Union of India & Anr. v. Jahangir Byramji Jeejeebhoy

Case / Petition Number:
/null
Neutral Citation:/null

Case Synopsis & Summary

This is a Supreme Court civil appeal arising from a Bombay High Court order dated 09.07.2019 (Civil Application No. 1494 of 2019 in Writ Petition No. 2307 of 1993) refusing to condone a delay of 12 years and 158 days in restoring the writ petition, which had been dismissed for non-prosecution in 2006. The underlying dispute concerns a Pune Cantonment property leased in 1951; the respondent obtained a final decree in 1987 for possession, damages, and mesne profits. The appellants challenged the decree in a 1987 civil appeal; that appeal was dismissed in 1992. The writ petition under Article 227 of the Constitution was filed in 1993 and dismissed for non-prosecution in 2006. Execution proceedings were initiated in 2014. In 2019 the appellants sought restoration and condonation of delay before the High Court, which refused. The Union of India argued a merits-based case and that condonation was warranted given government ownership of the land; the respondent urged no sufficient cause. The Supreme Court, while not examining merits, held that condonation is an exceptional remedy and should not be granted for such an inordinate delay. It dismissed the appeal, upheld the High Court order, and disposed of pending applications, emphasizing that public interest and diligence govern condonation.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • J. B. Pardiwala
  • Aniruddha Bose
Judgment Date
2024-04-03
Court Decision / Holding
The Supreme Court dismissed the appeal. It held that condonation of such a long delay is not warranted and that the High Court’s order denying restoration was correct. The decision emphasizes that condonation is an exceptional remedy and should not be treated as a routine benefit, especially for government departments; pending applications were disposed of accordingly.
Final Disposition
Appeal dismissed; no order as to costs; pending applications disposed

Parties to the Case

Appellants / Petitioners

  • Union of India & Anr

Respondents

  • Jahangir Byramji Jeejeebhoy

Legal Representation & Advocates

Counsels for Petitioners

  • • R. Venkataramani, Attorney General for India

Counsels for Respondents

  • • Sudhanshu Chaudhari, Senior Counsel for Respondent

Provisions of Law Cited

Article 227 of the Constitution of IndiaOrder 20 Rule 12(1) CPCSection 5 of the Limitation Act

Legal Doctrines & Maxims

  • Interest reipublicae ut sit finis litium
  • Condonation of delay is an exception to the general rule; substantial justice must be balanced with the strict doctrine of limitation
  • Liberal approach to condonation must be tempered by bona fides and diligence; delay after long periods warrants scrutiny

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners’ counsel contended that the merits of the case were strong and that condonation of a lengthy delay (12 years 158 days) was warranted, especially since the suit property lies within Pune Cantonment and is owned by the Union of India. It was argued that the private respondent’s rights should not defeat the government’s ownership and that delay was not adequately explained; nonetheless, a favorable outcome on merits would justify restoration if possession could be handed over in the interim. The government argued against rigid application of limitation rules, urging that the delay be condoned in the larger public interest and to avoid prejudice to governance. However, the matter remained within the discretionary remit of the court, and ultimately the merits could not be entertained due to the delay’s length and lack of satisfactory justification.

Contentions of Respondents

The respondent’s counsel opposed condonation, arguing there was no sufficient cause for condonation of such an inordinate delay and that the High Court correctly exercised supervisory jurisdiction under Article 227 to refuse restoration. He emphasized that the petition started in 1981, and years had elapsed without due diligence. The respondent also stressed that condonation does not absolve the party from the consequences of inaction and that public policy requires timely adjudication; hence the appeal should be dismissed with no inferences favorable to condonation.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (9)

Case NameCitationTreatmentExplanation
Oriental Aroma Chemical Industries Limited v. Gujarat Industrial Development Corporation(2010) 5 SCC 459PositiveCited as a precedent illustrating that condonation of delay should not be granted on weak explanations and that a liberal approach has limits.
Postmaster General and others v. Living Media India Limited(2012) 3 SCC 563PositiveHeld that condonation of delay is not an exception and should not be treated as a routine advantage for government departments.
Lanka Venkateswarlu (D) by LRs v State of Andhra Pradesh & others(2011) 4 SCC 363PositiveReiterates that liberal condonation cannot override the statutory period absent bona fides; delay must be justified.
N. Balakrishnan v. M. Krishnamurthy(1998) 7 SCC 123PositiveAffirms that limitation is to prevent dilatory tactics and is not meant to destroy rights; diligence is required.
Ramlal v. Rewa Coalfields Ltd.AIR 1962 SC 361PositiveOutlines two considerations in Section 5: accrual of a right on expiry and the court’s discretionary power to condone with sufficient cause.
Ajit Singh Thakur Singh v. State of Gujarat(1981) 1 SCC 495PositiveStresses that sufficient cause must arise before expiry; post-expiry events cannot constitute sufficient cause.
Esha Bhattacharjee v. Managing Committee of Raghunathpur Nafar Academy(2013) 12 SCC 649PositiveArticulates guidelines for liberal yet prudent condonation, balancing substantial justice with bona fides.
Office of the Chief Postmaster v Living Media India Ltd(2009) 8 AD 201 (Del)PositiveAffirms that government delays require reasonable explanation; delay cannot be treated as an automatic benefit.
Pundlik Jalam Patil (D) by LRs v. Executive Engineer, Jalgaon Medium Project & others(2008) 17 SCC 448PositiveApplies the Ajit Singh Thakur Singh principle, emphasizing pre-expiry cause for condonation.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,177 words•~24 min read

In The Court Record

Union of India & Anr. v. Jahangir Byramji Jeejeebhoy

2024 INSC 262 **==> picture [72 x 72] intentionally omitted <==** ## REPORTABLE # IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## CIVIL APPEAL NO. OF 2024 (arising out of S.L.P. (Civil) No. 21096 of 2019) UNION OF INDIA & ANR. …APPELLANT(S) VERSUS JAHANGIR BYRAMJI JEEJEEBHOY …RESPONDENT(S) (D) THROUGH HIS LR ## J U D G M E N T ## J.B. PARDIWALA, J. : Leave granted. Signature Not Verified Digitally signed by SNEHA DAS Date: 2024.04.03 16:40:54 IST Reason: 2. This appeal arises from an order passed by a learned single Judge of the High Court of Judicature at Bombay dated 09.07.2019 in Civil Application No. 1494 of 2019 filed in Writ Petition No. 2307 of 1993 by which the High Court declined to condone the delay of 12 years and 158 days in filing the application for 1 restoration of the Writ Petition No. 2307 of 1993 referred to above which came to be dismissed for non-prosecution vide order dated 10.10.2006. 3. The facts giving rise to this appeal may be summarized as under. 4. The suit property bearing S. No. 402, Bungalow No. 15A, situated at Staveley Road, Pune Cantonment, Pune–1 was leased by the respondent in favour of the appellants on 09.03.1951. 5. As the appellants committed breach of the terms of the lease deed, the respondent herein instituted civil suit bearing No. 2599 of 1981 before the Court of the 4[th] Additional Small Causes Judge, Pune for the recovery of the possession of the suit property & arrears towards the rent. 6. On 02.05.1987, the suit came to be allowed and the final decree came to be passed in the following terms: 2 ## _“ORDER_ _1) The plaintiffs are entitled to possession of the suit premises._ _2) The defendant shall deliver vacant and peaceful possession of the suit premises to the plaintiffs or before 30.6.1987._ _3) The defendants do pay by way of damages and mesne profits and notice charges Rs. 17,383/- to the plaintiffs._ _4) The defendant shall also pay future mesne profits at the rate of Rs. 316/- per month from the date of filing of the suit till recovery of possession of the suit premises under order 20 rule 12(1) of CPC._ _5) The defendant shall pay costs of this suit to the plaintiffs and shall bear their own.”_ 7. The appellants herein challenged the judgment and decree referred to above by preferring Civil Appeal bearing No. 850 of 1987 in the Court of the District Judge, Pune. The appeal filed by the appellants herein came to be dismissed vide the judgment and order dated 29.08.1992 passed by the 8[th] Additional District Judge, Pune. 8. The judgment and order passed by the first appellate court dismissing the appeal referred to above 3 came to be challenged by the appellants herein by filing the Petition No. 2307 of 1993 before the High Court of Bombay invoking its supervisory jurisdiction under Article 227 of the Constitution of India. 9. On 10.10.2006, the Petition No. 2307 of 1993 referred to above came to be dismissed for nonprosecution. The order reads thus: _“Coram : D.G. Deshpande – J.) on 10.10.06_ _AND UPON hearing Shri. D.S. Mhaispurkar for Respondent Nos. 1A to 1C and 2 this Court has passed the following order:-_ _"None for the Petitioners. Mr. D.S. Mhaispurkar for the Respondents 1A to C and 2._ _Petition is dismissed. Rule discharged. Interim order is vacated._ _IT IS ACCORDINGLY ordered that this writ petition is disposed of as per the accompanying court's order. The directions given in the court's order hereinabove shall be carried out and complied with scrupulously._ _It is accordingly ordered that this order be punctually observed and carried into execution by concerned.”_ 4 10. On 26.11.2013 the respondent herein filed Execution Petition bearing No. 16 of 2014. The appellants herein were served with the notice in the execution proceedings on 18.03.2016 by the Executing Court. 11. On 20.08.2018, the appellants herein filed an application seeking to set aside the order passed by the Executing Court. On 30.10.2018 the Executing Court set aside the said order referred to above. 12. On 12.04.2019, the appellants herein filed Civil Application No. 1294 of 2019 seeking restoration of the Petition No. 2307 of 1993 referred to above and for condonation of delay of 12 years and 158 days in preferring such restoration application. 13. On 09.07.2019, a learned single Judge of the High Court vide the impugned order declined to condone the delay of 12 years and 158 days in filing the restoration application. 14. In view of the aforesaid, the appellants are here before this Court with the present appeal. 5 ## Submissions on behalf of the appellants 15. Mr. R. Venkataramani, the learned Attorney General for India appearing for the appellants vehemently submitted that he has a very good case on merits and considering the merits alone, the delay of 12 years and 158 days deserves to be condoned. The learned Attorney General laid much emphasis on the fact that the suit property is situated within the Pune cantonment which is under the ownership of the Union of India and the same was held by the respondent herein on old grant lease and in such circumstances, according to the learned Attorney General, the respondent in his capacity as a private party should not be permitted to deprive the Government of its land after having admitted that the super structure alone belongs to him and that the land belongs to the Government. 16. On the aspect of delay of 12 years and 158 days in filing the restoration application before the High Court, 6 the learned Attorney General has no explanation worth to offer. ## Submissions on behalf of the respondent 17. Mr. Sudhanshu Chaudhari, the learned senior counsel appearing for the respondent, on the other hand, vehemently opposed the present appeal and submitted that no error not to speak of any error of law could be said to have been committed by the High Court in passing the impugned order. 18. He submitted that no sufficient case worth the name has been assigned by the appellants for the purpose of getting such a long and inordinate delay of more than 12 years condoned for filing the restoration application. 19. In such circumstances referred to above, the learned counsel prayed that there being no merit worth the name in the present appeal, the same may be dismissed. 7 ## Analysis 20. Having heard the learned counsel appearing for the parties and having gone through the materials on record, the only question that falls for our consideration is whether the High Court committed any error in passing the impugned order? 21. When this matter was heard for the first time by this Bench, we brought to the notice of the learned Attorney General something very relevant as observed by the High Court in para 18 of its impugned order. Para 18 of the impugned order reads thus: _“18. During the course of hearing, I suggested Mr. Singh that in case the defendants are ready and willing to handover possession of the suit property to the respondents, the Court will consider restoring the Petition to its original position. The respondents in turn will give undertaking to the effect that in case the defendants succeed in the Petition, before approaching the Apex Court, they will handover possession of the suit property to the defendants. Upon taking instructions, Mr. Singh submitted that defendants are not ready and willing to handover possession of the suit property. In view of the aforesaid discussion, no case is made out for condoning the delay.”_ 8 22. Thus, it appears that the High Court made a reasonable suggestion to the appellants that if the possession of the suit property is handed over to the respondent, then probably the Court may consider restoring the Petition No. 2307 of 1993 which came to be dismissed for default on 10.10.2006. The High Court noted as above that the learned counsel appearing for the appellants declined to hand over the possession of the suit property to the respondent herein. We reiterated the very same suggestion before the learned Attorney General that if the appellants are ready and willing to hand over the suit property to the respondent, then, despite there being a long and inordinate delay, we may consider condoning the same and remanding the matter back to the High Court so that the High Court may be in a position to hear the matter on its own merits. However, the learned Attorney General, after taking instructions from his clients, regretted his inability to persuade the 9 appellants to hand over the possession of the suit property to the respondent. 23. In such circumstances referred to above, we were left with no other option but to call upon the learned Attorney General to make submissions as to why we should look into only the merits of the matter and condone the delay of 12 years and 158 days. 24. In the aforesaid circumstances, we made it very clear that we are not going to look into the merits of the matter as long as we are not convinced that sufficient cause has been made out for condonation of such a long and inordinate delay. 25. It hardly matters whether a litigant is a private party or a State or Union of India when it comes to condoning the gross delay of more than 12 years. If the litigant chooses to approach the court long after the lapse of the time prescribed under the relevant provisions of the law, then he cannot turn around and say that no prejudice would be caused to either side by the delay being condoned. This litigation between the 10 parties started sometime in 1981. We are in 2024. Almost 43 years have elapsed. However, till date the respondent has not been able to reap the fruits of his decree. It would be a mockery of justice if we condone the delay of 12 years and 158 days and once again ask the respondent to undergo the rigmarole of the legal proceedings. 26. The length of the delay is a relevant matter which the court must take into consideration while considering whether the delay should be condoned or not. From the tenor of the approach of the appellants, it appears that they want to fix their own period of limitation for instituting the proceedings for which law has prescribed a period of limitation. Once it is held that a party has lost his right to have the matter considered on merits because of his own inaction for a long, it cannot be presumed to be non-deliberate delay and in such circumstances of the case, he cannot be heard to plead that the substantial justice deserves to be preferred as against the technical considerations. While considering the plea for condonation of delay, the 11 court must not start with the merits of the main matter. The court owes a duty to first ascertain the _bona fides_ of the explanation offered by the party seeking condonation. It is only if the sufficient cause assigned by the litigant and the opposition of the other side is equally balanced that the court may bring into aid the merits of the matter for the purpose of condoning the delay. 27. We are of the view that the question of limitation is not merely a technical consideration. The rules of limitation are based on the principles of sound public policy and principles of equity. We should not keep the ‘Sword of Damocles’ hanging over the head of the respondent for indefinite period of time to be determined at the whims and fancies of the appellants. 28. At this stage, we would like to quote few observations made by the High Court in its impugned order pointing towards lack of _bona fides_ on the part of the appellants. The observations are as under:- _“9. A perusal of paragraph 4 extracted hereinabove shows that on oath, solemn_ 12 _statement is made that notice of Darkhast No.16 of 2014 for execution of the decree issued by the executing Court was received by the Department on 25.02.2019. As against this, in paragraph 3 of the additional affidavit dated 04.07.2019 made by Rajendra Rajaram Pawar, it is stated that the averments made in paragraph 4 as regards service of Darkhast on 25.02.2019 is factually incorrect. Notice of Darkhast No. 16 of 2014 was received by the defendants on 18.03.2016. The error in the application is out of inadvertence for which he tendered unconditional apology. It is further stated that inadvertent mistake on facts as to knowledge of execution proceedings was purely because of oversight in the light of possibilities of issuance of possession warrant by the executing court and requirement of expeditious urgency of moving before this Court to save the proceeding in litigation since 1981 which otherwise would have got frustrated. He stated that the same is nothing beyond human error._ **==> picture [8 x 8] intentionally omitted <==** **==> picture [152 x 8] intentionally omitted <==** _12. The assertions made in paragraph 4 are bereft of any particulars and are totally vague. In fact the solemn statement made in paragraph 4 that notice of Darkhast for execution of the decree issued by the executing Court was received by the Department on 25.02.2019, to put it mildly, is incorrect statement. In view of paragraph 3 of the additional affidavit dated 04.07.2019 made by Rajendra Rajaram Pawar, it is evident that notice of Darkhast was received by the defendants on 18.03.2016. It is material to note that no particulars are given as to when the_ 13 _Department sought legal opinion. There is also no explanation as to why Department did not instruct lawyer in the High Court to apply for restoration of the Petition and why the Department defended execution proceedings. It is worthwhile to note that execution proceedings were filed by the respondents only because Writ Petition was dismissed. If the Writ Petition was restored, automatically the execution proceedings would have been stayed by the executing Court. Instead of adopting appropriate proceedings, the defendants unnecessarily went on defending the execution proceedings. In paragraph 4(b) though it is stated that Department was regularly following up with its panel lawyer till 2003, this statement is also not substantiated by producing any document. Even if I accept that the Department was regularly following up with its panel lawyer till 2003, there is no explanation worth the name as to why the Department did not follow up the matter between 2003 and 2006 when the Petition was dismissed in default. That apart, equally, there is no explanation as to why no follow up action was taken by the 2006 and 2016 when officers between Department acquired knowledge about dismissal of Writ Petition on 18.03.2016._ _13. It is no doubt true that while considering the application for condonation of delay, the expression ‘sufficient cause’ has to be liberally construed. It, however, does not mean that without making any sufficient cause, the Court will condone the delay regardless of the length of the delay. In the present case, the delay is of 12 years and 158 days. A perusal of the application as also the additional affidavit hardly indicates any sufficient cause for condoning_ 14 _the unpardonable delay of 12 years and 158 days.”_ ## 29. In _Oriental Aroma Chemical Industries Limited_ ## _v. Gujarat Industrial Development Corporation_ , (2010) 5 SCC 459, this Court rejected the application for condonation of delay of 4 years in filing an application to set aside an _exparte_ decree on the ground that the explanation offered for condonation of delay is found to be not satisfied. 30. In _Postmaster General and others v. Living Media India Limited_ , (2012) 3 SCC 563, this Court, while dismissing the application for condonation of delay of 427 days in filing the Special Leave Petition, held that condonation of delay is not an exception and it should not be used as an anticipated benefit for the government departments. In that case, this Court held that unless the Department has reasonable and acceptable reason for the delay and there was _bona fide_ effort, there is no need to accept the usual explanation that the file was kept pending for several months/years due to considerable degree of procedural 15 red tape in the process cannot be accepted. In Para Nos. 25, 26, 27, 28, and 29 respectively, this Court dealt with the scope of ‘sufficient cause’ and held as follows: _“25. We have already extracted the reasons as mentioned in the “better affidavit” sworn by Mr. Aparajeet Pattanayak, SSRM, Air Mail Sorting Division, New Delhi. It is relevant to note that in the said affidavit, the Department has itself mentioned and is aware of the date of the judgment of the Division Bench of the High Court in Office of the Chief Postmaster v. Living Media India Ltd. [(2009) 8 AD 201 (Del)] as 11-9-2009. Even according to the deponent, their counsel had applied for the certified copy of the said judgment only on 8-1-2010 and the same was received by the Department on the very same day. There is no explanation for not applying for the certified copy of the impugned judgment on 11-9-2009 or at least within a reasonable time. The fact remains that the certified copy was applied for only on 8-1-2010 i.e. after a period of nearly four months._ _26. In spite of affording another opportunity to file better affidavit by placing adequate material, neither the Department nor the person-in-charge has filed any explanation for not applying the certified copy within the prescribed period. The other dates mentioned in the affidavit which we have already extracted, clearly show that there was delay at every stage and except mentioning the dates of receipt of the file and the decision taken, there is no_ 16 _explanation as to why such delay had occasioned. Though it was stated by the Department that the delay was due to unavoidable circumstances and genuine difficulties, the fact remains that from day one the Department or the person/persons concerned have not evinced diligence in prosecuting the matter to this Court by taking appropriate steps._ _27. It is not in dispute that the person(s) concerned were well aware or conversant with the issues involved including the prescribed period of limitation for taking up the matter by way of filing a special leave petition in this Court. They cannot claim that they have a separate period of limitation when the Department was possessed with competent persons familiar with court proceedings. In the absence of plausible and acceptable explanation, we are posing a question why the delay is to be condoned mechanically merely because the Government or a wing of the Government is a party before us._ _28. Though we are conscious of the fact that in a matter of condonation of delay when there was no gross negligence or deliberate inaction or lack of bona fides, a liberal concession has to be adopted to advance substantial justice, we are of the view that in the facts and circumstances, the Department cannot take advantage of various earlier decisions. The claim on account of impersonal machinery and inherited bureaucratic methodology of making several notes cannot be accepted in view of the modern technologies being used and available. The law of limitation undoubtedly binds everybody, including the Government._ 17 _29. In our view, it is the right time to inform all the government bodies, their agencies and instrumentalities that unless they have reasonable and acceptable explanation for the delay and there was bona fide effort, there is no need to accept the usual explanation that the file was kept pending for several months/years due to considerable degree of procedural red tape in the process. The government departments are under a special obligation to ensure that they perform their duties with diligence and commitment. Condonation of delay is an exception and should not be used as an anticipated benefit for the government departments. The law shelters everyone under the same light and should not be swirled for the benefit of a few.”_ ## 31. In the case of _Lanka Venkateswarlu (D) by LRs v. State of Andhra Pradesh & others_ , (2011) 4 SCC 363, this Court made the following observations: _“20. In N. Balakrishnan, [(1998) 7 SCC 123] this Court again reiterated the principle that: (SCC p. 127, para 11)_ _“11. Rules of limitation are not meant to destroy the rights of parties. They are meant to see that [the] parties do not resort to dilatory tactics, but seek their remedy promptly.”_ _21 to 27........._ 18 _28. We are at a loss to fathom any logic or rationale, which could have impelled the High Court to condone the delay after holding the same to be unjustifiable. The concepts such as “liberal approach”, “justice oriented approach”, “substantial justice” cannot be employed to jettison the substantial law of limitation. Especially, in cases where the court concludes that there is no justification for the delay. In our opinion, the approach adopted by the High Court tends to show the absence of judicial balance and restraint, which a Judge is required to maintain whilst adjudicating any lis between the parties. We are rather pained to notice that in this case, not being satisfied with the use of mere intemperate language, the High Court resorted to blatant sarcasms._ _29. The use of unduly strong intemperate or extravagant language in a judgment has been repeatedly disapproved by this Court in a number of cases. Whilst considering applications for condonation of delay under Section 5 of the Limitation Act, the courts do not enjoy unlimited and unbridled discretionary powers. All discretionary powers, especially judicial powers, have to be exercised within reasonable bounds, known to the law. The discretion has to be exercised in a systematic manner informed by reason. Whims or fancies; prejudices or predilections cannot and should not form the basis of exercising discretionary powers.”_ 19 ## 32. In the case of _Pundlik Jalam Patil (D) by LRs. v. Executive Engineer, Jalgaon Medium Project &_ _others_ , (2008) 17 SCC 448, this Court held as follows: _“19. In Ajit Singh Thakur Singh v. State of Gujarat [(1981) 1 SCC 495 : 1981 SCC (Cri) 184] this Court observed: (SCC p. 497, para 6)_ _“6. … it is true that a party is entitled to wait until the last day of limitation for filing an appeal. But when it allows limitation to expire and pleads sufficient cause for not filing the appeal earlier, the sufficient cause must establish that because of some event or circumstance arising before limitation expired it was not possible to file the appeal within time. No event or circumstance arising after the expiry of limitation can constitute sufficient cause.”_ _(emphasis supplied)_ _This judgment squarely applies to the facts in hand._ _x x x x_ _21. Shri Mohta, learned Senior Counsel relying on the decision of this Court in N. Balakrishnan v. M. Krishnamurthy [(1998) 7 SCC 123] submitted that length of delay is no matter and acceptability of explanation is the only criterion. It was submitted that if the explanation offered does not smack of mala fides or it is not put forth as a part of dilatory tactics, the court must show utmost consideration to the suitor. The very said_ 20 _decision upon which reliance has been placed holds that the law of limitation fixes a lifespan for every legal remedy for the redress of the legal injury suffered. Unending period for launching the remedy may lead to unending uncertainty and consequential anarchy. The law of limitation is thus founded on public policy. The decision does not lay down that a lethargic litigant can leisurely choose his own time in preferring appeal or application as the case may be. On the other hand, in the said judgment it is said that court should not forget the opposite party altogether. It was observed: (SCC p. 128, para 11)_ _“11. … It is enshrined in the maxim interest reipublicae ut sit finis litium (it is for the general welfare that a period be put to litigation). Rules of limitation are not meant to destroy the rights of the parties. They are meant to see that parties do not resort to dilatory tactics but seek their remedy promptly. The idea is that every legal remedy must be kept alive for a legislatively fixed period of time.”_ _22. In Ramlal v. Rewa Coalfields Ltd. [AIR 1962 SC 361] this Court held that: (AIR pp. 363-65)_ _“In construing Section 5 of the Limitation Act, it is relevant to bear in mind two important considerations. The first consideration is that the expiration of period of limitation prescribed for making an appeal gives rise to right in favour of the_ 21 _decree-holder to treat the decree as binding between the parties and this legal right which has accrued to the decree-holder by lapse of time should not be light-heartedly disturbed. The other consideration which cannot be ignored is that if sufficient cause of excusing delay is shown discretion is given to the court to condone the delay and admit the appeal. It is further necessary to emphasise that even if the sufficient cause has been shown a party is not entitled to the condonation of delay in question as a matter of right. The proof of a cause is a condition sufficient precedent for the exercise of the discretionary jurisdiction vested in the court by Section 5. This aspect of the matter naturally introduces the consideration of all relevant facts and it is at this stage the diligence of the party or its bona fides may fall for consideration.” (emphasis supplied)_ _23. On the facts and in the circumstances, we are of the opinion that the respondent beneficiary was not diligent in availing the remedy of appeal. The averments made in the application seeking condonation of delay in filing appeals do not show any acceptable cause much less sufficient cause to exercise courts' discretion in its favour.”_ 33. In the case of _Esha Bhattacharjee v. Managing Committee of Raghunathpur Nafar Academy & Others_ , (2013) 12 SCC 649, this Court made the following observations: 22 _“21. From the aforesaid authorities the principles that can broadly be culled out are:_ _21.1. (i) There should be a liberal, pragmatic, justice-oriented, non-pedantic approach while dealing with an application for condonation of delay, for the courts are not supposed to legalise injustice but are obliged to remove injustice._ _21.2. (ii) The terms “sufficient cause” should be understood in their proper spirit, philosophy and purpose regard being had to the fact that these terms are basically elastic and are to be applied in proper perspective to the obtaining fact-situation._ _21.3. (iii) Substantial justice being paramount and pivotal the technical considerations should not be given undue and uncalled for emphasis._ _21.4. (iv) No presumption can be attached to deliberate causation of delay but, gross negligence on the part of the counsel or litigant is to be taken note of._ _21.5. (v) Lack of bona fides imputable to a party seeking condonation of delay is a significant and relevant fact._ _21.6. (vi) It is to be kept in mind that adherence to strict proof should not affect public justice and cause public mischief because the courts are required to be vigilant so that in the ultimate eventuate there is no real failure of justice._ _21.7. (vii) The concept of liberal approach has to encapsulate the conception of_ 23 _reasonableness and it cannot be allowed a totally unfettered free play._ _21.8. (viii) There is a distinction between inordinate delay and a delay of short duration or few days, for to the former doctrine of prejudice is attracted whereas to the latter it may not be attracted. That apart, the first one warrants strict approach whereas the second calls for a liberal delineation._ _21.9. (ix) The conduct, behaviour and attitude of a party relating to its inaction or negligence are relevant factors to be taken into consideration. It is so as the fundamental principle is that the courts are required to weigh the scale of balance of justice in respect of both parties and the said principle cannot be given a total go by in the name of liberal approach._ _21.10. (x) If the explanation offered is concocted or the grounds urged in the application are fanciful, the courts should be vigilant not to expose the other side unnecessarily to face such a litigation._ _21.11. (xi) It is to be borne in mind that no one gets away with fraud, misrepresentation or interpolation by taking recourse to the technicalities of law of limitation._ _21.12. (xii) The entire gamut of facts are to be carefully scrutinised and the approach should be based on the paradigm of judicial discretion which is founded on objective reasoning and not on individual perception._ 24 _21.13. (xiii) The State or a public body or an entity representing a collective cause should be given some acceptable latitude._ _22. To the aforesaid principles we may add some more guidelines taking note of the present day scenario. They are:_ _22.1. (a) An application for condonation of delay should be drafted with careful concern and not in a haphazard manner harbouring the notion that the courts are required to condone delay on the bedrock of the principle that adjudication of a lis on merits is seminal to justice dispensation system._ _22.2. (b) An application for condonation of delay should not be dealt with in a routine manner on the base of individual philosophy which is basically subjective._ _22.3. (c) Though no precise formula can be laid down regard being had to the concept of judicial discretion, yet a conscious effort for achieving consistency and collegiality of the adjudicatory system should be made as that is the ultimate institutional motto._ _22.4. (d) The increasing tendency to perceive delay as a non-serious matter and, hence, lackadaisical propensity can be exhibited in a nonchalant manner requires to be curbed, of course, within legal parameters.”_ 34. In view of the aforesaid, we have reached to the conclusion that the High Court committed no error much 25 less any error of law in passing the impugned order. Even otherwise, the High Court was exercising its supervisory jurisdiction under Article 227 of the Constitution of India. 35. In a plethora of decisions of this Court, it has been said that delay should not be excused as a matter of generosity. Rendering substantial justice is not to cause prejudice to the opposite party. The appellants have failed to prove that they were reasonably diligent in prosecuting the matter and this vital test for condoning the delay is not satisfied in this case. 36. For all the foregoing reasons, this appeal fails and is hereby dismissed. There shall be no order as to costs. 37. Pending application, if any, shall also stand disposed of accordingly. ………………………………..J. ( ANIRUDDHA BOSE ) NEW DELHI; ………………………………..J. APRIL 03, 2024 ( J.B. PARDIWALA ) 26
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.