Tenetowl LogoTenetowl
Supreme Court of India
Civil Appeal No. 2035 of 1987

Gurpreet Singh v. Chatur Bhuj Goel

The Supreme Court addresses whether a settlement reached during an appeal can be enforced under Order XXIII Rule 3 CPC when it is not reduced to a writing and signed by the parties. The appellant Gurpreet Singh and the respondent Chatur Bhuj Goel had a civil suit for specific performance arising from a contract involving a father acting as guardian. During the Letters Patent Appeal, the parties reached a settlement; the terms were stated in court and endorsed on the record, but no formal written compromise was prepared. The respondent then sought to resile from the settlement. The Division Bench directed the appeal to be decided on merits and to be placed before another Bench, since the compromise lacked a written instrument. The appellant contends that the amendment to Rule 3, introduced in 1976, makes a written and signed compromise mandatory, and that where a settlement reaches within the court, it should be enforceable as an adjustment under Rule 3. The respondent argues that the statements in court formed part of the proceedings and that the compromise should be recognized. The Court clarifies that the amendment’s object is to prevent false or frivolous pleas to delay proceedings, and holds that for an adjustment to be valid, the compromise must be in writing and capable of being embodied in a decree. Since the terms were not so reduced, the appeal is to be heard on merits, and the appeal is dismissed with no costs.

Supreme Court of India
Civil Appeal No. 85 (N) of 1972

K.P. SUBBARAMA SASTRI & ORS. ETC. v. K.S. RAGHAVAN & ORS. ETC.

This Supreme Court judgment concerns a Kuri (Chit Fund) transaction in which subscribers defaulted after realising the amounts. The bonds carried a clause that on default the entire remaining instalments would become payable in one lump sum with interest at 12%, with no credit for dividends. The trial court decreed the principal plus interest and balance due; the Kerala High Court, following a Division Bench, held the terms unconscionable and penal and reduced the amount, criticizing the overall contract as onerous. The appellants sought to uphold their rights under the Kuri scheme, arguing the instalment facility was a legitimate concessional arrangement and that the “lump-sum on default” clause was not a penalty. A Full Bench of the Kerala High Court later clarified the correct test for penalties: whether the amounts were debita in praesenti but solvenda in futuro, or due only on instalment dates. Applying this test, the Supreme Court held that the Kuri contract’s stipulation was not a penalty and that the instalment facility was a permissible concession. The Court reversed the High Court’s view in the civil appeal, while dismissing the accompanying Special Leave Petition challenging the High Court’s modification. The decision clarifies the penalty-test for instalment contracts and legitimizes certain concessional instalment terms in chit funds.

Supreme Court of India
Writ Petition No. 5222 of 1985

WORKERS OF MIS ROHTAS INDUSTRIES LTD. v MIS ROHTAS INDUSTRIES LTD.

This is a Supreme Court of India decision under Article 32 arising from a writ petition by workers of Rohtas Industries Ltd., a company declared a sick undertaking. The Court had previously directed in February 1986 that all salaries and wages due from May 1984 onwards be paid in three installments, but payments had not been made. The State of Bihar issued a notification in December 1986 declaring the industry a sick undertaking under Section 3 of the Bihar Relief Undertakings (Special Provisions) Act, 1981, for one year, raising questions about enforceability of the workers’ liabilities. Financial institutions, including banks, contended that the finished goods stock, pledged as security, afforded them priority and that liquidation of stock could jeopardize revival plans; the State counsel, however, conceded that wages should be paid. The Official Liquidator’s report indicated stock value of ₹91,77,000 and unpaid wages of ₹89,00,000 from May 1984 to 8 July 1984. The Court held that although the stock is pledged, the workers’ labour contributed to producing it, and their wages up to closure deserve priority. It directed sale of the stock and payment to workers from the sale proceeds, with the balance for other demands, within two months, and that Bihar’s notification would not block sale or payment. The judgment endorses a humane, revival-oriented approach to worker rights while seeking to preserve the possibility of industry revival.

Supreme Court of India
Civil Appeal No. 1463 of 1986

BHARAT BARREL & DRUM MANUFACTURING COMPANY PVT. LIMITED v. BHARAT BARREL EMPLOYEES UNION

This is a Special Leave Petition addressing whether the rule of res judicata applies to industrial adjudication and, if so, to what extent. Bharat Barrel, a Bombay-based manufacturer, closed its factory in 1971 due to material shortages and other compelling circumstances, announcing that employees would be paid compensation under s. 25FFF IDA. Subsequently, workers’ disputes were referred to two industrial tribunals. The first tribunal held that the workers were validly discharged on 30 October 1971 under Standing Order 21, preceding the closure, and thus not retrenchment-connected; the reference was rejected. A separate reference concerning 440 workers (LT. 245 of 1975) led the second tribunal to deem these workers retrenched on 20 March 1980, awarding s. 25F retrenchment compensation and back wages from 31 October 1971. The management challenged these findings, arguing that the res judicata doctrine barred re-litigation of whether the workers remained in service, and that the first tribunal’s discharge validity could not be reopened. The Supreme Court held that res judicata applies to industrial tribunals but recognizes limited exceptions where changing circumstances render re-litigation permissible. It quashed the March 1980 award, found the earlier discharge finding final, and directed distribution of Rs. 48 lakh among 440 workers (ex gratia) with adjustments for those who already received sums, while refunding Rs. 1.63 lakh to the appellant. The appeal was allowed, and the High Court judgments were set aside with specific directions.

Supreme Court of India
Civil Appeal No. 1557 of 1986

Oil & Natural Gas Commission v Western Company of North America

This appeal arises from a drilling contract under which differences were referred to arbitration governed by Indian law with London as the hearing venue. An Umpire issued an interim award (without hearing) and later a final costs award. Western Company moved to enforce the awards in a U.S. District Court, while ONGC petitioned in India under Sections 30 & 33 of the Indian Arbitration Act to set aside the award and sought a stay of the U.S. proceedings. The Bombay High Court granted an interim restraint but later vacated it; ONGC challenged the U.S. enforcement on the ground that the award is enforceable only after being transformed into a judgment and decree in India, and that the Indian Court alone has jurisdiction to determine validity/enforceability under the Indian Arbitration Act. The Supreme Court held that under Indian law an arbitral award is lifeless until made a rule of the Court by judgment and decree under Section 17; enforcement is governed by the law of the country of origin and Article V(1)(e) of the New York Convention requires the award to be binding there; recognizing potential for conflicting judgments and oppression, the Court allowed the appeal, but on a conditional restraint requiring ONGC to pay undisputed sums at the rate of $18,500 per day, with undertakings and a Division Bench to hear the matter expeditiously. The decision underscores India’s exclusive jurisdiction and the need to harmonize foreign enforcement with Indian arbitration, contract terms and provisions of the New York Convention.

Supreme Court of India
Criminal Appeal B No. 829 of 1985

K. CH. PRASAD v. SMT. J.VANALATHA DEVI AND ORS.

This Supreme Court decision concerns whether Section 197 of the Criminal Procedure Code is applicable to a prosecution involving a public servant in a nationalised banking context. The appellant, K. Ch. Prasad, faced a complaint under Section 120(b) read with Sections 467 and 471 IPC, and the core issue was whether cognizance could be taken without prior sanction of the Government. The Metropolitan Magistrate initially held that Section 197 does not apply because the appellant is an officer who could be removed by a competent authority, not requiring Government sanction, and this view was affirmed by the Andhra Pradesh High Court. The appellant argued that post-nationalisation the department, and hence the appellant, should be treated as a public servant fallwithin the purview of Section 197, and that although the removal authority is not the Government, it has been empowered under regulations framed under the relevant Act with the approval and sanction of the Central Government, so Section 197 ought to apply. The respondents contended that Section 197 is triggered only where a public servant is not removable from office save by or with Government sanction, and that mere empowerment of a non-Government removal authority by regulations does not circumvent this requirement. The Supreme Court held that Section 197 is attracted only where the public servant is not removable except by or with Government sanction; since the appellant does not occupy such a post, Section 197 does not apply and the appeal is dismissed. The judgment was delivered by G. L. Oza, J., with M. M. Dutt, J. concurring.

Supreme Court of India
Cr. Misc. Petition No. 2662 of 1986; Writ Petition (Cr.) No. 1061 of 1982

BANWASI SEWA ASHRAM v. STATE OF U.P. AND ORS.

Banwasi Seva Ashram v. State of Uttar Pradesh and Ors. concerns a writ petition under Article 32 by Banwasi Seva Ashram seeking protection and regularisation of land rights of Adivasis living in Dudhi and Robe rtsganj Tehsils in Mirzapur district. After the Uttar Pradesh Government declared parts of the jungle as reserved forest under the Indian Forest Act, 1927 and issued notifications under section 4 for final declaration as reserved forests, the Adivasis faced disruption of their long-standing habitation and livelihoods. Forest officers registered encroachment and other forest offences and steps were taken under the UP Public Premises (Eviction of Unauthorized Occupants) Act to dispossess them. The Court previously directed a high-powered committee to investigate land claims and reach a final decision, and later ordered a Maheshwar Prasad-type mechanism for adjudicating claims of those belonging to Scheduled Castes and Backward Classes, including rights to fodder, fuel, and small forest produce. As NTPC planned a super-thermal plant on part of these lands, the petition raised the need to balance ecological, economic, and energy imperatives with the rights of the Adivasis. The decision sets out a framework to demarcate lands under section 4, admit and adjudicate claims, provide legal aid, and monitor implementation through a Board of Commissioners while allowing acquisition only under the Land Acquisition Act with safeguards. The petition was disposed of with directions to implement these schemes.

Supreme Court of India
Civil Appeal No. 4096 of 1987

FOOD CORPORATION OF INDIA v. SURENDRA TRANSPORT CO.

Food Corporation of India (appellant) entered into three successive transport and handling contracts with Surendra Transport Co. A dispute arose under the terms of the arbitration clause; an arbitrator issued a speaking award. The award declined FC I’s claim for demurrage and wharfage paid to Railways totaling Rs. 15,63,863.02, awarding only 25% of that amount, and also reduced the claim for shortage in transit by 40%, granting 60% (Rs. 52,971.99). The arbitrator awarded Rs. 12,64,175.97 to Surendra Transport Co. and pendente lite interest at 6% per annum. FC I challenged the award under sections 30 and 33 of the Arbitration Act, 1940, in the Calcutta High Court. The High Court’s Single Judge set aside the award; the Division Bench reversed and upheld it, prompting FC I to seek relief under Article 136. The Supreme Court framed three questions: (i) Rs. 13,94,982.46 for demurrage/wharfage, (ii) Rs. 2,35,769.46, and (iii) interest. The Court found the total demurrage/wharfage paid was Rs. 15,63,863.21; it examined clauses 9(a) and 9(b) of the agreement, noting that the Manager’s decision was final and binding. It held pendente lite interest unjustified in light of later three-judge precedents, modified the award accordingly, and disposed of the appeal. The decision maintains the High Court’s judgment on all other aspects.

Supreme Court of India
Civil Appeal No. 2935 B of 1981

SMT. SHANTI SHARMA v. SMT. VED PRABHA

This is a rent-control eviction appeal under Delhi Rent Control Act, 1958, Section 14(1)(e), involving SMT. Shanti Sharma (tenant/applicant) and SMT. Ved Prabha (landlord/respondent). The key issue is whether the landlord, who built a house on land leased from the Delhi Development Authority (DDA), can be treated as the “owner” for the purposes of eviction on the ground of bona fide personal occupancy when the lease of the plot has been or is being canceled. The Rent Controller and Tribunal had granted eviction on the ground of bona fide requirement, a decision upheld by the Delhi High Court that the landlord, though the lease of the plot might be terminated, remained in possession and could still be regarded as the owner vis-à-vis the tenant. On appeal, the Supreme Court examined the statutory meaning of “owner” in the context of the Act’s protective aim for tenants and the modern reality that land may be held on lease from the State or its authorities. The Court rejected a narrow interpretation equating “owner” with absolute ownership. It held that a landlord who builds on leasehold land and remains in possession may fall within the term “owner” for Section 14(1)(e), provided bona fide occupancy is established. The appeal was dismissed, and costs were awarded to the respondents.

Supreme Court of India
Civil Appeal No. 8295 of 1983

S.K. DAS v. A.P. JOGANI

Dr. Saroj Kumar Das, a medical practitioner, filed a suit for recovery of possession of the second-floor rear portion of premises at 248, C.I.T. Road, Calcutta, from the respondent tenant on the ground that he reasonably required the premises for his own occupation and had no other reasonably suitable accommodation in the town. The trial court and the first appellate court granted eviction under the West Bengal Premises Tenancy Act, 1956. During the pendency, the landlord acquired a flat in South Calcutta (13th floor). The respondent tenant moved the High Court seeking to set aside the eviction in light of this subsequent event, arguing that the available alternative accommodation satisfied the landlord’s need. The High Court permitted amendment and additional evidence and, on that basis, set aside the eviction decree. The Supreme Court, by a single judge, allowed the landlord’s appeal, holding that while the alternative accommodation must be reasonably suitable, mere availability is not enough to defeat eviction if there is a genuine requirement. It concluded that the 13th-floor South Calcutta flat was not reasonably suitable for a retired doctor intending to practice locally, particularly given its distance from the site of the landlord’s practice. Accordingly, the eviction decree was restored, albeit with stay conditions for execution upon undertakings and rent payments. The judgment underscores the primacy of genuine need and reasonableness of alternative housing in eviction matters under the Act and CPC Sec. 100.

Supreme Court of India
Civil Special Leave Petition (Civil) No. 9887 of 1987.

Maneklal and Sons v. Trustees of Port of Bombay & Ors.

This case concerns whether the occupants of a godown erected on land owned by the Port Trustees can claim protection under the Bombay Rent, Hotel and Lodging Houses Rates (Control) Act, 1947. In 1945 the Port Trustees leased land to Mustafa Husein for a godown; a brick-and-mortar structure was erected in 1946, and in 1958 the godown was leased to the petitioners (Maneklal and Sons). The Trustees then sued for eviction on the ground of termination of tenancy. The petitioners obstructed possession, and a Chamber Summons under Order 21 R.97–101 CPC was filed. They contended that, as lessees of the original tenant, they were entitled to the protection of the Bombay Rent Act, since the building had been erected by a lessee from the local authority and thus fell within section 4(1)(a). The Trial Court allowed the Chamber Summons; the High Court dismissed the petition, and the Letters Patent Appeal was also dismissed. The central issue was whether protection under section 4(1)(a) could extend to buildings erected by the lessee on land belonging to a local authority, absent a building lease, and whether section 4(4)(a) immunizes such premises. The Supreme Court held that protection under section 4(1)(a) does not apply where the building was erected not pursuant to any agreement with the lessor, especially where the original lease was only a monthly tenancy. Consequently, the Special Leave Petition was dismissed; however, time to vacate was granted until 15 September 1988 upon filing an undertaking.

Supreme Court of India
Special Leave Petition No. 420 of 1987

Md. Salim v. Md. Ali

Md. Salim v. Md. Ali concerns whether the petitioner, who participated in a 1966 arrangement with his landlord to manage a shop, was a sub-tenant and thus bound by an eviction decree against the tenant. The petitioner contends that, with the landlord’s knowledge and consent, he was effectively a sub-tenant and should not be bound by a decree in which he was not a party. The High Court of Calcutta held that the petitioner was not a sub-tenant and thus bound by the eviction decree, since there was no sub-tenancy. The Supreme Court dismissed the Special Leave Petition and affirmed the High Court’s view. The Court found that the memorandum dated 1 September 1966 between Abdur Rahaman and Md. Salim, with the landlord as an attesting witness, was an arrangement for managing the business rather than a sub-tenancy, noting there was no exclusive possession transferred and the premises were not parted with possession. Although the landlord’s knowledge was present, it did not amount to consent to sub-tenancy. The Court also referred to section 2(4) of the West Bengal Premises Tenancy Act, 1956, to support the decision. A decision in Mis. Girdhar Lal & Sons v. Balbir Nath Mathur was cited and distinguished on the facts. The petition is accordingly dismissed, with no order as to costs.

Supreme Court of India
/

STATE OF KERALA v. A. LAKSHMIKUTTY

This Supreme Court judgment concerns the direct recruitment of District Judges from the Bar under Article 233(1) of the Constitution and Kerala’s system of communal reservation and rotation under Rule 14, 15 of the Kerala State and Subordinate Services Rules, 1958, and the Kerala State Higher Judicial Service Rules, 1961. The Kerala High Court had prepared a panel of fourteen (initially fifteen) names for appointment from the bar, and, due to non-representation of certain communities in the rotation, allocated vacancies according to the rotation rules (e.g., Lakshmikutty, an Ezhava, was placed sixth in merit but 14th in rotation). Mary Teresa Dias, Latin Catholic, was found unsuitable, and there was extensive public discussion following cabinet meetings (January 30, 1985; February 28, 1985) about not appointing anyone from the panel and then inviting fresh applications. Lakshmikutty petitioned under Article 226; the High Court issued mandamus directing appointments from the panel. The State Government challenged this, arguing appointment is an executive function to be exercised in consultation with the High Court and not bound to accept its recommendations. The Supreme Court held that consultation under Article 233(1) must be real, full and effective; it reversed the mandamus and directed the Government to communicate its views to the High Court and, if necessary, reconsider with the High Court’s opinion. It emphasized that the High Court’s role in candidate selection remains decisive, and that the Government’s November 1985 policy must be reconciled with the two Subhadra Amma and Sadanandan directions. There shall be no order as to costs.

Supreme Court of India
Criminal Appeal No. 300 of 1985

Sheela Barse v. Children Aid Society

This appeal arises from a writ petition filed by Sheela Barse challenging the working of the New Observation Home at Mankhurd run by the Children’s Aid Society, Bombay. Barse alleged that children in the Observation Homes were forced to work without remuneration, engaged in hazardous employment, and that follow‑up and supervision were inadequate. The Bombay High Court treated her letter as a writ petition, issued directions, and laid out recommendations on repatriation, escort services, and administrative measures. Barse contended that the Society should be treated as a State under Article 12, so constitutional rights under Articles 21 and 24, and the Directive Principles of State Policy would bind it. The Society argued it is a voluntary organization registered under the Societies Registration Act, and a Public Trust under the Bombay Public Trusts Act, not a State instrumentality, and that the High Court’s directions were adequate. The Supreme Court, in a Division Bench, held that the Society is an instrumentality of the State under Article 12 and that the State of Maharashtra must enforce the statutory provisions and implement the High Court’s and this Court’s directions. The Court stressed training for Child Welfare Officers, a sensitive Juvenile Court structure, and humane treatment of children, and directed deletion of disparaging observations about Barse, while awarding costs to the appellant.

Supreme Court of India
Civil Appeal No. 696 of 1973

MAHABIR PRASAD SANTUKA & ORS. v. COLLECTOR, CUTIACK & ORS.

The case concerns land acquired under Section 4 of the Land Acquisition Act, 1894 for construction of an Aviation Research Centre at Charbatiya, Orissa. The Collector awarded compensation at Rs. 2,000 per acre; on reference the Subordinate Judge enhanced to Rs. 15,000 per acre. On appeal by the respondents, the High Court reduced the amount to Rs. 7,500 per acre, holding that the State Government had been offering land in the adjacent Industrial Area to industrialists at Rs. 7,500 per acre and that the appellants had purchased the land in 1956 at Rs. 100 per acre, implying they were not entitled to more than Rs. 7,500. The appellants contended that the market value was much higher, supported by evidence of development around the land and by other cases where adjacent lands were valued at Rs. 15,000 per acre. They argued that concessional sales to industrialists do not reflect market value, since the industrialists are not willing purchasers. The Supreme Court allowed the appeal, set aside the High Court’s order, and directed compensation at Rs. 15,000 per acre. It clarified that market value depends on what a willing purchaser would pay a willing seller, considering nearby development and potential use, and rejected reliance on concessional governmental offers as reflecting market value. The Court remitted to pay Rs. 15,000 per acre with costs and noted unresolved solatium/interest questions for a larger Bench.

Supreme Court of India
Civil Appeal No. 1295 of 1973

Kotak & Co. v. State of U.P.

This Supreme Court decision concerns rateable distribution under the Civil Procedure Code, 1908, and whether the money realized from the judgment-debtor's assets passes to decree-holders at the moment a Court determines their respective shares. The Allahabad High Court had reversed an executing-court order, prompting Kotak & Co. to appeal. The Court surveys jurisprudence in Madras (Official Receiver of Tanjore v. M.R. Venkatarama Iyer, AIR 1922 Mad 31), Calcutta (Murli Tahilram v. T. Asoomal & Co., AIR 1955 Cal 423; Basanta Kumar Bhattacharjee v. Panchu Gopal Dutta & Ors., AIR 1956 Cal 23), and Bombay (Income-tax Officer Ward C., Sangli & Anr. v. Chandanbai Balaram Doshi & Ors., AIR 1957 Bombay 91). It holds that once the Court has determined rateable distribution and passes an order as to how to apportion the debtor's assets, the rights of the decree-holders crystallize; the monies cease to be the judgment-debtor's property and vest in the decree-holder, irrespective of whether actual payment has yet been made. Officials must implement the Court's order. If the State asserts a claim after distribution, it is moot. Accordingly, the appeal is allowed, the High Court's order reversed, and the executing Court's order restored for the appellant. No costs.

Supreme Court of India
Civil Appeal Nos. 6245-46 of 1983

Executive Engineer Irrigation Galimala & ors. v. Abaaduta Jena

This batch of Civil Appeals concerns whether an arbitrator, appointed under contract without court intervention, may award interest for periods before the reference and during the pendency of the arbitration. The Court analyzes the evolution of Indian interest jurisprudence under the Interest Act (1839 and 1978) and the Civil Procedure Code (CPC) Section 34, in light of pre and post-1981 arbitral regimes. The contracts underlying the disputes contained arbitration clauses (notably Clause 23 and Clause 11 on variations and payment) appointing a Superintending Engineer as arbitrator, with the award deemed final. The key doctrinal question is whether an arbitrator can award pendente lite interest when the reference is made without court intervention, and whether pre-reference interest can be awarded in the absence of a court’s intervention. The Court traces numerous authorities, including Bengal Nagpur Railway Co. v. Ruttanji Ramji, Seth Thawardas Pherumal v. Union of India, Nachiappa Chettiar v. Subramaniam Chettiar, Satinder Singh v. Amrao Singh, and others, to explain when interest can be awarded and by whom. It distinguishes cases where references were in suits (where s.34 CPC may apply in effect) from those where arbitrators are not courts. Ultimately, the Court dismisses most appeals and disallows pendente lite and/or pre-proceedings interest, clarifying the post-1978 regime’s applicability and the continued limits on arbitrators’ power to award interest.

Supreme Court of India
Civil Appeal No. 2794 of 1986

Samarjit Ghosh v. Bennett Coleman & Company and Another

This is an appeal by Samarjit Ghosh, a working journalist employed by Bennett Coleman & Company Limited, challenging the reference made by the Government of West Bengal under Section 17(2) of the Working Journalists and Other Newspaper Employees (Conditions of Service) and Miscellaneous Provisions Act, 1955, to the First Labour Court, West Bengal, for adjudication of a dispute regarding unpaid wages for the period 1968–1973. The appellant had initially worked in Calcutta and, during the conciliation process initiated in 1975, was promoted and transferred to Pune in 1976. The conciliation failed in 1976, and on 23 August 1977 the Government of West Bengal referred the dispute to the First Labour Court. The employer challenged the reference in the Calcutta High Court, which upheld the challenge; a Division Bench affirmed the High Court’s decision. The Supreme Court reversed, holding that the appropriate State Government to whom an application under Section 17(1) is made determines who may refer the amount due to a Labour Court under Section 17(2). The Court explained that Rule 36 of the Rules under the Act designates the State Government based on the location of the central or branch office where the newspaper employee is employed, which in this case was Calcutta, thus making West Bengal competent to make the reference. The appeal was allowed, the High Court’s judgment set aside, and the Labour Court directed to proceed expeditiously with the adjudication, with costs to the appellant.

Supreme Court of India
Civil Appeal No. 5032 of 1985

AUNDAL AMMAL v. SADASIVAN PILLAI

This is a Supreme Court appeal arising from Kerala High Court C.R.P. Nos. 1643 and 2552 of 1980 concerning eviction of a tenant under the Kerala Buildings (Lease and Rent Control) Act, 1965 on bona fide personal need. The Rent Controller dismissed the landlord’s petition; the Appellate Authority upheld the dismissal. The District Judge dismissed the landlord’s revision under Section 115 CPC. During the proceedings, the tenant died and was substituted as legal representative. The Kerala High Court later set aside the lower orders and ordered eviction according to its view of the Act’s scheme. The central issue is whether the High Court can entertain revisions under Section 115 CPC against orders passed under the Act, given that Section 18(5) declares the appellate order final and Section 20 provides limited revision. The appellant tenant contends that the High Court’s revisional interference is barred by the Act’s finality provision, while the respondent landlord argues for continued revisional jurisdiction under Section 115, citing Kerala High Court authorities and relevant precedents. The Supreme Court ultimately holds that the High Court had no jurisdiction to entertain a second revision under Section 115, overruling the Kerala High Court Full Bench position, and allows the appeal. It directs eviction in line with statutory proceedings and increases rent to Rs. 500 per month from the date of decision, with no costs.

Supreme Court of India
Special Leave Petition (Criminal) No. 419 of 1987

Bakhshish Singh Brar v. SMT. Gurmej Kaur

This Supreme Court Special Leave Petition concerns the protection of public servants from harassment in criminal proceedings and the conditions under which sanction under section 197 CrPC is required before cognizance can be taken or trials can proceed. Bakshish Singh Brar, a Deputy Superintendent of Police, was charged with multiple IPC offences and other penal provisions connected to a raid for illicit liquor and unlicensed arms. He argued that without sanction under s. 197 CrPC, cognizance could not be taken nor could the trial proceed, and that the absence of sanction rendered the proceedings invalid. The Sessions Court adopted a view that the question of sanction could be evaluated after some evidence. The Punjab and Haryana High Court dismissed the petition under section 482 CrPC seeking to stay proceedings. The Supreme Court held that while it is essential to protect public servants and prevent harassment, the rights of private citizens must also be safeguarded, and the courts must balance these interests. It affirmed that criminal trials should not be stayed at the preliminary stage in all cases, but that sanction under s.197 CrPC may be raised after some evidence has been recorded, citing Pukhraj v. State of Rajasthan as illustrative authority. The Court directs expeditious trial with the possibility of later consideration of sanction.