **(9) Even post­notification instances can be taken into account (1) if they are very proximate, (2) genuine and (3) the acquisition itself has not motivated the purchaser to pay a** 10 **higher price on account of the resultant improvement in development prospects. (10) The most comparable instances out of the genuine instances have to be identified on the following considerations:** **(i) proximity from time angle,** **(ii) proximity from situation angle.** **(11) Having identified the instances which provide the index of market value the price reflected therein may be taken as the norm and the market value of the land under acquisition may be deduced by making suitable adjustments for the plus and minus factors vis­ à­vis land under acquisition by placing the two in juxtaposition.** **(12) A balance­sheet of plus and minus factors may be drawn for this purpose and the relevant factors may be evaluated in terms of price variation as a prudent purchaser would do. (13) The market value of the land under acquisition has thereafter to be deduced by loading the price reflected in the instance taken as norm for plus factors and unloading it for minus factors.** **(14) The exercise indicated in clauses (11) to (13) has to be undertaken in a common sense manner as a prudent man of the world of business would do. We may illustrate some such illustrative (not exhaustive) factors:** **Plus factors** **1. smallness of size** **2. proximity to a road** **3. frontage on a road** **Minus factors** **1. largeness of area** **2. situation in the interior at a distance from the road** **3. narrow strip of land with very small frontage compared to depth** 11 **4. nearness to developed area** **5. regular shape** **6. level vis­à­vis land under acquisition** **7. special value for an owner of an adjoining property to whom it may have some very special advantage** **4. lower level requiring the depressed portion to be filled up** **5. remoteness from developed locality** **6. some special disadvantageous factor which would deter a purchaser** **==> picture [206 x 87] intentionally omitted <==** **(15) The evaluation of these factors of course depends on the facts of each case. There cannot be any hard and fast or rigid rule. Common sense is the best and most reliable guide. For instance, take the factor regarding the size. A building plot of land say 500 to 1000 sq. yds. cannot be compared with a large tract or block of land of say 10,000 sq. yds. or more. Firstly while a smaller plot is within the reach of many, a large block of land will have to be developed by preparing a lay out, carving out roads, leaving open space, plotting out smaller plots, waiting for purchasers (meanwhile the invested money will be blocked up) and the hazards of an entrepreneur. The factor can be discounted by making a deduction by way of an allowance at an appropriate rate ranging approximately between 20 per cent to 50 per cent to account for land required to be set apart for carving out lands and plotting out small plots. The discounting will to some extent also depend on whether it is a rural area or urban area, whether building activity is picking up,** 12 **and whether waiting period during which the capital of the entrepreneur would be locked up, will be longer or shorter and the attendant hazards.** **(16) Every case must be dealt with on its own fact pattern bearing in mind all these factors as a prudent purchaser of land in which position the judge must place himself.** **(17) These are general guidelines to be applied with understanding informed with common sense.”** 21) These principles are invariably kept in mind by the Courts while determining the market value of the acquired lands (also see **Union of India vs. Raj Kumar Baghal Singh (Dead) Through Legal Representatives & Ors.,** (2014) 10 SCC 422). 22) In addition to these principles, this Court in several cases have laid down that while determining the true market value of the acquired land especially when the acquired land is a large chunk of undeveloped land, it is just and reasonable to make appropriate deduction towards expenses for 13 development of acquired land. It has also been consistently held that at what percentage the deduction should be made varies from 10% to 86% and, therefore, the deduction should be made keeping in mind the nature of the land, area under acquisition, whether the land is developed or not and, if so, to what extent, the purpose of acquisition, etc. It has also been held that while determining the market value of the large chunk of land, the value of smaller pieces of land can be taken into consideration after deduction in the value of lands making proper especially when sale deeds of larger parcel of land are not available. This Court has also laid down that the Court should also take into consideration the potentiality of the acquired land apart from other relevant considerations. This Court has also recognized that the Courts can always apply reasonable amount of guesswork to balance the 14 equities in order to fix a just and fair market value in terms of parameters specified under Section 23 of the Act. (See **Trishala Jain & Anr. Vs. State of Uttaranchal & Anr.** , (2011) 6 SCC 47 and **Vithal Rao** **& Anr. Vs. Special Land Acquisition Officer,** (2017) 8 SCC 558) 23) Keeping in mind the aforementioned principles, when we take note of the facts of the case at hand, we find that firstly, the land acquired in question is a large chunk of land (101 acres approx.); Secondly, it is not fully developed; Thirdly, the respondents (landowners) have not filed any exemplar sale deed relating to large pieces of land sold in acres to prove the market value of the acquired land; Fourthly, exemplar relied on by the respondents, especially Ex.P­18 pertains to very small pieces of land (19 guntas); Fifthly, the three distinguishing features 15 noticed in the land in sale deed (Ex.P­18) are not present in the acquired land. 24) It was for the aforementioned reasons, in our opinion, the Reference Court was justified in making deduction of 50% towards developmental charges from the market value. The High Court, in our opinion, did not assign any good reason as to why and on what basis, it considered proper to make deduction towards developmental charges at the rate of 25% in place of 50%. 25) This Court has held in **Trishala Jain’s case** (supra) that it depends upon the facts of each case to decide for determination of the market value of the land as to what percentage should be adopted for deduction. In our opinion, the reasons mentioned above were rightly made basis by the Reference Court to support the deduction of 50%. 16 26) So far as the determination of market value made by the Reference Court is concerned, i.e., Rs.21,29,600/­ per acre, the same having been upheld by the High Court, we do not find any justification to examine this issue again. Even the learned ASG did not challenge this finding and confined his submissions only relating to the issue of percentage of the deduction only. 27) Learned counsel for the respondents was not able to point out any fact/evidence which could persuade us to uphold the reasoning and conclusion arrived at by the High Court in the impugned judgment. 28) In view of the foregoing discussion, we are inclined to uphold the reasoning and the conclusion arrived at by the Reference Court instead of the High Court. 17 29) As a consequence of the foregoing discussion, the appeals succeed and are accordingly allowed. Impugned judgment is set aside and that of the Reference Court (Civil Court) dated 23.07.2010 in OP No.27/2007 is restored. ……........................……........J. [ABHAY MANOHAR SAPRE] ………...................................J [UDAY UMESH LALIT] New Delhi; July 25, 2018 18
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.