Case Synopsis & Summary

The petitioner Triveni Pramanand, carrying on an industrial unit under consumer no. ES 4096, challenges a demand for electricity charges under Ext.P6, following inspections by the Anti Power Theft Squad. In 1999–2000, meters were inspected; a reported negative error of 16.6% led to the previous six months’ consumption being inflated and charged at Rs. 2.20 per unit, producing a demand of Rs. 21,504.76 (Ext.P1). The petitioner objected to the reassessment and paid one-fifth of the demanded amount to maintain the bill while the matter was pending. The old meter was replaced on 20.7.2000, and the appellate process continued, with hearings concluding on 28.6.2000. By Ext.P4 (3.3.2001), the Government authority held the reassessment as not in order and directed reassessment from 1999 onwards based on the average consumption for the next three months after the meter replacement. Ext.P6 demanded Rs. 69,033. The petitioner contends that Regulation 31C prescribes the method for determining average consumption when a meter is faulty and that Regulation 42 penal provisions require tampering; Ext.P4 and Ext.P6 are unsustainable. The court sets aside Ext.P4 and Ext.P6 and directs the appellate authority to reconsider in light of Regulation 31C and Nirmala Metal Industries v. KSEB with an opportunity to be heard, within three months, crediting amounts already paid and adjusting any excess against future charges.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • K. Surendra Mohan
Judgment Date
2009-04-01
Court Decision / Holding
Writ petition allowed. Ext.P4 and Ext.P6 set aside. The appellate authority is directed to reconsider the petitioner's matter in the light of Regulation 31C and the decision in Nirmala Metal Industries v. KSEB (2006(3) KLT 465), after affording an opportunity to be heard. Final orders to be passed within three months from receipt of a copy of this judgment. Credit shall be given for amounts already paid, and any excess shall be adjusted towards future electricity charges payable by the petitioner.
Final Disposition
Writ petition allowed; directions for reconsideration within three months; account adjustments as stated, with credits for amounts paid and adjustments for any excess against future charges.

Parties to the Case

Appellants / Petitioners

  • TRIVENI PRAMANAND, RATHNAMMA FREEZE LAND, P.O. PUTHYANGADI, CALICUT

Respondents

  • KERALA STATE ELECTRICITY BOARD
  • THE DEPUTY CHIEF ENGINEER, APTS (HQ), VYDYUTHI BHAVAN, TRIVANDRUM
  • THE ASSISTANT ENGINEER, ELECTRICAL SECTION, ERANLIKKAL, P.O. PUTHYANGADI, CALICUT
  • THE ASSISTANT EXECUTIVE ENGINEER, ELECTRICAL MAJOR SECTION, WEST HILL, CALICUT

Legal Representation & Advocates

Counsels for Petitioners

  • • MR.P.V.JYOTHI PRASAD

Counsels for Respondents

  • • MR.KODOTH SREEDHARAN, SC, KSEB
  • • MR.C.K.KARUNAKARAN.SC.KSEB

Provisions of Law Cited

Regulation 31C of the Conditions of Supply of Electrical EnergyRegulation 31(c)Regulation 42

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends Ext.P6 is arbitrary and not in conformity with Regulation 31C, which prescribes determining the correct energy quantity by averaging the consumption for the previous three months when a meter is faulty, or if that period cannot be used, the succeeding three months. The reversal of reassessment without reason, as directed by Ext.P4, and the demand under Ext.P6 for Rs. 69,033, are challenged as unsustainable. The meter was replaced during the proceedings, and there was no finding of tampering; penalties under Regulation 42 cannot be levied without a showing of misuse. The appellate order fails to apply the statutory framework; the matter should be reconsidered with due process, referencing Nirmala Metal Industries v. KSEB (2006(3) KLT 465). Credit for payments already made and adjustment of any excess against future charges should be allowed, within a three-month timeline.

Contentions of Respondents

The Board contends that Regulation 31C provides the method for calculating average consumption when a meter is faulty and that Regulation 42 permits penal charges for misuse of energy; Ext.P4’s direction was to reassess in accordance with Regulation 31C and levy appropriate charges, with the understanding that penalties may follow misuse. The appellate authority’s approach is grounded in statutory provisions and prior decisions, and the matter requires consistency with Regulation 31C and related penalties where appropriate.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Nirmala Metal Industries v. KSEB2006(3) KLT 465PositiveCited to support the proper procedure under Regulation 31C and its interplay with penalties; used to justify remand for fair process and proper reassessment.
W.P(C) 16312/2006W.P(C) 16312/2006Mentioned OnlyCited by the standing counsel to illustrate that both computation of charges and penalties can be invoked; not treated as binding authority within this judgment.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,517 words•~7 min read

In The Court Record

Triveni Pramanand v. Kerala State Electricity Board

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE K.SURENDRA MOHAN** **WEDNESDAY, THE 1ST APRIL 2009 / 11TH CHAITHRA 1931** **WP(C).No. 26542 of 2003(I)** **------------------------------------** **PETITIONER(S):** **----------------------** **TRIVENI PRAMANAND, RATHNAMMA FREEZE LAND, P.O. PUTHYANGADI, CALICUT.** **BY ADV. MR.P.V.JYOTHI PRASAD** ## **RESPONDENT(S):** **-------------------------** **1. KERALA STATE ELECTRICITY BOARD, REPRESENTED BY CHAIRMAN, TRIVANDRUM.** **2. THE DEPUTY CHIEF ENGINEER, APTS (HQ), VYDYUTHI BHAVAN, TRIVANDRUM.** **3. THE ASSISTANT ENGINEER, ELECTRICAL SECTION, ERANLIKKAL, P.O. PUTHYANGADI, CALICUT.** **4. THE ASSISTANT EXECUTIVE ENGINEER, ELECTRICAL MAJOR SECTION, WEST HILL, CALICUT.** - **BY ADVS. MR.KODOTH SREEDHARAN, SC, KSEB MR.C.K.KARUNAKARAN.SC.KSEB.** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 01/04/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **W.P.(C) NO.26542/2003** ## **APPENDIX** ## **PETITIONER'S EXHIBITS** **P1:- COPY OF THE ORDER ISSUED BY THE 4TH RESPONDENT TO THE PETITIONER DT. 3.5.00.** **P2:- COPY OF THE ORDER ISSUED BY THE 2ND RESPONDENT TO THE PETITIONER DT. 12.5.00.** **P3:- COPY OF THE PAYMENT MADE PURSUANT TO EXT.P2.** **P4:- COPY OF THE ORDER OF THE 2ND RESPONDENT DT. 3.3.01.** **P5:- COPY OF THE REVIEW PETITION FILED BY THE PETITIONER DT. 26.6.01.** **P6:- COPY OF THE ORDER AND BILL ISSUED BY THE 3RD RESPONDENT TO THE PETITIONER DT. 11.8.03.** **TRUE COPY** **P.S. TO JUDGE** **TSS** **K. SURENDRA MOHAN, J -----------------------------------------------------------W.P(C) NO: 26542 OF 2003 ----------------------------------------------------------Dated this the 1[st] April, 2009.** ## **JUDGMENT** The petitioner challenges the levy of electricity charges on him as per Ext.P6 proceedings, is being arbtirary and uncalled for. 2. The petitioner is running an industrial unit and for the purpose, she has taken an electricity connection from the respondents, consumer No: ES 4096. According to her she was paying the electricity charges regularly and there was no complaint against her at any time. While so on 24.7.1999 the Anti Power Theft Squad inspected the petitioner's premises and found that her metre was in order. Subsequently on 11.4.2000 there was a further inspection by the same squad. After inspection, they recorded that the existing metering system was showing a negative percentage error of 16.6%. Based on the above, the meter reading of the previous six months was taken, 16.6% of the reading was added to it and charges for electricity energy was computed at the rate of Rs.2.20 per unit. Accordingly an amount of Rs.21,504.76 was demanded. The said order is Ext.P1. 2. The petitioner challenged Ext.P1 before the Deputy Chief WPC 26542/2003 2 Engineer, Thiruvananthapuram who is the Appellate Authority. The petitioner paid 1/5[th] of the amount demanded as a condition for maintaining the bill. Though the meter was found faulty on 11.4.2000, the same was not replaced. Therefore, the petitioner requested the fourth respondent, Assistant Executive Engineer to replace the same and to keep the faulty meter in safe custody till the dispute was finally settled. Finally on 20.7.2000 the old meter was replaced by a new meter. Meanwhile the appeal was finally heard on 28.6.2000. 3. As per order dated 3.3.2001, the Government authority found that the reassessment made as per Ext.P1 was not in order. Therefore the appeal was set aside. According to the Appellate Authority, the petitioner was due for re-assessment for the period from 1999 onwards. The Appellate Authority further directed reassessment to be conducted on the basis of the average consumption of the petitioner for the future three months after replacing the faulty meter. On the above basis an amount of Rs.69,033/- has been demanded from the petitioner. The petitioner challenges the above demand, evidenced herein by Ext.P6 has being arbitrary and unsustainable. 4. Though the above writ petition was admitted on WPC 26542/2003 3 20.8.2003, no counter affidavit has been filed on behalf of the respondent. However, I have heard counsel for the petitioner and the standing counsel for the KSEB. 5. According to the standing counsel, Regulation 31C of the Conditions of Supply of Electrical Energy lays down only a method for finding out the average monthly consumption whenever a meter is found to be faulty. According to the standing counsel apart from the amount computed in accordance with Regulation 31C, penalty under Regulation 42 for misuse of energy could also be levied on a consumer who is found to be at fault. Therefore, the demand under Ext.P6 was perfectly justified, according to the standing counsel. Regulation 31(c) reads as follows:- “In the event of any meter being found incorrect (which includes meter ceasong to record, running fast or slow, creeping or running in reverse, direction) and where the actual errors on reading cannot be ascertained, the meter will be declared faulty and the correct quantity of energy shall be determined by taking the average consumption for the previous three months, due regard being paid to the conditions of working, occupancy etc. If the average consumption for the previous three months cannot be taken due to the meter ceasing to record the consumption or any other reason, the correct consumption will be determined based on the average consumption for the succeeding three months. Where any difference or dispute arises as to the correctness of the meter, the matter shall be decided upon by WPC 26542/2003 4 the Electrical Inspector to Government upon the application of either the Board or the consumer. During such periods the consumer will be charged only the meter minimum. After determining the correct consumption due billing will be made and necessary adjustment made in the next invoice issued.” It may be seen from the above that the procedure to be adopted under the above regulation for determining the correct quantity of energy is by taking the average consumption for the previous three months. If the average consumption for the previous three months cannot be taken due to any reason, then the average consumption can be determined by taking into account the consumption after exceeding three months. It has further been provided that where there is difference or dispute regarding the correctness of the meter, the matter shall be decided by the Electrical Inspector to Government upon an application either by the Board or the consumer. The Appellate Authority does not advert to any of the above procedures against the order evidenced by Ext.P4. The appellate authority has directed re-assessment of the consumption of the petitioner for the period from 1/1999 onwards, without any basis. Therefore the direction in Ext.P4 is not in conformity with the regulation referred to above. The standing counsel has not been able to point out any other provison of law which authorise WPC 26542/2003 5 the procedure that has been directed to be followed by appellate authority in Ext.P4. Therefore the directions in Ext.P4 are unsustainable. Ext.P6 which has been issued pursuant to the directions in Ext.P4 are also unsustainable. Exts.P4 and P6 proceedings are set aside. 6. The respondents have no case that the petitioner is guilty of tampering with the electricity meter. If so, the defect in the working of the meter could be due to various factors including mechanical defects. For such discrepancies the consumer is not responsible and cannot be made liable. Therefore as required in the latter part of Regulation 31(c) it is necessary to ascertain the reason for the fault in the electrical meter. The appellate authority is not entitled to invoke the penal provisions under Regulation 42 in the absence of any allegation of tampering. The standing counsel for the KSEB has relied on the decision of this Court in W.P(C) 16312/2006 to point out that while Regulation 31(c) deals with the method of finding out the average monthly consumption when the meter is faulty regulation 42 deals with levy of penal charges. According to the standing counsel the Board has the right not only to compute the correct electricity charges but also to levy penal charges. It is true that the authorities have both the powers WPC 26542/2003 6 referred to above viz., the power to compute the correct electricity charges as well as to levy penalty in appropriate cases. But, the order of the appellate authority shows that the said authority has not referred to any of the above provisions or found a case for invoking the powers thereunder. Therefore, the appeal filed by the petitioner is directed to be reconsidered by the appellate authority in the light of regulation 31(c) referred to above and the decision of this Court reported in **Nirmala Metal Industries v. KSEB** (2006(3) KLT 465) after affording an opportunity to the petitioner of being heard in the matter. Such orders shall be passed within a period of three months from the date of receipt of a copy of this judgment. Any further payment of electricity charges from the petitioner shall be made only after such final orders are passed. While passing such final orders credit shall be given to the petitioner for the amounts already paid by him. In case of there being any excess the same shall be adjusted towards future electricity charges payable by him. Writ petition is allowed on the above terms. ## K. SURENDRA MOHAN Judge jj WPC 26542/2003 7 K. SURENDRA MOHAN, J. **-----------------------------** **W.P(C) NO:26542 OF 2003-I -----------------------------** ## **JUDGMENT** Dated: 1[st] April, 2009.
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.