Supreme Court of IndiaSupreme Court · 2014Division BenchI.As disposed of; direction to appoint National...

T.N. Godavarman Thirumulpad v. Union of India & Ors.

Case / Petition Number:
Writ Petition (Civil) No. 202 of 1995; I.A. Nos. 1868, 2091, 2225-2227, 2380, 2568, 2937
Neutral Citation:[2014] 1 S.C.R. 88

Case Synopsis & Summary

This Supreme Court decision centers on the interpretation and implementation of the Environment (Protection) Act, 1986, especially Section 3(3), and the need for a national regulator to appraise environmental projects, enforce clearance conditions, and impose penalties on polluters. Relying on Lafarge Umiam Mining Private Limited v. Union of India (2011), the Court examines whether the earlier directive to appoint a National Regulator was a mandamus or a mere suggestion. The Court reiterates that Lafarge held Section 3(3) confers a power coupled with a duty on the Central Government to establish an appropriate regulator at both State and Central levels for project appraisal, enforcement of environmental conditions, and penalties, with the regulator to oversee environmental clearances and monitoring. The Union of India argued that the EIA mechanism under the 2006 Notification suffices and that powers under the Forest (Conservation) Act, 1980 cannot be delegated. The Amicus and the Court, however, treat Lafarge’s directions as mandamus, not mere recommendations, noting the lack of a national regulatory mechanism and deficiencies in implementation. The Court directs the Union of India to appoint a Regulator under Section 3(3) and to file an affidavit along with a notification by 31 March 2014, disposing of the IA petitions and underscoring the imperative for a robust regulatory architecture for environmental clearances.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • A.K. Patnaik
  • Surinder Singh Nijjar
  • Fakkir Mohamed Ibrahim Kalifulla
Judgment Date
2014-01-06
Court Decision / Holding
The Court held that Lafarge Umiam Mining Private Limited v. Union of India (2011) creates a mandamus-like obligation under Section 3(3) to appoint a National Regulator at the State and Central levels. It directed the Union of India to appoint a Regulator with offices in as many States as possible under Subsection (3) of Section 3 of the Environment (Protection) Act, 1986, and to file an affidavit along with the notification by 31 March 2014. The IA petitions were disposed of accordingly, emphasizing the need for a robust, independent regulatory mechanism to oversee environmental clearances and compliance with conditions.
Final Disposition
I.As disposed of; direction to appoint National Regulator and file affidavit with notification by 31 March 2014.

Parties to the Case

Appellants / Petitioners

  • T.N. Godavarman Thirumulpad

Respondents

  • Union of India
  • Ors.

Provisions of Law Cited

Environment (Protection) Act, 1986 – Section 3(3)Forest (Conservation) Act, 1980 – Section 2EIA Notification dated 14.09.2006National Forest Policy, 1988

Legal Doctrines & Maxims

  • Power coupled with a duty (under Section 3(3) of the Environment (Protection) Act, 1986)
  • Mandamus (as interpreted in Lafarge Umiam Mining case)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petition contends that Lafarge Umiam Mining Private Limited v. Union of India (2011) established that Section 3(3) of the Environment (Protection) Act, 1986 confers a power coupled with a duty to appoint an effective regulator at the national level to appraise projects, enforce environmental conditions, and impose penalties, due to deficiencies in the EIA 2006 mechanism. Therefore, a National Regulator should be established and an affidavit with notification should be filed by a specified date; MoEF’s current processes and reliance on MoEF for appraisals are insufficient and prone to conflicts of interest without a separate regulator.

Contentions of Respondents

Union of India submitted that the existing EIA framework under the 2006 Notification, with MoEF oversight across regional offices, suffices for environmental clearance, monitoring, and enforcement. It argued that Section 3(3) creates powers but does not mandate immediate creation of a National Regulator and that Lafarge’s Part II guidelines were merely suggestive, not mandatory mandamus. The Government contends that appropriate mechanisms exist and is considering steps toward regulator implementation.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Lafarge Umiam Mining Private Limited v. Union of India & Ors.(2011) 7 SCC 338PositiveThe judgment relies on Lafarge to interpret Section 3(3) as conferring a duty to appoint a regulator; the current Court treats Lafarge as mandamus rather than a mere suggestion, directing action.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,172 words•~15 min read

In The Court Record

T.N. Godavarman Thirumulpad v. Union of India & Ors.

## [2014] 1 S.C.R. 88 A ## T.N. GODAVARMAN THIRUMULPAD _v._ UNION OF INDIA & ORS. I.A. NOs.1868, 2091, 2225-2227, 2380, 2568 AND 2937 IN **B** WRIT PETITION (CIVIL) No. 202 OF 1995 JANUARY 06, 2014. **[A.K. PATNAIK, SURINDER SINGH NIJJAR AND FAKKIR MOHAMED IBRAHIM KALIFULLA, JJ.]** c _ENVIRONMENT (PROTECT/ON) ACT, 1986:_ _s. 3(3)_ - _National Regulator_ - _Order of Supreme Court dated 6.7. 2011 directing for appointment of National Regulator -Held: In Lafarge Umiam Mining's case, on an_ 0 _interpretation of s. 3 (3), the Court took a view that it confers a power coupled with duty to appoint an appropriate authority in the form of a Regulator at the State and at the Central level for appraising projects, enforcing environmental conditions for_ E _approvals and to impose penalties on polluters and accordingly directed the Central Government to appoint a National Regulator under the said provision, as the Court did not find the mechanism of making the EIA appraisals of projects by MoEF to be satisfactory- The mechanism under EIA Notification dated 14.09.2006, issued by Government with_ F _regard to processing, appraisals and approval of the projects for environmental clearance is deficient in many respects and what is required is a Regulator at the national level having its offices in all the States which can carry out an independent, objective and transparent appraisal and approval of the_ S _projects for environmental clearances and which can_ also _monitor the implementation of the conditions laid down in the Environmental Clearances_ - _The Regulator_ so _appointed ul s 3(3) can exercise only such powers and functions of Central_ 0 H 88 ## T.N. GODAVARMAN THIRUMULPAD _v._ UNION OF 89 INDIA _Government under the Act as are entrusted to it and obvibusly_ A _cannot exercise powers of Central Government u/s 2 of Forest (Conservation) Act, 1980, but while exercising such powers under Environment Protection Act, he will ensure that the National Forest Policy, 1988 is duly implemented as held in the order dated 06.07.2011 in the case of Lafarge Umiam_ B _Mining_ - _Union of India is directed to appoint a Regulator with offices in as many States as possible under sub-s. (3) of s. -3 of the Environment (Protection) Act as directed in the order in the case of Lafarge Umiam Mining and file an affidavit along with the notification appointing the Regulator in_ c _compliance of this- direction_ - _Forest (Conservation) Act, 1980_ - _National Forest Policy, 1988_ - _EIA Notification dated 14.09.2006._ _Lafarge Umiam Mining Private Limited_ v. _Union of India_ & _Ors._ 2011 (7) SCR 954 = (2011) 7 SCC 338 - referred to. D ## Case Law Reference: ## 2011 (7) SCR 954 referred to para 1 CIVIL ORIGINAL JURISDICTION I.A. NOs.1868, 2091, E 2225-2227, 2380, 2568 AND 2937 IN Writ Petition (Civil) No. 202 OF 1995. F Harish N. Salve, Uday U. Lalit, Vivek Tankha, R.K. Raizada, Mahaveer Singh, A.D.N. Rao, Siddharth Chowdhury, P.K. Manohar, Group Capt. Karan Singh Bhati, Dr. Prikshayat Singh, Karmendra Singh, Prashant Kumar, Joseph Pookkatt (for APJ Chambers), Rajiv Tyagi (for Rajiv Tyagi Associates), Vivek Gupta, S.S. Shamshery, Bhakti Vardhan Singh, Bharat Sood, Dr. Kailash Chand, Arvind Kumar Shukla, Amit Shukla, Nihal Ahmad, Alok Shukla, R.C. Kohli, Yash Pal Dhingra, Himanshu Shekhar, Sanchit Guru, Gunwant Dara, D.K. Thakur, Sukhbeer Kaur Baiwa, Shreekant N. Terdal, Gopal Prasad, C.D. Singh, Hemantika Wahi, Preeti Bhardwaj, Parul Kumari, G H ., ## 90 SUPREME COURT REPORTS [2014] 1 S.C.R. - A Gopal Prasad, Anitha Shenoy, ~ishra Saurabh, Vanshja Shukla and Abhishek Chowdhury for the appearing parties. The following Order of the Court was delivered ## **0 RD ER** 1. In the case of _Lafarge Umiam Mining Private Limited_ v. _Union of India_ & _Ors._ [(2011) 7 SCC 338], this Court, while refusing to interfere with the decisions of the Ministry of Environment and Forests (MoEF) granting site clearance, EIA _C_ clearance read with revised environmental clearance and Stage I forest clearance to the mining project of Lafarge Umiam Mining Private Limited, laid down some guidelines to be followed in future cases in Part-I I of its order dated 06.07.2011. These guidelines have been stated in Para 122 D of the said order and sub-para (i.1.) of Para 122, this Court called upon the Central Government to appoint a National Regulator under Section 3(3) of the Environment (Protection) Act, 1986 for appraising projects, enforcing environmental conditions for approvals and to impose penalties on polluters. F.! Despite the order dated 06.07.2011 of this Court, the Central Government did not appoint a National Regulator under Section 3(3) of the Environment (Protection) Act, 1986. On 09.09.2013, this Court therefore requested Mr. Mohan Parasaran, learned Solicitor General, to obtain instructions and F apprise this Court as to when the direction of this Court will be complied with. 2. When the matter was taken up on 18.11.2013 again, Mr. Mohan Parasaran, learned Solicitor General, relying on the G affidavit filed on behalf of the MoEF, submitted that in the case of Lafarge Umiam Mining Private Limited, this Court was really concerned with the National Forest Policy, 1988. He submitted that so far as the National Forest Policy, 1988 is concerned, the same relates to forests and under Section 2 of the Forest H (Conservation) Act, 1980 the duty of a Regulator has been cast ## T.N. GODAVARMAN THIRUMULPAD _v._ UNION OF 91 INDIA upon the Central Government. He submitted that the A responsibility to appraise proposals seeking prior approval of the Central Government under Section 2 of the Forest (Conservation) Act, 1980 lies with the Forest Advisory Committee constituted by the Central Government under Section 3 of the Forest (Conservation) Act, 1980. He argued B that these statutory duties of the Central Government under Section 2 of the Forest (Conservation) Act, 1980 cannot be delegated to any other authority. B 3. Mr. Parasaran next submitted that sub-section (1) of C Section 3 of the Environment (Protection) Act, 1986 similarly confers powers on the Central Government to take all such measures as it deems necessary or expedient for the purpose of protecting and improving the quality of the environment and preventing, controlling and abating environmental pollution and 0 the Central Government in exercise of its powers under subsection (1) and clause (v)(b) of sub-section (2) of Section 3 Environment (Protection) Act, 1986 had issued the EIA Notification dated 14.09.2006. He explained that the EIA Notification dated 14.09.2006 provides that the prior E environmental clearance from the Central Government, or as the case may be, from the State Level Environment Impact Assessment Authority, shall be taken for construction of new projects or activities or the expansion or modernization of existing projects or activities mentioned in the Schedule to this Notification. He submitted that the Central Government through MoEF is, thus, undertaking appraisals of projects in accordance with the Notification dated 14.09.2006. He submitted that compliance of the conditions stipulated in the environmental clearance granted to the projects are being G monitored and enforced six Regional Offices of the MoEF are functioning at Bangalore, Bhopal, Bhubaneswar, Chandigarh, Lucknow and Shillong. He submitted that as an appropriate mechanism for appraising projects as well as monitoring and enforcing compliance of environmental conditions that govern E F G H ## 92 SUPREME COURT REPORTS [2014) 1 S.C.R. A Environmental Clearances is already in place, it is not necessary for the Central Government to appoint a National Regulator under sub-section (3) of Section 3 of the Environment (Protection) Act, 1986. Mr. Parasaran finally submitted that Part II of the order dated 06.07.2011 of this Court in the case of B Lafarge Umiam Mining Private Limited is titled "Guidelines to be followed in future cases" and hence the observations of this Co.urt in Part II were in the nature of suggestions of this Court and the Central Government is considering these suggestions and has not taken a decision to appoint a National Regulator c under sub-section (3) of Section 3 of the Environment (Protection) Act, 1986. 4. Mr. Harish N. Salve, learned Amicus Curiae, on the other hand, submitted that it will be clear, on a reading of Para 122 of the order dated 06.07.2011 of this Court in the case of 0 Lafarge Umiam Mining Private Limited, that this Court held that Section 3 of the Envrionment (Proection) Act, 1986 confers a power coupled with duty and it is incumbent on the Central Government, to appoint a Regulator. He submitted that the order E of this Court was therefore in the nature of a mandamus to the Central Government to appoint a National Regulator and the plea taken on behalf of the Union of India that the order to appoint a National Regulator was in the nature of a suggestion is misconceived. He argued that the order in the case of F _Lafarge Umiam Mining Private Limited_ was passed on 06.07.2011, and no review petition was filed in response of the order dated 06.07 .2011, and after two years of the passing of the order, the Union of India cannot refuse to comply with the order of this Court. Mr. Salve referred to notifications issued by the Central Government under Section 3(3) of the G Environment (Protection) Act, 1986 constituting authorities, such as the Notification dated 17.09.1998 constituting the Arunachal Pradesh Forest Protection Authority. H ' , ## T.N. GODAVARMAN THIRUMULPAD _v._ UNION OF 93 INDIA 5. We have considered the submissions of Mr. Parasaran A and Mr. Salve and the main question that we have to decide is whether the order of this Court in _Lafarge Umiam Mining Private Limited_ for appointing a National Regulator under Section 3(3) of the Environment (Protection) Act, 1986 was merely a suggestion or a mandamus to the Central Government. B Sub-paragraphs (i.1 ), (i.2.), (i.3.}, (i.4.) and (i.5.) of paragraph 122 of the order of this Court in the case of _Lafarge Umiam Mining Private Limited_ are extracted hereinbelow: _"(i.1.)_ The time has come for this Court to declare and we c hereby declare that the National Forest Policy, 1988 which lays down far-reaching principles must necessarily govern the grant of permissions under Section 2 of the Forest (Conservation) Act, 1980 as the same provides the road map to ecological protection and improvement under the o Environment (Protection) Act, 1986. The principles/ guidelines mentioned in the National Forest Policy, 1988 should be read as part of the provisions of the Environment (Protection) Act, 1986 read together with the Forest (Conservation) Act, 1980. This direction is required to be E given because there is no machinery even today established for implementation of the said National Forest Policy, 1988 read with the Forest (Conservation) Act, 1980. Section 3 of the Environment (Protection) Act. 1986 confers a power coupled with duty and. thus. it is incumbent **F** on the Central Government. as hereinafter indicated. to appoint an appropriate authority. preferably in the form of regulator, at the State and at the Central level for ensuring implementation of the National Forest Policy. 1988. (i.2.) The difference between a regulator and a court must be kept in mind. The court/tribunal is basically an authority which reacts to a given situation brought to its notice whereas a regulator is a proactive body with the power conferred upon it to frame statutory rules **and** .H ## 94 SUPREME COURT REPORTS [2014] 1 S.C.R. - A regulations. The regulatory mechanism warrants open discussion, public participation and circulation of the draft paper inviting suggestions. - (i.3.) The basic objectives of the National Forest - B Policy, 1988 include positive and proactive steps to be taken. These include maintenance of environmental stability through preservation, restoration of ecological balance that has been adversely disturbed by serious depletion of forests, conservation of natural heritage of the - c country by preserving the remaining natural forests with the vast variety of flora and fauna, checking soil erosion and denudation in the catchment areas, checking the extension of sand dunes, increasing the forest/tree cover in the country and encouraging efficient utilisation of forest produce and maximising substitution of wood. D E (i.4.) Thus, we are of the view that under Section 3(3) of the Environment (Protection) Act. 1986. the Central Government should appoint a National Regulator for appraising projects. enforcing environmental conditions for approvals and to impose penalties on polluters. F G _(i._ 5.) There is one more reason for having a regulatory mechanism in place. Identification of an area as forest area is solely based on the declaration to be filed by the user agency (project proponent). The project proponent under the existing dispensation is required to undertake EIA by an expert body/institution. In many cases, the court is not made aware of the terms of reference. In several cases, the court is not made aware of the study area undertaken by the expert body. Consequently, MoEF/ State Government acts on the report (Rapid EIA) undertaken by the institutions who though accredited submit answers according to the terms of reference propounded by the project proponent. We do not wish to H ## T.N. GODAVARMAN THIRUMULPAD _v._ UNION OF 95 INDIA cast any doubt on the credibility of these institutions. However, at times the court is faced with conflicti'ng reports. Similarly, the Government is also faced with a fait accompli kind of situation which in the ultimate analysis leads to grant of ex post facto clearance. To obviate these difficulties. we are of the view that a regulatory mechanism should be put in place and till the time such mechanism is put in place, MoEF should prepare a panel of accredited institutions from which alone the project proponent should obtain the Rapid EIA and that too on the terms of reference to be formulated by MoEF." A B C It will be clear from the underlined portions of the order of this Court in _Lafarge Umiam Mining Private Limited_ extracted above that this Court on an interpretation of Section 3 (3) of the Environment (Protection) Act, 1986 has taken a view that it confers a power coupled with duty to appoint an appropriate authority in the form of a Regulator at the State and at the Central level for appraising projects, enforcing environmental conditions for approvals and to impose penalties on polluters and has accordingly directed the Central Government to appoint a National Regulator under the said provision of the Act. Mr. Parasaran is, therefore, not right in arguing that in the case of _Lafarge Umiam Mining Private Limited,_ this Court has merely suggested that a National Regulator should be appointed and has not issued any mandamus to appoint a National Regulator. D E F 6. We further find on reading of sub-paragraphs (i.2), (i.3) and (i.5) of Paragraph 122 of the order in the case of _Lafarge Umiam Mining Private Limited_ extracted above that this Court has not found the mechanism of making the EIA appraisals of G projects by the MoEF to be satisfactory. As a matter of fact, we also find that the Department of Management Studies, Indian Institute of Technology, Delhi, has prepared report on 'Scope, _Structure and Processes of National Environment_ H ## 96 SUPREME COURT REPORTS [2014] 1 S.C.R. A _Assessment and Monitoring Authority_ (NEAMA)' for the Ministry of Environment and Forest, Government of India, and the Executive Summary of the Report points out the problems with regard to the implementation of EIA 2006 Notification. Paragraph 4 from Section I of the Executive Summary under B the heading _'Major Findings_ & _Recommendations',_ is extracted hereinbelow: c "4. We analysed the implementation of EIA 2006 notification and the proposed CZM notification 2010 in terms of policy, structure and process level issues. Almost all the problems 'n implementing these notifications relate to structure and processes. Key issues are mentioned below D E a. The presence of MoEF in both the appraisal and approval processes leads to a perception of conflict of interest. The Member Secretary (who, according to the 2006 notification, was supposed to be the Secretary) is involved in the processing, appraisal and approval of the EIA applications. b. Lack of permanence in the Expert Appraisal Committees leads to lack of continuity and institutional memory leading to poor knowledge management. F G c. Current EIA and CRZ clearances rely predominantly on the data provided by the project proponent and the absence of authenticated and reliable data and lack of mechanisms to validate the data provided by the project proponent might lead to subjectivity, inconsistency and inferior quality of EIA reports. H d. Though the EIA notification requires several documents like ToRs (for every project), minutes of public hearing meetings (for each project), EIA report (with clearance , conditions) and self-monitoring reports to be put in public # T.N. GODAVARMAN THIRUMULPAD _v._ UNION OF 97 INDIA domain (predominantly on the website), this has not been done for lack of institutional mechanisms. This leads to a perception of lack of transparency in the processes. A e. Several studies have pointed toward the poor monitoring of the clearance conditions. Huge gaps in monitoring and B enforcement of clearance conditions actually defeats the very purpose of grant of conditional environmental clearance." (See moef.nic.in/downloads/public-information/ exec-summ~NEMA.pdf) 7. Hence, the present mechanism under the EIA · Notification dated 14.09.2006, issued by the Government with regard to processing, appraisals and approval of the projects for environmental clearance is deficient in many respects and what is required is a Regulator at the national level having its offices in all the States which can carry out an independent, objective and transparent appraisal and approval of the projects for environmental clearances and which can also monitor the implementation of the conditions laid down in the Environmental Clearances. The Regulator so appointed under Section 3(3) of the Environment (Protection) Act, 1986 can exercise only such powers and functions of the Central Government under the Environment (Protection) Act as are entrusted to it and obviously cannot exercise the powers of the Central Government under Section 2 of the Forest (Conservation) Act, 1980, but while exercising such powers under the Environment Protection Act will ensure that the National Forest Policy, 1988 is duly implemented as held in the order dated 06.07.2011 of this Court in the case of _Lafarge Umiam Mining Private Limited._ Hence, we also do not find any force in the submission of Mr. Parasaran that as under Section 2 of the Forest (Conservation) Act, 1980 the Central Government alone is the Regulator, no one else can be appointed as a Regulator as directed in the case of _Lafarge Umiam Mining Private Limited._ c 0 E F G H 98 SUPREME COURT REPORTS (2014] 1 S.C.R. A 8. We, therefore, direct the Union of India to appoint a Regulator with offices in as many States as possible under subsection (3) of Section 3 of the Environment (Protection) Act, 1986 as directed in the order in the case of _Lafarge Umiam Mining Private Limited_ and file an affidavit along with the B notification appointing the Regulator in compliance of this direction by 31st March, 2014. 9. The I.As. will stand disposed of accordingly. R.P. I.As disposed of.
End of Judgment Record
Browse All Supreme Court of India (2014) Decisions
2014-07-01

Duryodhan Rout v. State of Orissa

These appeals challenge a common judgment convicting Duryodhan Rout of rape and murder of a 10-year-old girl, Subhasini Bhoi. The trial court convicted him under IPC sections 376(f), 302, and 201 and sentenced him to death; on reference, the High Court remitted the death sentence for the 302 offence to life imprisonment while keeping the other sentences unchanged. The prosecution's case rested solely on circumstantial evidence. PW-1 and PW-2 saw the accused with the victim on a bicycle around 4 p.m. and returning alone about an hour later; PW-5 (father) and PW-6 (mother) testified that the child was taken on the pretext of talking on the phone. In custody, the accused confessed before PW-3 and PW-4, and under Section 27 of the Evidence Act the recovery of the body and the underwear was recorded; the autopsy by PW-9 indicated throttling and injuries consistent with rape. The chain of circumstances — last-seen with the victim, recovery of the corpse in the jungle, and the forensic findings — formed a robust basis for conviction. The central legal issue was whether sentences for multiple offences should run consecutively. The Court held that life imprisonment is the remainder of a convict's natural life, and the proviso to Section 31(2) Cr.P.C. prevents aggregation beyond fourteen years, thus consecutive sentences cannot be imposed where life imprisonment is one of the terms. Consequently, all IPC sentences should run concurrently; the death sentence for the 302 offence was replaced by life imprisonment, and the appeal was allowed in part.

2014-12-16

Nand Kishore v. State of Madhya Pradesh

This is a criminal original jurisdiction writ petition under Article 32 challenging the continued incarceration of a convict under Section 302 IPC, with the petitioner contending entitlement to the Juvenile Justice (Care and Protection of Children) Act, 2000 (JJC Act) protections on the ground that he was a juvenile at the time of the offence (born 14 April 1980; incident on 18 June 1997). The Court scrutinized documentary and oral evidence from the Juvenile Justice Board indicating the petitioner’s true date of birth and concluded that on the date of occurrence he was 17 years 2 months 4 days old, thereby satisfying the juvenile criteria. The judgment clarifies a central legal question: whether the protections and benefits under the JJC Act, enacted in 2000, can be extended to those convicted before its coming into force if they were juveniles at the time of the offence. Relying on earlier decisions such as Hariram v. State of Rajasthan and Ajay Kumar v. State of Madhya Pradesh (and others), the Court held that a person who had not completed 18 years on the date of offence is entitled to the Act’s benefits as if the provisions had always existed, effectively retroactively applying the protective regime. The petition was allowed; the petitioner is to be released forthwith, with bail bonds and sureties discharged, reflecting the Court’s protective stance for juveniles in criminal proceedings.

2014-04-24

Vishal Goyal & Ors. v. State of Karnataka & Ors.

This batch of writ petitions under Article 32 concerns admissions to Post Graduate Medical and Dental courses in government medical/dental colleges and the state quota in private colleges in Karnataka for the 2014-2015 academic year. The petitioners, who completed MBBS/BDS in Karnataka, challenged sub-clause (a) of clause 2.1 of two National Board of Examinations Information Bulletins (PGET-2014) which defined “Karnataka Origin” to permit admission only to those who satisfy certain criteria, effectively excluding many who studied in Karnataka institutions. They argued this violates Article 14 (equality before law and equal protection of laws) and undermines merit-based selection for postgraduate courses. They invoked Dr. Pradeep Jain & Others v. Union of India (1984) to contend that institutional preference may be permissible but must conform to equality; Magan Mehrotra v. Union of India (2003), Saurabh Chaudhri v. Union of India (2003), and Nikhil Himthani v. State of Uttarakhand (2013) were cited to support the continuing emphasis on merit and equality. The State countered that Article 371J allows reservation for the Hyderabad-Karnataka region and argued that the Pradeep Jain framework applies only to government or state-instrumentality institutions and not to private colleges. The Court held sub-clause (a) ultra vires Article 14, directed fresh Information Bulletins, and ordered admissions in accordance with the law on the basis of existing entrance test results, with the general counselling schedule from Dr. Fraz Naseem & Ors. not applying for 2014-2015 Karnataka admissions.

2014-08-21

SINGH RAM (D) THR. L.Rs. v. SHEO RAM & ORS.

This is a Supreme Court of India decision on the limit of time within which a usufructuary mortgagee can seek relief, and the corresponding equity of redemption for the mortgagor. The appellants challenged the Punjab and Haryana High Court Full Bench’s view that there is no fixed time for redemption in a usufructuary mortgage and that the right to seek redemption arises on payment/deposit of mortgage money, irrespective of the mortgage date. The HP High Court’s decision was later reversed by a larger bench of this Court in the context of reconciling conflicting precedents such as Sampuran Singh, Prabhakaran and Jayasingh Dhyanu Mhoprekar, Parichhan Mistry and Harbans etc., emphasizing that Section 62 of the Transfer of Property Act confers a special right on the usufructuary mortgagor to recover possession, which begins only when the mortgage money is paid out of rents and profits or when paid/deposited by the mortgagor. Article 61 of the Limitation Act governs the period for redeeming or recovering possession (30 years from accrual of the right, unless restricted). The Court reaffirms the principle ‘once a mortgage, always redeemable’ and rejects a blanket 30-year extinguishment rule for usufructuary mortgages, upholding the Full Bench view of the Punjab and Haryana High Court and dismissing the appeals. The decision emphasizes equity, statutory recognition under Section 62, and the distinctive treatment of usufructuary mortgages.