This Supreme Court appeal arises from a Karnataka High Court decision concerning a sale of land dispute and the interpretation of limitation rules in relation to a specific performance claim. The appellants and the respondent entered into an agreement on 16 March 1989 for sale of plot No. 114/8 in Peenya Industrial Suburb II Stage, Bangalore for Rs. 64 lakhs, with a fixed date for performance on 28 May 1989. The appellants, seeking to compel performance, required the respondent to obtain income-tax clearance and permission from the Urban Ceiling Authority. The respondent repudiated the contract on 6 November 1989, yet execution/purchase was not completed. The appellants filed a suit on 21 April 1992 for a mandatory injunction demanding compliance with the contract terms. While the suit was pending, an application under Order VI, Rule 17 CPC was made on 5 November 1992 to amend the plaint and seek specific performance. The trial court rejected the amendment, a decision affirmed by the High Court. The key legal issue was limitation under Article 54 and whether time is the essence of the contract, given the fixed date for performance. The High Court and trial court held that the amendment was barred by limitation. The Supreme Court, while noting that Chand Rani does not control the facts, held that once a date for performance is fixed, the period begins to run from that date, making the amendment untenable and upholding dismissal of the appeal.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. Ramaswamy
  • G. T. Nanavati
Judgment Date
1997-01-06
Court Decision / Holding
Appeal dismissed.
Final Disposition
Appeal dismissed.

Parties to the Case

Appellants / Petitioners

  • T. L. Maddukrishana
  • Anr.

Respondents

  • Smt. Lalitha Ramchandra Rao

Legal Representation & Advocates

Counsels for Petitioners

  • • G.V. Chandrasekhar
  • • P.P. Singh

Counsels for Respondents

  • • Harish Salve
  • • S.K. Kulkarni
  • • Ms. Sangeeta Kumar

Provisions of Law Cited

Code of Civil Procedure, 1908: Order 6 Rule 17Limitation Act, 1963: Section 3Limitation Act, 1963: Article 54 (Schedule)

Legal Doctrines & Maxims

  • Id certum est quod certum reddi potest (certainty may depend on a future event)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants argued that time was not inherently the essence of the contract for sale of immovable property and that the contract could be performed after obtaining requisite clearances. They contended that the limitation began from the date fixed for performance and that the amendment seeking specific performance should not be barred solely on the ground of late filing, as the terms of the contract allowed for performance upon the happening of certain conditions. They urged reliance on Article 54 of the Limitation Act and invoked prior constitutional bench dicta (Smt. Chand Rani) to support their position that time is not always the essence of such contracts.

Contentions of Respondents

The respondent contended that the date fixed for performance makes time of the essence of the contract. Thus, once the date of performance is fixed, limitation begins to run from that date under Article 54, and an amendment seeking specific performance filed after three years is barred. It was argued that the trial court and High Court correctly refused amendment and that the remedy sought by amendment was unavailable due to the lapse of the statutory period.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Smt. Chand Rani (dead) by Lrs. v. Smt. Kamal Rani (Dead) by Lrs.[1993] 1 SCC 519DistinguishedThe Court noted that Chand Rani, a Constitution Bench decision, does not help the appellant’s stance in this matter; the facts of the case at hand differ, and Chand Rani’s approach to time being non-essence is not applicable to a contract with a fixed date for performance.
K. Raheja Construction Ltd. v. Alliances Ministries & Ors.[1995] Supp. 3 SCC 70PositiveUsed to support the proposition that where time for performance is fixed, limitation begins from the fixed date under Article 54."
Tarlok Singh v. Vijay Kumar Sahhfwal(1996) 3 SCALE 558PositiveAffirms that when time for performance is fixed under Article 54, limitation runs from that date; supports the court’s reasoning about the starting point of limitation.
Ramzan Hussaini v. Hussaini[1990] 1 SCC 104PositiveCited for the doctrine that certainty can be linked to events that fix performance time; supports applying the event-based trigger for limitation.
R. Muniswami Goundar v. B.M. Shamanna, GaudaN/APositiveCourt indicates agreement with Madras High Court on the applicability of the maxim/id certum est that performance timing can be contingent; used to justify timing-based limitation.
Duncombe v. Brighton Club and Norfolk Hotel CompanyN/APositiveReferenced to illustrate the principle that performance may become due upon a contingent event; supports the timing-based approach to limitation.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,769 words•~13 min read

In The Court Record

T. L. Maddukrishana and Anr. v. Smt. Lalitha Ramchandra Rao

A # T.L. MADDUKRISHANA AND ANR. _v._ # SMT. LALITHA RAMCHANDRA RAO JANUARY, 6, 997 [K. RAMASWAMY AND G.T. NANAVATI, JJ.] B _Code of Civil Procedure, 1908 : Order 6 Rule l7-Amend111ent of plai11t-Pennissibility of_ • ,.-, _Li111itatio11 Act, 1963 : Sectio11 3-Schedule-A1ticle 54---Suit for_ C _specific perfonna11ce-Li111itation pe1iod for._ _Agree111ent of sale of plot betwee11 appellants a11d respondents-The date for the pe1fomwnce of the contract was ftxed as May 28, 1989-Appella11ts calling upon the respo11dents to comply with the tenns of the agree111e11t: to obtain Income-tax clearance ce1tificate and pemiission from the Urban_ D _Ceiling Autho1ity to alienate the prope1ty to the_ appellant~~Respondents _repudiating the contract-Suit filed by appellallts for mandato1y injunction directing the respondents to comply with the requirements-Dwing pendency of suit appellants made an application 011 November_ 5, _1992 under Order VI, Rule 17 of the CPC for amending the plaint and seeking specific perf onnance_ E _of the contract-Application rejected by the T1ial Cowt-Rejection affinned by the High Cowt-Appeal-Held for the pwpose of limitation, what_ is _mate1ial is that the limitation begins to nm from the date the pmties have stipulated for pe1f onnance of the contract-The suit is required to be filed within three years from the date ftxed by the palties under the contract-Since the application for ame11dme11t of the plaint came to be filed after the expi1y_ F _of three years, ce1tainly it cha11ged the cause of action as required to be specified in the plaim-The suit for 111a11dato1y injunction was filed a11d the specific pe1fo1111ance was sought for by way of an amendment-T71e cause of action was required to be stated initially i11 the plaint but it was not pleaded-It was sought to be amended, alongwith an application for specific_ G _perf on11a11ce which was rejected-T11eref ore even by the date of filing of the application, namely, November_ 5, _1992, the suit was ba1Ted by limitatiort-T71e High Coult, therefore, was right in refusing to pem1it the amendment of the plaint._ _Smt. Chand Rani (dead) by Lrs._ v. _Sml Kanta Rani (dead) by Lrs.,_ H 11 \ • ## 12 # SUPREME COURT REPORTS [1997) 1 S.C.R. A [1993] 1 SCC 519; _K. Raheja Co11st111ctioii Ltd._ v. _Alliances Ministlies &_ 01:~., [1995] Supp. 3 SCC 70; _Tarlok Singh_ v. _Vijay Kumar Sahhafwal,_ (1996) 3 SCALE 558 and _Ramza11_ ~lfussaini, [1990] 1 SCC 104, referred to. > CIVIL APPELLATE JURISDICTION : Civil Appeal No. 104 of 1997. - B From the Judgment and Order dated 29.5.96 of the Karnataka High Court in C.R.P. No. 2246 of 1993. _r·_ G.V. Chandrasekhar for P.P. Singh for the Appellants. c I Harish Salve, S.K. Kulkarni and Ms. Sangeeta Kumar for the Respondent. The following Order of the Court was delivered : Leave granted. This appeal by special leave arises from the judgment D of the learned single Judge of the High Court of Karnat~ka, made on 29.5.1996 in CRP No. 2246/93. _:,.,1_ The admitted facts are that the appellants and the respondent · entered into an agreement on March 16, 1989 for sale of plot of land E bearing No. 114/8 situated at Peenya Industrial Suburb II Stage, Peenya Village, Bangalore for a consideration of Rs. 64 lakhs. The date for the performance of the contract was fixed as May 28, 1989. The appellants issued notice on October 2, 1989 calling upon th~ respondent to comply with the conditions mentioned under the agreement, namely to obtain Income-tax clearance certificate and• from the Urban Ceiling Authority F' permitting the respondent to alienate the property to the appeHants. The respondent had issued a notice on November 6, 1989 repudiating the contract though the execution thereof was admitted. The appellants then filed a suit' for mandatory injunctio~ on April 21, 1992 directing the respol).dent to comply with the requirements as mentioned in the agreeG ment. While the suit was pending, the appellants made an application on November 5, 1992 under Order VI, Rule 17 of the CPC for amending the plaint and seeking specific performance of the contract. The said application was rejected by the trial Court and the rejection was affirmed by the High Court. Thus, this appeal by special leave. H Learned counsel for the appellants has contended that time is not 13 T.L.M. KRISHANA _v._ SMT. L.R. RAO the essence of the contract; and, the performance, though it was fixed for A May 28, 1989, the other clauses relating to payment of interest for the delayed period of performance would indicate that the time is not essence of the contract. The application, therefore, could not have been dismissed at that stage. It is further contended that the appellants held an oral agreement with the respondent that the agreement will be performed after the respondent obtained requisite permission from the competent B authority. Thus, his contention is that the relief of specific perf~rmante was not barred by limitation. It is then contended for the respondent that by operation of first clause of Article 54 of the Schedule to the Limitation Act, 1963, once the date has been fixed for the performance limitation begins to run from that date. Whether time is the essence of the contract C or not is not relevant for the purpose of deciding the question of limitation. In the agreement, time having been fixed for performance of the contract as May 28• 1989, the limitation began to run under the first clause from that date. The second clause, therefore, has no application to the facts in this case. Tht; courts below, therefore, were correct in refusing permission D for amendment of the plaint introducing specific relief of performance. It is seen that limitation under Section 3 of the Limitation Act is one of the defences available to the defendant. Article 54 of the Schedule to the Limitation Act postulates that for specific performance of a contract the period of limitation is three years from the dated fixed for the perforE mance, or, if no such date is fixed, from the date the plaintiff has notice that performance is refused. Under first part of Article 54, once date for performance of the contract has been fixed by the parties, the limitation begins to run from that date and specific performance of the contract could be had within three years from that date unless the parties by an agreement F extent the fixed time. In this case, date was fixed for performance, i.e., May 28 1989. The question whether or not the time is the essence of the contract is not of much relevance since the case falls in first part of Article 54? The decision relied on by the learned counsel for the appellant in _Smt. Chand Rani (dead) by Lrs._ v. _Smt. Kamal Rani (Dead) by Lrs.,_ (1993] 1 SCC 519 of the Constitution Bench doe!i not help the learned counsel for the G appellant. In that case, this Court has reviewed the entire case law and need for reiteration is obviated. The Court held thus : "It is well-accepted principle that in the case of sale of immovable property, time is never regarded as the essence of the contract. In H [1997] 1 S.C.R. 14 \ ## SUPREME COURT REPORTS A B fact, there is a presumption against time being the essence of the contract. This principle is not ill any way different from that obtainable in England. Under the law of equity which governs th~ rights of the parties in the case of specifii;: perfonnance of contract to sell real estate, law looks not at the letter but at the substance of the agreement. It has to be ascertained whether under the terms of the contract the parties named as specific time within which completion was to take place, really and in substance it was intended that it should be completed within a reasonable time. An intention to make time the essence of the contract must be expressed in unequivocal language." _'r_ c After considering the question in the light of the terms of the contract made by the parties extracted in paragraphs 25 and 26 of the judgment, the Constitution Bench concluded in paragraph 28 that the parties intended to make time as the essence of the contract. The contract **D** was to be performed within a particular period and the respondent had repudiated the contract. Under those circumstances, it was held that the time was an essence of the contract. The same ratio was reiterated by this Court in _K. Raheja Constniction Ltd._ v. _Alliances Minstries & Ors.,_ (1995) Supp. 3 SCC 70 which relates to the amendment of the plaint. It was **held** E therein that since the party had repudiated the agreement, the limitation began to run from that date. Since the application for amendment of the plaint was filed after the expiry of three years, the same could not be entertained. The controversy in regard to the limitation was also considered by this Court in _Tarlok Singh_ v. _Vijay Kumar Sabha/Wal,_ (1996) 3 SCALE 558 wherein this Court has held that when the time has been fixed F for performance of the contract by operation of Article 54 of the Limitation Act, the time begins to run from the date fixed by the parties. The Court observed thus : G "The question is : as to when the limitation began to run? In view of the admitted position that the contract was to be performed within 15 days after the injunction was vacated, the limitation began to run on April 6, 1986. In view of the position tkat the suit for perpetual injunction was converted into one for specific performance by order dated August 25, 1989, the suit was clearly barred by limitation. We find force in the sand of the appellants.We **thiDk** **H** 15 T.L.M. KRISHANAv. SMT. L.R. RAO that parties had, by agreement, determined the date for perfor- A mance of the contract. Thereby limitation began to run from April 6, 1986. Suit merely for injunction laid on December 23, 1987 would not be of any avail nor the limitation began to run from that date. Suit for perpetual .injunction is different from suit for specific performance. The suit for specific performance in fact was claimed B by way of amendment application filed under order YI, Rule 17, CPC on September 12, 1979. It will operate only on the application being ordered. Since the amendment was ordered on August 25, 1989, the crucial date would be the date on which the amendment was ordered by which date, admittedly, the suit is barred by limitation. The courts below, therefore, were not right in decreeing C the suit. In _Ramzan_ v. _Hussaini,_ [1990] 1 SCC 104 ~his Court held in paragraph 6, thus : "The relevant provisions in the alleged agreement of sale as quoted D in the judgment of the trial Court reads as follows : "This house is under mortgage with Jethamal Bastimal for Rs. 1000. When you will get this house, the description of which is given below, redeemed from M/s. Jethamal Bastimal and take the papers of the registry in your possession, on that day I will have E the sale deed of the said house, written, executed and registered in your favour." The question is whether a date was fixed for the performance of the agreement and in our view the answer is in the affirmative. It F is true that a particular date from the calendar was not mentioned in the document and the date was not ascertainable originally, but as soon as the plaintiff redeemed the mortgage, it became an ascertained date. If the plaintiff had, immediately after the redemption, filed the suit, could it be thrown out on the ground that she was not entitled to the specific performance asked for? G We do not think so. She would have been within her rights to assert that she had performed her part of the contract and was entitled to insist that her brother should complete his part. The agreement is a typical illustration of a contingent contract with the meaning of Section 31 of the India Contract Act, 1872 and became enfor- H 16 SUPREME COURT REPORTS f.1997] 1 s. C.R. A B c E F D G ## H ceable as soon as the even of redemption (by the plaintiff herself) happened. We agree with the view of the Madras High Court in _R. Muniswami Goundar_ v. _B.M. Shamanna, Gauda_ expressed in slightly different circumstances. The doctrine of _id ce1tum est quad ce1tl1111 reddi potest_ is clearly applicable to the case before us which in the language of Herbert Broom (in his book dealing with legal maxims) is that certainty need not be (11;Certained at the time; for if, in the fluxion of time, a day will arrive which will make it certain, that is sufficient. A similar question had arisen in _Duncombe_ v. _Biighton Club and Norfolk Hotel Company,_ relied upon in the Madras case. Under an agreement, the plaintiff had supplied some furniture to the dtfendant for which payment was made but after some delay. He claimed interest. The rule at common law did not allow interest in such a case, and the plaintiff in support of his claim relied upon a statutory provision which could come to his <!id only if the price was payable at a certam time. Blackburn, J. observed that he did not have the slightest hesitation in saying that the agreement contemplated a particular day, which, when the goods were delivered would be ascertained; and then the money wouW be payable at a certain time; 1'>.:t • t:Jected the plaintiffs demand on the ground that the price did not become payable by the written instrument at a certain time. The other learned Judges did not agree with him, and held that t:.e statute did not require that the document should specify the time of payment by mentioning the day of payment. If it specified the event upon which the payment was to be made, and if the time of event was capable of being ascertained the requirements of the action were satisfied. The same is the position in the case before us. The requirement of Article 54 is not that the actual day should necessarily be ascertained upon the face of the deed, but that the basis of Yte calculation which was to make it certain should be found therein. We, accor.dingly, hold that under the agreement the date for the defendant to execute the sale deed was fixed, although not by mentioning a certain date but by a reference to the happening.of a certain event, nam.cl¥, the redemptioa of the mortgage; and, ilDl!lediately after the redemption by the plaintiff, the defendant became liable to execute the sale deed which the plaintiff was entitled to enforce. The period of limitation thus started running 17 T.L.M.-KRISJ!bNA V:-SM'.f. L.R. RAO _.J._ on that date. The case is, therefore, covered by the &st pan cl A A-rtisle -54 _ft,hi'!"d column) and not t4te second part." .. .Unde'.r~e--cirrmnstances,-it must be held that for the purpose of Ttmitatioo, What is materia1 is that the limitation begins to rwilrom the date the parties have stipulated for performance of the ~ontract. The suit is required to be filed within three ye11rs from the date fixed by the parties B under the contr~ct. Since the application for amendment of the plaint came to be filed after the expiry of three years, certainly it changed the cause of action as required to be specified in the plaint. The suit for mandatory injunction is filed and the specific performance was sought for by way of an amendment. The cause of attion -is required to be stated initially in the C plaint btit it was not pieaded. It was sought to be amended, -alongwith an application for specific performance which, as stated earlier, was rejected. Under these circumstances, even by the date of filing of the application, namely, November 5, 1992, the Sllit was barred l3y 1imitation. The High Court, therefore, was right in refusing to permit the. amendment of the plaint. D It is then contended that the appellants have already paid the substantial amount and, therefore, they will be deprived of the remedy of recovery thereof. Shri Harish Salve, learned counsel for the respondent, in fairness, has stated that his client would refund by depositing in the trial E Court the entire amount with interest as stipulated in the contract within a IJeriod sf six months from today. ~ The appeal is accordingly dismissed subject to the above undertaking given by the respondent. No costs. Appeal dismissed.[F ] T.N.A.
End of Judgment Record
Browse All Supreme Court of India (1997) Decisions
1997-12-17

Sharad Vasant Kotak and Ors. v. Ramniklal Mohanlal Chawda and Anr.

This Supreme Court judgment concerns the maintainability of a suit for dissolution of partnership and accounts under the Indian Partnership Act, 1932, as amended by the Maharashtra Amendment of 1984 (Section 69(2A)). The Paramount Builders partnership, registered in 1980 with seven partners (Kotak family and Chawda family), underwent changes after the death of partner Mohanlal Chawda in 1986, when his widow was inducted as a partner. A series of deeds (1986, 1992) reconstituted the firm without informing the Registrar of Firms, raising questions about registration and the applicability of Section 69(2A), which restricts suits to registered firms where the suing partner is shown in the Register of Firms. The Bombay High Court Division Bench held that reconstitution does not cancel registration and that amendments to pleadings were permissible; it concluded that Section 69(2A) does not bar the suit. The appellants argued that induction of a new partner dissolves the old firm and requires a fresh registration, while the respondents contended that dissolution and reconstitution are distinct concepts and that registration continues despite changes. The Supreme Court ultimately held that the firm was merely reconstituted, not dissolved; non‑compliance with registration provisions may attract penalties, but does not erase registration. The Special Leave Appeal was dismissed, with no costs.

1997-11-18

National Insurance Co. Ltd. v. Santro Devi and Ors.

National Insurance Co. Ltd. v. Santro Devi deals with a motor-accident compensation claim under the Motor Vehicles Act. A Tribunal found that the offending vehicle was driven by a person who held a valid driving licence, which had been renewed on the date of the accident, and the claimants were accordingly awarded compensation. The Punjab and Haryana High Court affirmed this finding on appeal but then referred the matter to a full Bench to decide a legal question: whether a forged or fake licence, if renewed, would be treated as a valid licence for purposes of liability. The full Bench answered that a forged licence would not become valid under the Motor Vehicles Act and that an insured, bonafide believing in the licence’s validity, would still incur liability toward third parties under the policy; several related conclusions regarding insurer liability were laid down. The Insurance Company challenged these High Court observations. The Supreme Court allowed the appeal in part, holding that the claimants were rightly granted compensation on the facts, and that the High Court’s observations on forged licences were obiter and not binding precedents since there was concurrent factual finding that the driver held a valid licence renewed on the date of the accident. The Court affirmed the substantive order and dismissed the related Special Leave Petition.

1997-02-03

JAIPUR DEVELOPMENT AUTHORITY v. SITA RAM AND ORS.

This appeal concerns the validity of notifications under Section 52 of the Rajasthan Urban Improvement Act, 1959, by which the Jaipur Development Authority sought to continue land acquisition even after the repeal of the 1959 Act, and after a fresh notification was issued in 1984 under the Jaipur Development Authority Act. The Rajasthan High Court had held that unless the master plan scheme under the JDA Act had been properly framed, the notification issued under Section 52 was not valid in law. The appellants challenge this proposition, contending that framing of a scheme is not a mandatory pre-condition for acquisition and that the 1984 notification cannot be quashed solely for lack of a sanctioned scheme. The matter traces several precedents: Pratap v. State of Rajasthan; State of Tamil Nadu v. Mohd. Yousef; Narain v. State of Rajasthan; and Urban Improvement Trust v. State of Rajasthan. The decision ultimately clarifies that framing of a scheme is not a required pre-condition for land acquisition; overruled or distinguished interpretations in earlier decisions, especially Tamil Nadu Yousef, Krishnan’s later formulation and Narain’s approach. The Court endorses the view that the notification for acquisition cannot be invalidated on account of non-framing of a scheme, and thus allows the appeals, setting aside the High Court’s judgment and dismissing the writ petitions, with no costs to either side.

1997-07-07

Delhi Administration (Now Govt. of N.C.T. Delhi) through the Chief Secretary, Delhi and Ors. v. Nand Lal Pant and Anr.

Delhi Administration v. Nand Lal Pant concerns the scope of promotion from the cadre of Trained Graduate Teachers (TGT) to Post-Graduate Teachers (Sanskrit) in the Delhi education cadre, and the remedy when a sanctioned channel does not exist. Pant, appointed as a TGT in 1974 and confirmed, was asked to officiate in the PGT (Sanskrit) post when it became vacant after the retirement of S.N. Sastri, a Sanskrit-qualified officer. He repeatedly sought promotion to the PGT position, which the Delhi High Court granted in 1996, directing promotion with effect from 1986 and ordering payment of consequential benefits. The Delhi Administration appealed on the ground that there was no direct promotional channel from TGT (General) to PGT (Sanskrit), and that the SC caste reservation for the post should be respected. The Supreme Court accepted that there is no direct channel, but noted Pant’s extended officiation in the PGT post since 1986. It held that justice required a workable remedy: creation of a supernumerary PGT (Sanskrit) post in any school or directorate, allowing Pant to continue there until retirement, with pay from the date of creation. The decision clarifies it as a discretionary remedy and not a general precedent, and it disposed of the appeal with no costs.