Supreme Court of IndiaSupreme Court · 1962Single JudgeAppeal allowed

Tatanagar Foundry Company v. Their Workmen

Case / Petition Number:
Civil Appeal No. 315 of 1961
Neutral Citation:1962 SCR 796

Case Synopsis & Summary

This Supreme Court case concerns the lay-off of workers at Tata Nagar Foundry's Sleeper Foundry in Jamshedpur following acute shortages of raw materials in 1959–60. After the Railway Board's orders for sleepers dwindled, suppliers Bhilai Steel Works and others failed to deliver pig iron; shipments were misrouted or never reached the factory. Consequently, the company issued a December 15, 1959 lay-off notice for the Sleeper Factory, which continued until September 11, 1960, followed by a notice of retrenchment on September 12, 1960. The workers received statutory compensation for the lay-off under s. 25C of the Industrial Disputes Act, but challenged it as not fully justified. The Government of Bihar referred the dispute to the Industrial Tribunal, which found the lay-off not altogether justified and awarded compensation to the workers in excess of the statutory amount. The Tata Nagar Foundry challenged the Tribunal’s order in a special appeal. The Court held that the lay-off was justified due to lack of raw materials and that the only relief available to workers is statutory compensation under s. 25C; malafide, if proven, would remove the lay-off from the s. 2(kkk) category. The Tribunal’s inquiry into management foresight was deemed beyond its jurisdiction. Accordingly, the appeal was allowed, the Tribunal’s extra compensation set aside, and no costs were awarded.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • P. B. Gajendragadkar
  • A. K. Sarkar
  • K. N. Wanchoo
Judgment Date
1962-03-09
Court Decision / Holding
Appeal allowed. The Supreme Court held that the lay-off was justified due to non-availability of raw materials at the relevant time. The only relief to which the laid-off workers were entitled is statutory compensation under s. 25C. The Tribunal’s conclusion to award 75% of wages beyond the statutory amount was set aside. The Court also limited the Tribunal’s jurisdiction to examine management foresight and rejected allegations of malafide as grounds to grant extra relief. No costs were awarded.
Final Disposition
Appeal allowed

Parties to the Case

Appellants / Petitioners

  • Tatanagar Foundry Company

Respondents

  • Their Workmen

Legal Representation & Advocates

Counsels for Petitioners

  • • Not specified in document

Counsels for Respondents

  • • Not specified in document

Provisions of Law Cited

Industrial Disputes Act, 1947, s. 2(kkk)Industrial Disputes Act, 1947, s. 25CIndustrial Disputes Act, 1947, s. 250

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the lay-off was compelled by a genuine shortage of raw materials and not by any malafide motive. They argued the lay-off satisfied the definition in s. 2(kkk) and that statutory relief under s. 25C is the sole remedy when such lay-off is justified; they had already paid the statutory compensation. The Tribunal erred in examining management foresight and in awarding extra compensation beyond the statutory 50% under s. 25C. Malafide, if any, was not proved, and thus there was no basis to bypass the statutory remedy.

Contentions of Respondents

The respondents argued that the lay-off was not justified and that malafide may have been involved, possibly to divert orders elsewhere (to Belur factory). They asserted that the Tribunal’s finding of not altogether justified supported higher compensation beyond the statutory amount, and that the management’s lack of foresight suggested negligence requiring greater relief to the workers. They relied on witness testimony to show the difficulty of operations and alleged manipulation of raw material procurement.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,073 words•~14 min read

In The Court Record

Tatanagar Foundry Company v. Their Workmen

# a s.c.R. SUPREME COURT REPORTS 795 TATANAGAR FOUNDRY COMPANY _v._ THEIR WORKMEN P. B. GAJENDRAGADKAR, A. K. SARKAR and K. N. WANOHOO, JJ.) _Industrial Dispute-Compensation-Statutory_ _compen·_ _sation-Lay_ _off_ _when_ _,iustijied and_ _when_ _malafide-Scope of_ _enquiry_ _by_ _Tribunal-Industrial Disputes Act, 1947(14 of_ _1947),_ _88,_ 2(kkk), 250. The appellant has its factory atJamshcdpur. It manufactures cast iron sleepers, pipes, etc., in the said factory. The raw materials mainly. required for the manufacture of sleepCrs are pig iron, coke, limestone and moulding- sand. The Railway Board is the only buyer of sleepers, and the sleepers are manufactured only on !'eceipt of orders from the said Board and not otherwise. Inspite of its best efforts to secure the raw materials in 1959, the appellant failed to secure the same. As the appellant found that the manufacture of sleepers could not be carried on, it issued a notice and laid-off the workers of the sleeper factory. The lay-off continued from December 15, 1959 to September II, 1960. On September 12, 1960, the appellant closed the Sleeper Foundry Department and issued :µotice of retrenchment. Retrenchment compensation was also paid to the workmen retrenched. The appellant paid the respondents the statutory compensation for the Jay-off period as prescribed bys. 250 _of_ the Industria1 Disputes Act 1947. However, the respondents contended that the lay-off ;.as not justified. The dispute between the parties was referred for adjudication by the Government _of_ Bihar to the Industrial Tribunal. The Tribunal found that the appellant was in financial diffi culties at the relevant time, the appellant was not actuated by any malafide intentions and the lay-off was not the result of any ulterior motive. However, it held that if the affairs of the appellant had been better managed and more foresight had been shown by the appellant prior to the time when the crisis was reached, pig iron could have been secured and lay-off could have been avoided. Under the circum stances, the Ttibunal held that the lay-off could not be held to be altogether justified, and awarded compensation to the respondents in excess of the amount fixed by the statute. _1962_ _March 9._ _1962_ _**TataJiogar Foundry**_ _**ComparrJ'**_ v. _**Tluir W orkmtn**_ Gajtndra.~odlcar _**J,**_ 796 SUPREME COURT REl'ORT:S [l!lti2] SCP F. _Held,_ that the lay-off was justified as raw materials were not available to 1he appcllan1 at the relevant time. The **only relief to which the \vorkmcn** **\Vere** **entitled was the** **stalut-** tory relief prescribed by s. 25C. If the lay off is malafide in the sense that the employer has deliberately and malaciously brought ahout a situation **\vherc lay** **off** **becomes necessary,** **it** **is not a lay-off \\'hich** in justified 11nder s. 2(kkk) and the relief provided under s. 25C is not the only relief to which the workmen are entitled. The malafides of the employer in declaring Jay-off really means that no lay-off has in law taken place and a **finding** **a!i** **to the malafide of the employer** **in** **declaring a** **lay-** off takes the lay-off 011t of the definition of s. 2(kkk). If **Jay-off is** **d<'clarc<l** **in** **order** **to** **victin1ise** **\\rorkmen** **or** **for** **son1e** **ulterior purpose, the position in the same.** C1vrr, APPELLATE Ju1nso1CTJ0l\: Civil Appr11l Ko. 315 of l!l61. Appeal by special leave from t.lie award dated December 29, l!JflO, of tho Industrial Trina!, Bihar at Patn:i in Reference No. 4 of Hl60. _C._ _K. Daplitary, Solid lur-Gt11oa/_ _n_{ lr1dia._ and _Sardar Bal!lldur,_ for tho appellants. _B._ _P._ _Malwshumri,_ for the.respondents. 1962. Mardi 9. The Judgment of the Court was deli\'Ned by GA.IF.XDRAGAllKAH, J.-This appeal by special leave is directed against the order pnssed by the Industrial Tribunal, Patna, directing the appellant, the Tata· nagar Foundry Co., to pay to the respondent~, its workmen, 75% of the consolidated wages as com· pensation for having laid them off for a period of 4i"i days commencing from December lfi, l95!l. It i~ common ground that the appellant laid off tho respondents for the said period. The appellant's case was that it had paid the respondents tho statutory compcru;ation for the said lay-off as prescribed by s.25C of tho Industrial Disputes Act (No. 14 of 1947) (hereinafter called 1,he Act). T~o ###### :i 8.C.R. SUPREME COURT REPORTS 797 respondents, however, contended that the lay-off was not justified and so the statutory compensation paid by the appellant did not satisfy the ends of justice. It was this dispute between the parties which was referred for adjudication by the Government of Bihar to the Industrial Tribunal on February _\!,_ 1960. On this reference, the Tribunal has held "that the lay-off could not be held to be altogether justified." That is why it has awarded compensation to the respondents in. excess of the amount statutorily fixed in that behalf. The appellant contends that the award thus made by the Tribunal is contrary to law. Before dealing with the merits of the contentions raised by the appellant, it would be necessary to state some rclevent facts which led to the lay-off. The appellant is a Public Limited Company and ###### bas its factory in Jamshedpur. It manufactures east iron sleepers, pipes, general engineering casting and non.ferrous castings in the said factory. The raw materials mainly required for the manufacture of sleepers are pig-iron, coke, limestone and moulding sand. The Railway . Board is the only buyer of sleepers and the . sleepers are, therefore, manufac tured only on receipt of orders u:pon tenders from the said B Jard, and not otherwise.· The normal procedure for procuring raw material was that after an order was received from the Railway Board, the appellant submitted its requirement of pig iron to the Iron & Steel Controller of the Government of ·India who allocates the quantity for· the said commodity to the vario~s manufactures, such as Tata Iron & Steel Co. Ltd. and Indian Iron & Steel Co. Ltd. Formerly, supply of pig iron used to come from the said two concerns to the appellant and the appellant used to pay cash to Tata Iron & Steel Co. Ltd. for the pig iron supplied by it and by a Letter of credit to the Indian Iron & Steel Co. Ltd. on which the said Company used to supply the raw material made by it. In 1959, both the companies _1962_ _**Tatanag11r**_ _**roundry**_ _**Company**_ v. _**Their**_ _**Workmen**_ _**Gajendragadkllr J.**_ _1962_ _**Tatanr:gar**_ _**f"'&11ndr7**_ _**CampanJ**_ v. _**Tlttir Workmtn**_ _**Oajnzdratalikar**_ **J.** 798 SUPREME COURT REPORTS [1962) SUPP. stopped supply of pig iron in spite of the order iBSucd in that behalf by the Controller, and they wrote to the appellant suggesting that the appellant should request the Controller to cancel his order and place the same with some other suppliers. Correspondence followed between the said companies and the appellant and finally in November, l 959, the appellant was informed by the said companies that they could not supply its requirements of raw material. · In June, 1959, the Bhila.i Steel Works made their first shipment of pig iron addressed to the appellant. In August, 1959, the said Works despatched some wagons of pig iron to the appel lant, but out of 20 wagons of the consignment, I 4 were lost completely, and the rest misrlclivcred and were subsequently found somewhere in Gomoh and some in Tatanagar and they never reached the appellant in time. In May, l9ri9, the appellant arranged for Letter of Credit for a sum of Rs. 1,00,000/- fol' the Bhilai Steel Works. In August, there was a supply of 440 tons and in September, followed a supply of 36 wagons containing pig iron to the extent of 20 to 21 tons each roughly. In all, this latter supply came to about 760 tons. In the two subsequent months, no supply was rec,eivcd from Bhilai. The Letter of Credit which the appellant had opened for Bhilai Steel Works was revolving, with the result that as soon aa one transaction was completed, the said letter was ready for the subsequent transaction. The effect of this revolving letter was that the value of credit of Rs. l,00,000/- continued to be outstanding all the time. In spite of this revolving letter, the Bhilai Steel Works failed to supply pig iron in the two months October and November. The appellant reminded the Works that no supply of pig iron was received from them and yet no advice of ·any despatch of pig iron waa received from the ##### ~ s.c.li. SUPREME COURT REPORTS 799 Works after July 27, 1959. Even the 20 wagons which had been sent in August and September did not arrive at the factory. These wagons, it was later learnt, had been delivered to K. P. Docks and some other destinations. In regard to the supply of pig iron from Rourkela, the appellant arranged for finance on cash basis. In fact, between August and December a total advance of Rs. 1,75,000/- was made to the Rourke la Steel Works. _A_ supply of pig iron worth about Rs. 1,64,000/- was received by the appellant, but th~ balance of Rs. 11,000/- was still outstanding. Jn addition to the cash advances, the appellant also opened a Letter of Credit for Rs. 1,00,000/- in November, 1959, for financing the purchase of steel from the said Works. As early as 1959, TISCO informed the appellant that it regretted that it would not be possible for it to supply the requirements of the company regularly, while in regard to the supply from IISCO, the position was still worse. The appellant kept its employees and the Assistant Labour Commissioner fully informed of these unfortunate developments from time to time. Both the Assistant Labour Commissioner and Mr. John, - President of the respondents' Union, did what they could by moving the Government to assist the appellant in securing the raw material. Even so, when the situation did not show any signs of improvement and the appellant found that no raw material was available with whioh its foundry could 0arry on tho manufacture of sleepers, it issued a notice on December 15, 1959, and laid off the workers of the Sleeper Factory. This lay-off continued until September, 11,.1960 and from September 12, 1960, the appellant closed the Sleeper Foundry department and issued notice of retrenchment. Subsequently, retrenchment compensation was duly vaid to the workmen who had been retrenched. _1962_ _**Tatanagar**_ _**Foundry**_ _**Compat:Y**_ v. _**Their**_ _**Workmen**_ _**Gajendragadkar J.**_ 800 SUPRE'.IIE COURT REPORTS (1962] SUPP. _/98t_ That, in short, is the background of the la.y-off, tho - validity of which formed tho subject-matter of the _**T alim.gttt**_ _**F0111tdry**_ f' _CMflP••.1_ present re erence. Tl,.;,~-.,;,,,,. It appears that boforc the Tribunal it was urged by the respondents that the appellant had _**Oojer.Uracadlcor**_ _**J.**_ deliberately brought about a situation which led to the lay-off in order to divert the relevant orders for sleepers to its Belur factory. The argument was that at Belur, the appellant gets its work done at cheaper cost with the help of contract labour. Now, if this contention had been established, then it would clearly have been a case of malafides on the part of the appellant and a claim for additional compensation may have been justified. But the Tribunal has rej<>ctcd thie contention and has held that no ovideacu had been adduced to prove such a malafide intontion on the part _of_ the appellant. It was also urged by the respondents that even in the absence of pig iron, the manufacture of slee pers could have been curried on by utilising a substitute, 'ln<l in support Df this case, four witnesses were examined by the respondents. The Tribunal has rejected this ca.so also. It has found that the evidence given by tho four witnesses was unreliable and un-satisfactory and the statement made by the General Manager in cross-examina.tion on this point was sufficient to show that in the absence of pig iron, castings with scrap iron and tin could not have been made. In fact, the Genera.I Manager categorically stated that the appellant had not casted any sleeper without pig iron at any time. Thus, the alternative plea raised by the respondents to suggest that if the appellant bad so desired, it could have avoided to la.y-otf its workmen, bas also been rejected by the Tribunal. The Tribunal, however, was inclined to take the view that if the management had been more foresighted, it could have avoided the unfortunate ##### • _1962_ _**Tatan1gaf'**_ _**Foundry**_ _**Company**_ v. _**Their**_ _**Hrorkmen**_ _**Gaje11drt11adkar**_ **J.** •1 ## 3 s.c.R. SUPREME COURT REPORTS sot position which it had to face at the relevant time and because the Tribunal thought that the situation which faced the appellant at the relevant time was partly due to its negligence, it reached the final conclusion that the lay-off was not altogether justified. The Tribunal's view appears to be that if reasonable care had been exercised by the appellant, the situation could have been avoided. It is this part of its finding that is seriously disputed before us by the appellant. Under s. 2 (kkk), "lay-off" men,ns, _inter nlia,_ the failure, or inn,bility of an employer on n,ccount of shortage of raw materials to give employment to a workman whose name is borne on the muster rolls of his industrial establishment and who has not been retrenched. As we have already seen, - there is no doubt that raw materials were not -available to the appellant at the relevant time and so. the lay· off which is the subject-matter of the present dispute satisfies the test prescribed by the definition. Section 25C provides for the right of workmen laid-off for compensation, and it is common ground that compensation, equal to 50% of the total of the basic wages and dearness allowance, as th.erein prescribed has been paid hy the appellant to the respondents. The issue referred to the Tribunal was whether the action of the management in laying off the work##### men was justified. If not, to what relief were the respondents entitled ? In other words, the reference shows that it was only if the Tribunal came to the conclusion that the lay-off was not justified that the question of considering what additional compensation should be paid to the respondents could arise. ##### If the lay-off is justified and it satisfies the require ments of the definition under s. 2(kkk), the only relief to which the workmen laid off are entitled is the statutory relief prescribed by s. 250. Ther<C is no doubt ur dispute about this position. ##### so2 SUPREME dOUR'i' REi>oRTS [1962] SUPP. _1162_ 1·a~a11a1sr _F1,u1id1.J_ _Co1t1pat!}'_ ## .. _'fhtir.WOYkmc'I_ _UajenJ,ttgadl.:ar_ _**J.**_ mal1~lido . in ihe sense that the employer has dcliboratcly and maliciously brought about a situation where laj off became nocl'ssary, then it would not bn a lay-off which is justified under s. :?(kkk) and the relief provided to the laid-off workmou under s. 25C would not be the only relief to which they are entitled. Malafidee of the employer in declaring a lay-off really mean that no lay-off, as contemplated by th1~ definition, has iu law taken place and so, a finding as t-0 malafides of the employer in declaring a lay-off naturally takes the lay-off out of ihe definition of s. 2(kkk) and as such s. 25C cannot be held to be applicable to it so as to confiw., the workmen's right to the compensation ###### therein prescribt<l. If the lay-off has been declared in order to victimise . the workmen or for some other ulterior purposP, the position would be the same. It would not be a lay-off as contemplated It is also not in disp!Jfo that if the lay.off is by 8. 2(kkk). But when dealing with a lay-off like the one with which we arc concerned in the present appeal it would not be open to the Tribuual to enquire whether the appellant could have avoided the lay· off if he had been more diligent, more careful or more far-sighted. That is a matter rclat· iug to the management of the undertaking and unless malafides are alleged or proved, it would Le dilllcult to asi;ume that the Industrial Tribunal has jurisdiction to sit in judgment over the acts of manag:;rnent of tho employer and inveetigMe whether a more prudent management could have avoided the situation which led to lay-off. The danger involved in permitting such jurisdiction to the Tribunal is illustrated by the present award itself. The Tribunal has found that tho appellant :was in financial difficulties at the relevant time ; it has fow1d that the appellant was not actuated by any malafide intention, it has come to the conclusion that the lay-off was not the result of any ulerioJ~ #### 3 S.C.R. SUPREME COURT REPORTS so3 - motive, and yet it has finally come to the conclu· sion that if the affairs of the appellant had been better managed and more foresight had been shown by the appellant prior to the time when the crisis was reached, pig iron could have been secured and lay-off could have been avoided. Apart from the fact that this conclusion does not appear to be borne out hy any evidence on record, it seems to us that the Tribunal exceeded its jurisdiction in trying to decide whether better management could have avoided the crisis. The appellant is, no doubt, expected to manage its affairs prudently, but it would, we think, not be reasonable or fair to hold that if the employer is faced with a situation under which for lack of raw materials he has to lay-off his workmen, it is necessary that he must submit to an enquiry by the Industrial Tribunal about the prudence of the management and the fore-thought displayed by it in anticipating and avoiding the diffi· culties. That is why we think in embarking upon an enquiry as to whether the . appellant had shown sufficient foresight in managing its affairs, the Tribunal bas exceeded its jurisdiction. Besides, as we have just indicated, its finding on the question of negligence is not supported by any evidence on record nor by probabilities in the case. In that connection, it is significant that subsequently the section in question has been closed and the retrenched workmen have been paid retrenchment compensation due to them. The result is, the appeal succeeds and the order passed by the Tribunal for the payment of compensation of 75% of the consolidated wages is set aside. There would be no order as to costs. _Appeul allowed._ _196:i_ _**Tatonogar**_ _**FotJndry**_ _**Comp1ny**_ ###### Their Comp1ny Workmen •• _**Gajtndrcga!fkir**_ **J.** 1
End of Judgment Record
Browse All Supreme Court of India (1962) Decisions
1962-12-13

Laxman Purshottam Pimputkar v. State of Bombay and Others

This is a special-leave appeal concerning the resumption and subsequent revised allotment of Watan lands under the Bombay Hereditary Offices Act, 1874 and related Bombay Revenue Jurisdiction Act provisions. The plaintiff-appellant, Laxman Purshottam Pimputkar, claimed that an order of October 9, 1946, resumed Watan lands in the possession of defendants 2–4 and directed restoration to him, followed by a May 2, 1947 order that modified the arrangement by allowing continued possession but mandating rent. The Government’s 1946 order was challenged as a judicial or quasi-judicial order under s.79 of the Watan Act, not subject to revision absent express statutory authorization, and, crucially, not amenable to administrative revision under s.74. The trials and appellate courts disagreed: the District Court decreed for the plaintiff, the Bombay High Court affirmed, and the Supreme Court ultimately intervened. The Court held that the entire process, including the order under s.3 and the subsequent s.12 action, is quasi-judicial rather than administrative; consequently, the Government’s revisional order after a long lapse was ultra vires and beyond its jurisdiction. It reversed the High Court, restored the trial court’s decree in favor of Pimputkar, and directed that costs be borne by the respondents, holding that the Government did not possess authority to revise the 1946 order without statutory provision. The decision clarifies the quasi-judicial character of Watan proceedings and the limits of executive revision.”

1961-04-04

Shri Mahadeo Paikaji Kolhe v. The State of Bombay

These two writ petitions challenge the constitutional validity of the Bombay Tenancy and Agricultural Lands Act, 1958 (Bom. 99 of 1958), which extended to Vidarbha and Kutch the provisions of the Bombay Tenancy and Agricultural Lands (Amendment) Act, 1956. The earlier Act XIII of 1956 had been held constitutional in Sri Ram Narain Medhi v. State of Bombay, with one key finding that the lands covered fell within the definition of “estate” under the Bombay Land Revenue Code, 1879. The petitions contend that the lands in Amraoti and Yeotmal were not “estate” within Art. 31A(2)(a), since the Madhya Pradesh Land Revenue Code, 1954 did not use the term “estate” and, thus, the impugned Act could not be protected by Art. 31A. The Court examines the impugned Act’s definitions (ss. 2(17) and 2(18)) read with the Madhya Pradesh Code (ss. 2(7) and 2(20)) and the Code’s Ss. 145 and 146, noting the Lands held by petitioners were tenure-holders paying land revenue and thus, in substance, estates. It concludes that Art. 31A(2)(a) applies to these lands as a local equivalent of “estate,” validating the stated objectives of the Act. Accordingly, the petitions are dismissed with costs. The judgment is delivered by a five-judge bench (Gajendragadkar, Sarkar, Wanchoo, Das Gupta, and Rajagopala Ayyangar).

1962-05-03

Kalipada Chowdhury v Union of India

This is a constitutional challenge to Regulation 127(3) of the Coal Mines Regulations, 1957 framed under the Mines Act, 1952, on the ground that the draft regulation was not validly published because it did not comply with the consultation requirements of sections 12 and 59(3) of the Act. The petitioners—four miners in charge of Salanpur A Seam Col­liery in Burdwan, West Bengal—argue that the Central Government must constitute all Mining Boards under section 12 and, before publishing the regulations, must refer the draft to every Mining Board so constituted, and that individual communications from Bihar Board members cannot substitute for board-level consultation. They further contend that Regulation 127(3) extends to West Bengal without a valid board for that area, thus rendering the prosecution under the Regulations invalid. The Union of India and the Mining Inspectorate defend the regulations as valid; they submit that section 59(3) is a mandatory requirement only if a Mining Board exists and that the Bihar Board, properly consulted, satisfies the obligation. The majority (Gajendragadkar, J., with others) holds that section 12 is enabling and that the Central Government is not bound to create Mining Boards for every area; section 59(3) is mandatory in the sense that if a Board exists it must be consulted before drafting regulations. Since the Bihar Board existed and was consulted, and the draft was published after such consultation, the Regulations are valid and the petition is dismissed. A separate dissent by Subba Rao, J. would have found the Regulations void for lack of West Bengal Board consultation. The case thus revolves around the statutory scheme for Mining Boards, consultation, and the validity of mining regulations; the majority concludes that the Coal Mines Regulations, 1957 are validly framed and applicable, with the petition dismissed.

1961-08-31

The Andhra Bank Ltd. v. R. Srinivasan

This is an appeal by The Andhra Bank Ltd. against a Madras High Court decision, arising from two Hyderabad High Court decrees in suits nos. 62 and 61 of Fazli 1353, decreed against Raja Bahadur Krishnamachari and his legal representatives. The appellant-bank filed a money-suit in the Hyderabad High Court on the basis of two foreign decrees obtained by the bank against the respondent in Hyderabad. After Raja Bahadur’s death, his legal representatives, including non-residents of Hyderabad, were brought on the record as his heirs under a settlement deed and a registered will. The High Court of Madras held that the Hyderabad court had no jurisdiction over non-resident representatives and that the decrees obtained against them were invalid under the rule of private international law. The Andhra Bank contends that the suits were competently filed in Hyderabad and that the private international law rule should not override jurisdiction once the action began; the legal representatives were properly brought on record, and the earlier judgments should bind the estate as represented. The Supreme Court reverses the Madras High Court’s ruling, holding that the rule of private international law does not automatically defeat the jurisdiction of the court where the suit was originally instituted and that the legal representatives are properly within the court’s process. It restores the trial court decree against the respondent and the assets of Raja Bahadur with costs to the appellant.