SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS.

Case / Petition Number:
Civil Appeal No. 2773 of 2022
Neutral Citation:[2022] 2 S.C.R. 1041

Case Synopsis & Summary

The appellants, Sukh Dutt Ratra and Bhagat Ram, claim ownership of subject land in Mauzal Sarol Basach, Himachal Pradesh, which the State utilized for the Narag Fagla Road in 1972–73. They allege that no land acquisition proceedings were initiated nor compensation paid, while adjoining lands were compensated after a 2001–2005 sequence of events culminating in awards in 2005. Following High Court directions, a Section 4 notification was issued in 2001 and the reference court awarded enhanced compensation for neighboring lands. The appellants challenged the State’s conduct, arguing that delay and laches cannot absolve the State of its obligation to provide compensation and due process under Article 300-A (and prior Article 31). The writ petition was disposed of with liberty to file a civil suit. The High Court held the matter involved disputed questions of law and fact concerning limitation, unsuitable for writ proceedings, and declined immediate relief. The Supreme Court, noting the State’s clandestine and arbitrary actions and its constitutional duties, held that delay cannot shield denial of justice. It directed the State to treat the subject lands as a deemed acquisition, compute and disburse compensation with solatium and interest from the date of notification, and pay costs, exercising its extraordinary jurisdiction under Articles 136 and 142 to grant relief decades after dispossession. The decision emphasizes the primacy of due process and remedy in a welfare state.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. Ravindra Bhat
  • Pamidighantam Sri Narasimha
Judgment Date
2022-04-06
Court Decision / Holding
Appeal allowed. Impugned High Court order set aside. The State is directed to treat the subject lands as a deemed acquisition and to compute and disburse compensation in the same terms as the 04.10.2005 reference court order, with solatium and interest from 16.10.2001 until 12.09.2013. The State must ensure disbursement within four months and pay legal costs of Rs. 50,000 to the appellants. The decision also recognizes the appellants’ right to due process under Article 300-A and invokes the Supreme Court’s jurisdiction under Articles 136 and 142 to remedy decades of dispossession.
Final Disposition
Appeal allowed; High Court’s order set aside; State directed to deem the subject lands as acquisition and pay compensation with solatium, interest, and costs within four months; legal costs of Rs. 50,000 to be paid to appellants; relief granted under Articles 136 and 142 of the Constitution.

Parties to the Case

Appellants / Petitioners

  • Sukh Dutt Ratra
  • Bhagat Ram

Respondents

  • State of Himachal Pradesh
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Sharan Thakur
  • • Mahesh Thakur
  • • Siddhartha Thakur
  • • Vipasha Singh
  • • Biswendra Singh

Counsels for Respondents

  • • Abhinav Mukerji
  • • Bihu Sharma
  • • Pratishtha Vij
  • • Akshay C. Shrivastava

Provisions of Law Cited

Constitution of India, Article 300-AConstitution of India, Article 136Constitution of India, Article 142Constitution of India, Article 226Constitution of India, Article 19(1)(f) (as amended by the 44th Amendment)Land Acquisition Act, 1894 (Sections 4, 18, 23(1-A), 28)

Legal Doctrines & Maxims

  • No person shall be deprived of property save by authority of law (Art. 300-A)
  • Rule of law and due process
  • Doctrine of delay and laches
  • Condonation of delay as a judicial discretion
  • Continuing cause of action
  • Deemed acquisition doctrine
  • Equity and fairness in protection of fundamental rights
  • Extrordinary jurisdiction under Art. 136 and 142
  • Precedents emphasizing state responsibility to follow due process (e.g., Vidya Devi; Tukaram Kana Joshi)
  • State’s higher duty to demonstrate legality of acts affecting private property

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants argued that the State illegally dispossessed them of their land for the Narag Fagla Road in 1972–73 without following due process or paying compensation. They highlighted that subject land was never acquired under law, while neighboring lands received compensation in 2005 after a directive from the High Court. They urged that delay and laches cannot shield State liability and invoked Article 300-A and Article 31 to demand compensation or initiation of lawful acquisition. They relied on Tukaram Kana Joshi and Vidya Devi to contend that due process must be observed regardless of delay, and that verbal consent cannot substitute for written approval. They asserted the lands were acquired for the same road and used similarly, and that the remedy lies in a declaratory order and compensation.

Contentions of Respondents

The State contended that the appellants waited for decades to seek relief, making delay and laches fatal. It argued that the lands in question may not be adjoining the subject land and that the road may have been constructed with voluntary land donations from landowners, including the appellants. Differing writ petitions concerning other parcels were cited to challenge parity. The State submitted that the matter involves disputed questions of fact and limitation, and that civil court adjudication would be appropriate. It urged that no immediate relief was warranted given the elapsed time and procedural prerequisites for acquisition, and that the High Court’s writ jurisdiction should not be invoked to override established processes.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (18)

Case NameCitationTreatmentExplanation
Vidya Devi v. State of Himachal Pradesh(2020) 2 SCC 569PositiveRelied upon as a controlling precedent to affirm compensation with full statutory benefits despite delay.
State of U.P. v. Manohar(2005) 2 SCC 126Mentioned OnlyCited for general reference on delay; not adopted as a direct ruling in this matter.
Tukaram Kana Joshi & Ors. v. Maharashtra Industrial Development Corporation (MIDC)(2013) 1 SCC 353PositiveUsed to support requirement of following due process in acquisition; later referenced by Vidya Devi and others.
Air India Ltd. v. Vishal Capoor(2005) Supp 3 SCR 670Mentioned OnlyCited in argument about oral consent; not adopted as a direct ruling.
Hindustan Petroleum Corporation Ltd. v. Darius Shapur Chenai(2005) Supp (3) SCR 388PositiveCited in context of compensation framework and statutory benefits.
N. Padmamma v. S. Ramakrishna Reddy(2008) 15 SCC 517PositiveCited for human and constitutional rights framing of property deprivation.
Delhi Airtech Services Pvt. Ltd. & Ors. v. State of Uttar Pradesh & Ors.(2011) 12 SCR 191PositiveCited for related writ jurisdiction principles and due process.
Jilubhai Nanbhai Kahchar v. State of Gujarat(1994) Supp (1) SCR 807PositiveCited for principles on due process and property rights.
Bishandas v. State of Punjab(1962) 2 SCR 69PositiveCited for protection of property rights against unlawful state action.
Maharashtra State Road Transport Corporation v. Balwant Regular Motor Service(1969) 1 SCR 808PositiveCited for laches doctrine and equitable relief in delayed claims.
State of Madhya Pradesh & Anr v. Bhailal Bhai & Ors(1964) 6 SCR 261PositiveCited for due process and state liability principles.
Brijesh Kumar & Ors. v. State of Haryana(1989) 1 SCR 176PositiveCited for state responsibility in land acquisition contexts.
State of Uttar Pradesh and Ors. v. Dharmander Prasad Singh and Ors.(1989) 1 SCR 176Mentioned OnlyReferenced to illustrate related lines but not followed as controlling authority.
Entick v. Carrington(1765) EWHC (KB) 198Mentioned OnlyHistorical authority cited for rule of law and due process.
Wazir Chand v. The State of Himachal Pradesh(1955) 1 SCR 408Mentioned OnlyCited for foundational rule-of-law principles.
Shankar Dass v. State of Himachal PradeshCWP No. 1966/2010 (Judgment dated 02.03.2013)PositiveFull bench decision relied upon regarding written consent and due process.
State of Haryana v. Mukesh Kumar(2011) 10 SCC 404PositiveCited for human rights dimension of property rights.
State of Haryana (2014) 11 SCC 351—PositiveCited for parity and due process considerations.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,425 words•~25 min read

In The Court Record

SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS.

1041 [2022] 2 S.C.R. 1041 SUKH DUTT RATRA & ANR. A v. STATE OF HIMACHAL PRADESH & ORS. (Civil Appeal No. 2773 of 2022) APRIL 06, 2022 B ## **[S. RAVINDRA BHAT AND PAMIDIGHANTAM SRI NARASIMHA, JJ.]** _Constitution of India, 1950: Art. 300-A – Right against depriviation of property – Respondent state utilised subject land and adjoining lands for the construction of road in 1972-73 – Appellants claimed to be owners of subject land – Allegedly no land acquisition proceedings were initiated nor compensation was given to the appellants or the owners of the adjoining lands – Land acquisition proceedings were initiated in respect of neighbouring land owners and award was passed on 04.10.2005 – Appellants filed writ petition in 2011 before the High Court seeking compensation for the subject land or initiation of acquisition proceedings under the Land Acquisition Act – High Court held that the matter involved disputed questions of law and fact for determination on the starting point of limitation, which could not be adjudicated in writ proceedings – In the instant appeals, question that arose was can the State, merely on the ground of delay and laches, evade its legal responsibility towards those from whom private property was expropriated – Held: The State cannot shield itself behind the ground of delay and laches – There cannot be a ‘limitation’ to doing justice – The State has, in a clandestine and arbitrary manner, actively tried to limit disbursal of compensation as was required by law – This arbitrary action was also violative of the appellant’s prevailing Art. 31 right – The State was unable to produce any evidence indicating that the land of the appellants was taken over in the manner known to law or have ever paid any compensation – Appellants too were illegally dispossessed without following due process of law – In the absence of written consent to voluntarily give up their land, the appellants were entitled to compensation in terms of law – Invoking extraordinary jurisdiction under Arts.136 and 142 of the Constitution, the State is directed to_ C D E F G H 1041 1042 SUPREME COURT REPORTS [2022] 2 S.C.R. - A _treat the subject land as a deemed acquisition and appropriately disburse compensation to the appellants in the same terms as the order of the reference court dated 04.10.2005 – State is also directed to pay legal costs and expenses of Rs. 50,000 to the appellants – Land acquisition – Limitation – Delay and laches._ ## B **Allowing the appeal, the Court** **HELD: 1. The facts of the present case reveal that the State has, in a clandestine and arbitrary manner, actively tried to limit disbursal of compensation as required by law, only to those for which it was specifically prodded by the courts, rather than to all** C **those who are entitled. This arbitrary action, which is also violative of the appellants’ prevailing Article 31 right (at the time of cause of action), undoubtedly warranted consideration, and intervention by the High Court, under its Article 226 jurisdiction. [Para 19][1051-C-E]** D _State of U.P. v. Manohar_ , **(2005) 2 SCC 126 – referred to.** **2. The State has merely averred to the appellants’ alleged verbal consent or the lack of objection, but has not placed any material on record to substantiate this plea. Further, the State was** E **unable to produce any evidence indicating that the land of the appellants had been taken over or acquired in the manner known to law, or that they had ever paid any compensation. This was the State’s position and subsequent findings of the High Court in 2007 as well, in the other writ proceedings. [Para 21][1052-F-H]** F **3. The State’s contention that since the property is not adjoining to that of the appellants, it disentitles them from claiming benefit on the ground of parity cannot be accepted. Despite it not being adjoining (which is admitted in the rejoinder affidavit filed by the appellants), it is clear that the subject land was acquired for the same reason – construction of the** _**Narag Fagla Road**_ **, in** G **1972-73, and much like the claimants before the reference court, these appellants too were illegally dispossessed without following due process of law thus resulting in violation of Article 31 and warranting the High Court’s intervention under Article 226 jurisdiction. In the absence of written consent to voluntarily give** H SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1043 **up their land, the appellants were entitled to compensation in terms of law. The forcible dispossession of a person of their private property without following due process of law, was violative of both their human right, and constitutional right under Article 300A. [Paras 22 and 25][1052-H; 1053-A-C; 1054-D]** _Vidya Devi vs. State of Himachal Pradesh_ **(2020) 2 SCC 569- relied on.** **4. In view of this court’s extraordinary jurisdiction under Article 136 and 142 of the Constitution, the State is hereby directed to treat the subject lands as a deemed acquisition and appropriately disburse compensation to the appellants in the same terms as the order of the reference court dated 04.10.2005. The Respondent-State is directed, consequently to ensure that the appropriate Land Acquisition Collector computes the compensation, and disburses it to the appellants, within four months. The appellants would also be entitled to consequential benefits of solatium, and interest on all sums payable under law w.e.f 16.10.2001 (i.e. date of issuance of notification under Section 4 of the Act), till the date of the impugned judgment, i.e. 12.09.2013. Given the disregard for the appellants’ fundamental rights which has caused them to approach this court and receive remedy decades after the act of dispossession, the RespondentState is directed to pay legal costs and expenses of Rs. 50,000 to the appellants. [Paras 26 and 27][1054-E-G; 1055-A-B]** _Bishandas v. State of Punjab_ **[1962] 2 SCR 69;** _Maharashtra State Road Transport Corporation v. Balwant Regular Motor Service_ **[1969] 1 SCR 808 – followed.** _Hindustan Petroleum Corporation Ltd. v. Darius Shapur Chenai_ **[2005] Supp (3) SCR 388;** _N. Padmamma v. S. Ramakrishna Reddy_ **(2008) 15 SCC 517;** _Delhi Airtech Services Pvt. Ltd. & Ors. v. State of Uttar Pradesh & Ors._ **[2011] 12 SCR 191;** _Jilubhai Nanbhai Kahchar v. State of Gujarat_ **[1994] Supp 1 SCR 807 – relied on.** A B C D E F G H 1044 SUPREME COURT REPORTS [2022] 2 S.C.R. - A _Tukaram Kana Joshi & Ors. v. Maharashtra Industrial Development Corporation_ **(MIDC) [2012] 13 SCR;** _Air India Ltd. vs. Vishal Capoor_ **[2005] Supp 3 SCR 670;** _State of Maharashtra vs. Digambar_ **[1995] Supp 1 SCR 492;** _State of Madhya Pradesh & Anr vs. Bhailal Bhai & Ors_ . **[1964] 6 SCR 261;** _Brijesh Kumar & Ors. vs._ - B _State of Haryana_ **(2014) 11 SCC 351;** _Wazir Chand vs. The State of Himachal Pradesh_ **[1955] 1 SCR 408;** _State of Uttar Pradesh and Ors. vs. Dharmander Prasad Singh and Ors._ **[1989] 1 SCR 176 – referred to.** - _Entick vs. Carrington_ **[1765] EWHC (KB) 198 –** - C **referred to.** ## **Case Law Reference** ||**(2005) 2 SCC 126**|**referred to**|**Para 6**| |---|---|---|---| |D|**[2012] 13 SCR**|**referred to**|**Para 6**| ||**[2005] Supp 3 SCR 670**|**referred to**|**Para 8**| ||**(2020) 2 SCC 569**|**relied on.**|**Para 9**| ||**[1995] Supp 1 SCR 492**|**referred to**|**Para 10**| |E|**[1964] 6 SCR 261**|**referred to**|**Para 10**| ||**(2014) 11 SCC 351**|**referred to**|**Para 10**| ||**[ 1955] 1 SCR 408**|**referred to**|**Para 14**| ||**[1962] 2 SCR 69**|**followed**|**Para 15**| |F|**[1989] 1SCR 176**|**referred to**|**Para 15**| ||**[1969] 1 SCR 808**|**followed**|**Para 18**| ||**[2005] Supp 3 SCR 388**|**relied on**|**Para 25**| |G|**(2008) 15 SCC 517**|**relied on**|**Para 25**| ||**[2011] 12 SCR 191**|**relied on**|**Para 25**| ||**[1994] Supp 1 SCR 807**|**relied on**|**Para 25**| H SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1045 CIVIL APPELLATE JURISDICTION: Civil Appeal No. 2773 of 2022. A From the Judgment and Order dated 12.09.2013 of the High Court of Himachal Pradesh at Shimla in CWP No.7873 of 2011. Sharan Thakur, Mahesh Thakur, Siddhartha Thakur, Ms. Vipasha Singh, Ms. Biswendra Singh, Advs. for the Appellants. B Abhinav Mukerji, Ms. Bihu Sharma, Ms. Pratishtha Vij, Akshay C. Shrivastava, Advs. for the Respondents. The Judgment of the Court was delivered by ## **S. RAVINDRA BHAT, J.** 1. Delay condoned and leave granted. With consent of counsel for the parties, the appeal was heard finally. The appellants are aggrieved by final judgment[1] of the High Court of Himachal Pradesh at Shimla, disposing their writ petition, with liberty to institute a civil suit in accordance with law. C D ## _Facts_ 2. Sukh Dutt Ratra and Bhagat Ram (hereafter ‘appellants’) claim to be owners of land[2] situated at Mauzal Sarol Basach, Tehsil Pachhad, District Sirmaour, Himachal Pradesh (hereafter ‘subject land’). The Respondent-State utilised the subject land and adjoining lands for the construction of the ‘Narag Fagla Road’ in 1972-73, but allegedly no land acquisition proceedings were initiated, nor compensation given to the appellants or owners of the adjoining land. 3. Pursuant to a judgment by the Himachal Pradesh High Court[3] (hereafter ‘High Court’) directing the State to initiate land acquisition proceedings, a notification under Section 4 of the Land Acquisition Act, 1894 (hereafter ‘Act’) was issued on 16.10.2001 (published on 30.10.2001) and the award was passed on 20.12.2001 fixing compensation at 30,000 per bigha. Proceedings under Section 18 of the Act for enhancement of compensation, were initiated by ten neighbouring land owners (Mata E F G > 1 Dated 12.09.2013 in CWP No. 7873/2011. 2 Khasra Nos. 141, 232/142, 143, 144, 145, 281/267, 206/147, 158, 268/149, 282/267, and Khasra Nos. 201/138, 242/146, 209/154, 158, 211/163, 16/172, further Khasra Nos. 50, 51, 89, 278/92, 280/93, and 205/147, 281/267, 151, 152, 283/153, 285/20. > 3 In _Devender Singh &Ors. v. State of Himachal Pradesh_ CWP No. 816/1992. H 1046 SUPREME COURT REPORTS [2022] 2 S.C.R. - A Ram and others), whose lands were similarly utilised for the construction of the same road and an award[4] dated 04.10.2005 was passed by the reference court in their favour. It was held that the reference petitioners were entitled to enhanced compensation of 39,000 per bigha; solatium of 30% per annum on the market value of the land; additional compensation at the rate of 12% per annum under Section 23(1-A) of - B the Act w.e.f. 16.10.2001 (date of issuance of notification under Section 4) till the date of making of the award by the Collector, i.e. 20.12.2001; and under Section 28, interest of 9% per annum from 16.10.2001 for a period of one year, and thereafter 15% per annum, till date of payment. In 2009, the High Court dismissed[5] the appeal against this order by - C thoseclaimants, who were seeking statutory interest from the date of taking possession (rather than date of initiation of acquisition proceedings). 4. Similarly situated land owners, filed writ proceedings before the High Court: a writ petition filed by one Anakh Singh, from the adjoining village was allowed by the High Court[6] with the direction to acquire D lands of the writ petitioners under the Act, with consequential benefits; subsequently other similarly situated owners also received[7] the benefit of these directions. 5. This led the appellants to file a writ petition before the High Court in 2011, seeking compensation for the subject land or initiation of E acquisition proceedings under the Act. Relying on a Full bench decision _[8]_ of the High Court _,_ it was held in the impugned judgment that the matter involved disputed questions of law and fact for determination on the starting point of limitation, which could not be adjudicated in writ proceedings. The writ petition was disposed of, with liberty to file a civil suit in accordance with law. Aggrieved, the appellants have approached F this court through these appeals. ## _Contentions of parties_ 6. Mr. Mahesh Thakur, learned counsel on behalf of the appellants argued that the State had illegally usurped the appellants’ G - 4 Award in Land Ref. Petition No. 10-LAC/4 of 2004 and consolidated matters. - 5 Dated 25.08.2009 in RFA No. 1-9/2006. - 6 Order dated 23.04.2007 in CWP No. 1192/2004. - 7 Order dated 20.12.2013 in CWP No. 1356/2010. - 8 _Shankar Dass v. State of Himachal Pradesh_ CWP No. 1966/2010-C, judgment dated - H 02.03.2013 (hereafter “ _Shankar Dass”_ ). SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1047 [S. RAVINDRA BHAT, J.] lands, without following due process of law and reliance was placed A on this court’s decision in _State of U.P. v. Manohar[9]_ and _Tukaram Kana Joshi & Ors. v. Maharashtra Industrial Development Corporation (MIDC)[10] ._ 7. It was further submitted that the appellants’ case is on the same footing as that of adjoining land owners who were granted B compensation and consequential benefits by land acquisition award dated 04.10.2005, and in subsequent writ proceedings. Counsel urged that the state’s inaction is arbitrary, given that the lands adjoining the subject land were acquired under directions of the High Court, despite it being used for the same purpose. C 8. Counsel highlighted that the Respondent-State had not disputed that the appellants were owners of the subject land, that it had been taken and used by the State for construction of Narag Fagla Road, and that no compensation had been paid. So, given that these facts are undisputed, it was urged that the High Court had erred in dismissing the writ petition, in light of this court’s decision in _Air India Ltd. v. Vishal Capoor[11] ._ D 9. Counsel drew our attention to a judgment of this court in _Vidya Devi v. State of Himachal Pradesh_[12] , which he argued had similar facts and prevailing circumstances: petitioners’ lands had been taken by the State at the same time and for the same purpose as that of the appellants, and this court had after condoning delay of 1756 days, allowed the appeal and directed the State to pay compensation along with all statutory benefits, including solatium, interest, etc. E 10. Mr. Abhinav Mukerji, learned counsel on behalf of the State of Himachal Pradesh, urged that the petition was hit by immense delay and latches and liable to be dismissed on this ground alone: appellants had approached the High Court after an inordinate delay of 38 years in 2011, against action taken by the State in 1972-73; and an inordinate delay of about 6 years in approaching this court after passing of the impugned judgment in 2013. Reliance was placed on this court’s decisions F G > 9 (2005) 2 SCC 126 (hereafter “ _Manohar_ ”) > 10 2012 (13) SCR29 (hereafter “ _Tukaram Kana Joshi_ ”) > 11 2005 Supp (3) SCR 670. > 12 (2020) 2 SCC 569; Civil Appeal Nos. 60-61/2020, judgment dated 08.01.2020 (hereafter “ _Vidya Devi_ ”). H 1048 SUPREME COURT REPORTS [2022] 2 S.C.R. - A in _State of Maharashtra v. Digambar[13]_ , _State of Madhya Pradesh & Anr v. Bhailal Bhai & Ors.[14]_ and _Brijesh Kumar & Ors. v. State of Haryana[15]_ . Counsel also submitted that the decision in _Tukaram Kana Joshi_ ( _supra_ )which the appellants strongly rely on, is per incuriam in light of the larger bench decision in _Digambar_ ( _supra_ ), which was not considered in _Tukaram Kana Joshi_ . The Respondent-State opposes - B the application for condonation of delay filed by the appellants on the same grounds, by way of reply. 11. On facts, counsel on behalf of State submitted that the Narag Fagla road was in fact constructed at the request of the appellants, and C other landowners who wanted the benefit of connectivity; counsel claims that they volunteered their land for this purpose, and hence, it was constructed with their verbal consent. Since 1972-73 when it was built, there was no objection raised or compensation sought by the appellants till 2011. Further, counsel contended that the lands dealt with in other writ proceedings (CWP No. 1192/2004 and 1356/2010) are not adjoining D to the subject land of the appellants’, as claimed by them. It was submitted that the appellants’ land falls in Sirmour District while the lands in the other writ proceedings, were acquired for the road between Jalari to Sujanpur via Bara-Choru, which is a different road, falling in the Hamirpur district. Therefore, on these facts, the counsel urges that the ground of E parity is untenable. 12. Lastly, it was argued that in light of the disputed questions of fact relating to limitation, construction of the road, and verbal consent for the same – the appropriate forum would be the civil court, and thus the impugned order required no intervention. F _Analysis and conclusion_ 13. While the right to property is no longer a fundamental right[16] , it is pertinent to note that at the time of dispossession of the subject land, this right was still included in Part III of the Constitution. The right against deprivation of property unless in accordance with procedure established G by law, continues to be a _constitutional_ right under Article 300-A. > 13 1995 Supp (1) SCR 492 (hereafter “ _Digambar_ ”) 14 1964 (6) SCR 261 15 (2014) 11 SCC 351 16 Constitution (Forty Fourth Amendment) Act, 1978. H SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1049 [S. RAVINDRA BHAT, J.] 14. It is the cardinal principle of the rule of law, that nobody can be deprived of liberty or property without due process, or authorization of law. The recognition of this dates back to the 1700s to the decision of the King’s Bench in _Entick v. Carrington[17]_ and by this court in _Wazir Chand v. The State of Himachal Pradesh_[18] . Further, in several judgments, this court has repeatedly held that rather than enjoying a wider bandwidth of lenience, the State often has a higher responsibility in demonstrating that it has acted within the confines of legality, and therefore, not tarnished the basic principle of the rule of law. 15. When it comes to the subject of private property, this court has upheld the high threshold of legality that must be met, to dispossess an individual of their property, and even more so when done by the State. In _Bishandas v. State of Punjab[19]_ this court rejected the contention that the petitioners in the case were trespassers and could be removed by an executive order, and instead concluded that the executive action taken by the State and its officers, was destructive of the basic principle of the rule of law. This court, in another case - _State of Uttar Pradesh and Ors. v. Dharmander Prasad Singh and Ors_ .[20] , held: A B C D _“A lessor, with the best of title, has no right to resume possession extra-judicially by use of force, from a lessee, even after the expiry or earlier termination of the lease by forfeiture or otherwise. The use of the expression ‘re-entry’ in the leasedeed does not authorise extra-judicial methods to resume possession. Under law, the possession of a lessee, even after the expiry or its earlier termination is juridical possession and forcible dispossession is prohibited; a lessee cannot be dispossessed otherwise than in due course of law. In the present case, the fact that the lessor is the State does not place it in any higher or better position. On the contrary, it is under an additional inhibition stemming from the requirement that all actions of Government and Governmental authorities should have a ‘legal pedigree’”._ E F G > 17 [1765] EWHC (KB) 198 18 1955 (1) SCR 408 19 1962 (2) SCR 69 > 20 1989 (1) SCR 176 H 1050 SUPREME COURT REPORTS [2022] 2 S.C.R. A 16. Given the important protection extended to an individual _visa-vis_ their private property (embodied earlier in Article 31, and now as a constitutional right in Article 300-A), and the high threshold the State must meet while acquiring land, the question remains – can the State, merely on the ground of delay and laches, evade its legal responsibility towards those from whom private property has been expropriated? In B these facts and circumstances, we find this conclusion to be unacceptable, and warranting intervention on the grounds of equity and fairness. 17. When seen holistically, it is apparent that the State’s actions, or lack thereof, have in fact compounded the injustice meted out to the appellants and compelled them to approach this court, albeit belatedly. C The initiation of acquisition proceedings initially in the 1990s occurred only at the behest of the High Court. Even after such judicial intervention, the State continued to only extend the benefit of the court’s directions to those who specifically approached the courts. The State’s lackadaisical conduct is discernible from this action of initiating acquisition proceedings D selectively, only in respect to the lands of those writ petitioners who had approached the court in earlier proceedings, and not other land owners, pursuant to the orders dated 23.04.2007 (in CWP No. 1192/2004) and 20.12.2013 (in CWP No. 1356/2010) respectively. In this manner, at every stage, the State sought to shirk its responsibility of acquiring land required for public use in the manner prescribed by law. E 18. There is a welter of precedents on delay and laches which conclude either way – as contended by both sides in the present dispute – however, the specific factual matrix compels this court to weigh in favour of the appellant-land owners. The State cannot shield itself behind the ground of delay and laches in such a situation; there cannot be a F ‘limitation’ to doing justice. This court in a much earlier case - _Maharashtra State Road Transport Corporation v. Balwant Regular Motor Service[21]_ , held: G _“Now the doctrine of laches in Courts of Equity is not an arbitrary or a technical doctrine. Where it would be practically unjust to give a remedy, either because the party has, by his conduct, done that which might fairly be regarded as equivalent to a waiver of it, or where by his conduct and neglect he has, though perhaps not waiving that remedy, yet_ H 21 1969 (1) SCR 808 SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1051 [S. RAVINDRA BHAT, J.] _put the other party in a situation in which it would not be reasonable to place him if the remedy were afterwards to be asserted in either of these cases, lapse of time and delay are most material._ _But in every case, if an argument against relief, which otherwise would be just, is founded upon mere delay, that delay of course not amounting to a bar by any statute of limitations, the validity of that defence must be tried upon principles substantially equitable. Two circumstances, always important in such cases, are, the length of the delay and the nature of the acts done during the interval, which might affect either party and cause a balance of justice or injustice in taking the one course or the other, so far as relates to the remedy.”_ 19. The facts of the present case reveal that the State has, in a clandestine and arbitrary manner, actively tried to limit disbursal of compensation as required by law, only to those for which it was specifically prodded by the courts, rather than to all those who are entitled. This arbitrary action, which is also violative of the appellants’ prevailing Article 31 right (at the time of cause of action), undoubtedly warranted consideration, and intervention by the High Court, under its Article 226 jurisdiction. This court, in _Manohar_ ( _supra_ ) _-_ a similar case where the name of the aggrieved had been deleted from revenue records leading to his dispossession from the land without payment of compensation – held: _“Having heard the learned counsel for the appellants, we are satisfied that the case projected before the court by the appellants is utterly untenable and not worthy of emanating from any State which professes the least regard to being a welfare State. When we pointed out to the learned counsel that, at this stage at least, the State should be gracious enough to accept its mistake and promptly pay the compensation to the respondent, the State has taken an intractable attitude and persisted in opposing what appears to be a just and reasonable claim of the respondent._ _Ours is a constitutional democracy and the rights available to the citizens are declared by the Constitution. Although Article 19(1)(f) was deleted by the Forty-fourth Amendment to the Constitution, Article 300-A has been placed in the Constitution, which reads as follows:_ A B C D E F G H 1052 SUPREME COURT REPORTS [2022] 2 S.C.R. A _“300-A. Persons not to be deprived of property save by authority of law.—No person shall be deprived of his property save by authority of law.”_ _This is a case where we find utter lack of legal authority for deprivation of the respondent’s property by the appellants_ B _who are State authorities. In our view, this case was an eminently fit one for exercising the writ jurisdiction of the High Court under Article 226 of the Constitution…”_ 20. Again, in _Tukaram Kana Joshi_ ( _supra_ ) while dealing with a similar fact situation, this court held as follows: C _“There are authorities which state that delay and laches extinguish the right to put forth a claim. Most of these authorities pertain to service jurisprudence, grant of compensation for a wrong done to them decades ago, recovery of statutory dues, claim for educational facilities and other categories of similar cases, etc. Though, it is true that there_ D _are a few authorities that lay down that delay and laches debar a citizen from seeking remedy, even if his fundamental right has been violated, under Article 32 or 226 of the Constitution, the case at hand deals with a different scenario altogether. The functionaries of the State took over possession_ E _of the land belonging to the appellants without any sanction of law. The appellants had asked repeatedly for grant of the benefit of compensation. The State must either comply with the procedure laid down for acquisition, or requisition, or any other permissible statutory mode.”_ D F 21. Having considered the pleadings filed, this court finds that the contentions raised by the State, do not inspire confidence and deserve to be rejected. The State has merely averred to the appellants’ alleged verbal consent or the lack of objection, but has not placed any material on record to substantiate this plea. Further, the State was unable to produce any evidence indicating that the land of the appellants had been G taken over or acquired in the manner known to law, or that they had ever paid any compensation. It is pertinent to note that this was the State’s position, and subsequent findings of the High Court in 2007 as well, in the other writ proceedings. 22. This court is also not moved by the State’s contention that H since the property is not adjoining to that of the appellants, it disentitles SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1053 [S. RAVINDRA BHAT, J.] them from claiming benefit on the ground of parity. Despite it not being adjoining (which is admitted in the rejoinder affidavit filed by the appellants), it is clear that the subject land was acquired for the same reason – construction of the Narag Fagla Road, in 1972-73, and much like the claimants before the reference court, these appellants too were illegally dispossessed without following due process of law, thus resulting in violation of Article 31 and warranting the High Court’s intervention under Article 226 jurisdiction. In the absence of written consent to voluntarily give up their land, the appellants were entitled to compensation in terms of law. The need for written consent in matters of land acquisition proceedings, has been noted in fact, by the full court decision of the High Court in _Shankar Dass_ ( _supra_ ) itself, which is relied upon in the impugned judgment. A B C 23. This court, in _Vidya Devi_ ( _supra_ )facing an almost identical set of facts and circumstances – rejected the contention of ‘oral’ consent to be baseless and outlined the responsibility of the State: _“12.9. In a democratic polity governed by the rule of law, the State could not have deprived a citizen of their property without the sanction of law. Reliance is placed on the judgment of this Court in Tukaram Kana Joshi v. MIDC [Tukaram Kana Joshi v. MIDC, (2013) 1 SCC 353 : (2013) 1 SCC (Civ) 491] wherein it was held that the State must comply with the procedure for acquisition, requisition, or any other permissible statutory mode. The State being a welfare State governed by the rule of law cannot arrogate to itself a status beyond what is provided by the Constitution._ _12.10. This Court in State of Haryana v. Mukesh Kumar [State of Haryana v. Mukesh Kumar, (2011) 10 SCC 404 : (2012) 3 SCC (Civ) 769] held that the right to property is now considered to be not only a constitutional or statutory right, but also a human right. Human rights have been considered in the realm of individual rights such as right to shelter, livelihood, health, employment, etc. Human rights have gained a multi-faceted dimension.”_ D E F G 24. And with regards to the contention of delay and laches, this court went on to hold: _“2.12. The contention advanced by the State of delay and laches of the appellant in moving the Court is also liable to_ H 1054 SUPREME COURT REPORTS [2022] 2 S.C.R. - A _be rejected. Delay and laches cannot be raised in a case of a continuing cause of action, or if the circumstances shock the judicial conscience of the Court. Condonation of delay is a matter of judicial discretion, which must be exercised judiciously and reasonably in the facts and circumstances of a case. It will depend upon the breach of fundamental rights,_ - B _and the remedy claimed, and when and how the delay arose. There is no period of limitation prescribed for the courts to exercise their constitutional jurisdiction to do substantial justice._ - _12.13. In a case where the demand for justice is so compelling,_ - C _a constitutional court would exercise its jurisdiction with a view to promote justice, and not defeat it. [P.S. Sadasivaswamy v. State of T.N., (1975) 1 SCC 152 : 1975 SCC (L&S) 22]”_ 25. Concluding that the forcible dispossession of a person of their private property without following due process of law, was violative[22] of D both their human right, and constitutional right under Article 300-A, this court allowed the appeal. We find that the approach taken by this court in _Vidya Devi_ ( _supra_ ) is squarely applicable to the nearly identical facts before us in the present case. 26. In view of the above discussion, in view of this court’s E extraordinary jurisdiction under Article 136 and 142 of the Constitution, the State is hereby directed to treat the subject lands as a deemed acquisition and appropriately disburse compensation to the appellants in the same terms as the order of the reference court dated 04.10.2005 in Land Ref. Petition No. 10-LAC/4 of 2004 (and consolidated matters). F The Respondent-State is directed, consequently to ensure that the appropriate Land Acquisition Collector computes the compensation, and disburses it to the appellants, within four months from today. The appellants would also be entitled to consequential benefits of solatium, and interest on all sums payable under law w.e.f 16.10.2001 (i.e. date of issuance of notification under Section 4 of the Act), till the date of the G impugned judgment, i.e. 12.09.2013. > 22 Relying on _Hindustan Petroleum Corporation Ltd. v. Darius ShapurChenai_ 2005 Supp (3) SCR 388; _N. Padmamma v. S. Ramakrishna Reddy_ (2008) 15 SCC 517; _Delhi Airtech Services Pvt. Ltd. &Ors. v. State of Uttar Pradesh &Ors._ 2011 (12) SCR 191; H and _JilubhaiNanbhaiKahchar v. State of Gujarat_ 1994 Supp (1)SCR807. SUKH DUTT RATRA & ANR. v. STATE OF HIMACHAL PRADESH & ORS. 1055 [S. RAVINDRA BHAT, J.] 27. For the above reasons, the appeal is allowed and the impugned A order of the High Court is hereby set aside. Given the disregard for the appellants’ fundamental rights which has caused them to approach this court and receive remedy decades after the act of dispossession, we also deem it appropriate to direct the Respondent-State to pay legal costs and expenses of 50,000 to the appellants. Pending applications, if B any, are hereby disposed of. Devika Gujral Appeal allowed. C D E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.