Supreme Court of IndiaSupreme Court · 1992Division BenchAppeals partly allowed.

State of Orissa v. B.N. Agarwala

Case / Petition Number:
Civil Appeal Nos. 3096-97 of 1981

Case Synopsis & Summary

The present appeal concerns a contract for construction of Kukuteswar Minor Irrigation Project between the State of Orissa and the respondent, awarded in 1969-70. The dispute arose when the respondent claimed extra for additional work, and the matter was referred to the Superintending Engineer as sole Arbitrator. The Arbitrator, in 1980, awarded Rs. 1,59,298 (comprising Rs. 61,086.61 towards interest and Rs. 98,212.09 for the extra work). The interest component included both pre-reference period interest and pendente lite interest. The contract contains Clause 11 (alterations/additions; rate fixes; monthly claims) and Clause 23 (arbitration). The appellant State contends that claims relating to additional work fall outside arbitration and that the Superintending Engineer’s decision on such work is final, with reference to these clauses; reliance is placed on Executive Engineer (Irrigation) v. Abaaduta Jena. The respondent argues these claims are within arbitration and that pendente lite interest is permissible under GC Roy. The High Court’s adjudication and the Civil Appeal were heard together. The Supreme Court partially allows the appeals, holding that (i) the arbitrator’s power to determine rates for added work cannot bar arbitration if the contract does not fall under the proviso; (ii) the arbitrator had no power to award pre-reference interest, since the award predates the Interest Act, 1978; pendente lite interest may be awarded; (iii) the matter is remanded to ascertain pre-reference interest. The award is modified accordingly, and the matter is remitted to the Subordinate Judge for calculation of pre-reference interest; costs awarded none.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • B.P. Jeevan Reddy
  • G.N. Ray
Judgment Date
1992-11-24
Court Decision / Holding
Appeals partly allowed. The matter is remitted to the Subordinate Judge for determining pre-reference interest and for modifying the award accordingly. The respondent is not entitled to pre-reference interest. No costs.
Final Disposition
Appeals partly allowed.

Parties to the Case

Appellants / Petitioners

  • State of Orissa

Respondents

  • B.N. Agarwala

Legal Representation & Advocates

Counsels for Petitioners

  • • Raj Kumar Mehta

Counsels for Respondents

  • • Vinoo Bhagat

Provisions of Law Cited

Arbitration Act - Section 14Arbitration Act - Section 29Arbitration Act - Section 30Arbitration Act - Section 33Interest Act, 1978

Legal Doctrines & Maxims

  • Pendente lite doctrine (interest during arbitration)
  • Finality of Engineer-in-Charge’s decisions in contract disputes

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the claims relate to extra/additional work under Clause 11; the decision of the Superintending Engineer is final for the amount payable for such work; disputes relating to rates for additional work cannot be a subject of arbitration if they fall within the proviso of Clause 11; reference to arbitration is permissible only to determine rates where no specified rates exist; Reliance is placed on Executive Engineer (Irrigation) v. Abaaduta Jena (1988) to contend that pre-reference interest cannot be awarded and that pendente lite interest is addressed by GC Roy.

Contentions of Respondents

The respondent contends that arbitration is permissible for disputes relating to additional works under Clause 23; pendente lite interest is permissible as per GC Roy; the earlier decisions should not be treated as limiting arbitration of rates for added work; the finality of the Superintending Engineer’s decision relates to rates only where such rates are fixed, and otherwise arbitration is permissible; GC Roy clarifies pendente lite scope, and the Constitution Bench decision is discussed to resist a broad bar on arbitration and to justify pre-reference interest where applicable.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Executive Engineer (Irrigation) v. Abaaduta Jena[1988] 1 S.C.C. 418PositiveCited and followed in the context of pendente lite interest; pre-reference interest is addressed separately via Jena and GC Roy.
Secretary Irrigation Department, Govt. of Orissa & Ors. v. G.C. Roy[1992] 1 S.C.C. 508PositiveConstitution Bench clarifies that GC Roy addressed pendente lite power; its reasoning does not bind pre-reference issues, which are addressed via Jena.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,159 words•~15 min read

In The Court Record

State of Orissa v. B.N. Agarwala

A ## STATE OF ORISSA _v._ ## B.N. AGARWALA NOVEMBER 24, 1992 [B.P. JEEVAN REDDY At-.'D G.N. RAY, JJ.] _Arbitration Act: Sections 14, 29, 30 and 33--Arbitrator-Jurisdiction to award interest for pre reference period._ An agreement was entered· into between the appellant-State and the C respondent for the construction of an Irrigation Project. The work was completed on 11.9.69. On 8.8.1977, the respondent claimed certain amounts 011 account of extra work done by him, and the dispute was referred to the Superintending Engineer, as the sole Arbitrator, who maae a reasoned award on 25.2.1980 granting a total sum of Rs.1,59,298. This amount comprised of Rs. 61,086.61p. towards interest and Rs. 98,212.09p. D towards the extra work done by the respondent. The interest amount of Rs. 61,086.61p. represented interest for the period 10.10.69 to 24.2.80, ire. for the pre-reference period as well as for the period the Arbitration proceedings were pending _(Pendente lite_ interest). The Arbitrator_ directed that the sum awarded be paid within a period of three months, and in E default thereof it shall carry interest at 9 per cent per annum till payment is made or till the passing t ~the decree by the Civil Court, whichever' is earlier. The appellant applied for setting aside the award while the respondent applied for making it the Rule of the Court. The Subordinate Judge F over-ruled the objections raised by the appellant and made the award a rule of the court. So far as interest was concerned, it was directed, evidently under a mistake, that the amount awarded by the Arb1trator shall carry "interest at the rate of 6 per cent per annum", whereas the Arbitrator awarded interest at the rate of 9 per cent. G On appeal to the High Court a Single Judge affirmed the Judgment ·of the Subordinate Judge, and corrected the aforesaid error relating to interest. In the appeal to this Court it was contended on behalf of the H 221 SUPREME COURT REPORTS (1992] SUPP. 3 S.C.R. 222 c F G A A appellant, that all the claims made by the respondent pertain to addition.al 'fOrk, and that the decision of the Superintending Engineer was final with respect to the amount payable therefor. A claim with respect to additional work done cannot be the subject matter of arbitration in view of Clause 11 of the Agreement read with Clause 23 thereof. Relying on the decision in B _Executive Engineer (Irrigation)_ v. _Abaaduta Jena,_ [1988] 1 S.C.C. 418 the power of the ~bitrator to award interest for the pre reference period was assailed. Allowing the appeals in part and remitting the matter to the Subordinate Judge, this Court, HELD: 1. In the event of dispute, the decision of the Superintending Engineer is made final. It is evident from the use of the words "as lastly hereinbefore mentioned", that the proviso applies to second part of Clause 11 but not to the first part. The proviso contemplates a situation where additional work is done by the contractor before the rates are determined. D It is only in 'l°espect of the rates payable for such work that the decision of Superintending Engineer is made final. It is not the case of the appellant/State that the items tor which the Arbitrator has awarded the aforesaid amount was a work of the nature contemplated by the proviso. If so, there is n,!> bar to the dispute relating to rates for the additional work E being referred to the Arbitration. [227 -E·F] 2. _G.C. Roy's_ case was confined to the power of the Arbitrator to award _interestpendente lite:It_ did not pertain to nor did it pronounce upon the power of the Arbitrator to award interest for the period prior to his entering upon the reference (pre-reference period). [228-A] 3. The Arbitrator had no power to award interest for the pre-reference period in.this case inasmuch as the.award was made prior to coming into force of the Interest Act, 1978. So far as interest for the period during which the arbitration proceedings were pending _(pendente lite_ interest) is concerned, the Arbitrator does have the power to award the same. [228-B-C] · _Executive Engineer (Irrigation)_ v. _Abaaduta Jena,_ [1988) 1 S.C.C. 418, followed. _Secretary Irrigation Department, Govt. of Orissa & Ors._ v. _G.C. Roy,_ H [1992] 1 S.C.C. 508, referred to. STATEOFORISSA _v._ B.N.AGARWAI.:A[JEEVANREDDY,J.) 223 B C 4. The interest awarded by the Arbitrator (Rs. 61,086.69p.) pertains both to the pre-reference period as well as period during which the arbitration proceedings were pending _<pendente lite)._ It is not clear from the material placed before th.e Court when the Arbitrator entered upon the reference. In these circumstances the matter has to go back to the Subordinate Judge for ascertaining the interest for the period prior to the Arbitrator entering upon the reference (p~e-reference period). The respondent shall not be entitled to interest for the pre-reference period. The award shall stand modified to this extent. [228-E-F] CIVIL APPELLATE JURISDICTION : Civil Appeal Nos.3096-97 of 1981. From the Judgment and Order dated 20.4.1981 of the Orissa High Court in Misc. Appeal Nos. 253 & 254 of 1980. Raj Kumar Mehta for the Appellant. Vinoo Bhagat for the Respondent. The Judgment of the Court was delivered by B.P. JEEVAN REDDY, J. Civil Appeal No. 3096of1981 arises from the judgment of a learned Single Judge of Orissa High Court in Miscellaneous Appeal No. 253 of 1980. Civil Appeal No. 3097of1981 arises from Miscellaneous Appeal No.254 of 1980. The appeals pertain to two identical contracts entered into between the State of Orissa and the respondent, Sri B.N. Agarwala. All the relevant facts and contentions are identical in both the appeals. It would, therefore, be sufficient if we refer to the facts in Civil Appeal No.3096 of 1981. E F An agreement No. 8-F2/67-68 was entered into between the State of Orissa (appellant) and the respondent for construction of Kukuteswar Minor Irrigation Project. The value of the agreement was Rs. 3,84,690. The work was completed on 11.9.69. On 8.8.77, the respondent claimed certain amount on account of extra work done by him, which dispute was referred G to Sri B.N. Das, Superintending Engineer, as the sole Arbitrator. He made a reasoned award on 25.2.1980 granted a total sum of Rs. 1,59,298. This amount comprised of Rs. 61,036.61p. towards interest and Rs. 98,212.09p. towards the extra work done by the respondent. The interest amount Rs. 61,086.61p. represented interest for the period 10.10.69 to 24.2.80. In other H SUPREME COURT REPORTS (1992] SUPP. 3 S.C.R. 224 D E A words this sum represented interest both for the pre-reference period as well as for the period the Arbitration proceedings were pending _(Pendente lite_ interest). The Arbitrator directed that the said sum of Rs.1,59,298 should be paid within a period of three months, in default where of it shall ~rry interest at the rate of 9 pe_r cent per annum till the payment is made B[or till the passing of the decree ][by ][the ][Civil ][Court, whichever ][is ][earlier. ] The appellant applied for setting aside the award while the respondent applied for making it the Rule of the Court. The learned Subordinate Judge over-ruled the objections raised by the appellant and made the award a rule of the court. Sci far as interest is concerned, he directed, C evidently under a mistake, that the amount awarded by the Arbitrator shall carry "interest at the rate of 6 per cent per annum as per the award." (As stated hereinbefore the arbitrator awarded interest at the rate of 9 per cent and not 6 per cent. For the period subsequent to the award, however, he awarded interest at the rate of 6 per cent). On appeal, the learned Single· Judge of the Orissa High Court affirmed the judgment of the learned Subordinate Judge. He corrected the aforesaid error relating to rate of interest. He directed that the sum of Rs.1,59,298 shall carry interest at the rate of 9 per cent per annum from 25.5.80 till the date of decree and at the rate of 6 per cent per annum from the date of the decree of the learned· Subordinate Judge till the date of realisation. The first contention urged by the learned counsel for the appellant before us relates to the _very_ maintainability of the arbitration dispute with respect to the claims made by the respondent. The contention is that all F the claims made by the respondent pertained to additional work. So far as additional work is concerned, the decision of the Superintending Engineer is final with respect to the amount payable therefor. A claim with respect to additional work done cannot be the subject matter of arbitration. This contention is based upon clause-11 of the Agreement read with Clause-23. G For a proper appreciation of the said contention it is necessary to set out Clause-11 in its entirety. It reads as follows: ## _"C/ause-11:_ H The Engineer-in-Charge shall have power to make any alterations or addition to the original specifications, draw- 225 STATEOFORISSA _v._ B.N.AGARWALA[JEEVANREDDY,J.] A > ""\~ ' > ' . ings, designs and instructions that may appear to him to be necessary or advisable during the progress of the work, and the contractor shall be bound to carry out the work, in accordance with any instructions which may be given to him in writing signed by the Engineer-in-Charge, and such alteration shall not invalidate the contract and any additional work which the contractor may be directed to do in the manner above specified as part of the work, shall be carried out by the contractor on the same conditions in all respects on which he agreed to do the main work, and at the same r-ates as are specified in the tender for the main work. The time for the completion of the work shall be extended in the proportion that the additional work bears to the original contract work and t~e certificate o( the Engineer-in-Charge shall be conclusive at to such proportion and if the additional work includes any class of work, for which no rate is specified in this contract then such class of work shall be carried out at the rates entered in the sanctioned schedule of:rates of the locality during the period when the work is being carried on and if such last mentioned class of work is not entered in the schedule of rates of the district then the contract shall within seven days of the date of his receipt of his order to carry out the work inform the Engineer-in-Charge of the rate which it is his intention to charge for such class of work and if the Engineer-in-Charge does not agree to this rate he shall by notice in writing be at liberty to cancel his order to carry out such class of work and arrange to carry it out in such manner as he may consider advisable. B c D E F _<_ '• ~ No deviations from the specification stipulated in the contract or additional items of works shall ordinarily be carried out by the contractor, nor shall any altered, additional or substituted work to be carried out by"him, unless the rates of the Substituted, altered or additional items have been approved and fixed in writing by the Engineerin-Charge. The contractor shall be bound _to submit_ his claim for any additional work done during any month on or before the 15th day· of the following· month accom- G H SUPREME COURT REPORTS [1992] SUPP. 3 S.C.R. 226 _i_ I ( A panied by a copy of the order in writing of the Engineerin- Charge, for the additional work and that the contractor shall not be entitled to any payment in respect of such additional work if he fails to submit his claim within the aforesaid period. B C Provided always that if the contractor shall· commence work incur any expenditure in . regard thereof before the rates shall have been determined _as lastly_ hereinbefore mentioned,_ then and _in such case he shall only be entitled to be paid in respect of the work carried out or expenditure incurred by him JJrior to the date Of the determination of the rate as aforesaid according to such .rate or rates as shall be fixed by the Engineer-in-Charge. In the event of a dispute, the decision of the Superintenq~nt Engineer of the Circle will be final." ## D. (emphasis added) Clause 23· is the Arbitration Clause in the agreement. According to this Clause all disputes and claims arising out of or relating to the agreement shall be referred to the arbitration of the Superintending Engineer of the State Public Works Department connected with the work nominated by the concerned Chief Engineer. For the present purpose only the opening words of"Cla~se-23 are relevant. The opening words are _"except where, otherwise providedJn the contract_ all questions and disputes ............ ". The contention of· the learned' counsel for the appellant is that by F virtue of the proviso contained in Clause-11, the decision of the Superintending Engineer of the Circle is final on any dispute relating to the rates payable for the extra work done by the Contractor. It is not possible to agree. Clause-11 is in three parts. The first part says that a contractor is bound to carry out such extra G work as he m~y ge called upon to do by the Engineer"in-Charge. The extra work shall.have; to :be carried out subject to the same conditions in all respects as. are applicable to the main work and at the' same rates. If, however, the agreement does not contain rates for such work, the rates . entered in· the sanctioned schedule of the rates of locality during the H relevant period shall be applicable. If, however, the schedule of rates also STATEOFORISSA _v._ B.N.AGARWALA[JEEVANREDDY,J.] 227 does not provide for such work the contractor should, within seven days of A the order to do such additional work, inform the Engineer-in-Charge of the rates which he proposes to charge. If the Engineer-in-Charge does not agree thereto, it is open to the Engineer-in-Charge to get the said extra work done through some other agency. B The second part of the Clause-11 says that no deviations from the specifications stipulated in the contract or additional items of work shall ordinarily be carried out by the contractor unless the rates therefor ar~ approved and fixed in writing by the Engineer-in-Charge. The contractor must submit· his claim for the additional work done during any month on or before the 15th day of the following month accompanied by a copy of C the order in writing of the Engineer-in-Chief for doing additional work. If he does not so submit the claim, he is not entitled to any payment. ·The third part of clause-11 contains the proviso relied upon by the counsel for the appellant before us. It says that if the contractor shall. D commence work and incur any expenditure _before_ the rates shall have been determined "as lastly hereinbefore mentioned" he shall only be entitled to be paid for such work at such rate as may be determined by the Engineerin-Charge. In the event of dispute, the decision of the Superintending Engineer is made final. It is evident from the use of the words "as lastly hereinbefore mentioned" that the proviso applies ~o second part of ClauseE 11 but not to the first part. The proviso contemplates a situation where additional work is done by the contractor before the rates are determined. It is only in respect of the rates payable for such work that the decision of Superintending Engineer .is made final. It is not the case of the appellant/State that the items for which the Arbitrator has awarded the aforesaid F amount was a work of the nature contemplated by the proviso. If so we see no bar to the dispute relating to rates for the additional work being ref erred to arbitration. The first contention is accordingly rejected. The next contention of learned counsel for the appellant/State relates to the power of the Arbitrator to award interest for the pre-reference G period. Reliance is placed upon the decision of this Court in _Er:ecutive Engineer (Irrigation)_ v. _Abaaduta Jena,_ [1988] 1 S.C.C. 418. Sri Bhagat, learned counsel appearing for the respondent, however, submits that the said decision is no longer good law in view of the Constitution Bench decision in _Secretary1, Irrigation Departmellt, Govt .. of Orissa & Ors._ v. G.C. H SUPREME COURT REPORTS [1992] SUPP. 3 S.C.R. 228 A _Roy,_ [1992] 1 S.C.C. 508. We cannot agree with Sri Bhagat. Both of us were members of the Constitution Bench which decided G.C. _Roy._ It was confined to the power of the Arbitrator to award interest _pendente lite._ ·It did not pertain to nor did it pronounce upon the power of the Arbitrator to award interest for the period prior to his entering upon the reference (pre-reference period). This very aspect has been clarified by one of us B (B.P. Jeevan Reddy, J.) in his co~curring order in I.A. No.10 in Civil Appeal No;l763of1980 etc. disposed of on 22.10.92. Accordingly, we hold following the decision in _Jena_ that the Arbitrator had no power to award interest for the pre-reference period in this case inasmuch as the award was made prior to coming into force of the Interest Act, 1978. (The Interest c Act, 1978 came into force with effect from 19th August, 1981) So far as interest for the period during which the arbitration proceedings were pending _(pendente lite_ interest) is concerned, the Arbitrator does have the power to award the same as held in G.C. _Roy._ A request iS made by Sri Bhagat to refer the matter to a larger Bench to decide the question relating to the power of the Arbitrator to award interest for the pre-reference D period even in cases where the award is made before the coming into force of Interest Act, 1978. _Jena_ was decided by a Bench of three Judges. We do not also feel persuaded to refer the matter to a larger Bench. B D The interest awarded by the Arbitrator (Rs. 61,086.69p.) pertains E both to the pre-reference period as well as period during which the arbitration proceedings were pending _(pendente lite)._ It is not clear from the material placed before us when did the Arbitrator enter upon the reference. In the circumstances the matter has to go back to the learned Subordinate Judge for ascertaining the interest for the period period to the arbitrator entering upon the reference (pre-reference period). The responF dent shall not be entitled to interest for the pre- reference period as stated above. The award shall stand modified to the above extent. In all other respects, the award is affirmed. The Appeals are accordingly allowed in part. The matter is remitted G to the learned Subordinate Judge for working out the direction contained in the preceding paragraph. 'No orders to costs. N.V.K. Appeals partly allowed.
End of Judgment Record
Browse All Supreme Court of India (1992) Decisions
1992-01-07

Jaiswal v. Debi Mukherjee

Dr. P. K. Jaiswal challenged a UPSC process for the post of Assistant Director General (Prevention of Food Adulteration). The Union Government had initially asked UPSC to fill the post by direct recruitment but, before advertisements, informed it to withhold the process while examining possible promotion from Assistant Secretary and amending recruitment rules to create higher tiers. Despite this, the UPSC advertised the post and the appellant was interviewed. Debi Mukherjee, then Assistant Secretary and seeking promotion upon the rule-amendment, obtained an interim stay from the Central Administrative Tribunal and later a direction to provide promotional avenues. In the meantime, two higher-pay tiers were created, without separate designations, under an amendment directed by the Court in a related matter. The appellant argued that once the selection process begins, the Government and Tribunal cannot freeze it and that the Commission should complete the selection; and that overlooking the two new layers amended later was erroneous. The respondents contended on points of vested rights and the proper policy- and rule-based framework for promotions versus direct recruitment. The Supreme Court held that the Government can withdraw the requisition before the advertisement if it intends to amend rules to permit promotion, that the Government’s pre-advertisement decision is permissible, and that a right to be considered for selection crystallizes only after advertisement and interview. The appeal was dismissed.

1992-09-24

S.B. Dogra v. State of Himachal Pradesh and Ors.

This Civil Appeal concerns the seniority of S.B. Dogra in the Himachal Pradesh Police Service in the wake of the demobilised armed forces concession. After HP State was formed, Rule 5(1) of the Demobilised Armed Forces Personnel (Reservation of Vacancies in the HP State Non-Technical Services) Rules, 1972, provided that the seniority of officers appointed against reserved vacancies shall be determined on the assumption that they joined the service at the first opportunity after their military service or training prior to commission. Dogra, who had military service and later joined the HP Police Service against a reserved vacancy for Demobilised Armed Forces Personnel, was placed with a notional entry year (1964) and thus ahead of some officers, including Durga Shanker Amist. The dispute escalated through High Court proceedings and a Central Administrative Tribunal decision relying on earlier cases. The Supreme Court, comparing Rule 5(1) with Punjab/Haryana rules and distinguishing the applicable statutory framework, held that the Tribunal erred in confining the seniority to the period of actual military service during the emergency. It noted that the rules are not pari materia with Haryana’s rules and that the language of Rule 5(1) permits a broader interpretation for notional entry. The Court distinguished certain earlier rulings (A.S. Parmar; Narendra Nath Pandey) as inapplicable here, while applying the State of Madhya Pradesh v. Rameshwar Prasad approach to preserve fair seniority. Ultimately, the appeal was allowed, the Tribunal’s seniority order was set aside, and the prior position was restored with directions for implementation of the judgment.

1992-12-11

State of Maharashtra v. Rattanlal

This is a Supreme Court decision interpreting the revisional powers of the State Government under the Maharashtra Agricultural Land (Ceiling and Holdings) Act, 1961. The respondent-declarant had a declaration under Sec. 12; the Surplus Land Determination Tribunal found surplus land (9 acres 8 guntas). On appeal, the Revenue Tribunal modified the resumption from Survey No. 11 to Survey No. 29, which was upheld. Later, after undisclosed lands came to light, the Additional Commissioner issued a show cause, remitted the matter to the primary Tribunal for redetermination and delimitation, and the High Court held that once an appeal under Sec. 21 is filed and an order is made, the Commissioner or the State Government lacks jurisdiction to determine the ceiling area. The State Government challenged this view. The Court held that under Sec. 45(2) and (3), the Commissioner has revisional powers, either suo motu or on an aggrieved person’s application, to call for records of inquiries under Secs. 17–21 and to pass orders after a hearing, subject to provisos including time limits and restrictions when appeals are pending. The decision also clarifies that suo motu revisional action can correct fraud or suppression of material facts, and that finality does not bar such action in cases of concealed lands. The High Court’s view was set aside and the Commissioner's order restored, with the appeal allowed along with costs.

1992-10-13

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others concerns the legality and timing of the 'sealed cover' procedure used by the Departmental Promotion Committee (DPC) for recommending promotions when disciplinary proceedings were contemplated. Syed Naseem Zahir, who rose to Superintending Engineer, was included in a 1987 panel for promotion to Chief Engineer, but his name was kept in sealed cover due to potential misconduct. A charge-sheet was issued in 1988. The Madhya Pradesh Administrative Tribunal later directed promotion based on the sealed-cover recommendation, prompting the State's special leave appeal. The Supreme Court held that the departmental enquiry had been completed and the charges proved, and while it emphasized that Jankiraman's case governs sealed-cover use, the peculiar facts allowed keeping the sealed cover unopened until the disciplinary proceedings concluded. The Court outlined that if exonerated, the sealed-cover would be opened and the respondent would be notionally promoted from the date a junior was promoted, with consequential benefits, including back wages; if punished, action would be taken in accordance with Jankiraman's guidelines. The Court set aside the Tribunal's order and allowed the State's appeal, directing that no promotion be granted until proceedings end, and that the sealed-cover mechanism be used consistent with the facts.