The Agricultural Produce Marketing Committee, Bangalore v. The State of Karnataka & Others

Case / Petition Number:
Civil Appeal Nos. 1345-1346 of 2022; Civil Appeal Nos. 1347-1374 of 2022

Case Synopsis & Summary

This consolidated Supreme Court decision deals with multiple land acquisitions made by the Agricultural Produce Marketing Committee (APMC), Bangalore, for establishing a mega market, by applying the Land Acquisition Act, 1894 (Act 1894) and later the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act 2013). The lands comprised three parcels: 172 acres 22 guntas (First Acquisition) in Srigandadakaval Village and 104 acres 5 guntas (Second Acquisition) in Herohalli Village, with a smaller portion not in dispute. Notifications under Section 4(1) and 6 of Act 1894 triggered the proceedings, triggering writ petitions and interim stays that delayed awards. Awards were issued for portions, possession was taken for some parcels, and compensation was deposited or paid in parts. When Act 2013 came into force, Section 24(2) of Act 2013 was invoked by the High Court to hold that the acquisitions had lapsed, despite earlier actions and stays. The Supreme Court reversed, holding that Indore Development Authority’s interpretation of Section 24(2) must govern, and that the High Court erred in treating all acquisitions as lapsed. The Court remanded the matters to the Single Judge to decide all issues on merits, within twelve months, and allowed the appeals with no costs, directing priority to writ appeal No.1089/21 to be decided by end-2022.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M. R. Shah
  • B. V. Nagarathna
Judgment Date
2022-03-22
Court Decision / Holding
Appeals allowed; the impugned High Court judgments and orders declaring lapse under Section 24(2) of Act 2013 are quashed and set aside. The matters are remitted to the learned Single Judge to decide the writ petitions afresh on all issues, in accordance with law and on merits, with directions to complete within twelve months. Writ Appeal No.1089 of 2021 is to be heard first and decided by 31.12.2022. There shall be no order as to costs.
Final Disposition
Appeals allowed; remanded to the Single Judge for fresh disposal on all issues; no costs; writ appeals to be decided within specified time frames.

Parties to the Case

Appellants / Petitioners

  • Agricultural Produce Marketing Committee, Bangalore

Respondents

  • The State of Karnataka and Others

Legal Representation & Advocates

Counsels for Petitioners

  • • Shri V. Giri, Senior Advocate

Counsels for Respondents

  • • Shri C. U. Singh, Senior Advocate
  • • Shri V. N. Raghupathy

Provisions of Law Cited

Section 4(1) of the Land Acquisition Act, 1894Section 6 of the Land Acquisition Act, 1894Section 17(4) of the Land Acquisition Act, 1894Section 5A of the Land Acquisition Act, 1894Section 16 of the Land Acquisition Act, 1894Section 11A of the Land Acquisition Act, 1894Section 31 of the Land Acquisition Act, 1894Section 34 of the Land Acquisition Act, 1894Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 - Section 24(1)(a), Section 24(1)(b), Section 24(2) (including proviso)Karnataka Land Reforms Act, 1961 - Section 66

Submissions & Arguments

Contentions of Appellants / Petitioners

APMC contends that the High Court erred in holding that the acquisitions lapsed under Section 24(2) of Act 2013. It argues the stay orders and pending Land Reforms proceedings must be excluded from the five-year window, that 65 acres’ award was deposited, and that non-deposit/deposits in court do not automatically lapse proceedings. It urges interpretation of Section 24(2) consistent with Indore Development Authority to prevent reopening concluded proceedings and to allow merits-based adjudication on remand.

Contentions of Respondents

The Trust (and other landowners) and State content that the lapse under Section 24(2) is triggered due to non-deposit of compensation and non-taking possession for the required period, despite interim orders. They argue that the 2013 Act provides a deemed lapse where delays persist, and that the acquisitions should be quashed as lapsed, with notices and Section 4/6 notifications being set aside.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
Indore Development Authority v. Shailendra(2018) 3 SCC 412PositiveConstitution Bench interpretation of Section 24(2) followed to interpret lapse, guiding the present decision.
Pune Municipal Corporation v. Harakchand Misirimal Solanki(2014) 3 SCC 183OverruledOverruled by Indore Development Authority for interpretation of Section 24(2).
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu(2015) 3 SCC 353OverruledOverruled by Indore Development Authority regarding Section 24(2) interpretation.
Nusli Neville Wadia v. Ivory Properties & Ors.(2020) 6 SCC 557PositiveCited to emphasize that courts should adjudicate all issues (Order 14 Rule 2 analogies), supporting comprehensive adjudication.
Indore Development Authority v. Manoharlal & Ors.(2020) 8 SCC 129PositiveConstitution Bench clarification on Section 24(2) interpretation used to guide the present remand framework.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•6,606 words•~31 min read

In The Court Record

The Agricultural Produce Marketing Committee, Bangalore v. The State of Karnataka & Others

**REPORTABLE** ## IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## **­ CIVIL APPEAL NOS. 1345 1346 OF 2022** The Agricultural Produce Marketing Committee ..Appellant (S) Bangalore Versus The State of Karnataka & Ors. ..Respondent (S) ## With ## **­ CIVIL APPEAL NOS. 1347 1374 OF 2022** ## **J U D G M E N T** ## **M. R. Shah, J.** 1. As common question of law and facts arise in this group of appeals and as such are between the same parties, all these appeals are decided and disposed of together by this common judgment and order. > Signature Not Verified 2. Digitally signed by R Natarajan Date: 2022.03.22 17:36:59 IST Reason: - Feeling aggrieved and dissatisfied with the impugned judgment and order in respective writ appeals preferred by 1 the appellant herein – the Agricultural Produce Marketing Committee, Bangalore (hereinafter referred to as the “APMC”), by which the Division Bench of the High Court has dismissed the said writ appeals and confirmed the common judgment and order passed by the learned Single Judge passed in respective writ petitions preferred by the private respondents herein – original land owners and declared that the acquisitions of the lands in question has lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as “the Act, 2013”), the APMC, Bangalore has preferred the present appeals. 3. The facts leading to the present appeals in a nutshell are as under: ­ - 3.1 That the lands in question were acquired in three parts. The first acquisition was in respect of 172 acres 22 guntas of land owned by respondent No.4 – Jamanlal Bajaj Seva Trust (for short “Trust”). Second acquisition was in respect 2 of 104 acres 5 guntas of land owned by very respondent No.4 – Trust and the third acquisition was in respect of 3 acres 34 guntas of land (which is not the subject matter of appeals before this Court). - 3.2 The relevant facts in respect of first and second acquisitions are as under: ­ ## **In respect of 172 acres 22 guntas (First Acquisition)** - 3.2.1 That a notification was issued under Section 4(1) of the Land Acquisition Act, 1894 (hereinafter referred to as “the Act, 1894”) on 03.09.1994 in respect of 172 acres 22 guntas of land owned by respondent No.4 herein – Trust in Srigandadakaval Village, Yeshwanthpura Hobli, Bengaluru for establishing a mega market by the appellant – APMC, Bangalore. - 3.2.2 One Rajajinagar House Building Co­operative Society challenged the notification issued under Section 4(1), before the High Court of Karnataka by way of Writ Petition No.28988/1994. It was the case on behalf of the said society that the land should be acquired for them and not 3 for APMC. The said writ petition came to be dismissed by the High Court vide order dated 23.12.1995. - 3.3.3 Thereafter a notification/declaration under Section 6 of the Act, 1894 was issued on 10.10.1996 and published on 13.10.1996. A draft award was prepared in respect of 172 acres 22 guntas of land on 12.08.1998. - 3.3.4 On the instructions given by the Land Acquisition Officer, the appellant – APMC deposited Rs.9,14,14,873/­ on - 19.08.1998 towards approximate cost of the acquisition. 3.3.5 It appears that the aforesaid Rajajinagar House Building Co­operative Society filed another writ petition being W.P. No.6880/1997 before the High Court, before the acquisition of 172.50 acres of land at Srigandadakaval Village could be completed. The High Court granted an ex­ parte order of stay of acquisition proceedings vide interim order dated 16.09.1998. Thereafter respondent no.4 – original land owner filed Writ Petition No.3884/1998 before the High Court, challenging the acquisition 4 proceedings. Vide interim order dated 08.02.1999, the High Court ordered stay of dispossession. ## **In respect of 104 acres 5 guntas (Second Acquisition)** - 3.4 That a notification under Section 4(1) read with Section 17(4) of the Act, 1894, dispensing with the requirement of hearing was issued on 13.04.1999 in respect of 104 acres 5 guntas of land owned by respondent No.4 – Trust in Herohalli Village, Yeshwanthpura Hobli, Bangalore North Taluk, for establishing a mega market by the appellant – APMC. A final notification under Section 6(1) read with Section 17(1) to 17(4) was issued in respect of 100 acres - 11 guntas out of 104 acres 5 guntas which had been notified under Section 4(1) on 13.04.1999, leaving an area of 3 acres 34 guntas out of acquisition. An enquiry under Section 5A was dispensed with. 3.4.1 That one Vishwaneedam Trust filed Writ Petition No.708/2000 before the High Court challenging the said acquisition. The High Court granted stay of dispossession in respect of 35 acres out of the 100 acres 5 guntas situated in Herohalli Village. 5 3.4.2 Respondent No.4 – Trust – original land owner filed Writ Petition No.37140/2000 challenging the notifications dated 13.04.1999 and 26.10.1999 in respect of the lands at Herohalli Village. - 3.4.3 According to the appellant, possession was taken and handed over to the APMC by the Land Acquisition Officer vide an Official Memorandum of Possession dated 06.10.2000 in respect of 65 acres 19 guntas of the lands at Herohalli Village. 3.4.4 That an award was made by the State Land Acquisition Officer (SLAO) on 22.05.2002, referring to a Government order dated 26.03.2002, in respect of 100 acres 11 guntas covered by Section 6 notification dated 26.10.1999. The award provided for payment of compensation to respondent No.4 – Trust after excluding 34 acres 14 guntas of acquired land treating the same as Phut Kharab belonging to the Government and further excluding 35 acres in respect of the writ petition filed Vishwaneedam 6 trust in which an order of stay of dispossession had been passed by the High Court. The said compensation was accepted by respondent No.4 under protest. Respondent No.4 – Trust – original land owner filed a Land Acquisition Case No.1/2003 seeking enhancement of compensation which seems to be pending. - 3.5 Thus, Writ Petition No.3884/1998 filed by respondent No.4 - original land owner was in respect of 172 acres 22 guntas of land. Writ Petition Nos.37140­37146/2000 was in respect of 100 acres of land and Writ Petition No.708/2000 was filed by Vishwaneedam Trust in respect of second acquisition (part). - 3.6 A common statement of objections was filed by the appellant – APMC to all the writ petitions. - 3.7 That the APMC filed IA No.01/2007 in W.P. No.37140/2000, to permit APMC to hand over 9 acres of land out of 65 acres 11 guntas to the Bangalore Development Authority (BDA) and 4 acres to the Bangalore Water Supply and Sewerage Board (BWSSB). That vide 7 order dated 21.03.2007, the learned Single Judge allowed the said IA No.01/2007 and granted permission to the APMC as prayed. 3.8 At this stage, it is required to be noted that in respect to the lands in question and other lands owned by respondent No.4 – Trust, proceedings were pending before the Land Reforms Tribunal, Bangalore N. Taluk. At this stage, it is required to be noted that it was the specific case on behalf of the State and the APMC that unless the proceedings under the Karnataka Land Reforms Act (KLR Act) are disposed of, the compensation is not required to be deposited as, if ultimately it is held that the land acquired is excess vacant land under the provisions of KLR Act, in that case, the said land would vest with the State Government and therefore, no compensation would be payable. Therefore, since the Government was not with of awards or proceeding making offering compensation on the ground that proceedings were pending before the Land Reforms Tribunal, by the same order dated 21.03.2007 the learned Single Judge directed 8 the Tribunal to dispose of application No.LRF 2099/74­75 under Section 66 of the KLR Act, within three months. 3.9 The order passed by the learned Single Judge dated 21.03.2007 granting permission to the APMC to hand over 9 acres of land to BDA and 4 acres of land to BWSSB was challenged before the Division Bench of the High Court by way of Writ Appeal No.1011/2007. The Division Bench of the High Court stayed the order of the learned Single Judge. The said appeal along with some companion appeals came to be disposed of by the Division Bench vide order dated 28.06.2012, directing learned Single Judge to decide all the connected writ petitions finally and continued the interim stay granted by the Division Bench until the final disposal of all the petitions. - 3.10 Thereafter APMC filed IA No.03/2008 seeking permission to build a wall around 65 acres of land, which came to be allowed vide order dated 12.02.2009. It is reported that thereafter APMC has completed the fencing work. ## **Proceedings before the Land Reforms Tribunal** 9 - 3.11 That the Land Reforms Tribunal (hereinafter referred to as “the Tribunal”) passed an order dated 12.01.2010 in the proceedings under the KLR Act holding that 213 acres 20 guntas of respondent No.4 – Trust’s land was excess land under the said Act. - 3.11.1 The order passed by the Tribunal was challenged before the High Court in Writ Petition No.4311/2010. The High Court vide order dated 24.03.2014 remitted the proceedings to the Tribunal with directions for a fresh consideration. - 3.11.2 On remand the Tribunal passed a fresh order dated 22.09.2015 and declared that 265 acres 24 guntas of land held by respondent No.4 – Trust was excess land. That the order passed by the Tribunal dated 22.09.2015 was challenged before the High Court and the High Court vide order dated 02.05.2017 set aside the order passed by the Tribunal dated 22.09.2015 and once again remitted the matter to the Tribunal. 10 - 3.11.3 That the Tribunal passed a fresh order dated 28.11.2017 and declared that 354 acres 10 guntas was excess land. The order passed by the Tribunal dated 28.11.2017 was again the subject matter before the High Court by way of Writ Petition No.55344/2017. By judgment and order dated 30.06.2021, the learned Single Judge has quashed and set aside the Tribunal’s order dated 28.11.2017. It is reported that against the judgment and order passed by the learned Single Judge of the High Court dated 30.06.2021 passed in Writ Petition No.55344/2017, the State has preferred a writ appeal being W.A. No.1089/21, which is reported to be pending before the Division Bench of the High Court. 3.12 That all the aforesaid writ petitions being W.P. No.3884/1998 (in respect of 172 acres of land), W.P. Nos. 37140­37146/2000 (in respect of 100 acres of land) and others writ petitions being W.P. No.708/2000 and 19579­ 19585/2001, were clubbed together. During the pendency of the aforesaid writ petitions the Act, 2013 came into force. Therefore, the writ petitioners submitted an 11 application dated 24.02.2014 seeking to invoke the benefit of the Act, 2013 and urged that the benefit of provisions of the said Act would be available to it. - 3.13 That the learned Single Judge framed the following points for consideration: ­ - a. Whether the disposal of these petitioners should be deferred pending adjudication and determination by the Land Tribunal, Bangalore North Taluk of the excess holdings or otherwise under the provisions of the Karnataka Land Reforms Act, 1961 of the very lands which are the subject matter herein. - b. Whether the possession of a portion of the lands in question having said to have been given to APMC can be said to be valid and in accordance with law. - c. Whether the invocation of Section 17 of the LA Act in the acquisition of a portion of the lands for the same purpose was justified. - d. Whether the acquiring authority could keeping abeyance the mandate to pay or deposit the compensation amount pending disposal of the proceedings before the Land Tribunal in respect of the lands. - e. Whether the acquisition proceedings have lapsed by virtue of the 2013 Act. - 3.14 That though some observations were made on the proceedings under the Act, 1894, thereafter, without further finally deciding any other point framed for 12 consideration, as reproduced hereinabove, the learned Single Judge has allowed the writ petitions by holding that respective acquisitions have lapsed under Section 24(2) of the Act, 2013. 3.15 Feeling aggrieved and dissatisfied with the common judgment and order passed by the learned Single Judge dated 24.06.2014 holding that respective acquisitions have lapsed under Section 24(2) of the Act, 2013, the APMC preferred writ appeals before the High Court. By the impugned common judgment and order, the Division Bench of the High Court has dismissed the said appeals confirming the judgment and order passed by the learned Single Judge declaring that the acquisition have lapsed under Section 24(2) of the Act, 2013. 3.16 Feeling aggrieved and dissatisfied with the impugned common judgment and order passed by the Division Bench of the High Court in respective Writ Appeal No.1732/2014 and others along with accompanied appeals, the APMC, Bangalore, has preferred the present appeals. 13 4 Shri V. Giri, learned Senior Advocate appearing on behalf of the appellant – APMC has vehemently contended that in the facts and circumstances of the case the High Court has erred in holding that the acquisitions in respect of the lands in question have lapsed under Section 24(2) of the Act, 2013. 4.1 It is further contended that in respect of acquisition of 172 acres land no award was declared in view of the stay granted by the High Court in various proceedings. It is submitted that therefore sub­section (2) of Section 24 of the Act, 2013 shall not be applicable. It is submitted that therefore the High Court has erred in declaring that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013. 4.2 It is further submitted that so far as the acquisition in respect of 100 acres of land situated at Herohalli Village is concerned, the award in respect of 65 acres of land was declared and the possession was also taken over. Further, the amount of compensation was deposited and the 14 respondent – original land owner withdrew Rs.2.37 crores, therefore it cannot be said that the acquisition has lapsed under sub­section (2) of Section 24 of the Act, 2013. 4.3 It is urged that the High Court has not properly appreciated the fact that in respect of acquisition of 172 acres and in respect of remaining 35 acres out of the 100 acres of land, the awards could not be declared in view of the stay orders granted by the High Court in various proceedings. Therefore, for the purpose of Section 24(1)(a) of the Act, 2013, being made applicable, the period during which the stay orders were in operation have to be excluded. 4.4 Now so far as the observations made by the High Court that the appellant was not ready to deposit the amount of compensation, it is submitted that the High Court ought to have appreciated that as such there was a very valid reason and/or justification for the APMC not to deposit the entire amount of compensation. It is submitted that with respect to the very land in question the proceedings under 15 the KLR Act were pending before the Land Reforms Tribunal and the Tribunal had to take a call and/or decision that the respondent­Trust is holding any excess vacant land or not and therefore, it was thought fit to wait till the outcome of the proceedings under the Land Reforms Act. It is submitted that the aforesaid reason cannot be ascribed against the appellant on the ground that the appellant was not ready to deposit/pay the compensation. - 4.5 It is further submitted that even the High Court has materially erred in holding that possession in respect of 65 acres of land was illegal which was taken by invoking urgency clause and not complying with the deposit of 80% of compensation as required under Section 17 of the Act, 1894. - 4.6 It is further submitted that as such in the impugned judgment and order the High Court has not at all quashed and set aside the notifications under Section 4 and 6 of the Act, 1894 in respect of 172 acres and 100 acres of lands, 16 respectively. It is submitted that after some discussion on the proceedings under the Act, 1894, the High Court has straightway considered the applicability of the Act, 2013 and has held that the acquisitions in respect of both the lands have lapsed under sub­section (2) of Section 24 of the Act, 2013. - 4.7 Relying upon the decision of the Constitution Bench of this Court reported in the case of **Indore Development Authority Vs. Manoharlal & Ors.,** (2020) 8 SCC 129, it is submitted that the impugned judgment and order passed by the High Court holding that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013, is not sustainable. - 4.8 A number of submissions are sought to be made by Shri V. Giri, learned Senior Advocate appearing on behalf of the appellant – APMC on repeal of the Act, 1894 in view of the enactment of the Act, 2013 and the effect of the Act, 2013 on the acquisitions under the Act, 1894. However, for the reasons stated hereinbelow and as the High Court has not 17 at all considered any of the submissions/issues on the validity of the notifications issued under Section 4 and 6 and the High Court having considered and dealt with the applicability of sub­section (2) of Section 24 of the Act, 2013 and having held that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013, we propose to remand the matter to the High Court to decide the other issues raised afresh, in accordance with law and on merits. Therefore, we have not dealt with any of the submissions made by Shri V. Giri, learned Senior Advocate and even Shri C.U. Singh, learned Senior Advocate appearing on behalf of the respondent – Trust on merits on other issues. Hence, we have restricted the consideration of the present appeals to the impugned judgment and order passed by the High Court declaring that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013. 5 Shri V.N. Raghupathy, learned counsel appearing on behalf of the State has supported the appellant – APMC. He has stated that the Writ Appeal No.1089/21 18 challenging the judgment and order passed by the learned Single Judge quashing and setting aside the order passed by the Tribunal, is pending before the Division Bench of the High Court. Therefore, it is prayed that if this honourable Court proposes, to remand the matter to the learned Single Judge, in that case, the aforesaid appeal be directed to be heard first by the Division Bench of the High Court. 6 All these appeals are vehemently opposed by Shri C.U. Singh, learned Senior Advocate appearing on behalf of the respondent – Trust – original land owner. It is submitted that in the present case respondent – Trust is undertaking various activities and running the ashram in furtherance of the object of the Trust. It is submitted that respondent – Trust is not an ordinary individual land owner. That the Trust was established in the year 1960. It is submitted that the lands in question was purchased in the year 1960 and the same is being used to carry out Gandhian activities and in furtherance of the object of the Trust. 19 - 6.1 It is submitted that in the present case the High Court has rightly observed that the State Government/APMC have no intention of paying any compensation for the acquisition of the subject lands and accordingly, chose to abandon the acquisition of the lands or to allow the same deliberately to lapse. 6.2 Shri Singh, learned Senior Advocate appearing on behalf of respondent – Trust has also made elaborate submissions on the legality and validity of the notifications under section 4 and 6 of Act, 1894 in respect of the acquisitions of 172 acres and 100 acres lands, respectively. However, by the impugned judgment and order the High Court has not declared and set aside the notifications under Section 4 and 6 of the Act, 1894 and has held and declared that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013 and the High Court has not at all decided the other issues which were placed before it. We propose not to deal with any of the submissions on other issues on which there is no decision by the High Court and we confine the present appeals to the decision 20 of the High Court declaring and holding that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013 and for the other issues we propose to remand the matter to the High Court. 6.3 Now so far as the impugned judgment and order passed by the High Court holding and declaring that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013, Shri Singh learned Senior Advocate appearing on behalf of respondent – Trust has fairly conceded that in view of the subsequent decision of this Court in the case of **Indore Development Authority** (supra), the view taken by the High Court that the acquisitions have lapsed under sub­section (2) of Section 24 of the Act, 2013 is unsustainable. However, he has submitted that the learned Single Judge and even the learned Division Bench of the High Court were right in holding so, considering the law prevailing at that time when the learned Single Judge decided the matters. It is submitted that the learned Single Judge followed the law prevailing at the relevant time and the learned Single Judge decided the matters accordingly. 21 It is submitted that therefore no fault can be found with the view taken by the learned Single Judge. - 7 We have heard the learned counsel appearing on behalf of the respective parties at length. 8 At the outset it is required to be noted that the proceedings before the learned Single Judge of the High Court by way of writ petition No. 3884 of 1998 was with respect to 172 acres 22 guntas of land acquired. In the writ petition No. 3884 of 1998, the original land owners prayed for the following reliefs: ­ - (i) Declare that the entire acquisition proceedings commencing with the issue of a preliminary notification gazette on 3.9.1994 marked as Annexure­ A in the writ petition have lapsed on account of the award not having been made within a period of two years in terms of Section 11A of the Land Acquisition Act. - (ii) Issue a writ of certiorari or any other writ, order or direction to quash Annexure­A, the preliminary notification LAQ (2) SR/32/94­95 DATED 2.9.1994 PUBLISHE DIN TH Karnataka Gazette dated 3.9.1994 and Annexure the final notification No. RDD 21 LAQ 96 dated 10.10.1996 published in the Karnataka Gazette dated 31. l 0.1996. By way of amendment the original writ petitioners – original land owners also prayed to declare that the acquisition 22 proceedings are deemed to have lapsed in view of the provisions of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. - 8.1 Writ petition Nos. 37140­37146 of 2000 filed by the original writ petitioners – original land owners was with respect to 100 acres of acquired land. In the said writ petitions original writ petitioners prayed for the following reliefs: ­ - (i) Issue a Writ of certiorari or any other writ or order, quashing the impugned notification at Annexure­B dated 13.04.1999 gazetted on 17.04.1999 in LAC(2) SR 2/99­2000 issued by the second respondent and also the notification at Annexure­C dated 26.10.1999 gazetted on 18.11.1999 in No. Kam.E.68.AQ8­99 issued by the first respondent. - OR - (ii) In the alternative direct the respondents to pay compensation to the petitioner in terms of the proceedings of the meeting dated 29.04.1999 Vide Annexure­D By way of amendment the original writ petitioners also prayed to declare the acquisition proceedings having been lapsed under the provisions of the Act, 2013. - 8.2 That the learned Single Judge framed the following common points for consideration: ­ - a. Whether the disposal of these petitioners should be deferred pending adjudication and determination by the Land Tribunal, Bangalore North Taluk of the excess holdings or otherwise 23 under the provisions of the Karnataka Land Reforms Act, 1961 of the very lands which are the subject matter herein. - b. Whether the possession of a portion of the lands in question having said to have been given to APMC can be said to be valid and in accordance with law. - c. Whether the invocation of Section 17 of the LA Act in the acquisition of a portion of the lands for the same purpose was justified. - d. Whether the acquiring authority could keeping abeyance the mandate to pay or deposit the compensation amount pending disposal of the proceedings before the Land Tribunal in respect of the lands. - e. Whether the acquisition proceedings have lapsed by virtue of the 2013 Act. Despite the fact that a number of issues/grounds were raised before the High Court on the legality and validity of the acquisition proceedings, the learned Single Judge decided only one issue, namely, whether the acquisition proceedings have lapsed by virtue of the 2013 Act. Whereas a number of issues/grounds were raised and as such the original reliefs sought (acquisition proceedings under Act 1894) were the main reliefs which were required to be dealt with and considered, unfortunately, the learned Single Judge did not give findings on the other issues/grounds and on the reliefs sought and as observed 24 hereinabove, disposed of the writ petitions considering only one relief/ground, namely, whether the acquisition proceedings have lapsed by virtue of the 2013 Act. When a number of submissions were made on the other issues/grounds, we are of the opinion that the High Court ought to have considered the other issues and ought to have given the findings on other issues also. Because of not deciding the other issues and deciding the matter only on one issue and thereafter when the decision on such one issue, is held to be bad in law for the reasons stated hereinbelow, this Court has no other alternative but to remand the matters to the learned Single Judge for deciding the Writ Petitions afresh on all other issues. 8.3 By way of analogy we observe that while considering Order 14 Rule 2 (as amended w.e.f. 01.02.1977), this Court in the case of **Nusli Neville Wadia Vs. Ivory Properties & Ors** , (2020) 6 SCC 557, has observed and held that after the amendment w.e.f. 01.02.1977, though Order 14 Rule 2(2) enables the court to decide the issue of law as a preliminary issue in case the same relates to (i) jurisdiction of court or (ii) a bar to suit created by any law for the time 25 being in force, a departure has been made in amended provision whereby now it mandates the court to pronounce judgment on all issues notwithstanding that a case may be disposed of on a preliminary issue. It is further observed that intendment behind this departure is to avoid remand in an appealable case for deciding other issues. 8.4 Therefore, the courts should adjudicate on all the issues and give its findings on all the issues and not to pronounce the judgment only on one of the issues. As such it is the duty cast upon the courts to adjudicate on all the issues and pronounce the judgment on all the issues rather than adopting a shortcut approach and pronouncing the judgment on only one issue. By such a practice, it would increase the burden on the appellate court and in many cases if the decision on the issue decided is found to be erroneous and on other issues there is no adjudication and no findings recorded by the court, the appellate court will have no option but to remand the matter for its fresh decision. Therefore, to avoid such an eventuality, the courts have to adjudicate on all the issues 26 raised in a case and render findings and the judgment on all the issues involved. 9 Now, so far as the impugned common judgment and order passed by the High Court declaring that the acquisition proceedings have lapsed under sub­section (2) of Section 24 of the Act, 2013, is concerned, the same is unsustainable in view of the decision of the Constitution bench of this Court in the case of **Indore Development Authority** (supra). This Court has concluded in paragraph 365 and 366 as under: ­ **“365.** Resultantly, the decision rendered in _Pune Municipal Corpn._ [ _Pune Municipal Corpn._ v. _Harakchand Misirimal Solanki_ , (2014) 3 SCC 183 : (2014) 2 SCC (Civ) 274] is hereby overruled and all other decisions in which _Pune Municipal Corpn._ [ _Pune Municipal Corpn._ v. _Harakchand Misirimal Solanki_ , (2014) 3 SCC 183 : (2014) 2 SCC (Civ) 274] has been followed, are also overruled. The decision in _Sree Balaji Nagar Residential Assn._ [ _Sree Balaji Nagar Residential Assn._ v. _State of T.N._ , (2015) 3 SCC 353 : (2015) 2 SCC (Civ) 298] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In _Indore Development Authority_ v. _Shailendra_ [ _Indore Development Authority_ v. _Shailendra_ , (2018) 3 SCC 412 : (2018) 2 SCC (Civ) 426] , the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. 27 **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)( _a_ ) in case the award is not made as on 1­1­2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)( _b_ ) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non­deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non­deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non­deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid 28 to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non­ payment or non­deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)( _b_ ). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1­1­2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1­1­2014. It does not revive stale and time­barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of 29 compensation in the treasury instead of court to invalidate acquisition.” We wish to emphasise that this Court has opined that all judgments rendered on the basis of _**Pune Municipal Corporation Vs. Harakchand Misirimal Solanki**_ **[(2014) 3 SCC 183]** are overruled in view of the interpretation made to Section 24(2) of the Act, 2013, in **Indore Development Authority** (supra). There has been a trend of land owners filing fresh cases seeking lapse of acquisition on the basis of Section 24(2) of the Act, 2013, although such land owners may have earlier unsuccessfully filed writ petitions challenging the acquisition notifications. Such land owners may have had the benefit of interim orders of stay of further proceedings in the acquisition process or dispossession resulting in a delay in the making of the award and payment/deposit of the compensation and consequently in taking over possession of the acquired land. There being a delay in the passing of the award owing to interim orders granted by the High Court or even by the civil courts, where suits may 30 have been filed against acquiring bodies, the land owners cannot now take advantage of the same so as to contend that no award has been made and consequently there has been no payment or deposit of the compensation and that possession of the acquired land continues with them. The land owners having had the benefit of interim orders granted in their favour in proceedings initiated by them against the acquisition cannot take benefit under Section 24(2) of the Act, 2013. The High Court or the civil courts which may have granted interim orders in favour of the land owners, ought to consider the aforesaid aspect before applying Section 24(2) of the Act, 2013 in favour of the land owners. 10 Applying the law laid down by this Court in the case of **Indore Development Authority** (supra) to the facts of the case on hand, the view taken by the High Court while declaring the acquisition proceedings have lapsed under sub­section (2) of section 24 of the Act, 2013, is unsustainable and is just contrary to the law laid down by this Court in the case **Indore Development Authority** 31 (supra). Even the same is also not disputed by Shri C. U. Singh, learned Senior Advocate appearing on behalf of the original writ petitioners – original land owners. Therefore, the common judgment and order passed by the High Court allowing the writ petitions and declaring that the acquisition proceedings with respect to the lands in question have lapsed under sub­section (2) of section 24 of the Act, 2013 cannot stand and the same deserve to be quashed and set aside. 11 As observed hereinabove, though a number of other issues were raised on the legality of the acquisition proceedings under the Act, 1894 and though other points for consideration were raised/framed by the High Court reproduced hereinabove, since none of the issues are adjudicated by the High Court on merits, we have no other alternative but to remand the matter to the learned Single Judge for deciding the writ petitions afresh and to adjudicate on all the other issues, other than the lapse of acquisitions under sub­section (2) of section 24 of the Act, 2013. At the cost of repetition, we observe that the High 32 Court ought to have adjudicated on all the issues raised and ought not to have decided and disposed of the writ petitions, adjudicating only on one issue which has been found to be erroneous. The Division Bench has also not applied its mind to this aspect of the matter and has simply dismissed the appeals filed by the appellant herein. 12 In view of the above discussion and for the reasons stated above, all these appeals are allowed. The impugned common judgment and order passed by the Division Bench of the High Court as well as the common judgment and order passed by the High Court in writ petition(s) No. 3884/1998 and Nos. 37140­37146/2000 are hereby quashed and set aside. The matters are remitted back to the learned Single Judge to decide and dispose of the aforesaid writ petitions afresh and in accordance with law and on their own merits. The learned Single Judge to adjudicate all other issues which were framed reproduced hereinabove and pronounce the judgment on all the points framed for consideration. The aforesaid exercise shall be 33 completed within a period of twelve months from the date of receipt of the present order. It is made clear that we have not expressed anything on the merits of these cases, in favour of either of the parties on other issues and it is ultimately for the learned Single Judge to deal with and consider the same in accordance with law and on their own merits. It is also made clear that on remand the learned Single Judge to adjudicate and pronounce the judgment on all other issues except the issue with respect to the lapse of the acquisition proceedings by virtue of the Act, 2013. All the appeals are allowed accordingly. We also observe and direct that Writ Appeal No.1089 of 2021 be heard first and to be decided and disposed of on or before 31.12.2022. There shall be no order as to costs. …………………………………J. **(M. R. SHAH)** …………………………………J. ## **(B.V. NAGARATHNA)** New Delhi, March 22, 2022. 34
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.