High Court of KeralaSingle JudgeDismissed

T.K. Muraleedharan v. Power Grid Corporation of India Construction Area Office, Kakkanad and Others

Case / Petition Number:CRP Nos. 356/2021 & 188/22

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V.G. Arun
Judgment Date
2024-02-16
Court Decision / Holding
The civil revision petitions are dismissed. The Power Grid Corporation shall pay the enhanced compensation fixed by the court below within three months of receipt of a copy of this order.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • T.K. Muraleedharan
  • Power Grid Corporation of India Construction Area Office, Kakkanad

Respondents

  • Power Grid Corporation of India Construction Area Office, Kakkanad
  • The Special Tahasildar (L.A.) Power Grid Corporation of India Ltd., Kozhikode
  • State of Kerala
  • Kerala State Electricity Board

Legal Representation & Advocates

Counsels for Petitioners

  • • P.T. Jose
  • • Millu Dandapani

Counsels for Respondents

  • • R. Harishankar
  • • P.T. Jose

Case Synopsis & Summary

This Civil Revision Petition arises from a common order of the Additional District Judge-VI, Ernakulam in O.P. (Electricity) No.549 of 2013, which dealt with compensation for the damage caused by drawing 400 kV transmission lines across the land owned by the claimant, T.K. Muraleedharan. The petitioner sought enhanced compensation for two heads: the value of trees cut and diminution in land value, arguing that the line corridor damaged land more extensively than the awarded amount. The court below declined to grant enhanced compensation for the value of trees due to lack of corroborative material beyond a single- witness Advocate Commissioner’s report, and it fixed enhanced diminution in land value using Ext.A7 and Exts.C10/C10(a), determining central corridor at 0.915 cents and outer corridor at 7.067 cents, at 40% and 20% of land value respectively, resulting in Rs.3,02,391/-. The Power Grid Corporation challenged the quantum as excessive. The respondent-corporation contended the reduction is unjustified and questioned reliance on Ext.A7 and the Commissioner's appraisal. The court observed that the trees were cut in 2011 and the Commissioner’s post hoc inspection had limited evidentiary value, but upheld the broader criteria in the KSEB v. Livisha precedent (2007) for determining land-value diminution due to transmission corridors, considering situs, distance, extent, and land use restrictions. The revisions were dismissed; the power grid was directed to pay the enhanced land-value compensation within three months.

Provisions of Law Cited

Code of Civil Procedure, Section 115

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimant/applicant argued that the impugned order grossly undervalued the loss occasioned by alteration of land use and the removal of trees; there was evidence of substantial diminution in land value and the value of trees cut. He contended that the Commissioner’s report and independent testimonies should have been weighed more heavily, and that 40% central and 20% outer corridor percentages did not reflect the true extent of damage.

Contentions of Respondents

The respondents contended that the court below appropriately relied on Ext.A7 and Exts.C10/C10(a) reports; the claim for additional compensation for the value of trees lacked corroboration beyond a solitary witness, and the fixation of diminution in land value took into account the nature of land, cultivation, and impact of the corridor, maintaining a just and proportionate compensation.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
KSEB v. Livisha[(2007) 6 SCC 792]PositiveCourt relied on the principles laid down in KSEB v. Livisha to determine diminution in land value due to the transmission line, applying the factors of situs, distance, extent, and land use.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against T.K. Muraleedharan v. Power Grid Corporation of India Construction Area Office, Kakkanad and Others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN** **FRIDAY, THE 16[TH] DAY OF FEBRUARY 2024 / 27TH MAGHA, 1945** ## **CRP NO. 356 OF 2021** **AGAINST THE ORDER/JUDGMENT OPELE 549/2013 OF VI** **ADDITIONAL DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** 1 T.K.MURALEEDHARAN AGED 71 YEARS X 2 T.K.MURALEEDHARAN AGED 71 YEARS S/O.NARAYANNIAMMA, VADAKKINIMARATH HOUSE, CHERANELLUR, KOOVAPPADY VILLAGE, KUNNATHUNADU TALUK BY ADV P.T.JOSE ## **RESPONDENT/S:** 1 POWER GRID CORPORATION OF INDIA CONSTRUCTION AREA OFFICE, KAKKANAD, NOW IN PAO/400, 220KV SUBSTATION, KUMARAPURAM P.O., PALLIKARA, KOCHI 682 303, REP.BY DEPUTY MANAGER 2 THE SPECIAL TAHASILDAR (L.A.) POWER GRID CORPORATION OF INDIA LTD., CHEVARAMBALAM, KOZHIKODE, NOW IN KAKKANAD P.O.682 030 3 STATE OF KERALA REP.BY DISTRICT COLLECTOR, ERNAKULAM KOCHI 682 031 4 KERALA STATE ELECTRICITY BOARD REP.BY CHAIRMAN AND MANAGING DIRECTOR, KSEB LTD., THIRUVANANTHAPURAM 695 001 BY ADV R.HARISHANKAR ## **OTHER PRESENT:** GP SYLAJA S.L.; SC FOR KSEB B.PREMOD THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 20.12.2023, ALONG WITH CRP.188/2022, THE COURT ON 16.2.2024 DELIVERED THE FOLLOWING: CRP Nos.356/2021 & 188/22 -2- ## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN** **FRIDAY, THE 16[TH] DAY OF FEBRUARY 2024 / 27TH MAGHA, 1945 CRP NO. 188 OF 2022** **AGAINST THE ORDER/JUDGMENT OPELE 549/2013 OF VI** **ADDITIONAL DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** POWER GRID CORPORATION OF INDIA CONSTRUCTION AREA OFFICE, MAVELIPURAM COLONY, KAKKANAD, COCHIN - 682 030, PRESENTLY AT CONSTRUCTION AREA OFFICE, 400/220, KV SUB STATION, KUMARAPURAM P.O, PALLIKKARA, ERNAKULAM REPRESENTED BY ITS SENIOR GENERAL MANAGER, PIN - 683565 BY ADV MILLU DANDAPANI ## **RESPONDENT/S:** 1 T K MURALEDHARAN S/O NARAYANIAMMA, AGED 72 YEARS, VADAKKININARATH HOUSE, CHERANELLOR, KOOVAPADI VILLAGE , KUNNATHUNADU TALUK, ERNAKULAM DISTRICT, PIN - 683544 2 THE SPECIAL TAHSILDAR (LA) POWER GRID CORPORATION OF INDIA LTD. CHEVARAMBALAM, KOZHIKODE, PIN - 673017 BY ADV P.T.JOSE **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 20.12.2023, ALONG WITH CRP.356/2021, THE COURT ON 16.2.2024 DELIVERED THE FOLLOWING:** CRP Nos.356/2021 & 188/22 -3- CRP Nos.356/2021 & 188/22 -4- ## **ORDER** Dated this the 16[th] day of February, 2024 These revision petitions are filed challenging the common order passed by the Additional District Judge-VI, Ernakulam in O.P. (Electricity) No.549 of 2013. The original petition was filed by the revision petitioner in CRP No.356 of 2021 (hereinafter called 'the claimant'), being dissatisfied with the compensation awarded towards the damage and loss sustained due to the drawing of 400 KV lines across his property by the Power Grid Corporation of India Ltd (hereinafter called 'the Corporation'). The essential facts are as under; The claimant is in ownership and possession of landed property having an extent of 14.15 Ares in Sy.Nos.38/16-2 and 44/8-2 of Koovappady Village in Kunnathunadu Taluk. The land was cultivated with various yielding and non-yielding CRP Nos.356/2021 & 188/22 -5- trees. According to the claimant, to facilitate drawing of the lines and smooth transmission of power, large number of trees were cut from their property. The drawing of high tension lines rendered the land underneath and adjacent to the lines useless, resulting in diminution of the value of the property. In spite of the huge loss suffered by the claimant, only an amount of Rs.27,909/- was paid as compensation towards the value of yielding and non-yielding trees cut. Surprisingly, no compensation was granted for diminution in land value. Hence, the original petition was filed, seeking enhanced compensation towards the value of trees cut and diminution in land value. 2. The court below rejected the claim for enhanced compensation for the value of trees cut since no evidence in support of the claim was produced. As far as the claim for enhanced compensation towards diminution in land value is CRP Nos.356/2021 & 188/22 -6- concerned, the court below relied on Ext.A7 document as well as Exts.C10 and C10(a) commission report and sketch. Relying on Ext.C10(a) sketch, the extent of central corridor was held to be 0.915 cents and of the outer corridor was held to be 7.067 cents. For the central corridor, 40% of the land value was granted as compensation and for the outer corridor, 20% of the land value. Accordingly, the claimant was found entitled to compensation of Rs.3,02,391/-. Dissatisfied with the quantum of enhancement, the claimant has filed CRP No.356 of 2021, whereas the Corporation has filed CRP No.188 of 2022 contending that the enhancement ordered is far in excess of the actual damage sustained. 3. Heard Adv.P.T.Jose for the claimant and Adv.Millu Dandapani for the Corporation. 4. Learned Counsel for the claimant contended that the court below committed gross CRP Nos.356/2021 & 188/22 -7- illegality in refusing to grant enhanced compensation for the loss sustained due to the cutting of valuable trees, in spite of the Advocate Commissioner assessing and reporting the loss. The findings in the Commissioner's report were not relied on by the court below for the reason that the property was inspected much after the trees were cut. The said reasoning is flawed since the trees were cut much after issuance of notification by the Corporation and the cause of action for filing the original petition arose only on payment of the initial compensation, even later. 5. It is submitted that the court below grossly erred in granting only 40% of the land value fixed for the central corridor and 20% for the outer corridor. Considering the extent of damage sustained and the diminution in land value consequent to the drawing of lines, the court below ought to have granted compensation as CRP Nos.356/2021 & 188/22 -8- claimed. 6. Learned Counsel for the Corporation contended that, compensation towards diminution in land value granted is exorbitant and there is no rationale in granting 9% interest on that amount. The court below also erred in relying on Ext.A7 for fixing the land value of the claimant's property. As the drawing of electric lines does not prohibit the landowner from conducting agricultural activities and putting up small structures, 40% of the land value granted for the central corridor and 20% for the outer corridor are exorbitant. 7. A careful scrutiny of the impugned order reveals that the claim for enhancement of compensation towards the value of trees cut was rightly rejected since no supporting material, other than the findings in the Advocate Commissioner's report, was made available. As found by the court below, apart from the CRP Nos.356/2021 & 188/22 -9- interested testimony of a solitary witness, who is the claimant in some of the connected cases, no other independent witness was examined to prove the claim. It is also not in dispute that the trees were cut in the year 2011 and the commissioner inspected the property after a long period and had assessed the value of the trees on a comparison with the trees standing in the remaining property and nearby properties. Such comparison, having no scientific basis, is not sufficient to discard the contemporaneous valuation statement prepared by the Corporation. 8. As far as the diminution in land value is concerned, the factors to be taken into consideration, as laid down in _**KSEB v. Livisha**_ ## _**[(2007) 6 SCC 792]**_ are as under; “ _10. The situs of the land, the distance between the high voltage electricity line laid thereover, the extent of the line thereon as also the fact as to whether the high voltage line_ CRP Nos.356/2021 & 188/22 -10- _passes over a small tract of land or through the middle of the land and other similar relevant factors in our opinion would be determinative. The value of the land would also be a relevant factor. The owner of the land furthermore, in a given situation may lose his substantive right to use the property for the purpose for which the same was meant to be used.”_ On careful scrutiny of the impugned order, it is seen that the compensation was enhanced after taking all the above factors into consideration. The nature of the land, the cultivation therein, and the manner in which the land was affected by drawing of the lines have all been considered fixing the land value as well as the percentage of diminution. For the central corridor, 40% of the land value is granted as compensation and for the outer corridor, 20% is granted, which I find to be just and proper. As such, there is no illegality or material irregularity in the impugned order, warranting intervention by this Court in exercise of the revisional power under CRP Nos.356/2021 & 188/22 -11- Section 115 of the Code of Civil Procedure. For the aforementioned reasons, the civil revision petitions filed by the claimant as well as the Corporation are dismissed. The Power Grid Corporation shall pay the enhanced compensation fixed by the court below within three months of receipt of a copy of this order. Sd/- **V.G.ARUN JUDGE** Scl/