Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2020Division BenchAppeals allowed.

STATE OF KERALA & ANR. v. M/S RDS PROJECT LIMITED & ORS.

Case / Petition Number:
Civil Appeal Nos. 3239-3246 of 2020
Neutral Citation:[2020] 6 S.C.R. 837

Case Synopsis & Summary

This case concerns the rehabilitation of the Palarivattom flyover on the National Highway in Kochi, Kerala. The flyover, constructed by Respondent No.1 and inaugurated in 2016, developed distress cracks after approximately one year. The Ministry of Road Transport and Highways appointed IIT Madras to assess the structure; IIT recommended repairing the bridge using a carbon-fibre fabric composite treatment rather than demolition. Dr. E. Sreedharan later proposed strengthening and replacing RCC girders with PSC girders, arguing this would ensure durability and a service life of 100 years, albeit requiring demolition and reconstruction. Conflicting expert opinions prompted the State Government to appoint a High-Level Committee of five engineers, which examined the IIT and Sreedharan reports and concluded in favor of Dr. Sreedharan’s plan, citing service life assurances and cost considerations. The State Government thereafter accepted the High-Level Committee’s recommendation and proposed rehabilitation, with DMRC potentially taking over the bridge. Respondent No.1 challenged these actions via a writ petition to the Kerala High Court, which directed a load test to ascertain strength. The Supreme Court held that the High Court erred by substituting its own decision-making standards for the established judicial-review framework under Article 14; consulting the Expert Committee’s report was rational and not arbitrary. The appeal was allowed, setting aside the High Court judgment and ordering that a load test be conducted by an approved agency, with costs borne by the petitioner. The Court directed disposal of pending writ petitions within six months and reaffirmed the Government’s approach to rehabilitation.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • R. F. Nariman
  • Navin Sinha
  • Indira Banerjee
Judgment Date
2020-09-22
Court Decision / Holding
Appeals allowed. The High Court judgment and the related review judgment are set aside. The Government’s acceptance of the Expert Committee’s recommendations is upheld as non-arbitrary. The Court directs that the load test be conducted by an approved agency, at the petitioner’s cost, and that the entire process be completed within three months, with a report filed before the Court. Pending writ petitions are to be disposed of within six months from today.
Final Disposition
Appeals allowed.

Parties to the Case

Appellants / Petitioners

  • STATE OF KERALA
  • ANR.

Respondents

  • M/S RDS PROJECT LIMITED
  • ORS.

Legal Representation & Advocates

Counsels for Petitioners

  • • K. K. Venugopal, Advocate General for India (for State of Kerala)

Counsels for Respondents

  • • Dr. Abhishek Manu Singhvi, Senior Advocate (for Respondent No.1)
  • • Gopal Sankaranarayanan, Senior Counsel (for Respondent No.3)
  • • Jaideep Gupta, Senior Counsel (for Respondent No.2)
  • • Rana Mukherjee, Senior Counsel (for Respondent No.9)
  • • V. Giri, Senior Counsel (for Respondents Nos. 4 & 5)

Provisions of Law Cited

Constitution of India, Article 14IRC 112:2011IS CodesPWD ManualOriginal tender clause 11

Legal Doctrines & Maxims

  • Judicial review under Article 14 (well-established parameters)

Submissions & Arguments

Contentions of Appellants / Petitioners

The State contends that judicial review must follow the established constitutional framework under Article 14. It argues that the Government’s decision to accept the High-Level Committee’s expert report was rational, based on cost, feasibility, and the long-term service life promised by Dr. E. Sreedharan, and should not be impeded by convening further load tests or substituting the Government’s determinations with those of the court. The tender terms and the possibility of rehabilitation through DMRC provide a practical, time-bound solution.

Contentions of Respondents

Respondents (the contractor and affiliates) contend that structural cracks indicate serious weakness. They urge a load test to determine strength before any demolition or major alteration. They challenge the Government’s reliance on Dr. E. Sreedharan’s plan, arguing it may contravene contractual terms, could be costlier, and risks delaying essential repairs. They argue the High Court correctly mandated a load test to safeguard structural integrity and stakeholder rights.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,310 words•~11 min read

In The Court Record

STATE OF KERALA & ANR. v. M/S RDS PROJECT LIMITED & ORS.

[2020] 6 S.C.R. 837 837 STATE OF KERALA & ANR. ETC. ETC. A v. M/S RDS PROJECT LIMITED & ORS. ETC. ETC. (Civil Appeal Nos. 3239-3246 of 2020) SEPTEMBER 22, 2020 B ## **[R. F. NARIMAN, NAVIN SINHA AND INDIRA BANERJEE, JJ.]** _Administrative Law: Judicial review – Project of flyover on National Highway constructed by respondent no.1 – After a year of its use, the Ministry of Road Transport and Highways found it to be in a distressed condition with several cracks requiring rehabilitation measures – The IIT was thereafter appointed as an expert agency which opined that the bridge could follow a carbon fibre composite treatment and be repaired instead of being demolished – Meanwhile Dr. E. Sreedharan recommended the strengthening and replacement of RCC girders with PSC girders to ensure durability which would necessitate demolition and reconstruction and further stated that his plan ensured a 100 year guarantee for the newly constructed flyover – In view of divergent opinion, the State government set up a High Level Committee – This Committee accepted the proposal by Dr. Sreedharan in view of the service life assured by him for 100 years – State Government accepted the report of High Level Committee – Writ petition by respondent no.1 against the order of State Government – High Court directed Government to conduct load test of the flyover – Hence the instant appeal – Held: High Court instead of applying well established parameters of judicial review and ascertaining whether the decision of the State Government would vitiate Art.14 went into the matter itself and held that was better to have a load test conducted to avoid any further controversy in the matter – State Government in accepting the Expert Committee report cannot be said to have behaved arbitrarily – Order of High Court set aside._ C D E F G CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 32393246 of 2020. From the Judgment and Order dated 20.12.2019 of the High Court of Kerala at Ernakulam in R.P. No. 1253/2019 in W.P.(C) 26030/2019, H 837 838 SUPREME COURT REPORTS [2020] 6 S.C.R. - A R.P. No. 1251/2019 in W.P.(C) 26405/2019, R.P. No. 1249/2019 in W.P.(C) 25362/2019, R.P. No. 1243/2019 in W.P.(C) 25343/2019 and common order dated 21.11.2019 in W.P.(C) No. 26030/2019, W.P.(C) No. 26405/2019, W.P.(C) No. 25362/2019 & W.P.(C) No. 25343/2019. - K.K. Venugopal, Attorney General for India, Dr. Abhishek Manu - B Singhvi, Jaideep Gupta, Gopal Sankaranarayanan, V.Giri, Rana Mukharjee Sr. Advs., Jishnu M.L., Ms. Priyanka Prakash, Ms. Beena Prakash, G. Prakash, Pragyan Pradip Sharma, Ms. Amita Singh Kalkal, Eeshan Pandey, Deepu Thankan, Ms. Madhavi Khanna, Karan Valecha, Ms. Lakshmi, Ms. Gurnoor Kaur, Prakash Ranjan Nayak, K.V. Manoj Kumar, Kumar Shashank, Surjendu Sankar Das, Nithin George, Ms. Annie Mittal, - C Krishna Dev Jagarlamudi, Zulfiker Ali P. S, Rafeek V.K., Advs. for the appearing parties. The Judgment of the Court was delivered by ## **R.F. NARIMAN, J.** - D 1. Leave granted. 2. Heard Mr. K.K. Venugopal, learned Attorney General for India appearing on behalf of the State of Kerala, Dr. Abhishek Manu Singhvi, learned Senior Counsel for the Respondent No.1, Mr. Gopal Sankaranarayanan, learned Senior Counsel for the Respondent No.3, E Mr. Jaideep Gupta, learned Senior Counsel for the Respondent No.2, Mr. Rana Mukherjee, learned Senior Counsel for the Respondent No. 9 and Mr. V. Giri, learned Senior Counsel for the Respondent Nos. 4 & 5. The impugned High Court judgment dealt with a project called the Palarivattom Flyover on the National Highway, Cochin City, State of Kerala. This was constructed by Respondent No.1 and inaugurated on F 12.10.2016. However, after one year of this Flyover being used, the Consultancy Agency for the Ministry of Road Transport and Highways, Government of India, on regular inspection of the bridge, reported on 16.03.2018 that the bridge was in a distressed condition with several cracks as a result of which measures should be taken to rehabilitate the G flyover. The IIT, Madras, was thereafter appointed as an expert agency which delivered several reports in which, according to it, the bridge could follow a carbon fibre fabric composite treatment and be repaired instead of being demolished. Meanwhile, Dr. E. Sreedharan submitted a report to the Chief Minister of Kerala on 03.07.2019 in which he recommended the strengthening and replacement of RCC girders with PSC girders to - H STATE OF KERALA & ANR.v. M/S RDS PROJECT LIMITED & 839 ORS. [R.F. NARIMAN, J.] ensure durability which would necessitate a demolition and re-construction A of the bridge. Dr. E. Sreedharan, by a report dated 14.09.2019, referred to the IIT reports and did not agree with the same, stating that if his plan was to be carried out, a 100 year guarantee would be given for the newly constructed flyover. 3. Given these divergent streams of opinion, the State Government B then set up a High Level Committee consisting of five persons who are as follows:- 1. Sri Ashok Kumar M. (Convenor) Chief Engineer, National Highways, Public Works Department Thiruvananthapuram 2. Sri S.Mano Mohan (Member) Chief Engineer, Bridges, Public Works Department Thiruvananthapuram C D 3. Sri M.N. Jeevaraj (Member) Chief Engineer (Rtd.), Public Works Department Thiruvananthapuram 4. Sri S. Saju (Member) Senior Bridge Engineer, Public Works Department Thiruvananthapuram 5. Sri S.M. Ashraf (Member) Senior Structural Engineer, Public Works Department Thiruvananthapuram E F 4. It will be noticed that apart from experts who were engineers, one of whom was a Senior Bridge Engineer, a Senior Structural Engineer of the PWD was also a member of this Committee. This Committee went into the IIT reports and the Sreedharan report in some detail, after G which it concluded as follows: ## “9. Conclusion “a. The tests carried out by IIT Chennai are as per IS codes and IRC recommendations. IIT Chennai being a premier and reputed H 840 SUPREME COURT REPORTS [2020] 6 S.C.R. A B C D E F institution, their findings can be accepted and relied on. However, a load test as specified in IRC 112:2011 has not been proposed by IIT Chennai. The reasons are not mentioned in their report. The Committee feels that since crack width in certain girders have exceeded the allowable limits which is one of the compliance criteria for load test, IIT might have decided that there is no point in doing a load test before strengthening. However, IIT has recommended load test after strengthening the flyover. IIT has suggested its scheme for strengthening the flyover, which again is as per IRC recommendations. But, IIT has not mentioned the service life of the flyover after strengthening. IRC also does not recommend service life of any structure after doing the strengthening works proposed by IIT. b) As mentioned by Dr. E.Sreedharan a new construction with proper design, with quality execution of the work with quality materials and strict technical supervision can expect a service life of 100 years. c) Construction cost of the proposal of demolishing and replacing of superstructure as proposed by Dr.E. Sreedharan will cost (18.71 crores), more than double the cost estimated for the strengthening scheme proposed by IIT (7.31 crores). The required completion time for both cases is almost the same. d) Normally rehabilitation/strengthening are required for old as well as distressed bridges having service life of 40 years or more and also strengthening works are normally required for limited members or locations of a flyover/bridge. In the case of Palarivattom flyover as per the findings of IIT Chennai, 97 RCC girders out of 102 girders requires strengthening which is an extensive strengthening work for superstructure. Based on the all the above factors, Committee is of the opinion that considering the service life assured by Dr. E. Sreedharan for 100 years, it is better to accept the proposal by him.” G 5. The State of Kerala, by a G.O. dated 25.10.2019, examined this High Level Committee Report, and accepted it, stating as follows: H “6. Government have examined the whole matter in detail and have decided to accept the recommendations of the Technical Committee and to proceed accordingly. STATE OF KERALA & ANR.v. M/S RDS PROJECT LIMITED & 841 ORS. [R.F. NARIMAN, J.] It is also decided to accept the letter of offer made by Delhi Metro A Rail Corporation to take over the bridge for rehabilitation as per letter read as 6[th] above. DMRC shall submit detailed item wise estimate for approval of Government. On the basis of the detailed estimate, Finance Department shall allot funds in the appropriate Head of Account for the purpose. RBDCK will hand over the B bridge site to DMRC free of all encumbrances. 7. RBDCK shall realize the loss sustained to the Government from the contractor in the light of the report of IIT Madras, report of Dr. E.Sreedharan and the FIR filed in case No. 1/2019 of Moovattupuzha Vigilance Court and as per the relevant provisions of the agreement. RBDCK shall also initiate action against the contractor for the lapses as per PWD Manual. C 8. This order will be subject to the final decision of Hon’ble High Court in WP (C)s 25343, 25362 and 26405 of 2019.” 6. At this point, a Writ Petition was filed by the Respondent No.1 in the Kerala High Court against the aforesaid G.O. By the impugned judgment, the Kerala High Court went into the terms, in particular, clause 11 of the original tender between the contractor- Respondent No.1 and the State, and then considered the various reports. The High Court also noticed that a vigilance enquiry had been conducted because there were allegations that there was large scale corruption, and as part of it, a team of experts from the Government Engineering College, Trichur reported that there are 2183 cracks on the girders out of which 99 cracks are above 0.3 mm width and 83 cracks on pier caps out of which 5 cracks are about 0.3 mm width. 7. After considering the arguments of counsel appearing for all parties, including the Respondent No.3- KITCO, stating that a load test is extremely necessary for the purpose of ascertaining the strength of the flyover before anything further is done to it, the High Court concluded: “19. There is no dispute about the fact that as per the terms of contract between the parties, load test is a requirement to be performed to ascertain the strength of the bridge and to ensure that it has the expected strength. According to the contractor, though certain cracks have developed in the girders, it needs only repairs which the contractor is willing to do and it would not affect the strength of the bridge in any way. A similar view had been D E F G H 842 SUPREME COURT REPORTS [2020] 6 S.C.R. A expressed by the consultant M/s KITCO as well. According to them, the load test is mandatory to ascertain the strength of the bridge, and if the girders and platform are demolished, such an opportunity will be lost. The Government and its authorities are not in favour of a load test since they feel that the aforesaid cracks itself are enough to arrive at a conclusion that those girders are to B be demolished. Government had already taken a decision to remove the platform and girders. Once it is removed and demolished, it may not be possible to ascertain the strength of the present structure, which may prejudicially affect the right of all the stakeholders, including the Government. The contractor as C well as the consultant still believes that the load test would prove that there is no requirement for demolishing the structure. Therefore, before demolishing the platform and the girders, it is better to have a load test conducted, to avoid any further controversy in the matter. After conducting such load test, it shall be open for the Government and its authorities to take a decision D whether they should proceed in accordance with the manner in which they have already decided or to take a different approach in the matter. In the result, the following directions are issued. - E (i) That the Government shall conduct a load test of the Palarivattom flyover through an approved qualified agency capable of conducting such a test, with notice to all the stakeholders. (ii) The entire expenditure for conducting the load test shall be borne by the petitioner in WP (C) No. 26030/2019. - F (iii) The entire process shall be completed within a period of three months or at an early date, as may be possible. (iv) After conducting the load test, the Government shall file a statement before this Court along with the report of the concerned agency.” - G 8. Having perused the High Court judgment, what is clear is that - the High Court, instead of applying the well-established parameters of judicial review and ascertaining whether the decision of the State Government would violate Article 14, went into the matter itself and stated that it is better to have a “load test conducted to avoid any further - H controversy in the matter”. STATE OF KERALA & ANR.v. M/S RDS PROJECT LIMITED & 843 ORS. [R.F. NARIMAN, J.] 9. Given the fact that an Expert Committee, which is a High level A Committee of five experts was set up to go into the divergent opinions of IIT Madras and Dr. E. Sreedharan, and the experts having come to a particular conclusion, it is very difficult then to say that the Government, in accepting such Expert Committee Report, could be said to have behaved arbitrarily. On this ground alone, we set aside the judgment of B the High Court, as also the review judgment. 10. The appeals are allowed in the aforesaid terms. 11. The Writ Petitions that are pending in the High Court may be disposed of within a period of six months from today. C Devika Gujral Appeals allowed. D E F G H
End of Judgment Record
Browse All Supreme Court of India (2020) Decisions
2020-01-17

SATPAL AND ANR. v. BANK OF INDIA AND ORS.

This appeal arises from the Debt Relief Scheme for agriculturists notified in the Union Budget 2008-09, under which farmers were categorized as marginal, small, or other farmers with varying waivers or debt-relief. The appellants, Satpal and Anr., approached the District Consumer Disputes Redressal Forum in Faridabad after borrowing Rs. 3,00,000 in 2008 for a tractor loan. They claimed they fell within the ‘small farmer’ category and sought full waiver under clause 5. The District Forum accepted that each held 38 kanals 11 marlas (roughly 4 acres 6 kanals 11 marlas) and thus fell within the small-farmer bracket based on the largest landholding in the pool; the State Commission affirmed. The National Commission, however, reversed, holding the district of Faridabad not listed in Annexure-I and denying full waiver, pursuing clause 6 and Annexure-I thresholds, and also applying that an investment credit for allied activities could fall under explanation 3. The Supreme Court reversed the National Commission, holding that the largest landholding in a pooled loan governs classification for the pool (explanation 2 to the definitions), that the appellants fall under the small farmer category, and that clause 5 governs their entitlement to the entire eligible amount. It held that clause 6’s Annexure-I restrictions were inapplicable to their clause-5 claim and that explanation 3 does not apply to a tractor loan in allied activities. The Court restored the District Forum order, with costs awarded to the appellants.

2020-09-09

Stalin v. State Represented by the Inspector of Police

This is a criminal appeal by Stalin challenging a Madurai Bench of the Madras High Court judgment that convicted him under Section 302 IPC for the murder of Kalidas and affirmed the trial court’s decision. The Supreme Court granted leave limited to whether the conviction ought to be under Section 304 Part II IPC or Section 302 IPC. The Court surveys a long line of authorities on single-injury cases, stressing there is no universal rule; the outcome depends on facts such as the nature of the injury, the part of the body struck, the weapon, and surrounding circumstances. The eye-witness PW3 testified that the deceased served extra beer to outsiders, provoking anger in the accused, who accused the deceased of discriminating against locals, and in a scuffle fired a knife from behind, injuring the victim. The Court acknowledges the lack of a fixed rule but notes the totality of circumstances, including weapon and injury to a vital area, points toward culpable homicide not amounting to murder but under Section 304 Part I, given a likelihood of death from the injury. Consequently, the Court allows the appeal in part, converting the conviction from 302 IPC to 304 Part I IPC, sentencing the accused to eight years’ RI with Rs 10,000 fine, in default one more year RI. The judgment clarifies that motive is not essential where eyewitnesses establish the facts.

2020-10-29

The State of Rajasthan & Ors. v. Heem Singh

This Supreme Court judgment concerns a civil appeal by the State of Rajasthan challenging a Division Bench order of reinstating Heem Singh, a police constable, after disciplinary proceedings that found him guilty of misconduct and the charge of murder while on leave. Heem Singh had been acquitted in a criminal trial, but the State argued that a criminal acquittal does not bar departmental action where misconduct affects public trust in the police. The High Court Division Bench had reinstated the respondent in service with consequential benefits but without back wages, prompting the State’s appeal. The Court clarifies that the standard of proof in disciplinary matters is a preponderance of probabilities, not beyond reasonable doubt, and that courts should not re-appreciate evidence as an appellate tribunal would. It emphasizes that the authority of the disciplinary process is to balance administrative autonomy with protection against perverse findings, while ensuring some evidentiary basis. The Court examines the disciplinary record, including witnesses’ testimony and cross-examination, and notes enmity between the parties, the presence of the respondent at or near the scene, and the impact on public confidence. It relies on precedents such as M. Siddiq v. Suresh Das and others to formulate the standard and to uphold limits on judicial review. The decision ultimately sets aside the reinstatement and directs cessation from service from minimum qualifying service, with retiral dues payable within three months, and no back wages.

2020-10-28

MRS RITIKA SHARAN v. MR SUJOY GHOSH

This Supreme Court judgment concerns a custody dispute involving a minor, Sattik, born in 2013, whose parents have lived apart since 2016. The appellant, Ritika Sharan, a working mother, relocated to Singapore in September 2017 for employment, while the child remained in Bengaluru with the maternal grandparents. The Family Court had, on 1 March 2018, restrained the appellant from taking the child out of Bengaluru, and the High Court dismissed writ petitions challenging this order. The matter reached the Supreme Court on appeal. The Court emphasized that the welfare of the child is the paramount consideration and invoked Article 142 of the Constitution as a tool to fashion an order that best serves the child’s interests. It held that the presence and care of the mother since birth, with the maternal grandparents merely assisting, does not legally transfer custody. The child expressed a desire to live with his mother in Singapore, and the Court found no compelling material to force him to stay with the grandparents in Bengaluru. Consequently, the impugned judgments were set aside. The Court permitted the child to accompany the mother to Singapore, ordered passport handover, and laid out an access/visitation framework to be observed, superseding prior Family Court and High Court orders, while guardianship proceedings proceed.