Supreme Court of IndiaSupreme Court · 1988Division BenchApplication for leave to appeal dismissed.

STATE OF ORISSA v. LALL BROS.

Case / Petition Number:
Special Leave Petition (Civil) No. 7396 of 1987
Neutral Citation:1988 Supp 2 SCR 580

Case Synopsis & Summary

This is a special leave petition from an arbitration award under the Arbitration Act, 1940, arising from a contract for constructing the balance work of the Koska Minor Irrigation Project. The State of Orissa contracted Lall Brothers to complete the work, with a due completion date of August 3, 1977, but the project was finished only on March 31, 1978. Disputes over payment and entitlement arose, leading to claims and counterclaims and the appointment of an arbitrator (initially by the Chief Engineer, later replaced by the Subordinate Judge on the respondent’s application). The arbitrator delivered a lump-sum award of Rs. 14.67 lakh with interest at 9% from April 30, 1978. The Subordinate Judge modified the interest period, and the High Court allowed the appeal in part, deleting the future-interest direction and sustaining the modified order. The State challenged the award in this Court, contending that it was unreasoned, that a lump-sum award without itemized grounds is defective, that accepting a final bill unconditionally closed the contract thereby ousting arbitration, and that the interest award was without jurisdiction. The Court held that an unreasoned award is not a ground to set aside, and a lump-sum award is not inherently invalid; an award can be set aside only for misconduct, improper procurement, or invalidity under ss. 30/35, or for errors on the face of the award. It declined to interfere further and dismissed the petition for leave to appeal.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Sabyasachi Mukharji
  • S. Ranganathan
Judgment Date
1988-08-25
Court Decision / Holding
Leave petition dismissed; the application for leave to appeal to this Court is dismissed.
Final Disposition
Application for leave to appeal dismissed.

Parties to the Case

Appellants / Petitioners

  • State of Orissa and Others

Respondents

  • Lall Brothers

Legal Representation & Advocates

Counsels for Petitioners

  • • M. K. Banerjee (Solicitor General)
  • • R. K. Mehta
  • • Miss Mona Mehta

Counsels for Respondents

  • • G. L. Sanghi
  • • A. P. Jena
  • • Vinoo Bhagat

Provisions of Law Cited

Arbitration Act, 1940 – Sections 14, 17, 30, 33

Legal Doctrines & Maxims

  • An award is conclusive as a judgment between the parties; the court may set aside only if the arbitrator has misconducted himself, or where an award has been improperly procured, or is otherwise invalid under Sections 30 and 35 of the Arbitration Act, 1940.
  • An award may be set aside by the Court on the ground of error on the face of the award; an award is not invalid merely because inference or argument may suggest a mistake in arriving at the conclusion.
  • It is not open to the Court to speculate, where no reasons are given by the arbitrator, as to what impelled him to arrive at his conclusions.
  • If a question of law was not specifically referred to the arbitrator, his decision is not final.
  • A lump-sum award is not bad per se.
  • Champsey Bhara & Co. v. Jivraj Baloo Spinning & Weaving Co. Ltd., L.R. 50 IA 324
  • Jivarajbhai Ujamshi Sheth & Ors. v. Chintamanrao Balaji & Ors., [1964] 5 SCR 480
  • Continental Construction Co. Ltd. v. State of Madhya Pradesh, [1988] 3 SCC 82 (distinguished)

Submissions & Arguments

Contentions of Appellants / Petitioners

The State contended that the award was unreasoned and a lump-sum figure was awarded without itemized grounds; no reasons were given, and reliance on case law such as Continental Construction Co. Ltd. v. State of Madhya Pradesh was misplaced. The petition urged that the arbitrator’s failure to specify each claim undermined validity, that unconditional acceptance of the final bill closed the contract and deprived the arbitrator of jurisdiction, and that the award of interest was without proper authority. It was urged that the High Court’s modifications were insufficient and the award should be set aside on grounds of law and procedure.

Contentions of Respondents

The respondents defended the lump-sum award, noting the arbitrator’s recital of the claim statement, counter-statement, and documents, and the hearing of representations. They argued there was no misconduct, no error of law apparent on the face of the award, and that the award was conclusive between the parties. They supported the High Court’s partial modification of interest and urged deference to arbitration outcomes, contending that an unreasoned award does not automatically invalidate the award and that lump-sum awards may be permissible.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Firm Madanlal Roshanlal Mahajan v. Hukumchand Mills Ltd., Indore[1967] 1 SCR 105Mentioned OnlyCited as authority but not expressly followed or distinguished; referenced among authorities.
Union of India v. Bungo Steel Furniture Pvt. Ltd.[1967] 1 SCR 324Mentioned OnlyCited among authorities without specific endorsement or distinction.
Allen Berry & Co. (P) Ltd. v. Union of India, New Delhi[1971] 3 SCR 282Mentioned OnlyCited but not material to the decisive reasoning in this judgment.
Champsey Bhara & Co. v. Jivraj Baloo Spinning & Weaving Co. Ltd.L.R. 50 IA 324PositiveCited for the proposition that the Court should not speculate where reasons are absent; used as supportive authority.
Jivarajbhai Ujamshi Sheth & Ors. v. Chintamanrao Balaji & Ors.[1964] 5 SCR 480PositiveCited to support rule regarding non-finality of arbitrator’s decision when questions of law are not referred.
Continental Construction Co. Ltd. v. State of Madhya Pradesh[1988] 3 SCC 82DistinguishedDistinguished by the Court; not controlling in the present context; used to clarify limits of its proposition.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,887 words•~9 min read

In The Court Record

STATE OF ORISSA v. LALL BROS.

STATE OF ORISSA & ORS. A _v._ LALL BROTHERS AUGUST 25, 1988 [SABYASACHI MUKHARJI AN,D S. RANGANATHAN JJ.] B _Arbitration Act_ _1940:_ _Sections_ _14, 17,_ _30_ _and 33-Unreasoned_ _award-No_ _ground_ _to_ _set_ _aside_ _award-Lump_ _sum_ _award-Not_ _bad_ _**per**_ ~e. The respondent-firm was entrusted with the construction work of a 'Minor Irrigation Project' by the State of Orissa-Petitioner. The work was due to be completed on 3rd August, 1977 but it was actually completed on 31st March, 1978. Disputes arose in regard to the payment for the work. The respondent-contractor raised certain claims and gave notice for th~ appointment of an arbitrator according to the contract. On 22nd April, 1980, the Chief Engineer appointed an arbitrator but, on an application by the respondent, the Sub-Judge removed him and appointed another arbitrator. Before the arbitrator, the respondent filed its claim along with some documents and the petitioner filed its counter statement. No - further evidence was adduced and on 23rd June, 1982, the arbitrator gave a lump sum award for Rs. 14.67 lakhs with interest at 9% from 30th April, 1978. On llth July, 1983, the Sub-Judge made the award rule of the Court with the modification that the interest was directed to run from 23rd June, 1982, instead of 30the April, 1978. . The High Court allowed the appeal in part and deleted the direction regarding future interest awarded by the arbitrator and modified by the Subordinate Judge. # c D E F _1n_ the appeal by special leave to this Co'!rt, it was contended on G behalf of the State-petitioner that the award in the instant case was· an unreasoned award and a lump such amount was awarded without specifying the amount awarded on particular grounds: Dismissing.the special leave petition, H 579 A B 580 SUPREME COURT REPORTS [1988) Supp. 2 S.C.R. HELD: I. The fact that there is an unreasoned award, is no ground to set aside an award .. L,ump sum award is not bad per se, as such. [583A] In the instant case, the award contained the recitals to the effect that the arbitrator had gone through the claim statement, counter' statement and documents produced before him and heard the representations made by the parties. There is no error of law apparent on tbe face of the award. There was no misconduct on the part of the arbitrator or in the conduct of the proceedings. [582G] _Firm Madan/a/ Roshanlal Mahajan_ v. _Hukumchand Mills_ _ltd.,_ #### C Indore, [1967] 1 SCR 105; Union of India v. Bungo Steel Furniture Pvt. _ltd.,_ [1967] 1 SCR 324 and _Allen Berry_ & _Co_ _(P)_ _ltd._ v. _Union_ _of_ _India, New Delhi,_ [1971) 3 SCR 282, referred to. 2. An award is conclusive as a judgment between the parties aitd the court is entitled to set aside an award only if the arbitrator has D misconducted himself, or where an award has been inproperly pro cured, or is otherwise invalid under Sections 30 and 35 of the Arbitration Act 1940. [583B] 3. An award may be set aside by the Court on the ground of error on the face of the award, but an award is not invalid merely IE because by a process of inference and argument it may be demons trated that the arbitrator has committed some mistake in arriving at his conclusion. [583C] 4. It is not open to the Court to speculate, where no reasons are given by the arbitrator, as to what impelled him to arrive at his F conclusions. [583D) _Champ5ey Bhara_ & _Co._ v. _Jivraj Ba/loo Spinning_ & _Weaving Co._ _Ltd .•_ L.R. 50 I.A. 324; _Jivarajbhai Ujamshi Sheth_ & _Ors._ v. _Chintamanrao Ba/aji_ & _Ors.,_ [1964] 5 SCR 480 referred to. G 5. If a question of law was not specifically referred to the arbitrator his decision is not final. [583F] _Continental Construction_ _Co._ _ltd._ v. _State_ _of Madhya Pradesh,_ ### [ 1988] 3 sec 82 distinguished. H CIVIL APPELLATE JURISDICTION: Special Leave Petition (Civil) No. 7396 of 1987. #### • STATE OF ORISSA _v._ LALL BROS. [MUKHARJI, J.] 581 From the Judgment and Order dated 8.4.1987 of the Orissa High ·; I - - A Court in M.A. No. 378 of ·i983. M.K. Banerjee, Solicitor General, R.K. Mehta and Miss Mona Mehta for the Petitioners. . G.L. Sanghi, A.P. Jena and Vinoo Bhagat for the Respondent. The.Judgment ofihe Court was delivered by B **SABYASACHI MUKHARJI,** **J.** This is an application for leave to appeal under Article 136 of the Constitution from the decision. and judgment of the High.Court of Orissa, dated 8th April, 1987. By the· C said judgment the High Court had allowed the appeal _in part and modified the award so far as it related to the payment of interest on the awarded amount. Another appeal challenging the validity of the award **was,** **howeve;r, dismisse;d.** In or about 1975-76 the respondent was entrusted with the work **D** of "Constrnction of balance work of earth dam of Koska Minor Irrigation Project" vide an agreement No. 207 F-2. The said work was due to be completed on 3rd August, 1977 but it was actually completed on 31st March, 1978. The estimated value of the work was Rs.25,06,299. It is stated that the contractor, respondent herein, had executed only 18 out of 22 items of w.ork beside. one extra item and he was paid a sum E of. Rs.23,63,122 for the work done. According to the petitioner, no further amount was due to the contractor, the respondent. Final bill was prepared on 12th February, 1980 and it was unconditionally accepted by the respondent-contractor. This contention, however; was sought. to be disputed before us by the respondent- **F** contractor by producing certain bill stated to be the final bill which was "accepted under protest". It is, however, not necessary for us to go into this question at this stage. On or about 16th April, 1980, the respondent-contractor raised certain claims and gave notice for appointment of an arbitrator accord- G ing to the contract. On 22nd April, 1980, the Chief Engineer appointed Shri N.K. Mishra as arbitrator. However, on· the applica, tion of the respondent the Subordinate Judge removed Shri N .K. Mishra and instead appointed Shri P .C. De as the arbitrator. Before the arbitrator the respondent filed its claim along with. some documents and the petitioner filed his counter statement. It is stated on H A B ## c D B F 582 SUPREME COURT REPORTS [1988] Supp. 2 S.C.R. \ behalf of the State that no further evidence was adduced by the respondent but the petitioner produced the measurement books. The petitioner contended that no amount was due. The respondent disputed that. The arbitrator on behalf of the claim statement and some document filed by the respondent-contractor, gave a lump sum award for Rs.14,67,000 plus interest at 9% from 30.4.1978. The award was given on 23rd June, 1982. On 11th July, 1983, the learned Subordinate Judge. made the award rule of the Court with the modification that the interest was directed to run from 23.6.1982 insiead of 30.4.1978. The High Court allowed the appeal in part and deleted the direction regarding future interest awarded by the arbitrator and modified by the learned.Subordinate Judge. In appeal it was contended before the High Court for the said judgment by the Subordinate Judge that the following objections were taken against the award, namely: "(i) that there _is an error of law apparent on the face of the **award;** (ii) that the arbitrator has misconducted himself by giving a lump sum award without examining each item of the **claims;** (iii) that the claimant having accepted the final bill unconditionally deposit, the contract between the parties stood closed and, therefore, the arbitration clause was not operative and the arbitrator appointed had no jurisdiction to adjudicated upon the disputes; (iv) that the award of interest is without jurisdiction". Except the documents on record, neither of the parties adduced any evidence. It was urged before us that the High Court did not accept challenge to the award but modified the order of interest as indicated before. The award in question contained the recitals to the G effect that the arbitrator had gone through the claim statement, counter statement and documents produced before him and heard the representations made by the parties. There is no error of law apparent on the face of the award. There was no misconduct on the part of the arbitrator or in the conduct of the proceedings. It was contended before us that this is an award which was an unreasoned and a lump H sum amount was awarded without specifying the amount awarded on particular grounds. STAIB OF OR!SSA _v._ LALL BROS. [MUKHARJI, J.] 583 In our opinion, the High Court was right in refusing to accept the challenge to the award. The fact that there is an unreasoned award, is no ground to set aside an award. Lump sum award is not bad per se. as such. An award is conclusive as a judgment between the parties and the court is entitled to set aside an award only if the arbitrat.or has misconducted himself in the proceedings or when the award h>is b~en made after the issue of an order by the Court superseding the arbitration or after arbitration proceedings have become invalid under section 35 of the Arbitration Act or where an award has been improperly 1 procured or is otherwise invalid under section 30 of the Act. An award may be set aside by the Court on the ground of error on the face of the award, but an award is not invalid merely because by a process of inference and agrument it may be demonstrated that the arbitrator has committed some mistake in arriving at his conclusion. It is not open to the Court to speculate, where no reasons are given by the arbitrator, as to what impellied him to arrive at his conclusions. See in this connection the observations of the Judicial Committee in _Champsey Bhara_ _&_ _Co._ v. _Jivraj Ba/loo Spinning_ _&_ _Weaving Co._ _Ltd.,_ L.R. 50 I.A. 324 and of tbis Court in _Jivarajbhai Ujamshi Sheth_ _&_ _Ors._ v. _Chintamanrao Balaji_ _&_ _Ors.,_ [1964] 5 SCR 480. The fact that a Jump sum award has been given, is no ground to declare the award bad: See further _Firm Madan/al_ Ros~anlal _Mahajan_ v. _Hukumchand_ _Mills_ _Ltd:·;_ _Indore,_ [1967] 1 SCR 105 and _Union_ _of_ _fndia_ v. _Bungo Steel Furniture Pvt. Ltd.,_ [1967] 1 SCR 324 as well as the ·decision of this Court in _Allen Berry_ _&_ _Co._ _(P) Ltd,_ v. _Union_ _of_ _India, New Delhi,_ [1971] 3 SCR 282. ·· '" Learned Solicitor General for the petitioner relied on _Continental_ _Construction Co. Ltd._ v .. _State_ _of Madhya Pradesh,_ [1988] 3 SCC 82. Reliance was misplaced. If a question of law was not specifically referred to the arbitrator his decision is not final. It was reiterated that the arbitrator is bound by law, and if an error of law in the award is on the face of it, it is amenable to"be corrected. ' ' · In that view of the matter the points sought to be urged in this application for leave, are not entertainable. The application fails and is accordingly dismissed. N.V.K. Petition dismissed. A B # c D E F G
End of Judgment Record
Browse All Supreme Court of India (1988) Decisions
1988-10-05

GIRJA SHANKAR TIWARI AND ANR. v. HIRDAY RANJAN CHAKRABORTY AND ANR.

This case concerns a dispute over occupancy and vacancy of a shop premises at Rae Bareli under the U.P. Urban Buildings (Regulation of Letting, Rent and Eviction) Act, 1972. The landlord’s successors claimed the premises had fallen vacant and sought allotment under Section 12, which deems vacancy if a landlord ceases to occupy the building or allows non-family occupancy. The premises had been rented originally to M/s Dhacca Swastic Aushadhalaya in 1946/1947. After its dissolution, an employee of the Aushadhalaya, Hirday Ranjan Chakraborty, continued occupying the premises and paid rent in the name of the Aushadhalaya, not in his own name. The Rent Controller found vacancy, and a Rent Control appeal upheld the controller’s view. The Allahabad High Court reversed, treating the Aushadhalaya as the tenant and the rent paid in its name as rent on behalf of Chakraborty, effectively denying deemed vacancy. The Supreme Court reversed the High Court, holding that Chakraborty’s occupation was by someone other than the tenant and that the deemed vacancy under Section 12 had occurred even though the building was not physically vacant. The Rent Controller’s order was restored, and the High Court’s decision set aside, with the appeal allowed.

1988-09-09

U.P. Bhoodan Yagna Samiti v. Braj Kishore

This appeal concerns land grants under the Uttar Pradesh Bhoodan Yagna Act, 1952 (Sections 14 and 15) made in 1968 to respondents described as traders living in Kanpur. The Additional Collector cancelled these pattas in 1976 on grounds that the respondents did not reside in the village where the plots were located, did not belong to the category of landless persons, and that the grants lacked government approval. The Allahabad High Court, in Misc. Writ Petitions, quashed the cancellation order and upheld the grants, holding that the respondents fell within the definition of “landless persons,” notwithstanding their urban residence and business. The UP Bhoodan Yagna Samiti challenged this in a Civil Appeal before the Supreme Court. The Court emphasizes interpreting the statute against its background and the philosophy of the Bhoodan movement, noting reliance on Vinoba Bhave and Jaya Prakash Narayan, and discusses the 1975 Amendment substituting “landless agricultural labourers” for “landless persons” in Section 14. It concludes that grants were to be made in accordance with the Bhoodan Scheme and to landless agricultural labourers resident in the village whose livelihood is agriculture; hence the basis for the amendment and its thrust to correct interpretation. Consequently, the appeals are allowed, the High Court’s judgment is set aside, the Additional Collector’s orders are restored, and costs are awarded to the appellants.

1988-08-16

A.S. GOKHALE v. R.T. OFFICER

Achyut Shivram Gokhale challenged the Bombay Regional Transport Authority’s refusal to issue a five‑day special permit under section 63(6) of the Motor Vehicles Act for the route Bombay–Shirdi, on grounds that the Maharashtra government had issued a scheme (under section 68‑D(3)) conferring exclusive contract carriage rights on the Maharashtra State Road Transport Corporation (MSRTC). The scheme listed seven saved categories and operated to exclude others from contract carriage on those routes, but the appellant argued that such a scheme does not bar special permits under section 63(6). The Regional Transport Authority had demanded a No Objection Certificate from MSRTC, and the Maharashtra State Transport Appellate Tribunal had held that a special permit is not a contract carriage permit and the scheme does not prevent issuing such permits. The Bombay High Court, however, set aside the Tribunal’s view. The Supreme Court clarified the law: a contract carriage permit under section 51 and a special permit under section 63(6) are distinct, though a special permit may share some features with a contract carriage permit. It held that the scheme’s exclusivity pertains to contract carriages under section 51 and does not bar special permits under section 63(6). It also distinguished Andhra Pradesh and Karnataka authorities, and found Adarsh Travels Bus Service distinguishable. The result is that a special permit can be issued notwithstanding the exclusive scheme, and the No Objection Certificate requirement was unwarranted.

1988-05-11

Bharat Petroleum Staff v. Bharat Petroleum Corporation Ltd.

This Supreme Court judgment concerns the pension rights of erstwhile Burmah Shell management staff following nationalisation under the Burmah Shell (Acquisition of Undertakings in India) Act, 1976, and their subsequent transfer to Bharat Petroleum Corporation Limited (the government company). The petitioners, i.e., the Burmah Shell management staff pensioners, sought two reliefs: (i) restoration of the commuted pension after 15 years as laid down in the Supreme Court’s Common Cause decision (AIR 1987 SC 210); and (ii) adequate escalation in pension to protect purchasing power given the rupee’s depreciation and rising living costs. The respondents argued that Burmah Shell’s pension scheme was funded, that the Common Cause decision could not be automatically extended to a public sector undertaking, and that any escalation would require funds beyond the existing pension fund, possibly necessitating government support. The Court held that the petitioners were entitled to a pension hike at the same rate as Hindustan Petroleum Corporation, directing the respondent to implement the increase from May 1, 1988 and to disburse the additional pension by July 31, 1988. It, however, reserved adjudication on restoration of commuted pensions, noting that issue was not to be decided in this petition. The judgment underscores the state’s welfare liability and judicial notice of the rupee’s devaluation, while ensuring a timely remedy for the petitioners.