The Central Warehousing Corporation vs Thakur Dwara Kalan Ul-Maruf Baraglan Wala (Dead) & Ors.

Case / Petition Number:
/
Neutral Citation:/

Case Synopsis & Summary

The Supreme Court, in a Civil Appeal arising from SLP (C) Nos. 30817-30818 of 2016, adjudicates the quantum of just compensation for land acquired under the Land Acquisition Act, 1894, for land in the village Narāingarh, Ambala. The Notification under Section 4 was issued on 10.11.2000; the Land Acquisition Collector initially fixed compensation at Rs. 72.31 per square yard based on Rs. 3.50 lacs per acre, with the Reference Court subsequently enhancing to Rs. 208.59 per square yard (Rs. 6,310 per Marla) by applying a 12% annual increase from 1989 to 2000. The High Court later adopted a 15% cumulative annual increase for 11 years, following a principle laid down in Oil and Natural Gas Corporation, Ltd. v. Rameshbhai Jivanbhai Patel. The appellant challenged this enhancement, contending that a 11-year interval with a flat 15% cumulative rate is unjustifiable and that a more cautious approach, consistent with earlier precedents, should be used. The Supreme Court surveys relevant authorities (Ashrafi, Narbadi Devi, Ramrao Tapase, Subhash Chander) and concludes that the rate of annual increase for determining just compensation has varied across cases, particularly with longer gaps. It holds that 8% annual increase, accumulated over 11 years, would be fair and reasonable. The impugned High Court judgment is set aside, and the LAC is directed to recompute compensation accordingly, with no costs and with appropriate adjustments for any past payments.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Vikram Nath
  • Ahsanuddin Amanullah
Judgment Date
2023-10-19
Court Decision / Holding
Appeals allowed. The impugned judgment and High Court order dated 01.06.2016 are set aside. The Land Acquisition Collector is to compute compensation using 8% annual increase with cumulative effect for 11 years, and to adjust for any sums already paid. If any excess has been paid, it is to be recovered; if there is any shortfall, the additional payment is to be made within two months from the date of this judgment. There shall be no order as to costs. Pending applications disposed of.
Final Disposition
Appeals allowed; High Court order set aside; LAC to recompute compensation using 8% annual increase cumulatively for 11 years; no costs; settle past payments as directed.

Parties to the Case

Appellants / Petitioners

  • The Central Warehousing Corporation

Respondents

  • Thakur Dwara Kalan Ul-Maruf Baraglan Wala (Dead) & Ors.

Provisions of Law Cited

Section 4 of the Land Acquisition Act, 1894Section 6 of the Land Acquisition Act, 1894Section 9 of the Land Acquisition Act, 1894Section 18 of the Land Acquisition Act, 1894

Legal Doctrines & Maxims

  • Just and reasonable compensation

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the High Court erred in applying a 15% cumulative annual increase for 11 years to determine just compensation. It argues that the base rate from the 1989 reference and the market-value evidence around 2000 do not justify a long, uniform escalator; reliance on earlier decisions (e.g., Rameshbhai Jivanbhai Patel, Ashrafi, Narbadi Devi, Ramrao Tapase, Subhash Chander) demonstrates that the rate of escalation must be calibrated to the time-gap and available data, and should not distort market realities. The 8% cumulative figure proposed by the Court, after considering geopolitical and economic factors, ensures fair treatment to landowners while protecting state finances.

Contentions of Respondents

The respondents contend for a fair and robust enhancement of compensation, citing the proximity of the land to urban development, irrigation status, and potential residential use, which should reflect higher market values (Rs. 30 lacs per acre or more were argued in the reference). They urge adherence to market-value-based and loss-compensation practices, urging the High Court’s increase of 15% cumulatively for 11 years, as justified by case law emphasizing escalations in relation to nearby developments and the date of notification.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
General Manager, Oil and Natural Gas Corporation Limited vs. Rameshbhai Jivanbhai Patel and Another3 (2013) 5 SCC 527Mentioned OnlyCited to illustrate the debate on applying cumulative annual increases; not treated as controlling rule due to long time-gap in the subject case.
Ashrafi and Others Vs. State of Haryana and Others/Mentioned OnlyReferenced in the context of annual-increase methodology; not adopted as a strict formula in this case.
Narbadi Devi & Ors. Vs. State of Haryana4 SLP(c)Nos.20531-20565 of 2014Mentioned OnlyDiscussed within the evolving jurisprudence on escalation of compensation.
Ramrao Shankar Tapase vs. Maharashtra Industrial Development Corporation and Others5 (2022) 7 SCC 563Mentioned OnlyCited in the corpus addressing cumulative annual increases and evolving standards.
State of Haryana and Another vs. Subhash Chander and Others6 (2023) 5 SCC 435Mentioned OnlyUsed to illustrate variations in annual-increase rates with different factual contexts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,598 words•~12 min read

In The Court Record

The Central Warehousing Corporation vs Thakur Dwara Kalan Ul-Maruf Baraglan Wala (Dead) & Ors.

2023 INSC 940 **==> picture [68 x 68] intentionally omitted <==** **==> picture [67 x 68] intentionally omitted <==** **REPORTABLE** **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NOS. OF 2023 (Arising out of SLP (C) NOS. 30817-30818 OF 2016)** **THE CENTRAL WAREHOUSING CORPORATION** **…APPELLANT(S)** ## **VERSUS** **THAKUR DWARA KALAN UL-MARUF BARAGLAN WALA (DEAD) & ORS. …RESPONDENT(S)** ## **J U D G M E N T** ## **VIKRAM NATH, J.** 1. Application for substitution is allowed. 2. Leave granted. Signature Not Verified Digitally signed by SONIA BHASIN Date: 2023.10.19 18:06:11 IST Reason: 3. The present appeals assail the correctness of common judgment and order of the High Court of Punjab & Haryana at Chandigarh dated SLP (C) No. 30817-30818 of 2016 Page **1** of **16** 01.06.2016, whereby the appeal filed by Respondent No.1 (RFA No. 295 of 2005) was partly allowed, and the appeals filed by the appellant and State of Haryana (respondent No.2) (RFA No. 2400 of 2004 and RFA No. 2522 of 2004) were dismissed, raising the amount of compensation to Rs.493/per square yard on the date of notification under Section 4 of the Land Acquisition Act, 1894[1] . The basis for the same being cumulative annual increase at the rate of 15% for a period of 11 years. The base figure was taken from an order of Reference Court dated 30.08.2000 relating to acquisition of land of the same village Naraingarh of the year 1989, and the period of 11 years being counted from 1989 to 2000, the year of the notification dated 10.11.2000 issued under Section 4 of the 1894 Act. 4. Relevant facts for deciding the present appeals are as follows: > 1 In short, ‘1894 Act’ SLP (C) No. 30817-30818 of 2016 Page **2** of **16** - i) Notification was issued under Section 4 of the 1894 Act on 10.11.2000 for acquiring land measuring 80 Kanals, 11 Marlas out of the revenue estate of Naraingarh, District Ambala for the benefit of the appellant. - ii) Objections were invited as per the provisions of the 1894 Act; however, no objections were filed. - iii)Declaration under Section 6 of the 1894 Act was issued on 19.03.2001. - iv) The Land Acquisition Collector/Sub Divisional Officer (Civil) who was duly authorised to give the award, started the process on 25.09.2001 by serving notices under Section 9 of the 1894 Act. After the parties led evidence and considering material on record, vide award dated 12.10.2001 the Land Acquisition Collector determined the rate of compensation at Rs.3.50 lacs per acre, which would be equivalent to Rs.2,187.50 Ps. per Marla and further equivalent to Rs.72.31 per square yard being the market value SLP (C) No. 30817-30818 of 2016 Page **3** of **16** prevailing on the date of notification under Section 4 of the 1894 Act. 5. The Land Acquisition Collector considered the following factors to determine the rate of compensation: - a) No objections were filed with respect to area and classification of the land in question. - b) The land owners (respondents) did not put forth any specific claim with regard to the market value of the land. The only claim was that fair and reasonable compensation be awarded. - c) The acquired land was purely an agricultural land situated by the side of a link road. - d) Report of the Committee constituted at the Divisional Level for evaluation under the chairmanship of Divisional Commissioner had fixed the market rate of Rs.3,50,000/- per acre after considering the market rates provided from the Office of the District Collector, Ambala. SLP (C) No. 30817-30818 of 2016 Page **4** of **16** - e) The material provided by the local revenue Patwari regarding sale deeds of similar land executed within closed proximity on the material date. 6. The respondent preferred a reference under Section 18 of the 1894 Act on 19.11.2001 seeking enhancement of compensation primarily for the following reasons: - (i) The acquired land was Chahi land (Irrigated land) which was used for residential purposes, and was situated within the Abadi near the Naraingarh District as well as near the sector carved by Haryana Urban Development Authority and was also near the Government College, Naraingarh and Government Senior Secondary School, Naraingarh. - (ii) The Market value of the acquired land was not less than Rs.30 lacs per acre at the relevant time and therefore the claim of Rs.35 lacs per acre was made. SLP (C) No. 30817-30818 of 2016 Page **5** of **16** 7. The appellant filed his objections and written statement in the reference proceedings denying all the assertions made by the respondent in the reference. 8. After considering the material on record, the Reference Court/ Additional District Judge, Ambala allowed the reference and determined the market value at Rs.6,310/- per Marla equivalent to Rs.208.59/- per square yard by taking into account 12% (simple/flat) increase per annum for 11 years from 1989 to 2000. Reliance was placed upon a judgment dated 30.08.2000 of the Reference Court pertaining to acquisition of land in the year 1989 of the same village (Naraingarh), wherein the Reference Court had fixed the rate at Rs.2720/- per Marla equivalent to Rs.89.91 per square yard. 9. Aggrieved with the enhancement by the Reference Court, both the parties appealed before the High Court. The said appeals came to be decided by the SLP (C) No. 30817-30818 of 2016 Page **6** of **16** common impugned order of the High Court as already mentioned in the opening paragraph. 10. The High Court granted an annual increase at the rate of 15% on cumulative basis for a period of 11 years, relying upon the judgment of this Court in the case of **General Manager, Oil and Natural Gas Corporation Limited vs. Rameshbhai Jivanbhai Patel and Another[2] .** While entertaining the special leave petition, this Court vide interim order dated 11.11.2016 granted stay subject to condition that the appellant would deposit 50% of the compensation as determined by the High Court. In compliance to the same, the appellant deposited Rs.2,54,46,007/on 04.01.2017 which was subsequently allowed to be withdrawn by the respondent vide order dated 12.04.2017. The said amount has since been withdrawn. 11. The appellant further pointed out that it has actually paid a total amount of Rs.3,72,01,551/- to > 2 (2008) 14 SCC 745 SLP (C) No. 30817-30818 of 2016 Page **7** of **16** the respondent. The breakup of which is as follows: (i) Rs.49,71,728/- was paid at the time of award; (ii) under interim order of the High Court, further amount of Rs.65,69,816/- along with TDS of Rs.2,14,000/was paid; and (iii) further Rs.2,54,46,007/- was deposited and paid as directed by this Court. 12. We have heard learned senior counsels for the parties and have also perused the material on record. 13. The core question to be decided in the present appeals is as to what would be a fair and just compensation so as to do justice between the parties that is to say that land owners may get a fair and reasonable amount of compensation for losing their land, and at the same time balancing the State exchequer by not awarding an amount which may be in excess of the market value so as not to put an additional burden on the appellant which is a State entity. SLP (C) No. 30817-30818 of 2016 Page **8** of **16** 14. It is an admitted position that there is no material in the form of exemplars of the relevant time that is the date of the notification under Section 4 of the 1894 Act so as to facilitate determination of the market value. Whatever sale deeds have been referred by the appellant, cannot be taken as exemplars to determine the market value for which the reasons given by the High Court are reasonable and we have no reason to interfere with the same. Thus, we have to fall back upon the order of the Reference Court dated 30.08.2000 which related to an acquisition of the year 1989. This Reference Court order of 30.08.2000 has been relied upon by the Reference Court and the High Court in the present case. The question to be determined would be as to at what rate the annual increase be applied? The Reference Court applied 12% flat rate increase, whereas High Court applied 15% cumulative. 15. The law on the point of annual increase whether on cumulative basis or non-cumulative basis and the SLP (C) No. 30817-30818 of 2016 Page **9** of **16** rate of annual increase to be applied are thus to be considered. Based upon the same a balance and equitable compensation needs to be determined in the present case. 16. The following cases have been relied upon by the parties with respect to determining the just compensation. - i) **General Manager, Oil and Natural Gas Corporation Limited vs. Rameshbhai Jivanbhai Patel and Another (supra),** - ii) **Ashrafi and Others Vs. State of Haryana and Others**[3] , - iii) **Narbadi Devi & Ors. Vs. State of Haryana**[4] , - iv) **Ramrao Shankar Tapase vs. Maharashtra Industrial Development Corporation and Others**[5] , - v) **State of Haryana and Another vs. Subhash Chander and Others**[6] > 3 (2013) 5 SCC 527 > 4 SLP(c)Nos.20531-20565 of 2014, (22.08.2014- Order) > 5 (2022) 7 SCC 563 > 6 (2023) 5 SCC 435 SLP (C) No. 30817-30818 of 2016 Page **10** of **16** 17. The case which was referred to by the High Court was **Rameshbhai Jivanbhai Patel (supra).** It no doubt referred to determining compensation on the basis of annual increase with cumulative effect, but at the same time it had put a caution that such annual increase can be taken only for 4-5 years as beyond that it would be unsafe to uniformly apply the same rate for increase and that too with cumulative effect. Paragraph 15 of the said judgment may be reproduced here which mentions the reasons where the gap is of several years, such standards may not be reliable rather the same maybe unsafe. “15. Normally, recourse is taken to the mode of determining the market value by providing appropriate escalation over the proved market value of nearby lands in previous years (as evidenced by sale transactions or acquisitions), where there is no evidence of any contemporaneous sale transactions or acquisitions of comparable lands in the neighbourhood. The said method is reasonably safe where the relied-on sale transactions/acquisitions precede the subject acquisition by only a few years, that is, up to four to five years. Beyond that it may be unsafe, even if it relates to a neighbouring land. What may be a reliable standard if the gap is of only a few years, may become unsafe and unreliable standard where the gap is larger. For example, for SLP (C) No. 30817-30818 of 2016 Page **11** of **16** determining the market value of a land acquired in 1992, adopting the annual increase method with reference to a sale or acquisition in 1970 or 1980 may have many pitfalls. This is because, over the course of years, the “rate” of annual increase may itself undergo drastic change apart from the likelihood of occurrence of varying periods of stagnation in prices or sudden spurts in prices affecting the very standard of increase.” 18. In the said case, after laying down the caution, this Court awarded cumulative annual increase at the rate of 7.5% for a period of five years. 19. In the case of **Ashrafi and others (supra),** this Court amongst many issues, considered the issue of applying annual increase cumulatively for determining just compensation. It also considered the law laid down in the case of **Rameshbhai Jivanbhai Patel (supra)** and many other judgments on the said point. It applied formula of 12% annual increase cumulatively for a period of five years. The base rate being of the year 1987 whereas the acquisition in question being of 1993. 20. We will also refer to order dated 22.08.2014 in the case of **Narbadi Devi & others (supra)** which relied SLP (C) No. 30817-30818 of 2016 Page **12** of **16** upon the judgment in the case of **Ashrafi & others** ( **supra** ) and accepted the annual increase of 12% cumulatively. The High Court in the said case had although followed the dictum in the judgment of **Ashrafi & others (supra)** , however, the annual increase of 12% was granted at a flat rate by the High Court and not cumulatively. This Court accordingly had modified the order of the High Court to the aforesaid extent that 12% annual increase would be cumulative. 21. Recently, in the year 2022, this Court in the case of **Ramrao Shankar Tapase (supra)** citing the judgment in the case of **Rameshbhai Jivanbhai Patel (supra)** and other similar matters, awarded annual increase cumulatively at the rate of 12% for a period of three years. The High Court in the said case had applied annual increase cumulatively at the rate of 10%. 22. The latest judgment is of 2023 in the case of **Subhash Chander (supra)** . In this case, the Court SLP (C) No. 30817-30818 of 2016 Page **13** of **16** held that rate of annual increase could vary from 8% to 15% per year. However, considering the facts of the said case, this Court had awarded 10% annual increase cumulatively for a period of two years only. 23. From the above, we notice that the consistent view taken by this Court for awarding annual increase to determine the just compensation varies from case to case and the period to be applied is a major factor to be considered. In the present case, the period is 11 years which is pretty large as compared to the time period considered in the cases referred to above. 24. Taking an overall view in the matter and the consistent view of this Court, the fair and reasonable compensation in the present case would be best determined if we apply 8% annual increase with cumulative effect. This is for the reason that the gap is huge i.e. 11 years. For shorter period of 3-5 years, it could have been 10% or 12%. But in SLP (C) No. 30817-30818 of 2016 Page **14** of **16** no case 15% would be justified for a period of 11 years as awarded by the High Court in the impugned order. In the present case, given the 11 years gap, 8% would be considered just and proper. 25. On rough assessment, the compensation would be equivalent to compensation awarded by the Reference Court. The High Court fell in error in enhancing the compensation by applying the cumulative annual increase of 15%. 26. In view of the above, the appeals are allowed. The impugned judgment and order of the High Court dated 01.06.2016 is set aside. The Land Acquisition Collector to calculate the compensation at the rate as determined above. 27. According to the appellant, an amount of Rs.3,72,01,551/- had already been deposited and also disbursed to the respondents. In case, after the final calculation, the Land Acquisition Collector finds that any additional amount has been paid to the respondents, the same be recovered in SLP (C) No. 30817-30818 of 2016 Page **15** of **16** accordance with the law, however, if the final calculation requires some additional amount to be paid to the respondents, the same to be paid within two months from the date of receipt of this judgment. 28. There shall be no order as to costs. ## 29. Pending applications, if any, are disposed of. **……………………………………J. (VIKRAM NATH)** **……………………………………J. (AHSANUDDIN AMANULLAH)** **NEW DELHI OCTOBER 19, 2023** SLP (C) No. 30817-30818 of 2016 Page **16** of **16**
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.