Union of India and another vs Mohiuddin Masood and others

Case / Petition Number:
Civil Appeal No. 6419 of 2019

Case Synopsis & Summary

This is a Civil Appeal filed by Union of India and the Director General of ITBP challenging orders of the Allahabad High Court quashing notifications issued under Sections 4 and 6 of the Land Acquisition Act, 1894 for acquiring land in Kanpur Nagar to establish an ITBP Battalion Headquarter. The ITBP sought about 72–75 acres; a Section 4 notification was issued on 2 September 2009 to initiate urgent acquisition, followed by a Section 6 notification on 11 December 2009 invoking the urgency clause and dispensing with Section 5A. The writ petitions challenging these actions were initially dismissed as premature, but subsequently the High Court held the notifications bad, relying on decisions including Radhy Shyam and Sahara India Commercial Corporation Limited, and directed compensation under the 2013 Act with date of acquisition to be the High Court’s order date (22.12.2016). The Union and ITBP challenged these findings in the Supreme Court. The Court held that there was in fact real urgency and that the three-month gap between Sections 4 and 6 did not negate urgency; it emphasized the public purpose, ongoing development already underway, and substantial public expenditure. It reversed the High Court’s view, allowed the appeal, and quashed the impugned judgment, dismissing the writ petition with no costs, thereby permitting completion of acquisition with compensation under applicable laws.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M. R. Shah
  • Arun Mishra
Judgment Date
2019-08-19
Court Decision / Holding
The appeal is allowed. The impugned judgment and order of the Allahabad High Court is quashed and set aside. The writ petition filed by the respondents is dismissed. There shall be no order as to costs. The notifications under Sections 4 and 6 of the Land Acquisition Act, 1894 stand upheld, and the land acquisition process for the ITBP battalion headquarters may proceed.
Final Disposition
Appeal allowed; High Court judgment set aside; writ petition dismissed; no costs.

Parties to the Case

Appellants / Petitioners

  • Union of India
  • Director General of ITBP

Respondents

  • Mohiuddin Masood
  • others

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Madhavi Divan, Additional Solicitor General

Counsels for Respondents

  • • Shri Ajit Kumar Sinha, Senior Advocate

Provisions of Law Cited

Land Acquisition Act, 1894Section 4 (Land Acquisition Act, 1894)Section 5A (Land Acquisition Act, 1894)Section 6 (Land Acquisition Act, 1894)Section 17(1) (Land Acquisition Act, 1894)Section 17(4) (Land Acquisition Act, 1894)Right to Fair Compensation and Transparency in Land Acquisition & Re‑Settlement Act, 2013

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that there existed real urgency to acquire land for establishing the ITBP Battalion Headquarter at Kanpur Nagar. They argued that the interval between the Section 4 notification and the Section 6 notification was short (about three months) and the land was required urgently due to Counter-Insurgency Operations, law and order duties, VVIP security, and Disaster Management. Dispensing with Section 5A was justified to avoid delay, and the development already undertaken indicated ongoing public use; consequently, the 4th and 6th notifications were valid and proper.

Contentions of Respondents

The respondents contended that the urgency clause was not justified; the High Court correctly struck down the urgency invocation and dispensed with 5A; reliance was placed on Radhy Shyam, Prabhawati, and Sahara India Commercial Corporation Limited to argue that the acquisition lacked urgent necessity and that compensation should be determined per the 2013 Act with date of notification.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Radhy Shyam v. State of Uttar Pradesh(2011) 5 SCC 553DistinguishedCourt stated that this decision would not be applicable to the present case on the facts, thus distinguishing it.
Sahara India Commercial Corporation Limited v. State of Uttar Pradesh(2017) 11 SCC 339DistinguishedHigh Court’s reliance on this decision was found not applicable to the case facts.
Prabhawati v. State of Bihar(2014) 13 SCC 721DistinguishedNot applicable to the facts of this case per the Supreme Court.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,254 words•~15 min read

In The Court Record

Union of India and another vs Mohiuddin Masood and others

REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## CIVIL APPEAL NO. 6419 OF 2019 (Arising from SLP(C) No. 9811/2018) Union of India and another ..Appellants Versus Mohiuddin Masood and others ..Respondents ## J U D G M E N T M.R. SHAH, J. Delay condoned. Leave granted. 2. Feeling aggrieved and dissatisfied with the impugned judgment and order dated 10.04.2017 passed by the High Court of Judicature at Allahabad in Writ Petition No. 2069 of 2010, by which the High Court has allowed the said writ petition and has quashed and set aside the notifications issued under Sections 4 & 6 respectively of the Land Acquisition Act, 1894 (hereinafter referred to as the ‘Act’) with respect to the land in question on the ground that the urgency clause was Signature Not Verified Digitally signed by JAYANT KUMAR ARORA Date: 2019.08.20 18:11:11 IST Reason: illegally and wrongly invoked, the Union of India and the acquiring 1 body, i.e., Director General of ITBP have preferred the present appeal. 3. That a request for providing about 75 acres of land for establishing one Battalion Headquarter of ITBP at Kanpur Nagar was made to the Government of Uttar Pradesh by the Director, Police Finance, ITBP as due to increasing Counter Insurgency Operations, Law and order duties of ITBP, VVIP security duties and Disaster Management Operations, it was decided to establish Battalion headquarter of ITBP at Kanpur Nagar, Uttar Pradesh and it was requested to urgently acquire the land by finding out suitable pieces of land. It appears that thereafter on 5.2.2009, the Special Secretary, State of Uttar Pradesh wrote a letter to the District Magistrate, Kanpur Nagar and Lucknow for identifying 72 to 75 acres of land for being provided for establishment of the Battalion headquarter of ITBP. 3.1 That thereafter, notification under Section 4 of the Act came to be issued on 2.9.2009 for urgent acquisition of the land in order to facilitate the accommodation of the troops and for ITBP headquarter. That immediately on issuance of notification under Section 4 of the Act, respondent nos. 1 & 2 herein filed writ petition No. 54836 of 2009 before the Allahabad High Court challenging the Section 4 notification. The aforesaid petition came to be dismissed by the High Court as pre­ mature vide order dated 3.11.2009. That thereafter the State 2 Government issued notification under Section 6 of the Act invoking the urgency clause and invoking Section 17 of the Act, vide notification dated 11.12.2009 and directed the Collector to take possession of the land. That thereafter again and on issuance of notification under Section 6 of the Act on 11.12.2009, respondent nos. 1 & 2 herein filed another writ petition No. 2069 of 2010 before the Allahabad High Court. Before the High Court, number of submissions were made on merits as well as on invoking the urgency clause and dispensing with the procedure under Section 5A of the Act. The said writ petition was opposed by the appellants justifying the invocation of urgency clause. It appears that thereafter the State Government acquired the land in the month of December, 2010 by adjudging the amount of compensation to the tune of Rs.6,33,09,176.41 inclusive of solatium for the land in question. 3.2 That by the impugned judgment and order and following and relying upon the decision of this Court in the case of _Radhy Shyam v. State of U.P., reported in (2011) 5 SCC 553_ , the High Court has observed and held that the State Government was not justified in invoking the urgency clause and dispensing with the enquiry under Section 5 A of the Act. The High Court has observed and held that there was no immediate urgency and no facts existed before the State Government for invoking the 3 power under Section 17(1) and Section 17(4) of the Act and consequently has held the notifications under Section 4 & 6 of the Act respectively as bad. However, taking note of the development of the acquired land and investment of public money for development of acquired land running into crores of rupees, subsequent to the acquisition notifications, after considering and following the decision of this Court in the case of _Sahara India Commercial Corporation Limited v. State of Uttar Pradesh, reported in (2017) 11 SCC 339_ , the High Court has observed and held that the notifications under Section 4 & 6 respectively of the Act are bad. The acquiring body should not return the possession of the land in question, however, the High Court has directed that the land owners be paid the compensation under the provisions of the Right to Fair Compensation and Transparency in Land Acquisition & Rehabilitation and Re­Settlement Act, 2013 (hereinafter referred to as the ‘2013 Act’) and compensation to be determined on the basis of the date of the order passed by the High Court as the date of the acquisition notification, i.e., 22.12.2016. 3.3 Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court, holding and declaring Sections 4 & 6 notifications with respect to the land in question as bad by holding that the invocation of the urgency clause and the provisions of 4 Section 17(1) and 17(4) of the Act were bad, the Union of India and another – ITBP have preferred the present appeal. 4. Ms. Madhavi Divan, learned Additional Solicitor General has appeared on behalf of the appellants and Shri Ajit Kumar Sinha, learned Senior Advocate has appeared on behalf of respondent nos. 1 & 2 herein – original writ petitioners. 4.1 Ms. Madhavi Divan, learned Additional Solicitor General has vehemently submitted that in the facts and circumstances of the case and considering the purpose for which the land in question was acquired, the High Court has materially erred in observing and holding that there existed no facts before the State Government for invoking the powers under Section 17(1) and Section 17(4) of the Act. 4.2 It is further submitted by Ms. Madhavi Divan, learned Additional Solicitor General that there was no delay at all in invoking the urgency clause and issuance of the notification under Section 4 of the Act by the State Government invoking the urgency clause. 4.3 It is further submitted by Ms. Madhavi Divan, learned Additional Solicitor General that the High Court has failed to appreciate that the land was urgently required by the appellants, due to increase in Counter Insurgency Operations, Law and order duties of ITBP, VVIP security duties and Disaster Management Operations, there was 5 urgent need to establish Battalion headquarter of ITBP at Kanpur Nagar. It is submitted that for establishing such Battalion headquarter approximately 72 to 75 acres of land was required and therefore it might have taken some time in identifying the land, preparing the plan and thereafter issuing the notification under Section 4 of the Act. It is submitted that the High Court has held the invocation of the urgency clause bad on the ground that there was much time gap between the proposal by the ITBP and issuance of the notification under Section 4 of the Act. It is submitted that while holding so, the High Court has not properly appreciated the true and correct facts, more particularly the time taken from the proposal till the issuance of the notification under Section 4 of the Act. 4.4 It is further submitted by Ms. Madhavi Divan, learned Additional Solicitor General that the High Court has failed to appreciate the fact that between notifications under Sections 4 & 6 respectively, the time gap was only three months, which clearly indicates that there was an urgency in the matter requiring dispensing with the enquiry under Section 5A of the Act. It is submitted that had the Section 5A compliance not been dispensed with, it would not have been possible to publish Section 6 notification within three months. 4.5 It is further submitted by Ms. Madhavi Divan, learned Additional 6 Solicitor General that from the very beginning the land was required urgently for the aforesaid public purpose, more particularly for establishment of the Battalion headquarter of ITBP and in the facts and circumstances of the case, there was no delay/inordinate delay in issuance of the notification under Section 4 of the Act. It is submitted that therefore the finding recorded by the High Court that no facts existed for invocation of the urgency clause cannot be sustained as the same is contrary to the material on record. 4.6 It is further submitted by Ms. Madhavi Divan, learned Additional Solicitor General that even the High Court has also wrongly observed in the impugned judgment and order that so far no award has been made by the Special Land Acquisition Officer with reference to the notification under challenge. It is submitted that as such and in fact the adjudgment of the compensation was pronounced after the sanction of the District Magistrate on 27.12.2010 by the Land Acquisition Officer. 4.7 Ms. Madhavi Divan, learned Additional Solicitor General has further submitted that in the facts and circumstances of the case, the decisions relied upon by the learned counsel appearing on behalf of respondent nos. 1 & 2, more particularly the decision of this Court in the case of _Radhy Shyam (supra)_ shall not be applicable to the facts of 7 the case on hand, more particularly with respect to the public purpose for which the land is acquired. 4.8 Making the above submissions and further submitting that on the 95% of the land acquired, by now the development has already taken place and public money to the tune of crores of rupees have been spent, it is prayed to allow the present appeal. 5. The present appeal is vehemently opposed by Shri Ajit Kumar Sinha, learned Senior Advocate on behalf of respondent nos. 1 & 2. Taking us to various dates and events right from the date of proposal by the ITBP till the notification under Section 6 of the Act was issued, it is vehemently submitted by Shri Ajit Kumar Sinha, learned Senior Advocate that in the facts and circumstances of the case, the High Court has rightly observed and held that the State Government was not justified in invoking the urgency clause and dispensing with the enquiry under Section 5A of the Act. 5.1 It is further submitted by Shri Ajit Kumar Sinha, learned Senior Advocate that in fact invoking the urgency clause was not explained and/or justified by the State Government and therefore considering the material on record, the High Court has rightly observed that there was no real and substantive urgency which could justify invoking the urgency clause under Section 17(1) of the Act and excluding the 8 application of Section 5A of the Act. 5.2 It is further submitted by Shri Ajit Kumar Sinha, learned Senior Advocate that as held by this Court in catena of decisions that enquiry under Section 5A of the Act is a valuable statutory right available to the land owners and unless there are compelling circumstances warranting invocation of the urgency clause under Section 17(1) of the Act, such statutory right cannot be taken away. In support of his submission, learned Senior Advocate appearing on behalf of respondent nos. 1 & 2 herein has heavily relied upon the decisions of this Court in the cases of _Radhy Shyam (supra); Prabhawati v. State of Bihar, reported in (2014) 13 SCC 721; and Sahara India Commercial Corporation Limited (supra)._ 5.3 It is further submitted by Shri Ajit Kumar Sinha, learned Senior Advocate that as such in the present case and by passing the impugned judgment and order, the High Court has tried to strike the balance and instead of directing to return the land acquired, the High Court has directed to pay the compensation as per the provisions of the 2013 Act and the compensation to be determined on the basis of the date of order as the date of the acquisition notification, i.e., 22.12.2016. 5.4 It is further submitted by Shri Ajit Kumar Sinha, learned Senior 9 Advocate that even till date the land owners have not received any compensation of the land acquired. It is submitted therefore that there is a non­compliance of Section 17(4) of the Act. 5.5 Making the above submissions, it is prayed to dismiss the present appeal. 6. We have heard the learned counsel appearing on behalf of the respective parties at length. 6.1 We have gone through and considered in detail the impugned judgment and order passed by the High Court. We have also considered the chronological dates and events leading to the issuance of the notification under Section 4 of the Act and thereafter issuance of the notification under Section 6 of the Act invoking the urgency clause. At the outset, it is required to be noted that by the impugned judgment and order the High Court has held invocation of urgency clause and invocation of Section 17 of the Act as bad by observing that there were no justifiable reasons to invoke the urgency clause and dispensing with the enquiry under Section 5A of the Act. However, considering the chronological list of dates and events and the object and purpose for which the land was sought to be acquired, we are of the opinion that the High Court has materially erred in holding that invocation of the urgency clause was bad. The High Court has failed 10 to appreciate and consider the fact that there was a time gap of only three months between the notification under Section 4 and notification under Section 6 respectively of the Act. 6.2 Even there was not much delay in considering the request made by the ITBP to acquire the land. Right from the very beginning the ITBP requested to acquire the land urgently as the land was urgently required by the ITBP to establish Battalion headquarter due to increase in Counter Insurgency Operations, Law and order duties of ITBP and Disaster Management Operations. It is required to be noted that for establishing such Battalion headquarter a large chunk of land approximately 72 to 75 acres of land was required. Such a huge land was required to be first identified at suitable places. Therefore, some time is bound to be consumed between the proposal and issuance of the notification under Section 4 of the Act. The said aspect has not at all been considered by the High Court. Therefore, merely that some time had been taken in identifying the land and in issuing actual Section 4 notification, the High Court is not justified in observing that there was no urgency at all and/or there were no grounds to invoke the urgency clause. Therefore, in the facts and circumstances of the case and considering the material on record, we are of the opinion that the High Court has erred in observing and holding that invocation of 11 the urgency clause was bad. We are more than satisfied that there was a real urgency and therefore the urgency clause and Section 17 of the Act was rightly invoked dispensing with the enquiry under Section 5A of the Act. Therefore, in the facts and circumstances of the case, the decisions of this Court relied upon by the learned Senior Advocate appearing on behalf of respondent nos. 1 & 2, referred to hereinabove, shall not be applicable to the facts of the case on hand, more particularly in the relied upon cases the acquisitions were either for private parties and/or companies and in the present case the acquisition was for establishing ITBP Battalion headquarter. 6.3 It is also required to be noted that on the land in question total admeasuring 28.1398 hectares (19.7548 + 8.3850 hectares = 28.1398 hectares) there is a development on 90 to 95% of the land acquired and 90 to 95% of the land has been put to use by the ITBP. It is also required to be noted that so far as respondent nos. 1 & 2 herein are concerned, out of the total land acquired, they were the owners/tenure holders of plot nos. 2348 area 1.138 hectares, 2353 area 1.2800 hectares and 2354 area 0.2970 hectare only. As observed hereinabove, the total land acquired was 28.1398 hectares and other land owners have not questioned the acquisition. Therefore also, the High Court ought not to have set aside the notifications under 12 Sections 4 & 6 respectively of the Act which were with respect to the acquisition of large chunk of land admeasuring 28.1398 hectares, which was not under challenge by the other land owners except respondent nos. 1 & 2 herein – original writ petitioners. 6.4 Now so far as the submission on behalf of the original writ petitioners that there is a non­compliance of Section 17(4) of the Act as 80% of the estimated amount of compensation was not deposited is concerned, at this stage, counter affidavit filed by the Tehsildar before the High Court is required to be considered. In the counter affidavit, it has been specifically stated that after the notification under Section 4 of the Act was issued, the ITBP has deposited 10% of estimated compensation amounting to Rs.3026675.00 vide treasury challan dated 17.06.2009, 70% of estimated compensation amounting to Rs.23674225.00 vide treasury challan dated 05.01.2009 and rest of 20% of estimated compensation amounting to Rs.6053350.00 vide treasury challan dated 22.01.2010. In the counter affidavit, it is also stated that notice dated 16.03.2010 was issued to the tenure holders to take 80% of the estimated amount of compensation but they did not come to take the compensation. Therefore, it cannot be said that there is a non­compliance of Section 17(4) of the Act and the tenure holders/land owners were not paid the 80% estimated amount of 13 ## compensation as required. 6.5 Considering the aforesaid facts and circumstances of the case and in the peculiar facts and circumstances of the case, we are of the opinion that the High Court is not justified in setting aside the notifications under Sections 4 & 6 respectively of the Act and/or observing and holding that the invocation of Section 17 of the Act and urgency clause was bad. 7. Now so far as submission on behalf of the original writ petitioners that they have not been paid any compensation is concerned, it is required to be noted and as observed hereinabove, in fact, ITBP had deposited the estimated amount of compensation in the year 2009/2010 itself and the land owners/tenure holders were served with the notice to withdraw and/or take 80% of the estimated amount of compensation but they refused to take the compensation. Therefore, thereafter it is not open for the original writ petitioners to make the grievance that they have not been paid any compensation. Still, it will be open to them to withdraw the amount of compensation. At this stage, it is required to be noted that in the year 2010 itself, final award directing adjudgment of the compensation to the tune of Rs.63309176.41 inclusive of solatium was published before that writ petition was filed and compensation was not accepted. 14 8. In view of the above and for the reasons stated above, the present appeal is allowed. The impugned judgment and order passed by the High Court is hereby quashed and set aside. Consequently, the writ petition filed before the High Court by respondent no. 1 & 2 herein stands dismissed. There shall be no order as to costs. ……………………………………..J. [ARUN MISHRA] ……………………………………..J. [M.R. SHAH] NEW DELHI; ………………………………………J. AUGUST 19, 2019. [B.R. GAVAI] 15
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.