Union of India & Ors. v. Gopaldas Bhagwan Das & Ors.

Case / Petition Number:
Civil Appeal No. 3636 of 2016

Case Synopsis & Summary

This Civil Appeal arises from a long-drawn dispute over land acquired under the Land Acquisition Act, 1894 for defence purposes in Village Malad, Mumbai. The land was requisitioned during 1943–45, with de-requisition in 1949 and eventual acquisition under a Section 4(1) notification issued on 24.10.1975, followed by a Section 6 declaration in 1978. A Draft Award was issued on 23.09.1986, and symbolic possession was taken on 06.01.1987, with possession continuing in the State’s hands. The respondents challenged the validity of the Section 4 notification, asserting mandatory compliance with Section 4(1) — including Official Gazette publication and locality notices — had not been fulfilled. The Bombay High Court quashed the acquisition proceedings on these grounds. The judgment in Kulsum R. Nadiadwala v. State of Maharashtra (2012) 6 SCC 348 was discussed, which held mandatory publication and notices are essential, even where the owner is aware. The Court also examined the role of delay and laches, citing Tamil Nadu Housing Board v. Meiyappan and Dayal Singh v. UoI, and observed conflicts with Rabindranath Bose and Printers Mysore. Considering defence needs and historical possession, a three-judge Bench concluded that delay may bar challenges, but ultimately dismissed the Union’s appeal, leaving the earlier status largely intact for these facts.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • R. F. Nariman
  • S. Ravindra Bhat
  • V. RAMASUBRAMANIAN
Judgment Date
2020-02-04
Court Decision / Holding
Appeal dismissed. The Union of India’s challenge is rejected; the Court upholds the existing position regarding Section 4 notification and defence project status, and dismisses the Union’s appeal.
Final Disposition
Appeal dismissed

Parties to the Case

Appellants / Petitioners

  • Union of India & Ors.

Respondents

  • Gopaldas Bhagwan Das & Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Rekha Pandey

Counsels for Respondents

  • • Shri Shyam Divan

Provisions of Law Cited

Defence of India Rules, 1939 Rule 75ALand Acquisition Act, 1894Section 4(1)Section 6Section 11Section 18Section 30

Legal Doctrines & Maxims

  • When a statutory provision provides a particular manner for doing a particular act, the act must be done in the manner prescribed in the Act (mandatory compliance).
  • Mandatory requirements of Section 4(1) and accompanying notices are to be strictly complied with (not merely by knowledge of proceedings).
  • Delay and laches can be a bar to challenging long-past acquisition (stale litigation).
  • Per incuriam as a concept (discussed in context of prior judgments).
  • Public notices and Gazette publication are cumulative mandatory requirements under Section 4 of the Act.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant Union of India contends that the principles laid down in Kulsum R. Nadiadwala v. State of Maharashtra (2012) 6 SCC 348 are binding, and that mandatory compliance with Section 4(1) was not satisfied in the present notifications, which should render the acquisition null and void. It emphasizes the defence nature of the project and argues for avoiding dismissal on delay, urging readiness for a larger Bench decision when needed. It also questions the interpretation of delay and laches given the long allowing of possession by the State and seeks relief on the broader legal framework for public projects.

Contentions of Respondents

The respondents rely on Kulsum R. Nadiadwala to stress mandatory publication and notices; they contend that delay and laches should not bar a challenge where procedural defects undermine legality. They highlight that possession has been with the Union since 1942 for a critical defence project and argue that quashing the entire notification would be unjust in similar settings. They also argue the need to await the Constitution Bench’s stance on delay in land acquisitions and emphasize non-compliance with Section 4(1) as a fatal flaw.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Kulsum R. Nadiadwala v. State of Maharashtra2012 (6) SCC 348DistinguishedCourt notes that Kulsum established mandatory compliance but doubts remain about its blanket application; views in Kulsum are not accepted without caveats and require broader examination.
J&K Housing Board v. Kunwar Sanjay Krishan Kaul—PositiveUsed to support the principle that formalities under Section 4 must be strictly complied with.
Tamil Nadu Housing Board v. M. Meiyappan2010 (14) SCC 309PositiveCited as authority that courts should not encourage stale litigation in inland acquisition proceedings.
Dayal Singh v. Union of India2003 (2) SCC 593OverruledDescribed as a contrary position whose rationale is in conflict with Rabindranath Bose and Printers Mysore, thus not followed in the present decision.
Rabindranath Bose v. Union of India1970 (1) SCC 84PositiveConstitution Bench authority cited as binding against the Dayal Singh view; supports stricter adherence to constitutional principles.
Printers (Mysore) Ltd. v. M.A. Rasheed2004 (4) SCC 460PositiveCited as a binding authority in the context of departure from Dayal Singh’s view.
Indore Development Authority v. ShailendraCivil Appeal No. 20982 of 2017 (2018) 8 FebMentioned OnlyConstitution Bench was seized of related questions; referenced for context rather than as controlling authority in the present decision.
Tamil Nadu Housing Board v. Meiyappan (additional reference)—Mentioned OnlyAppears as supportive context for early and timely challenge to acquisitions.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,927 words•~14 min read

In The Court Record

Union of India & Ors. v. Gopaldas Bhagwan Das & Ors.

**‘** _**REPORTABLE’**_ ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** **CIVIL APPEAL NO. 3636 OF 2016** **UNION OF INDIA & ORS. Appellant(s)** ## **VERSUS** **GOPALDAS BHAGWAN DAS & ORS. Respondent(s)** ## **J U D G M E N T** **R. F. Nariman J.** **This matter has a somewhat chequered history.** **In 1943, Government of India requisitioned 4 acres and 34 gunthas of the land owned by one Rajabahadur Bhagwandas Haridas, bearing Survey No. 120/2 (Part) of Village Malad, Mumbai, in exercise of powers conferred under Rule 75A of the Defence of India Rules, 1939. On 27.07.1949, the Collector, Thane, de-requisitioned 2.68 acres in the Survey No. 120 Part 2 out of the aforesaid 4 acres 34 gunthas. Ultimately, despite the land having first being requisitioned, a notification under Section 4(1) of the Land Acquisition Act, 1894 (hereinafter referred to as ‘Act’), was issued on 24.10.1975 acquiring the aforesaid extent of 8623 square meters. A declaration under Section 6 of the** Signature Not Verified Digitally signed by SUSHMA KUMARIBAJAJ **Act was issued on 30.11.1978. According to the respondents** Date: 2020.02.15 13:04:44 IST Reason: **herein, a Draft Award was passed under Section 11 of the Act** 1 **CIVIL APPEAL NO. 3636 OF 2016** **on 23.09.1986, against which references were made, both under Section 18 and 30, of the Act. The respondents confirmed that after symbolic possession was taken on 06.01.1987 by the State, such possession has remained with the State till date.** **In a proceeding that was filed, insofar as other lands in Village Malad were concerned, covered by the same section 4 notification, this Court in** _**Kulsum R. Nadiadwala**_ **v.** _**State of Maharashtra and Ors.**_ **(2012) 6 SCC 348, allowed an appeal by the land owner. After stating in paragraph 2 that the very same section 4 notification was issued in order that a Central Ordinance Depot for the Union of India be made for defence purposes, the judgment records that the beneficiary of these lands, being the Central Government, was served, but did not appear at the time of hearing of the appeal. The appellant in** _**Kulsum R. Nadiadwala**_ **’s case (supra) argued several points before this Court, which were resisted by the learned counsel appearing for the State of Maharashtra, basically on the ground that the writ petition should have been dismissed on the ground of delay and laches as was done by the impugned High Court judgment. After setting out Section 4 of the Act, this Court observed that the requirement that the notification under Section 4 be published in the Official Gazettee and the requirement that the Acquiring Authority should publish public notices of the substances of such notification in a convenient place or** 2 **CIVIL APPEAL NO. 3636 OF 2016** **places in the locality in which the land proposed to be acquired is situate, are cumulative conditions, both being mandatory. The Court then held: -** **“13. In the instant case, the respondents before the High Court had filed their reply affidavit. They did not dispute the contentions of the appellants that they had not issued any public notices as required under Section 4 of the Act. They only reiterated that such notification was published in the Official Gazette. Since the mandatory requirement as required under Section 4(1) of the Act is not complied with by the respondents, while acquiring the lands in question, in our opinion, the entire acquisition proceedings requires to be declared as null and void.** **14. This Court in J&K Housing Board v. Kunwar Sanjay Krishan Kaul has observed that all the formalities of serving notice to the interested person, stipulated under Section 4 of the Act, has to be mandatorily complied with in the manner provided therein, even though the interested persons have knowledge of the acquisition proceedings. This Court further observed thus:** **“32. It is settled law that when any statutory provision provides a particular manner for doing a particular act, the said thing or act must be done in accordance with the manner prescribed therefor in the Act. Merely because the parties concerned were aware of the acquisition proceedings or served with individual notices does not make the position alter when the statute makes it very clear that all the procedures/modes have to be strictly complied with in the manner provided therein. Merely because the landowners failed to submit their objections within 15 days after the publication of notification under Section 4(1) of the State Act, the authorities cannot be permitted to claim that it need not be strictly resorted to.”** **15. In view of the conclusion that we have reached on the first issue canvassed by the learned counsel for the appellants, we do not think that other issues that the learned counsel for the appellants has raised and canvassed before us need to be answered.”** 3 **CIVIL APPEAL NO. 3636 OF 2016** **It may only be mentioned that in** _**Kulsum R. Nadiadwala**_ **’s case (supra), the challenge was made by way of a writ petition filed in 1987, as opposed to the present challenge, which was made only in the year 2002.** **Ms. Rekha Pandey, learned counsel appearing on behalf of the appellant, has raised several points in support of this appeal. First and foremost, she adverted to an order of this Court dated 27.03.2018 by which a Division Bench of this Court has referred this matter to a larger Bench of three Judges. This order reads as follows:** **“1. The land of the respondents was acquired vide notification dated 24.10.1975 under Section 4 of the Land Acquisition Act, 1894 (the Act). The said land was earlier requisitioned in the years 1942 to 1945 for defence purpose. Award was made in the year 1986 and symbolic possession of the land was taken on 06.01.1987. Objections of the award were filed by the respondents against the award. A reference under Section 18 of the Act was made which was disposed of. Thereafter, the writ petition was filed by the respondents mainly on the ground that there was no due publication of the notification under Section 4 of the Act which was a mandatory requirement.** **2.The High Court upheld the plea of the respondents relying upon judgment of this Court in “Kulsum R. Nadiadwala Vs. State of Maharashtra” (2012) 6 SCC 348.** **3.Learned counsel for the appellants submitted that having regard to the fact that the land was already being used for defence purpose since the year 1942 to 1945 and the notification under Section 4 issued on 24.10.1975 was challenged for the first time by the writ petition filed on 24.06.2002, the High Court should have dismissed the writ petition on the ground of delay and laches as entertaining such petition will seriously affect public interest. It was submitted that view taken in the relied upon judgment ignores the concept of laches.** 4 **CIVIL APPEAL NO. 3636 OF 2016** **4.Learned counsel for the respondents submits that in spite of delay and laches, this Court in the aforesaid judgment quashed the acquisition.** **5.We are of the view that delay and laches may be a bar to challenge to the acquisition after 27 years. In Tamil Nadu Housing Board, Chennaiversus M. Meiyappan and ors (2010) 14 SCC 309 this Court held that inland acquisition proceedings the Court should not encourage stale litigation as it may hinder projects of public importance. The contra view in threeJudge Bench decision in Dayal Singh versus Union of India (2003) 2SCC 593 was held to be in conflict with the Constitution Bench judgment in Rabindranath Bose versus Union of India (1970) 1 SCC 84 and threeJudge Bench judgment in Printers (Mysore) Ltd. versus M.A. Rasheed(2004) 4 SCC 460. The said judgment was cited with approval in recent judgment of threeJudge Bench in Indore Development authority versus Shailendra (Dead) through Lrs. & Ors. (Civil Appeal No.20982 of 2017 –pronounced on 8th February, 2018).** **6.In view of above, the view taken by twoJudge Bench in Kulsum R.Nadiadwala versus State of Maharashtra(2012) 6 SCC 348 to the effect that delay and laches have to be ignored is not free from doubt.** **7.Thus, we are of the view that the matter needs to be placed before a Bench of three Judges.** **8.Accordingly, let the papers be placed before Hon’ble the Chief Justice of India for appropriate directions.”** **Ms. Pandey, learned counsel, has argued before us that as a matter of law, such a huge delay in filing a writ petition against Section 4 notification cannot possibly be countenanced. She has also argued that in** _**Kulsum R. Nadiadwala**_ **’s case (supra), really speaking, the delay is only of one year, as the Award in this case was issued only in the year 1986, and the writ petition filed in that case was of 1987. In the present case, the writ petition, as has** 5 **CIVIL APPEAL NO. 3636 OF 2016** **been stated earlier, was filed only in 2002. Another important point of difference, according to the learned counsel is that notice was personally served on the respondents in this case, which is not the case in** _**Kulsum R. Nadiadwala**_ **’s case (supra). She also raised the point that was raised in the special leave petition filed by the Union of India which is that** _**Kulsum R. Nadiadwala**_ **’s case (supra) is “per incuriam” inasmuch as it decided a point which arose out of the Amendment Act of 1984, when the Section 4 notification was only of 1975, the 1984 Amendment Act not being retrospective. She further went on to state that, in any case, the Constitution Bench is taking up, as one of the pleas before it in** _**Indore Development Authority**_ **v.** _**Manohar Lal and Others Etc.**_ **(SLP (C)Nos. 9036-9038 of 2016) whether delay would apply as a good ground for dismissing a writ petition on the ground of laches insofar as challenges to land acquisition proceedings are concerned, and that we should await the judgment of the Constitution Bench before proceeding with the judgment in this case. She kept harping upon the fact that the acquisition in this case is for important defence purposes and possession of this land has been with the Union Government since 1942. She also stated that** _**Kulsum R. Nadiadwala**_ **’s judgment, if properly read, did not amount to quashing of the entire section 4 notification, particularly in view of the last paragraph of the judgment, where the claim of the appellant was restricted only to 50** 6 **CIVIL APPEAL NO. 3636 OF 2016** **per cent of the land in question, the direction being that the respondents shall hand over 50 per cent of the vacant possession of the said land to the appellant forthwith.** **As against these submissions, Shri Shyam Divan, learned senior counsel appearing on behalf of the respondents, argued that that the section 4 notification in both these cases being the same, and** _**Kulsum R. Nadiadwala**_ **’s case being a final judgment of this Court in which a review petition and a curative petition have been dismissed, the said judgment would apply on all fours to the facts of this case. He pointed out that the question of delay, though raised by the learned counsel who appeared on behalf of the State, was not directly answered in** _**Kulsum R. Nadiadwala**_ **’s case inasmuch as, according to the Division Bench of this Court in** _**Kulsum R. Nadiadwala**_ **’s case, a mandatory condition of a section 4 notification not being adhered to, would amount to there being no acquisition at all in the eye of law. On this ground, he defended the impugned judgment passed by the Bombay High Court.** **Though this Court has, by its order dated 27.03.2018, referred this case to a larger Bench in view of the decision in** _**Kulsum R. Nadiadwala**_ **’s case that delay and laches have to be ignored, we are of the view that on the facts of this case, we need not answer this question. This is for the reason that the section 4 notification that was struck down in** _**Kulsum R. Nadiadwala**_ **’s case is the very notification in** 7 **CIVIL APPEAL NO. 3636 OF 2016** **the facts of this case. We may also note that in paragraph 13 of the** _**Kulsum R. Nadiadwala**_ **’s case set out hereinabove, this Court quashed the entire acquisition proceedings stating that they be declared as null and void. We are unable to agree with Ms.Pandey’s contention that the Section 4 notification not only deals with various other lands in Village Malad but also deals with a land in a different village altogether viz., Village Wadhawan, and that this Court’s judgment did not go to the extent of declaring the acquisition bad so far as village Wadhawan is concerned. So far as village Malad is concerned, where the land in** _**Kulsum R. Nadiadwala**_ **’s case was land that was adjacent to the present land, the very section 4 notification has been struck down and declared null and void, and this being the case, it would not be in the interest of justice to allow the present appeal in favour of the Union of India, as this would amount to a discrimination between two persons who are otherwise similarly placed.** **Adverting to some of the other submissions made by Ms.Pandey, first and foremost, in** _**Kulsum R. Nadiadwala**_ **’s case, the High Court dismissed the writ petition filed therein on the ground of there being a 12 years delay in filing the writ petition, and not on the ground that there was a one year delay as the Award in this case was passed only in 1986. Secondly, the factum of notices actually being served in this case, as opposed to notices not being** 8 **CIVIL APPEAL NO. 3636 OF 2016** **individually served in** _**Kulsum R. Nadiadwala**_ **’s case, apart from making no difference to mandatory conditions that have to be followed, as held in** _**Kulsum R. Nadiadwala**_ **, has been repelled by the judgment under appeal as follows:** **“11. Nevertheless, we are dealing with the contentions raised by the First Respondent. Perusal of the Writ Petition and in particular Clause (h) of Paragraph 4 thereof shows that a specific contention has been raised by the Petitioners that neither the Petitioners nor their predecessors were served with any notice and were not offered any opportunity of raising objections to the Notification under Subsection (1) of Section 4 of the said Act.** **……………………………………………………………………………………………………………………..** **……………………………………………………………………………………………………………………….** **Affidavit of Shri Manoj Shankarrao Gohad, the Special Land Acquisition Officer (4) is completely silent as far as this factual and legal challenge in this Petition is concerned.** **………………………………………………………………………………………………………………………….** **………………………………………………………………………………………………………………………….”** **Insofar as the “** _**per incuriam”**_ **point is concerned, this can be disposed of by stating that even though newspaper publication of the section 4 notification came in by amendment for the first time in 1984, the requirement of public notice where the land is situate in addition to publication in the Official Gazette, was always there from the inception.** _**Kulsum R. Nadiadwala**_ **’s case did not deal with newspaper publication at all. It only dealt with the requirement of publication in the Official Gazette and public notices of the substance of the notification being** 9 **CIVIL APPEAL NO. 3636 OF 2016** **given in the locality in which the lands are acquired, both of which were held to be cumulative and mandatory requirements of section 4.** **So far as the** _**Indore Development Authority**_ **’s case (supra) is concerned, the Constitution Bench is seized of several questions, all of which pertain to the construction of section 24 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.** **This being the case, and regard being had to what we have stated hereinabove, it is wholly unnecessary for us to adjourn this case in order to await the judgment of the Constitution Bench in this case.** **Given the fact that this is a Defence project in which possession has been with the Union since 1942, the same facts would obtain as in** _**Kulsum R. Nadiadwala**_ **’s case in which relief has been granted to** _**Kulsum R. Nadiadwala**_ **. This case, therefore, cannot lead to a different conclusion on similar facts.** **As to the argument that no declaration that the entire section 4 notification is quashed inasmuch as the claim of the appellants in** _**Kulsum R. Nadiadwala**_ **’s case was restricted only to 50 per cent of the lands in question, it is important to make a distinction between a declaration of law which would bind other future cases under Article 141 of the Constitution of India and an order made in the facts of the** 10 **CIVIL APPEAL NO. 3636 OF 2016** **case which may equally be made to do substantial justice on the facts of a given case, sometimes under Article 142.** **On a reading of paragraph 16 of** _**Kulsum R. Nadiadwala**_ **’s judgment, it is important to note that though the appellant’s claim was restricted to only 50 per cent of the land in question, so far as the other 50 per cent is concerned, the judgment itself makes a reference to the fact that the appellants are legal heirs of one deceased Ismail Nadiadwala and that there was another claimant whose name was Ibrahim Nadiadwala to whom, presumably, 50 per cent of the property went. Since only Ismail Nadiadwala’s heirs were prosecuting the appeal, this direction appears to have been made.** **This being the case, we dismiss the appeal of the Union.** **………………………………………………………., J. [ ROHINTON FALI NARIMAN ] ………………………………………………………., J. [ S. RAVINDRA BHAT ] ………………………………………………………., J. [ V. RAMASUBRAMANIAN ]** **New Delhi; February 04, 2020.** 11
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.