Supreme Court of IndiaSupreme Court · 2024Division BenchAppeal Dismissed.

The State of West Bengal represented through the Secretary & Ors. v. Rajpath Contractors and Engineers Ltd.

Case / Petition Number:
Civil Appeal No. 7426 of 2023
Neutral Citation:[2024] 7 S.C.R. 1 : 2024 INSC 477

Case Synopsis & Summary

This judgment concerns a Civil Appeal arising from a dispute under the Arbitration and Conciliation Act, 1996, wherein the State of West Bengal challenged an arbitral award awarding Rs. 2,11,67,054 with interest to Rajpath Contractors and Engineers Ltd. The sole arbitrator had dismissed the counter-claims of the appellants. The award was received by the appellants on 30 June 2022, and they filed a Section 34 application challenging the award on 31 October 2022, when the Calcutta High Court was closed for pooja vacation. The High Court dismissed the petition on the ground that it was not filed within three months from the date of receipt, as provided by Section 34(3) of the Act, and did not grant the benefit of Section 4 of the Limitation Act. The key questions addressed were (i) whether the limitation period should be computed from the date of receipt and whether that day should be excluded under Section 12(1) of the Limitation Act, (ii) whether Section 4 applies when the court is closed during a vacation, and (iii) whether the proviso to Section 34(3) allows a maximum 30-day extension and thereby postpones the period. The Court ultimately held that the limitation clock began on 1 July 2022 (excluding 30 June 2022) and that the three-month period expired on 30 September 2022, with the 30-day extension not sufficiently available to rescue the filing on 31 October 2022. Consequently, the appeal was dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Abhay S. Oka
  • Pankaj Mithal
Judgment Date
2024-07-08
Court Decision / Holding
Appeal Dismissed.
Final Disposition
Appeal Dismissed.

Parties to the Case

Appellants / Petitioners

  • The State of West Bengal represented through the Secretary & Ors.

Respondents

  • Rajpath Contractors and Engineers Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Madhumita Bhattacharjee
  • • Urmila Kar Purkayasthe
  • • Srija Choudhury

Counsels for Respondents

  • • Saurav Agrawal
  • • Priyankar Saha
  • • Sarad Kumar Singhania
  • • Mrs. Rashmi Singhania
  • • Anshuman Choudhary

Provisions of Law Cited

Arbitration and Conciliation Act, 1996Section 34Section 34(3)Limitation Act, 1963Section 12(1)Section 4Section 43General Clauses Act, 1897Constitution of India

Legal Doctrines & Maxims

  • Expir[y] of prescribed period when court is closed (Section 4, Limitation Act)
  • Exclusion of day for computation of limitation under Section 12(1) of the Limitation Act
  • Proviso to Section 34(3) excludes applicability of Section 5 of the Limitation Act

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the period of limitation for filing a petition under Section 34 should be reckoned from 1 July 2022, with the three-month period ending on 30 September 2022. They argued that the period of limitation should be extended by the maximum 30 days under the proviso to Section 34(3) and that Section 4 of the Limitation Act should apply because the court was closed during the pooja vacation, effectively delaying filing. They relied on Section 9 of the General Clauses Act and highlighted e-filing limitations during vacation.

Contentions of Respondents

The respondents urged that the period of limitation under Section 34(3) expired on 30 September 2022 and could be extended by only 30 days to 30 October 2022; the petition was filed on 31 October 2022, outside the extended window. They argued that Section 5 of the Limitation Act is excluded by proviso to Section 34(3) and that Section 4 does not operate since the ‘prescribed period’ ends prior to vacation. They relied on Assam Urban Water Supply & Sewerage Board v Subash Projects & Mktg. Ltd. and Union of India v. Popular Construction Co. to support their interpretation of the limitations framework.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
State of Himachal Pradesh and Another v. Himachal Techno Engineers and Another[2010] 8 SCR 1025 : (2010) 12 SCC 210Mentioned OnlyCited in the judgment for reference; not treated as binding on the issue.
Assam Urban Water Supply & Sewerage Board v Subash Projects & Mktg. Ltd.[2012] 1 SCR 403 : (2012) 2 SCC 624Mentioned OnlyCited for discussion on Section 4 and the meaning of prescribed period; mentioned as authority but not overruled or distinguished in this context.
Union of India v. Popular Construction Co.[2001] Supp. 3 SCR 619 : (2001) 8 SCC 470Mentioned OnlyCited regarding the exclusion of Section 5 of the Limitation Act due to proviso to Section 34(3); treated as a cited authority.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,367 words•~11 min read

In The Court Record

The State of West Bengal represented through the Secretary & Ors. v. Rajpath Contractors and Engineers Ltd.

[2024] 7 S.C.R. 1 : 2024 INSC 477 # **The State of West Bengal represented through the Secretary & Ors.** **v.** ## **Rajpath Contractors and Engineers Ltd.** (Civil Appeal No. 7426 of 2023) 08 July 2024 ## **[Abhay S. Oka* and Pankaj Mithal, JJ.]** ## **Issue for Consideration** Issue arose as regards correctness of the order passed by the High Court dismissing the petition u/s. 34 of the Arbitration and Conciliation Act, holding that it was not filed within the period specified under sub-section (3) of s. 34 of the Act. ## **Headnotes[†]** **Arbitration and Conciliation Act, 1996 – s. 34 – Application for setting aside arbitral awards – Period of limitation for filing petition u/s. 34 – On facts, petition u/s. 34 filed by the appellant challenging the arbitral award – Dismissed by the High Court, holding that it was not filed within the period specified under sub-section (3) of s. 34 – Correctness:** **Held:** Period of limitation for filing a petition u/s. 34 will have to be reckoned from the day when the appellants received the award, i.e. 30th June 2022 – In view of s. 12(1) of the Limitation Act, the day from which the limitation period is to be reckoned must be excluded, as such 30[th] June 2022 will have to be excluded while computing the limitation period – Thus, in effect, the period of limitation, started running on 1[st] July 2022 – Period of limitation is of three months and not ninety days – Thus, from the starting point of 1[st] July 2022, the last day of the period of three months would be 30[th] September 2022 – Pooja vacation started on 1[st] October 2022 – Three months provided by way of limitation expired a day before the commencement of the pooja vacation – Furthermore, the prescribed period within the meaning of s. 4 of the Limitation Act ended on 30[th] September 2022 – Thus, the appellants are not entitled to take benefit of s. 4 – As per the proviso to sub-section (3) of s. 34, the period of limitation could have been extended by a maximum period of 30 days – Maximum period of 30 days * Author [2024] 7 S.C.R. 2 ## **Digital Supreme Court Reports** expired on 30[th] October 2022 – Petition was filed on 31[st] October 2022 – Thus, the High Court was right in holding that the petition u/s. 34 was not filed within the period specified under sub-section (3) of s. 34 of the Act. [Paras 6, 7, 10,11] ## **Case Law Cited** _State of Himachal Pradesh and Another v. Himachal Techno Engineers and Another_ **[2010] 8 SCR 1025 : (2010) 12 SCC 210;** _Assam Urban Water Supply & Sewerage Board v. Subash Projects & Mktg. Ltd._ **[2012] 1 SCR 403 : (2012) 2 SCC 624;** _Union of India v. Popular Construction Co._ **[2001] Supp. 3 SCR 619 : (2001) 8 SCC 470 – referred to.** ## **List of Acts** Arbitration and Conciliation Act, 1996; Limitation Act of 1963; Constitution of India; General Clauses Act, 1897. ## **List of Keywords** Arbitral awards; Period of limitation; Limitation period to be reckoned. ## **Case Arising From** CIVIL APPELLATE JURISDICTION: Civil Appeal No.7426 of 2023 From the Judgment and Order dated 04.05.2023 of the High Court of Calcutta in AP No. 737 of 2022 ## **Appearances for Parties** Ms. Madhumita Bhattacharjee, Ms. Urmila Kar Purkayasthe, Ms. Srija Choudhury, Advs. for the Appellants. Saurav Agrawal, Priyankar Saha, Sarad Kumar Singhania, Mrs. Rashmi Singhania, Anshuman Choudhary, Advs. for the Respondent. ## **Judgment / Order of the Supreme Court** ## **Judgment** ## **Abhay S. Oka, J.** ## **FACTUAL ASPECTS** **1.** The first appellant – the State of West Bengal appointed the respondent as a contractor for the construction of a bridge. As there [2024] 7 S.C.R.  3 **The State of West Bengal represented through the Secretary & Ors. v. Rajpath Contractors and Engineers Ltd.** was a dispute between the parties, the respondent invoked the arbitration clause in the contract, and a sole arbitrator was appointed. On 30[th ] June 2022, the Arbitral Tribunal passed an award directing the appellants to pay a sum of Rs.2,11,67,054.00 (Two Crores Eleven Lakhs Sixty-Seven Thousand Fifty-Four Rupees Only) to the respondent with interest thereon, as directed. The counter-claim made by the appellants was dismissed. The appellants received a copy of the award on the same day. The High Court of Judicature at Calcutta was closed for pooja vacation from 1st October 2022 to 30[th] October 2022 (both days inclusive). On 31[st] October 2022, the appellants filed a petition under Section 34 of the Arbitration and Conciliation Act, 1996 (for short, ‘the Arbitration Act’) to challenge the award. By the impugned order dated 4[th] May 2023, the High Court dismissed the petition under Section 34 of the Arbitration Act filed by the appellants on the ground of bar of limitation. The High Court held that the period of limitation for filing a petition under Section 34 expired on 30[th] September 2022. Therefore, the appellants are not entitled to the benefit of Section 4 of the Limitation Act of 1963 (for short, ‘the Limitation Act’). **2.** Being aggrieved by the view taken by the High Court, the appellants are in this appeal. We may note here that under the impugned judgment, the High Court granted a certificate to prefer an appeal before this Court by exercising powers under Article 133 (1) and Article 134(A)(a) of the Constitution of India. ## **SUBMISSIONS** **3.** The learned counsel appearing for the appellants submitted that as the period of limitation for filing a petition under Section 34 of the Arbitration Act ought to have been calculated from 1[st] July 2022, the prescribed period of limitation ended on 1[st] October 2022, which was the first day of pooja vacation. Therefore, the petition under Section 34 of the Arbitration Act filed immediately after the re-opening of the Court on 31[st] October 2022 must be held to be within limitation. The learned counsel relied upon Section 9 of the General Clauses Act, 1897 (for short, ‘the General Clauses Act’). The learned counsel also submitted that the petition could not be e-filed in pooja vacation as the relevant e-filing notification provided for e-filing of only urgent matters during the vacations. The learned counsel relied upon a [2024] 7 S.C.R. 4 ## **Digital Supreme Court Reports** decision of this Court in the case of _**State of Himachal Pradesh and Another v. Himachal Techno Engineers and Another[1]**_ . **4.** The learned counsel appearing for the respondent supported the findings recorded by the High Court. He submitted that in any event, the benefit of Section 4 of the Limitation Act is available only if the proceedings are filed within the prescribed period of limitation, which will be three months in this case in terms of Section 34(3) of the Arbitration Act. The learned counsel relied upon a decision made by this court in the case of _**Assam Urban Water Supply & Sewerage Board v Subash Projects & Mktg. Ltd.[2]**_ . He also invited our attention to a decision of this Court in the case of _**Union of India v. Popular Construction Company[3] .**_ He submitted that, as held by this Court in the said decision, the applicability of Section 5 of the Limitation Act is excluded in view of the language used in the proviso to subsection (3) of Section 34. ## **OUR VIEW** **5.** The facts are undisputed. The award made by the Arbitral Tribunal on 30[th] June 2022 was served upon the appellant on the same day. Between 1[st] October 2022 and 30[th] October 2022 (both days inclusive), the High Court was closed for pooja vacation. The petition under Section 34 of the Arbitration Act was filed on 31[st] October 2022. **6.** The period of limitation for filing a petition under Section 34 of the Arbitration Act is governed by sub-section (3) of Section 34. Subsection (3) of Section 34 reads thus: - “(3) An application for setting aside may not be made after three months have elapsed from the date on which the party making that application had received the arbitral award or, if a request had been made under section 33, from the date on which that request had been disposed of by the arbitral tribunal: Provided that if the Court is satisfied that the applicant was prevented by sufficient cause from making the application > 1 [2010] 8 SCR 1025 : (2010) 12 SCC 210 > 2 [2012] 1 SCR 403 : (2012) 2 SCC 624 > 3 [2001] Supp. 3 SCR 619 : (2001) 8 SCC 470 [2024] 7 S.C.R.  5 ## **The State of West Bengal represented through the Secretary & Ors. v. Rajpath Contractors and Engineers Ltd.** within the said period of three months it may entertain the application within a further period of thirty days, but not thereafter.” **7.** As per Section 12(1) of the Limitation Act, the day from which the limitation period is to be reckoned must be excluded. In this case, the period of limitation for filing a petition under Section 34 will have to be reckoned from 30[th] June 2022, when the appellants received the award. In view of Section 12(1) of the Limitation Act, 30[th] June 2022 will have to be excluded while computing the limitation period. Thus, in effect, the period of limitation, in the facts of the case, started running on 1[st] July 2022. The period of limitation is of three months and not ninety days. Therefore, from the starting point of 1[st] July 2022, the last day of the period of three months would be 30th September 2022. As noted earlier, the pooja vacation started on 1[st] October 2022. **8.** We may note here that Section 43 of the Arbitration Act provides that the Limitation Act shall apply to the arbitrations as it applies to proceedings in the Court. We may note here that the consistent view taken by this Court right from the decision in the case of _**Union of India v. Popular Construction Co.[3]**_ is that given the language used in proviso to sub-section (3) of Section 34 of the Arbitration Act, the applicability of Section 5 of the Limitation Act to the petition under Section 34 of the Arbitration Act has been excluded. **9.** Now, we proceed to consider whether the appellant will be entitled to the benefit of Section 4 of the Limitation Act. Section 4 of the Limitation Act reads thus: **“4. Expiry of prescribed period when court is closed** .— Where the prescribed period for any suit, appeal or application expires on a day when the court is closed, the suit, appeal or application may be instituted, preferred or made on the day when the court re-opens. Explanation.—A court shall be deemed to be closed on any day within the meaning of this section if during any part of its normal working hours it remains closed on that day.” (underline supplied) [2024] 7 S.C.R. 6 ## **Digital Supreme Court Reports** The meaning of “the prescribed period” is no longer _res integra._ In the case of _**Assam Urban Water Supply & Sewerage Board v. Subash Projects & Mktg. Ltd.[2,]**_ in paragraphs nos. 13 and 14, the law has been laid down on the subject. The said paragraphs read thus: “ **13.** The crucial words in Section 4 of the 1963 Act are “prescribed period”. What is the meaning of these words? **14.** Section 2(j) of the 1963 Act defines: “ **2. (** _**j**_ **)** ‘period of limitation’ [which] means the period of limitation prescribed for any suit, appeal or application by the Schedule, and ‘prescribed period’ means the period of limitation computed in accordance with the provisions of this Act; Section 2( _j_ ) of the 1963 Act when read in the context of Section 34(3) of the 1996 Act, it becomes amply clear that the prescribed period for making an application for setting aside an arbitral award is three months. The period of 30 days mentioned in the proviso that follows sub-section (3) of Section 34 of the 1996 Act is not the “period of limitation” and, therefore, not the “prescribed period” for the purposes of making the application for setting aside the arbitral award. The period of 30 days beyond three months which the court may extend on sufficient cause being shown under the proviso appended to sub-section (3) of Section 34 of the 1996 Act being not the “period of limitation” or, in other words, the “prescribed period”, in our opinion, Section 4 of the 1963 Act is not, at all, attracted to the facts of the present case.” (underline supplied) Even in this case, this Court was dealing with the period of limitation for preferring a petition under Section 34 of the Arbitration Act. We may note that the decision in the case of _**State of Himachal Pradesh and Another v. Himachal Techno Engineers and Another[1]**_ which is relied upon by the appellant, follows the aforesaid decision. [2024] 7 S.C.R.  7 ## **The State of West Bengal represented through the Secretary & Ors. v. Rajpath Contractors and Engineers Ltd.** **10.** In the facts of the case in hand, the three months provided by way of limitation expired a day before the commencement of the pooja vacation, which commenced on 1[st] October 2022. Thus, the prescribed period within the meaning of Section 4 of the Limitation Act ended on 30[th] September 2022. Therefore, the appellants were not entitled to take benefit of Section 4 of the Limitation Act. As per the proviso to sub-section (3) of Section 34, the period of limitation could have been extended by a maximum period of 30 days. The maximum period of 30 days expired on 30th October 2022. As noted earlier, the petition was filed on 31[st] October 2022. **11.** Thus, looking from the angle, the High Court was right in holding that the petition filed by the appellants under Section 34 of the Arbitration Act was not filed within the period specified under subsection (3) of Section 34. Hence, we find no merit in the appeal, and it is, accordingly, dismissed. _Result of the case:_ Appeal Dismissed. - _†Headnotes prepared by:_ Nidhi Jain
End of Judgment Record
Browse All Supreme Court of India (2024) Decisions
2024-04-09

Kizhakke Vattakandiyil Madhavan (Dead) Thr. Lrs. v. Thiyyurkunnath Meethal Janaki and Ors

This appeal concerns partition of a family property in Eravattur, Kozhikode, governed by pre-1956 Mitakshara succession. Madhavan died before 1910; his widow Chiruthey remarried Neelakandan, triggering Section 2 of the Hindu Widow’s Remarriage Act, 1856, which extinguishes a widow’s rights in her deceased husband’s property on remarriage. Chiruthey’s second marriage, and a sequence of instruments dated 1910–1925—back-to-back deeds creating a lease in favour of Cheriyamma and her son (Exhibits A-20 and A-1) and an assignment (Exhibit A-2)—formed the basis for Chandu (the plaintiff) and Sankaran’s successors-in-interest to seek partition in OS 157/1985. The Trial Court granted partition to the plaintiff; the First Appellate Court dismissed; the Kerala High Court restored the Trial Court’s decree. The Supreme Court, however, allowed the appeal. It held that on remarriage the widow’s title over Madhavan’s property stood lapsed under Section 2; yet the back-to-back deeds involved Nangeli (Madhavan’s mother) and Sankaran, who retained an interest. Exhibit A-20 was treated as a valid conveyance, but Chiruthey’s own title did not survive; the lease purportedly created by A-1 could not extend beyond its 12-year term. Consequently, the plaintiff’s claim for partition could not be sustained, and the appeal was allowed with the trial/decree of the lower courts set aside.

2024-10-04

Banshidhar Construction Pvt. Ltd. v. Bharat Coking Coal Limited & Others

Banshidhar Construction Private Limited (the appellant) challenged Bharat Coking Coal Limited’s tender for a mega project to salvage, develop, and operate a coal mine under a revenue-sharing arrangement for 25 years. The tender NIT dated 16.08.2023 imposed stringent eligibility criteria, including Clause 10 requiring financial capacity documentation and a Power of Attorney for signing bids. The appellant contended that its Power of Attorney (dated 07.11.2023 and notarised 14.11.2023) was valid, and its bid documents were uploaded before the last submission date (01.12.2023). Technical bids opened on 04.12.2023, yet the appellant was declared technically disqualified on 06.05.2024 on grounds that it did not meet Clause 10. Meanwhile, Respondent No.8 was declared technically qualified and later found to be the successful bidder after financial bids were opened on 07.05.2024, despite non-compliance with the “mandatory” Clause 10 documents, including delayed Audited Balance Sheets. The High Court dismissed the writ petition. The Supreme Court, while acknowledging limited review in mega-project tenders, held that public authorities must act with fairness, transparency, and without arbitrariness or malafides. It held that the Power of Attorney requirement was satisfied and that accepting the non-compliant Respondent No.8 while rejecting the appellant was arbitrary. The Court set aside the impugned decision and permitted a fresh tender process in accordance with law, reaffirming that Article 14 requires equal treatment and non-arbitrariness in public procurement.

2024-03-21

Union of India v. M/s Indian Oil Corporation Ltd.

This Supreme Court judgment concerns an appeal by the Union of India challenging a batch of Allahabad High Court orders that directed refunds to IOCL for a difference of approx. 110 km in freight charges on the Baad–Hisar route. IOCL had been charged on the basis of a distance of 444 km under the old Local Distance Table; following Railway Ministry circulars in 2004 and 2005 rationalizing the rounding-off of chargeable distance, the distance was reduced to 333.18–334 km in practice. IOCL issued notices under Section 106 of the Railways Act, 1989 (formerly Section 78-B of the Railways Act, 1890) seeking refunds of the alleged overcharge, and 122 consignments were paid at the old distance before the authorities corrected the distance. The Railway Claims Tribunal dismissed most claims as time-barred, while the Allahabad High Court allowed IOCL’s appeals, holding that the original 444 km charge was an “illegal charge” rather than an overcharge, and thus protected by equity. The Union of India challenged this, arguing that Section 106(3) only covers refunds of overcharges and not illegal charges; that the change in distance stemmed from policy rationalization and circulars, not an erroneous charge. The Court distinguishes Hindustan Petroleum, clarifies the overcharge/illegal charge distinction, and ultimately holds that the 444 km distance was illegal. As a result, the Union’s appeals are dismissed, and IOCL’s refunds for the difference would be payable to IOCL. The matter underscores the nuanced interplay between statutory time limits, chargeable distance, and the nature of the charge in refund claims.

2024-07-23

Gene Campaign & Anr. v. Union of India & Ors.

This is a batch of writ petitions initiated in 2004–2005 addressing the environmental and regulatory treatment of GM crops, specifically the environmental release of transgenic mustard DMH-11 (Dhara Mustard Hybrid-11). The Supreme Court examined whether GEAC’s 18.10.2022 conditional approval and the 25.10.2022 decision were legally sound, whether they violated Article 21 (right to a safe environment) and whether the precautionary principle was properly applied. The court undertook a comprehensive review of the regulatory framework under the Environment Protection Act, 1986 and the 1989 Rules, as well as the Technical Expert Committee (TEC) reports and Parliamentary Standing Committee recommendations. A key feature is the dual opinions: Justice Nagarathna (with Justice Karol concurring but delivering a separate opinion) upheld a robust judicial review of executive policy in GM regulation and found serious irregularities in the decision-making process, quashing the impugned approvals and directing a national policy on GM crops, greater public transparency, and safe-guarded field testing. Justice Karol, in a separate opinion, while endorsing the need for precaution, cautioned against an outright ban on HT crops and emphasized policy matters be left to the legislature. The judgment thus emphasizes environmental rule of law, public trust, intergenerational equity, and a precautionary approach, while mandating further regulatory reform and public participation.