Criminal Appeal No. 985 of 2010 This appeal arises from Criminal Appeal No. 985 of 2010 concerning the conviction of A-1 to A-3 for an offence punishable under Section 302 read with Section 34 IPC by the High Court of Karnataka, which reversed a trial court acquittal and convicted the appellants. The Supreme Court examines the admissibility of appellate interference in an appeal against acquittal under CrPC Section 378, emphasizing that interference is permissible only within the four corners of patent perversity, misreading or omission to consider material evidence, or where no two reasonable views are possible and only the guilt view is sustainable. The prosecution’s case centers on the alleged assault by the six accused on Malagounda (son of PW-1) with weapons, resulting in death, with PW-1 and other labourers as witnesses. The trial court acquitted all six; the Division Bench of the High Court reversed as to A-1 to A-3, convicting them under Section 302/34 IPC and sentencing life imprisonment. The Supreme Court scrutinizes the trial and corroborative evidence, noting significant infirmities: inconsistent eyewitness accounts, discrepancies about time and place of occurrence, and questions surrounding FIR timing (Exhibit P-10) and seizure/discovery under Section 27 of the Evidence Act. It concludes that the High Court failed to apply established principles and that the trial court’s acquittal should stand. The appeal is allowed; the accused are acquitted, bail bonds discharged, and the High Court’s judgment reversed.
Criminal Appeal No. 756 of 2024 Rajasekar challenged the conviction and the quantum of punishment imposed by the lower courts for offences under sections 3(a) read with section 4 of the Protection of Children from Sexual Offences Act, 2012. He was convicted by the Sessions Court and sentenced to ten years' RI, a fine of Rs 5,000 with a default clause of three months' SI, and an order directing the government to pay Rs 1,00,000 as compensation to the victim under Rule 7(2) of the POCSO Rules, 2012. The High Court of Judicature at Madras dismissed the appeal, upholding the conviction and the sentence. The Supreme Court granted leave only on the quantum of sentence; the court noted that at conviction the minimum sentence prescribed for Section 4 was seven years, and that the appellant had already served more than seven years. He contended that his ongoing support for the victim and her child and the impact on his family warranted leniency. After hearing the parties and considering the totality of circumstances, the Court held that ends of justice require reducing the imprisonment to the period already undergone, while upholding the conviction. The appeal was allowed in part; the appellant is to be released forthwith if not required in any other case, and all pending applications disposed of.
Criminal Appeal No. 3747 of 2024 Ravinder Kumar, a practitioner with radiology practice, faced an FIR under Section 23 of the Pre-Conception and Pre-natal Diagnostic Techniques (Prohibition of Sex Selection) Act, 1994, and a complaint under Section 28(1) for alleged sex-determination activity using ultrasound. The core issue is whether the search of Kumar’s clinic, conducted on 27 April 2017, was legally justified when no formal decision by the District Appropriate Authority (DAA) under Section 30(1) of the Act authorizing the raid had been taken. The Supreme Court held that Section 30(1) vests drastic power to search in the Appropriate Authority or its authorized officers, but only when the Authority has a “reason to believe” that an offence has been or is being committed. The Court emphasized that the decision must be an action by the Authority as a whole, not an individual member. In the present case, the order to conduct the raid was signed solely by the Civil Surgeon-Chairman, with other two members neither present nor signatories, rendering the search illegal. The seizure memo and subsequent materials relied upon in the FIR were therefore tainted by an unlawful search, constituting abuse of process. The High Court’s refusal to quash was reversed; the FIR and complaint were quashed, and the appeal was allowed. The decision underscores the necessity of proper procedure and timely, rational belief before exercising coercive search powers under the Act.
Special Leave Petition (C) No. 4049 of 2020 This Supreme Court judgment deals with interlocutory applications arising from four parallel landlord–tenant disputes in Calcutta concerning rents, dues and possession of a commercial property in Dalhousie, Kolkata. The lis governs four tenancies, with the landlord alleging long-standing non-payment of rent and seeking interim relief in the form of payment of occupational charges at market rent. The lease, executed between 1991 and 1992, is alleged to have been forfeited on account of non-payment of rent, yet the tenant remains in possession and has not vacated. A valuer’s report fixes market rent at Rs 41 per sq ft; the landlord argues that a market-rate deposit is warranted to ensure income from the property during the pendency of the SLPs. A central issue is whether the tenancy is governed by the West Bengal Tenancy Act, 1997 or the Transfer of Property Act, 1882, given the dates of the lease and the Act’s applicability. The High Court had held the tenancy to be governed by the Tenancy Act; the matter has been argued with ample reliance on established law on mesne profits, forfeiture, and interim relief. The Court ultimately directs the tenant to deposit Rs 5,15,05,512, while disposing of the interlocutory applications and keeping the main petitions for July 2024 to allow final outcomes to unfold, emphasizing market rents and justice in interim relief.
Criminal Appeal No. 4247 of 2024 Asim Akhtar v. The State of West Bengal & Anr. concerns the discretionary interplay between Section 319 CrPC and cross-examination in a trial for kidnapping-related offences under IPC and Arms Act provisions. The accused challenged a Calcutta High Court remand directing the trial court to decide the Section 319 CrPC application before continuing with the trial. At trial, the Examination-in-Chief of the key witnesses (the victim, her mother, and her father) was completed, but cross-examination was deferred repeatedly. The prosecution moved under Section 319 CrPC to summon the accused’s parents, but the witnesses failed to appear for cross-examination, and the trial court acquitted the appellant under Section 232 CrPC, while rejecting the Section 319 CrPC application for want of admissible evidence. The High Court allowed the complainant’s appeal, relying on a Constitution Bench view in Hardeep Singh that Section 319 CrPC should be considered even before cross-examination, effectively mandating a decision prior to cross-examination. The Supreme Court, however, held that Hardeep Singh does not mandate such pre-cross-examination action; examination-in-chief is evidence but does not preclude the trial court’s discretion to wait for cross-examination or to decide 319 based on the record. The Court clarified that a “mini-trial” should be avoided, and that the court may decide 319 with or without cross-examination depending on the material. Accordingly, the appeal was allowed, the High Court’s order set aside, and the Trial Court’s acquittal restored, with the 319 CrPC application rejected for lack of admissible evidence.
Civil Appeal No. 7821 of 2024; Civil Appeal No. 7822 of 2024 This Supreme Court judgment deals with two civil appeals arising from disputes over the settlement of a fire claim under an insurance policy and the invocation of arbitration under the Arbitration and Conciliation Act, 1996. The core issue is whether execution of a discharge voucher/full and final settlement can bar a subsequent reference to arbitration, and the appropriate scope of judicial scrutiny under Section 11(6) of the Act when a plea of accord and satisfaction is raised. The Court reiterates that while ordinarily a settlement may discharge the underlying contract, the arbitration clause contained in the original contract survives by the doctrine of separability, and disputes pertaining to the settlement itself can be referred to arbitration. It emphasizes the presumption of separability (Section 16) and arbital autonomy, and clarifies that Section 11(6-A) restricts inquiries to the existence of an arbitration agreement, not merits, non-arbitrability, or stamping issues. The judgment surveys a long line of authority, including Damodar Valley, SBP & Co., Boghara Polyfab, Mayavati Trading, Vidya Drolia, NTPC, Interplay, and Arif Azim, to explain the evolution from an expansive pre-2015 approach to a narrow post-2015 regime. Ultimately, the Court upholds the arbitrator’s appointment (Justice K.A. Puj) and vacates the stay on arbitration, keeping all contentions available for the arbitrator. The decision underscores that disputes about the accord and satisfaction (validity of the discharge) are to be decided by the arbitrator, not the referral court at the Section 11 stage.
Civil Appeal Nos. 5569-5570 of 2024 Swami Vedvyasanand Ji Maharaj (D) Thr LRs v. Shyam Lal Chauhan & Ors. is a Supreme Court judgment addressing substitution of legal representatives under Order XXII Rule 5 CPC in a title suit pending before the Patna High Court. The defendant Swami Shivdharmanand had died in 1999, leaving two claimants—Swami Triyoganand Ji Maharaj and Swami Satyanand Ji Maharaj—as potential legal representatives. The Patna High Court initially directed the Trial Court to conduct an inquiry under Order 22 Rule 5 and, after receiving the report, proceeded to substitute Swami Satyanand as the appellant, while dismissing the claim of Triyoganand. This order was later challenged by both rivals before this Court. Earlier, this Court, in 2018, remanded to the Patna High Court to decide the question of legal representation by considering the Trial Court’s report and the objections. In 2019 the High Court substituted Satyanand again and dismissed Triyoganand’s claim, despite an ongoing substitution application for Triyoganand and despite the remand order. The Court reiterates that the purpose of substitution is to ensure continuation of the case, not to confer title, citing Jaladi Suguna v. Satya Sai Central Trust to emphasize the limited nature of LR status under Rule 5. The Supreme Court ultimately holds that the High Court did not follow proper procedure, sets aside the challenged orders, and remands for a fresh decision on substitution, disposing of the appeals.
Civil Appeal No. 13050 of 2024 This Supreme Court judgment concerns the resolution of an inconsistency between a State amendment and a later Parliamentary amendment to Section 106 of the Transfer of Property Act, 1882. The dispute arose when the Uttar Pradesh (UP) Legislature amended Section 106 on 30 November 1954, substituting the phrase fifteen days’ notice with thirty days’ notice, and the Parliament later enacted Act 3 of 2003 with effect from 31 December 2002, substituting Section 106 anew. The question presented is whether, in a concurrent subject under Entry 6, List III of the Seventh Schedule, the Parliamentary amendment would prevail where there is an inconsistency with a State law, and whether the proviso to Article 254(2) permits the Parliament to repeal or amend a repugnant State law with respect to the same matter. The Court reiterates the principle of parliamentary supremacy under Article 254, the general rule that Parliament law prevails in case of repugnancy, and explains the operation of the proviso to Article 254(2) as enabling Parliament to override State legislation even after assent to the State amendment if the State law concerns the same matter and has been reserved for Presidential assent. It also notes the concept of implied repeal and the precedents on concurrent jurisdiction.
Civil Appeal No. 6186 of 2018 S.P. Pandey v. Union of India & Ors. is a Supreme Court case arising from a disciplinary dispute in the Indian Air Force. Airman S.P. Pandey, posted as Radar Fitter, was charged after an incident at a civil railway crossing on 17 May 2010 when he overtook a queue and parked close to the barrier. Squadron Leader H.V. Pandey questioned him and seized his motorcycle keys, directing him to the Guard Room; the charge alleged Violation of good order and Air Force Discipline and Use of insubordinate language toward a superior officer. An order of Admonition was passed on 18 May 2010. The matter later proceeded to de novo trial; a second admonition was imposed on 18 January 2011. The appellant’s statutory complaint and representation to the authorities followed, but the initial direction to expunge the admonition was not implemented. The Armed Forces Tribunal quashed the 2011 admonition, noting disproportionate and vindictive conduct in a public-spirited context and highlighting that the entire sequence caused unnecessary, long-drawn litigation. The Supreme Court found the institutional response to have grown beyond proportion, emphasizing balance and proportionality between infraction and punishment as core to good governance, and directed compensation of Rs 1 lakh for distress. The appeal was disposed of with a 30‑day payment deadline, reinforcing dignity and accountability within service institutions. The judgment underscores that even a minor misstep by military authorities cannot justify wholesale harm to a citizen’s dignity.
Civil Appeal No. 6333 of 2013 This appeal concerns a registered gift deed dated 05.03.1983 by which the defendant-appellant purportedly gifted the suit property to the plaintiff-respondent for manufacturing Khadi goods, with a covenant that the property would not be transferred for self-interest and without any right reserved to revoke. The plaintiff-respondent, upon accepting the gift, took possession and initiated mutation proceedings; construction followed, evidencing acceptance and actuation of the gift. The donor later executed a revocation deed on 17.08.1987, which the plaintiff-respondent challenged; the Trial Court dismissed the suit for declaration of title primarily on the ground that the gift deed was not accepted or acted upon. The District Judge reversed, holding the gift valid and acted upon, and the High Court affirmed. The central legal issue was whether a gift, though executed and accepted, could be revoked in the absence of any express clause or agreement allowing revocation. The Supreme Court held that the gift was duly acted upon and accepted; thus it could not be invalidated for want of acceptance. Section 126 of the Transfer of Property Act, 1882 bars revocation except in three enumerated contingencies, none of which applied here. The revocation deed was void ab initio. The suit for declaration of title coupled with possession is governed by the Limitation Act provisions, and the appellate courts’ decision decreeing the gift stands, while the appeal is dismissed.
Civil Appeal Nos.3088-3089 of 2020 The present Civil Appeals consider a contested question of set-off in the Corporate Insolvency Resolution Process (CIRP) under Chapter II Part II of the Insolvency and Bankruptcy Code, 2016 (IBC). Bharti Airtel Limited and Bharti Hexacom Limited (appellants) contend that they are entitled to statutory or insolvency set-off against amounts payable by Aircel entities in the CIRP, arising from spectrum trading and interconnection arrangements predating the CIRP. The Supreme Court undertook a structured examination of the various forms of set-off—statutory/legal, common law, equitable, contractual and insolvency set-off—and held that the IBC is a complete code, overriding other laws (Sections 238 and 243). Regulation 29 of the IBBI Liquidation Regulations cannot be applied to Part II of the IBC. The Court recognised two narrow exceptions to bar-set-off: (i) contractual set-off arising from pre-commencement agreements (where the right to set-off is clearly established before the CIRP began), and (ii) a closely connected, transactional or ‘equitable/transactional’ set-off where the claim and counterclaim are so linked that allowing separate payment would be inequitable. The decision also emphasizes the primacy of the moratorium during CIRP and the pari passu/anti-deprivation principles, noting that insolvency set-off is not automatic in CIRP. The Appeals are ultimately dismissed, and the Court affirms that statutory or insolvency set-off cannot be invoked in CIRP, except as expressly permitted by contractual or transactional set-off under defined conditions.
Civil Appeal No. 8446 of 2024 Usha Devi & Ors. v. Ram Kumar Singh & Ors. arises from a suit for specific performance of an agreement to sell dated 17 December 1989 in respect of land at Namkum, Ranchi. The agreement fixed that the sale deed would be executed and registered within one month (by 16 January 1990) and also provided that the agreement would remain valid for five years. The respondents filed a suit for specific performance in September 1993 after paying partial consideration. The Trial Court dismissed the suit; the First Appellate Court and the Jharkhand High Court decreed it. The single crucial question before the Supreme Court was the limitation period under Article 54 of the Limitation Act, 1963. The Court held that limitation for instituting a suit for specific performance is three years from the date fixed for performance, or, if no fixed date, when the plaintiff receives notice that performance is refused. Since a fixed date was 16 January 1990, the three-year period expired on 16 January 1993. The five-year validity clause did not fix or extend the performance date or the limitation period. Consequently, the suit was barred by limitation, and the appeal was allowed. The Court directed the return of Rs. 80,000 paid as advance along with 12% simple interest within three months, with no order as to costs. The decision narrows reliance on non-limitational factors and remits final relief to the trial court’s compliance with the direction.
Civil Appeal No. 934 of 2024 This Supreme Court judgment deals with whether a decree for divorce can be granted on the ground that the marriage has irretrievably broken down, under Article 142(1) of the Constitution. The parties, Indian citizens, married in 2004 and lived abroad in Canada until 2011, when the family returned to India. After 2011 they ceased living together; the respondent refused to resume marital life unless the husband separated from his family and established a separate household. The respondent has not appeared in any proceedings, including the present one, despite service. The appellant initially sought restitution of conjugal rights under Section 9 of the Hindu Marriage Act but later withdrew and filed for divorce on the grounds of cruelty and desertion. The Family Court dismissed the petition; the High Court affirmed. The question before the Court was whether Article 142(1) enables dissolution of a marriage on the ground of irretrievable breakdown, even in the absence of consent from the other spouse. Observing that the parties have been living apart for about 13 years with no contact, the Court held that the marriage has irretrievably broken down and dissolved it by a decree of divorce under Article 142(1). The decision relies on the principle of complete justice and the discretionary power under Article 142(1).
Civil Appeal No. 6977 of 2015 This appeal concerns the promotion of Dharamdeo Das, a physically challenged Scheduled Caste employee of the Bihar State Electricity Board, and the correct date from which promotion to Joint Secretary should be reckoned. Das joined as Lower Division Assistant in 1976 and progressed through multiple accelerated promotions, culminating in an accelerated promotion to Joint Secretary on 5 March 2003. He challenged a Division Bench judgment that directed his promotion to Joint Secretary with retrospective effect from 29 July 1997, arguing that the post was vacant from that date and that his case had not been considered in that period. The Board contended that Kal Awadhi (minimum qualifying service) is only an eligibility criterion and not a guarantee of promotion, and that post-reorganization after Bihar’s bifurcation and a 2003 reduction in Joint Secretary posts meant there was no vacancy, justifying a later promotion date. The Supreme Court held that promotion is effective from the date it is granted, not from vacancy, while recognizing that the right to be considered for promotion is a fundamental right under Articles 14 and 16(1) but does not create a vested right to promotion itself. Kal Awadhi is described as directory, and retrospective seniority or promotion is not permissible unless expressly provided by rules. Consequently, the Division Bench’s order was set aside, the Single Judge’s order restored, and the appeal allowed. The judgment emphasizes administrative exigencies and upholds the normal sequence of promotion from the grant date rather than retroactive dates.
Civil Appeal No. 7840 of 2023 Rajesh Kumar v. Anand Kumar & Ors. deals with the evidentiary role of a power‑of‑attorney (POA) holder in a suit for specific performance and the implications of delay in filing. The appellant entered into an agreement to sell land through a POA holder on behalf of co‑owners. Earnest money was paid and the balance was to be paid at registration, with extensions granted for execution of the sale deed. Subsequently, the POA holder executed the sale deed in favour of others. The plaintiff learned of this and filed suit in 2000, which the trial court decreed, but the High Court allowed the respondent’s appeal and set aside the trial court’s decree. The Supreme Court upheld the High Court, holding that under Section 12 of the Specific Relief Act, 1963, a POA holder cannot depose for the principal on matters requiring personal knowledge or where the principal must prove readiness and willingness in person. The Court observed that the plaintiff must enter the witness box to prove readiness and willingness and that a third party (the POA holder) cannot substitute. It relied on several precedents, including Janki Vashdeo Bhojwani, Man Kaur, and Atma Ram, and distinguished Floriano Armando Luis, which was overruled. The result is a dismissal of the appeal and affirmation of the High Court’s decision, clarifying the limitations on POA evidence and the relevance of timely filing in specific performance cases.
Civil Appeal Nos. 3098-3099 of 2023 This Supreme Court judgment resolves a preliminary question about the ability of Airports Economic Regulatory Authority of India (AERA) to contest before the Telecom Disputes Settlement and Appellate Tribunal (TDSAT) and, if aggrieved, to file an appeal in this Court under Section 31 of the AERA Act. The Court analyzes whether AERA, a statutory regulator, can be impleaded as a respondent in appeals arising from tariff orders and whether it can invoke Section 31 to challenge TDSAT orders. The decision engages a nuanced test of whether tariff-determination under Section 13(1)(a) of the AERA Act is an adjudicatory function or a regulatory function, guided by statutory structure, the seven enumerated factors to determine tariff, and the role of AERA as a regulator with public-interest concerns. It also clarifies the interplay between Sections 17, 18 and 31, and whether AERA’s presence in proceedings before TDSAT is necessary for just and effective adjudication. Ultimately, the Court holds that AERA can be a necessary party and that appeals under Section 31 are maintainable, directing listing before a Regular Bench on merits.
Civil Appeal Nos. 8038-8039 of 2024 This Supreme Court judgment resolves the question whether substantial questions of law must be formulated at the time of admission of a second appeal under Section 100 CPC, or can be formulated subsequently. Nek Pal & Ors. challenged the Uttarakhand High Court’s order in Civil Appeal Nos. 8038-8039 of 2024, arguing that the High Court partially heard the appeal without properly framing substantial questions of law at admission and without giving parties notice to argue on specific questions framed. The Court recalls that under Section 100 CPC, a second appeal can be finally heard only if substantial questions of law have been framed at the time of admission or subsequently, and that hearing a second appeal without such questions is illegal. The Uttarakhand High Court had confined itself to three questions, but did not show that the parties were given notice to argue on those precise questions. Accordingly, the Supreme Court set aside the impugned judgment (dated 13 November 2017) and restored the second appeals to the High Court, directing it to frame the substantial questions of law, allow the parties to argue on them, or frame additional questions if needed, and list the matter after a proper notice. The matter remains 21 years old; interim relief, if any, will continue. The Civil Appeals are partly allowed on these terms, keeping merits open for consideration.
Civil Appeal No. 14299 of 2024 This civil appeal challenges the Madras High Court’s order appointing an arbitrator under Section 11(6) of the Arbitration and Conciliation Act, 1996, in Arb O.P No. 31 of 2022, arising from a dispute between Dushyant Janbandhu and Hyundai AutoEver India Pvt. Ltd. The appellant, an employee, faced a show-cause process, disciplinary proceedings, and a termination order, while claims for non-payment of wages under the Payment of Wages Act and the legality of the termination fell within statutory adjudication. Hyundai sought to resolve these disputes through arbitration, asserting an arbitration clause. The Supreme Court held that appointing an arbitrator under Section 11(6) was an abuse of process, since the core disputes—non-payment of wages and the legality/propriety of the termination—were non-arbitrable and already pending before statutory authorities under the PW Act and ID Act, with bar implications under PW Act Section 22 and ID Act exclusivity. The alleged breach of non-disclosure obligations (Clause 19) was an afterthought, not raised in the show cause notice, inquiry report, chargesheet, or termination order, and thus non-existent. The Court set aside the High Court’s order, dismissed the Section 11(6) petition with costs, and clarified the fourfold arbitrability test (Vidya Drolia) while acknowledging Perkins Eastman’s ratio. The result: Civil Appeal allowed; costs imposed on the respondent.
Arbitration Petition No. 19 of 2024 This is a Supreme Court decision under Section 11(6) read with 11(9) of the Arbitration and Conciliation Act, 1996, addressing whether a non-signatory to a Family Arrangement Agreement (FAA) can be referred to arbitration along with signatories. The petition seeks appointment of a Sole Arbitrator to adjudicate disputes between the AMP Group (petitioners) and the JRS Group, with the SRG Group as a non-signatory stakeholding party. The Court surveys the post-2015 amendments that constrained Section 11(6) to the existence of an arbitration agreement (11(6A)) and clarifies the evolving test for non-signatories in light of Vidya Drolia, Cox & Kings, and Duro Felguera. While the existence of an arbitration agreement must be prima facie established, the arbitral tribunal may determine disputes, including the question of jurisdiction, where there exists a good arguable case and complex factual questions. The Court acknowledges that the SRG Group’s participation in negotiations and performance surrounding the FAA may render it a veritable party to the arbitration, but it refrains from a mini-trial at the Section 11 stage and directs the arbitral tribunal to decide after considering admissible evidence. The petition is allowed, and Justice Akil Kureshi is appointed as the sole arbitrator, with rights reserved for the tribunal to address jurisdiction and validity issues.
Civil Appeal No. 2886 of 2012 Basavaraj v. Indira and Others arises from an amendment application in a partition suit, where respondents sought to modify the plaint to include a declaration that an earlier compromise decree dated 14.10.2004 was null and void. The suit, originally for partition and separate possession, was at the arguments stage; the Trial Court dismissed the amendment, but the High Court allowed it subject to costs. The Supreme Court allowed the appeal, holding that amendment under Order VI Rule 17 CPC cannot introduce a totally new or inconsistent case or alter the fundamental character of the suit, especially after the trial has commenced, and that due diligence is required. The Court noted the amendment would change the nature of the suit from partition to declaration, potentially amounting to challenging a compromise decree outside the proper procedure. It emphasized that even if amendment were allowable, time limits apply; challenging the compromise decree is governed by Order XXIII Rule 3 CPC and its proviso, and a party must approach the same court that recorded the compromise. The decision cites that the mere oversight cannot override limits of limitation and the risk of prejudice to parties not before the Court. The Court ultimately set aside the High Court’s order, dismissed the amendment, and awarded costs to the appellant, preventing multiplicity of litigation and preserving the integrity of the suit process.