This Supreme Court contempt petition concerns the absorption of 18,006 contract workers in the Tamil Nadu Electricity Board in terms of the Khalid Commission recommendations. The petition was filed by a union alleging wilful violation of the Commission’s phased absorption schedule and the Court’s directions. The Board submitted a plan to absorb workers in three phases: 436 workers on or before 30 September 1995; 5,500 workers on or before 31 March 1997; and the remaining 5,506 workers on or before 31 March 1998 (initially 1999). The Union contended that the delay would leave about 2,000 workers without absorption and sought further consideration for workers who were found unfit, or who remained absent at scrutiny, as well as a chance to rectify erroneous entries. After hearing, the Court accepted explanations for the delays, including the need for matching employment in certain groups and the Board’s ongoing losses, and extended the timeline: 30 September 1995 for 436 workers; 31 March 1997 for 5,500 workers; and 31 March 1998 for the remaining 5,506, with Group V not limited to 485 but 1,424. It directed a forum to review unfit workers, allowed another opportunity for 588 absent workers to appear, and required adherence to reservations and standing orders. The petitions were slated for further orders on 1 May 1998. The matter ends with the petitions disposed of under the Court’s directions.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • R.M. Sahai
  • B.L. Hansaria
Judgment Date
1995-05-05
Court Decision / Holding
Time extended for absorption: 436 workers by 30-09-1995; 5,500 workers by 31-03-1997; remaining 5,506 workers by 31-03-1998. Group V numbers may extend to 1,424 (not limited to 485). No further extension will be granted for this group beyond 31-03-1998. A forum shall be available to challenge unfitness determinations before the Commissioner of Labour, and 588 absent employees shall be given another opportunity to appear before the Selection Committee. The Board’s obligation to comply with reservation regulations and Standing Orders is recognized. The petitions are disposed of with further orders to be issued on 1-05-1998 (if a working day) or the next working day.
Final Disposition
Petition disposed of.

Parties to the Case

Appellants / Petitioners

  • Tamil Nadu Electricity Board Employees and Contract Labour Union and Ors.

Respondents

  • Tamil Nadu Electricity Board and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Indira Jai Singh
  • • F.S. Nariman
  • • C.S. Vaidyanathan
  • • Sudarsh Menon
  • • Ms. Chandan Ramamurthi

Counsels for Respondents

  • • P.H. Parekh
  • • E.R. Kumar
  • • A Mariarputham
  • • Ms. Arona Mathur
  • • K.V. Vishwanathan
  • • Anil Aggarwal
  • • M.A. Krishnanmurthy
  • • K.V. Vijay Kumar
  • • V. Balachandran
  • • V.Krishnamurthy
  • • R. Mohan

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contended that the Board wilfully failed to implement the Khalid Commission’s absorption recommendations for 18,006 contract workers within the time schedule specified by the Commission and accepted by the Court. They argued that delays had already caused substantial hardship to workers and demanded strict adherence to the phased absorption plan, as well as a forum for reconsidering cases of workers found unfit or who were absent at scrutiny. They urged that the Union be given a forum to challenge unfitness determinations and that additional opportunities be provided to 588 employees who had remained absent to appear before the Selection Committee.

Contentions of Respondents

The Board argued the need for time to implement the complex matching-employment requirement in some groups and highlighted ongoing financial losses, justifying extensions. It submitted a phased absorption schedule and asked for further time to complete absorption while ensuring proper scrutiny, reservation compliance, and adherence to standing orders. The Board also stressed that some workers could be appropriately re-evaluated or absorbed as other groups became eligible, and that a reconsideration mechanism be provided for those deemed unfit.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,151 words•~10 min read

In The Court Record

TAMIL NADU ELECTRIC BOARD EMPLOYEES AND CONTRACT LABOUR UNION AND ORS. v. TAMIL NADU ELECTRICITY BOARD AND ORS.

A _4_ ' # TAMIL NADU ELECTRICITY BOARD EMPLOYEES AND CONTRACT LABOUR UNION AND ORS. _v._ ## TAMIL NADU ELECTRICITY BOARD AND ORS. MAY 5, 1995 B [R.M. SAHA! AND B.L. HANSARIA, JJ.] _Contempt-Contract Labour-Electricity Board-Absoption-Recommendation of Khalid Commission-implementation of-Delay in-Absoption proposed in phases-Extension of time for implementation-Directions_ c _regarding._ The appellant-Union filed a contempt petition alleging that the respondent-Electricity Board has wilfully violated the recommendations made by the Khalid Commission and accepted by this Conrt regarding absorption of 18006 contract workers within the specified time schedule.[D ] The respondent-Board made a statement to absorb the employees in phases i.e. 436 workmen on or before 30.9.1995, 5500 workers on or before 31.3.1997 and the remaining 5506 workers on or before 31st March, 1999. It explained reasons for the delay and sought extension of time for implementation of the directions in stages as indicated before. E ~. • ~ The appellant-Union opposed the extension of time and made a grievance that Board's absorption programme would leave about 2000 workers in the lnrch. However, the shortfall in various categories who would not be eligible for absorption i.e. those found common in more than F one list; those found unfit by the Selection Committee; those who remained absent at the time of scrutiny; and those who made erroneous claim was properly explained by the respondent-Board- The appellant-Union also requested for a forum to consider, if necessary, the cases of the workers who were earlier found nnfit by the Selection Committee as well as one more opportunity before the Committee for 588 employees who earlier remained G absent at the time of scrutiny. ## Disposing the petition, this Court HELD : 1. Time is extended till 30.9.1995 to absorb/employ 436 workers and till 31.3.97 to absorb/employ 5500 workers more belonging to H 13 SUPREME COURT REPORTS (1995] SUPP. 1 S.C.R. 14 .-- ·- A groups other than I to V. All the rest whose number would be 5506 shall be employed/absorbed on or before 31st March, 1998. In doing so, the nµmber of group V workers would not be confined to 485 as mentioned in paragraph 104(5) of the repan, ·lf!i their number really is 1424, as given in paragraph 100. No further extension will be given in this regard and the failure of the respondents to absorb all the remaining workers on or before B 31st March, 1998 shall be taken to be an act of wilful disQbedience and they would suffer the consequences accordingly. [16-H, 17-A-B] C D 2. In case of the workers who were found unfit by the Selection Committee earlier, or who might be so fund hereinafter, a forum should be made available to the petitioner-Union to be approached in case they were of the view that the workers in question were/are not really unfit. In this regard the decision of the concerned Commissioner of Labour shall be final and binding on all concerned. As regards 588 employees who remained absent at the time of scrntiny the respondent is directed to give another opportunity to them to appear once again before the Selection Committee and then to act in accordance with the recommendations of the Committee. [17-C, E, F] CIVIL ORIGINAL JURISDICTION: Contempt Petition No. 357/93 and I.A Nos. 13, 15 and 19. E ## IN Special Leave Petition (C) No. 1820 of 1990. F From the Judgment and Order dated 10.1.90 of the Madras High Court in W.P.No. 13886 of 1988. ## With Contempt Petition No. 354/93 in W.P. (C) No. 555/90. G Indira Jai Singh, F.S. Nariman, C.S. Vaidyanathan, Sudarsh Menon, Ms. Chandan Ramamurthi, P.H. Parekh, E.R. Kumar, A Mariarputham, Ms. Arona Mathur, K.V. Vishwanathan, Anil Aggarwal, M.A. Krishnanmurthy, K.V. Vijay Kumar, V. Balachandran, V.Krishnamurthy and R. Mohan for the appearing parties. • • H The Judgment of the Court was delivered by 15 T.N. ELECTRIC BD. EMPLOYEES _v._ T.N. ELECTRICITY BD. [HANSARIA, J.] ·"'·- • ·'· **HANSARIA, J.** It is said that the wearer only knows where the shoe A pinches. This aspect has been highlighted by the counsel appearing for the contempt-petitioners by urging that the recommendations of the Khalid Commission requiring the respondents to recruit 18006 contract workers within the time schedule specified by the Commission has been observed more in violation than in compliance. They, therefore, submitted that the B respondents have willfully violated the recommendations of the Commission which were accepted by this Court. They contend with force that as the time extended by this Court to implement in full the recommendations of the Commission has also expired, the respondents are guilty of contempt and they should, therefore, be dealt with suitably. c 2. When this matter was heard at length on April 20, 1995, we had desired the learned counsel appearing for the respondents to receive instructions as to whether the respondents could recruit all the remaining workers by 31st March, 1995. To know this, the case was taken up on 1st May, 1995 when we were informed that the respondent-Electricity Board would, on or before 30.9.1995, absorb/employ 436 workmen; and on or D before 31st March, 1997 further absorb/employ 5500 workers of the contractors. As to the remaining 5506 workers, the statement made was that they would be absorbed/employed on or before 31st March, 1999. 3. The learned counsel appearing for the respective-Union were sore E at the delay in recruiting/employing the workmen inasmuch as according to the time schedule mentioned by Khalid Commission in its report the target time for Groups I to V workmen was 31.12.1991. They, therefore, implored that the Board does not deserve any accommodation as regards the time schedule, because the workers have already suffered a lot and their agony has become untolerable and we may not, therefore, concede to F the unreasonable demand of the Board. 4. Shri Nariman, learned senior counsel appearing for the Board, has, however, drawn our attention to the detailed affidavit filed by the Board on 6th February, 1995 mentioning as to why the Board could not act earlier G as per the recommendations of the Khalid Commission and as to why it needs further time fully comply with the report. One of the aspects mentioned in this connection is that as per the recommendations of the Commission there has to be a matching employment LT.I. trained persons in the ratio of 1:1 for some groups of workmen. That apart, the loss which the Board incurring year after year has been brought to our notice. The **H** SUPREME COURT REPORTS [1995] SUPP. 1 S.C.R. 16 - A learned counsel urges that despite all sincerity and earnestness on the part of the Board it has not been able to work as recommended by the Commission and it would not be possible to employ/absorb all the remaining workmen even by 31st March, 197, but would do so as indicated above. B c D E F 5. We have duly considered the rival submissions and before we express our views on the time schedule to be followed, it would be necessary to deal with another grievance advanced on behalf of the petitionerUnions. According to the learned counsel for them, the statement has made by the respondents in their aforesaid affidavit and what was stated in the Court on 1st May, 1995 would leave some 2000 workers in the lurch. This has been so stated because the total number of workmen to be absorbed in 18006, of whom the Khalid Commission mentioned about 7000 in paragraph 104 so far as the time schedule is concerned. It is no doubt correct ihat this number is 7000; but it has been averred in paragraph 7(b) of the aforesaid affidavit that this number would be 5985, excluding those found common in more than one list given by the Union. Of these 5985 employees, 247 were found unfit by the Selection Committee instituted by Khalid Commission; and 588 employees remained absent at the time of scrutiny because of which they did not appear to be interested in taking job, as stated in sub-para (c). So, the number of 7000 aforesaid workmen would come down to 5150. Of these, 4381 employees have already recruited and leaving a balance of 769, of whom 436 would be recruited in a phase manner by 30th September, 1995. As to the remaining 333 it has been averred in sub-para (g) that they had claimed tenure of more than six years, but when the Selection Committee scrutinized their cases, it was found that their claim was erroneous and their service ranged from two years to five years. So these workmen would not be eligible for absorption in Phase 1 and 2, of which mention has been made in the report of the Commission. They would, however, be recruited as and when persons belonging to their respective groups become eligible for recruitment. , 6. The aforesaid shows that the shortfall of about 2000 workers, about G which mention has been made by the learned counsel for the Unions has been duly explained. 7. Coming to the extension of time as prayed for, we are prepared to extend time till 30.9.1995 to absorb/employ 436 workers and time till 31st H March, 1997 to absorb/employ 5500 more belonging to groups other than T.N. ELECTRIC BO. EMPLOYEES _v._ T.N. ELECTRICITY BD. (HANSARIA,J.j 17 • • ,. I to V. All the rest, whose number would be 5506, shal) have to be A employed/absorbed on or before 31st March, 1998. In doing so, the number of Group V workers would not be confined to 485 as mentioned in paragraph 104 (5) of the report, as their number really is 1424, as given in paragraph 100, to which our attention has been invited by Shri Vaidyanathan, appearing for one of the Unions. We make it absolutely B clear that no further extension shall be given in this regard and the failure of the respondents to absorb all the remaining workers on or before 31st March, 1998 shall be taken to be an act of willful dis-obedience and they would suffer the consequences accordingly. 8. Ms. Indira Jai Singh, appearing for the Central Organisation of C Tamil Nadu Electricity Employees, has prayed that in case of the workers who were found unfit by the Selection Committee earlier, or who might be so fund hereinafter, a forum should be made available to the petitionerUnions to be approached in case they were of the view that the workers in question were/are not really unfit. We find force in this submission and D order that in such a case it would be open to the concerned Union to approach the concerned Commissioner of Labour whose decision in the matter shall be final and binding on all concerned. Another submission made by Ms. Indira Jai Singh is that qua 588 employees about whom it has been stated in para 7( c) of the aforesaid affidavit that they remained absent at the time of scrutiny and as such do not appear interested in taking job, E one more opportunity to appear before the committee may be given, since in many cases the information about the interview reached them after the date of interview, as stated in paragraph 11 of the reply affidavit filed by this petitioner-Union. We accept this submission as well and direct the respondent to give another opportunity to the aforementioned 588 F employees to appear once again before the Selection Committee and then to act in accordance with the recommendations of the Committee. 9. Before closing, we have to deal with the prayer of the respondents seeking suitable directions on some of the matters mentioned in paragraph G 14 of the aforesaid affidavit. We allow the prayer made in sub-para ( d), but state that the recruitments so made shall not affect the right of the workers at hand to get recruited as already ordered. As to sub-para (e), we observe that the regulations relating to reservation for listed categories shall have to be complied with, but in doing so, the number of such categories of workers who would be recruited as per the order would be H 18 ## SUPREME COURT REPORTS (1995] SUPP. 1 S.C.R. - A counted, and it may well be that in that case the percentage of reservation is achieved; if not, extra recruitment shall have to be made as per the percentage of reservation fixed by the regulations in question. Qua subpara (f), all that can be said, as rightly submitted by Ms. Jai Singh, is that the recruited workers would abide, and abide fully, by the Standing Orders - B of the respondent Board. They cannot be treated differently from other workmen after they have become a part of working force of the Board. 10. The petitions shall be placed for further orders on 1st May, 1998, if that be a court working day; if not, on the immediately next working day. · T.N.A. Petition disposed of.
End of Judgment Record
Browse All Supreme Court of India (1995) Decisions
1995-02-23

Inder Singh v. State of Punjab

Inder Singh, convicted under Section 302 IPC for the murder of Amar Singh, questions the High Court’s affirmation of his life-term sentence. The prosecution’s version is that Amar Singh, who had gone to see off a tractor driver, did not return home; on the night of 31 March/1 April 1984, the appellant, armed with a barchha, lay in wait behind a heap of manure and suddenly sprang upon Amar Singh, while PW4 (the deceased’s father) and PW5 (the mother) were trying to intervene. Amar Singh died instantaneously from a fatal neck wound, with the post‑mortem revealing injuries that pointed to a lethal strike. The Trial Court convicted the appellant under Section 302 IPC, while acquitting two co‑accused. In the appeal before the Supreme Court, the defence argued that the appellant’s motive was merely to thrash Amar Singh for suspected theft of cauliflowers, and that lying in wait with a weapon did not necessarily prove an intention to kill. The Court rejects this: the manner of the assault, the weapon used, the location and extent of the injuries, and the fact that PW4 was also injured while trying to save Amar Singh indicate a determined intention to cause fatal injury. The Court also notes the prompt FIR, the medical evidence, and the recovery of the weapon as corroboration, sustaining the conviction. The appeal is dismissed.

1995-03-27

SUBORDINATE SERVICES SELECTION BOARD v. BIR SINGH AND ANR./RAM NIWAS AND ORS.

This Supreme Court decision concerns the interpretation of reservation in Ex-Servicemen posts and the eligibility of dependents of ex-servicemen for clerical posts in A-class offices. The case arose from a dispute over whether dependents of ex-servicemen, who possess Matriculation but do not have First Division in Matriculation or Second Division in Intermediate, could be considered for appointment to A-class clerical posts when ex-servicemen are unavailable and vacancies exist in the reserved quota. The government had reserved A-class posts for ex-servicemen and prescribed stratified qualifications for A-class and B-class offices; in 1979, to avoid lapsing of reserved posts, it was decided that dependent sons and daughters of ex-servicemen who fulfilled all prescribed conditions should be considered on merit for posts reserved for ex-servicemen to the extent of non-availability of suitable ex-servicemen. The respondents, dependents of ex-servicemen, argued that the 7.9.1991 advertisement did not distinguish between A- and B-class posts and that their Matriculation alone made them eligible for A-class posts on par with ex-servicemen. The High Court held them eligible, but the Court reversed, holding that such dependents are not entitled unless they meet the prescribed qualifications (Matric with First Division or Intermediate with Second Division) or are ex-servicemen. The appeals were allowed.

1995-11-01

Yadu Nandan Garg v. State of Rajasthan and Ors.

This appeal concerns a preliminary notification under Section 4(1) of the Rajasthan Land Acquisition Act, 1953 for the 'planned development of Jaipur city' and a declaration under Section 6 issued after the improvement scheme had been finalised. The appellant, Yadu Nandan Garg, had purchased part of the land in 1970 and built a residence there, while Anand Nursery nearby obtained an exemption. The challenge focused on: (i) alleged unexplained delay between the preliminary notification and the declaration, (ii) discriminatory treatment in granting exemption to Anand Nursery but not to the appellant, and (iii) misdescriptions of survey numbers in the Section 9 notice, namely 265 vs 265/1. The Rajasthan High Court had dismissed the challenge, and the Supreme Court, in its division bench, upheld the validity of the acquisition. The Court held that a purchaser cannot acquire title against the State by clinging to an encumbrance after the notification and finalisation of the scheme; under Section 16 the State is entitled to possession with absolute title free from encumbrances. It rejected the contention of inordinate delay, noting the usual administrative time involved in finalising the scheme. It also held that wrong exemptions or mis-stated survey numbers do not invalidate the notification under Section 4(1), provided the main survey number is mentioned, and that discrimination claims fail given lack of a universal benefit. Consequently, the appeal was dismissed without costs.

1995-09-19

Controller of Examination, Utkal University and Anr. v. Paurnamasi Das and Anr.

These two Civil Appeals arise from challenges to the awarding of BA honours by Utkal University under its Regulations for pre-degree and final degree examinations, and the operation of the 1990 Hard Case Rule. Regulation 12 prescribes separate classification in pre-degree and final degree exams, to be shown on the diploma, with specific percentage thresholds for Second Class and First Class honours in both stages. Regulation 16(b) makes the final degree honours list depend solely on marks obtained in the final examination, subject to retaining honours in the pre-degree stage. The Hard Case Rule provides grace marks (up to 0.5%) to enable a candidate to retain honours or attain a higher class, but must be applied per part of the examination. The respondents, in two appeals, were short by 4 marks in their final degree honours papers, seeking to add 4 grace marks (0.5% of 800) by aggregating marks across pre-degree and final degree, an approach the High Court accepted but the University challenged. The Court held that the Hard Case Rule applies separately to each examination part, and that only up to 2 grace marks could be added in the final degree examination (not across parts). The High Court’s view was thus incorrect, and the appeals were allowed with writ petitions dismissed."