STATE OF HARYANA v. M/S. VINOD OIL & GENERAL MILLS & ANR.

Case / Petition Number:
Civil Appeal Nos. 9098-9099 of 2014
Neutral Citation:[2014] 13 S.C.R. 524

Case Synopsis & Summary

This Supreme Court matter concerns land acquisition under the Land Acquisition Act, 1894 for the development of Sector 9 & 11 in Hissar (for residential and commercial use). The State of Haryana sought to acquire two strips of land belonging to the respondents, Vinod Oil & General Mills and Savitri Devi, after an earlier notification under Section 4 in 1992 had led to release of their lands. The High Court quashed the 2004 notification and acquisition as to two strips: one contiguous to the respondents’ factory (Khasra No. 148/2/2, 19 Marla) deemed adjustable in the Sector’s planning scheme, and another strip (Khasra No. 149, 1 Kanai 11 Marla) deemed hindrance to wholesome development. The Supreme Court held that prior permission for change of land use and setting up an industry does not bar acquisition; public interest overrides individual interests. It affirmed the State’s broad public purpose in developing residential and commercial areas, while noting that the State is the first judge to determine public purpose, subject to judicial scrutiny. The Court upheld the acquisition of the 1 Kanai 11 Marla strip but quashed the 19 Marla strip’s acquisition. It remitted limited questions under Section 24(2) of the 2013 Act to the High Court (possession and compensation) since the 2013 Act became effective from 1.1.2014. The matter is to be disposed expeditiously, with status quo maintained.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • T. S. Thakur
  • R. Banumathi
Judgment Date
2014-09-23
Court Decision / Holding
Appeals disposed of. The acquisition of 19 Marla in Khasra No. 148/2/2 is quashed; the acquisition of 1 Kanai 11 Marla in Khasra No. 149 is upheld. The High Court is directed to examine, on a limited basis, whether possession has been taken and whether compensation has been paid for the Khasra No. 149 land, under Section 24(2) of the 2013 Act. The matter is to be remitted with directions to decide expeditiously, preferably within four months, and to maintain the status quo in regard to the disputed property. Writ petitions are to be restored/ disposed of accordingly; no order as to costs.
Final Disposition
Appeals disposed of

Parties to the Case

Appellants / Petitioners

  • State of Haryana

Respondents

  • Savitri Devi
  • M/s Vinod Oil & General Mills

Legal Representation & Advocates

Counsels for Petitioners

  • • Narender Hooda
  • • Vineet Malik
  • • Nupur Choudhary
  • • Kamal Mohan Gupta

Counsels for Respondents

  • • Puneet Jindal
  • • Rajat Sharma
  • • Subhashish F Bhowmick
  • • Dr. Kailash Chand

Provisions of Law Cited

Land Acquisition Act, 1894 – Sections 4, 5-A, 6, 9Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – Sections 24(1), 24(2)

Legal Doctrines & Maxims

  • Public purpose (not a static concept; broad public interest of the community overrides individual interests)
  • State is the first judge to determine whether public purpose exists, subject to judicial review
  • Non-obstante clause in Section 24(2) of the 2013 Act overrides Section 24(1)
  • De hors the Act
  • Fraud on statute
  • Estoppel (not a conclusive bar to reacquisition; distinguishable on facts)
  • Public purpose evolves with time and conditions; authority to declare need rests with the Government

Submissions & Arguments

Contentions of Appellants / Petitioners

The State argued that development and utili zation of land for residential and commercial purposes in Sector 9 & 11 would benefit the public. It asserted that earlier release from acquisition does not bar re-acquisition if the land is required for the development plan; that permission for change of land use to develop the area as an industry has relevance only to compensation rights, not to invalidate the acquisition. It contended that possession and payment of compensation shall be addressed under the new Act, and Section 24(2) of the 2013 Act can apply to lapse proceedings initiated under the 1894 Act; remand to the High Court for limited questions was appropriate given the new law.

Contentions of Respondents

The respondents argued that reacquisition after a long interval and after lands were released earlier is illegal and arbitrary. They contended that the two strips have different touchpoints with the development scheme: 19 Marla could be adjusted in the planning scheme; 1 Kanai 11 Marla is an obstacle to wholesome development. They relied on earlier estoppel principles and argued that the 1992 release bars reacquisition, and that the State cannot re-arrogate land previously released. They urged maintaining the quashing of acquisitions and a careful consideration of Section 24(2) implications.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (11)

Case NameCitationTreatmentExplanation
Daulat Singh Surana & Ors. v. First Land Acquisition Collector & Ors.2007 (1) SCC 641PositiveCited to articulate the evolving concept of public purpose; supports the principle that public purpose is a Government-declared function subject to potential judicial review.
Sooraram Pratap Reddy & Ors. v. Distt. Collector, Rangareddy Dist. & Ors.2008 (9) SCC 552PositiveAffirms that State's decision on public purpose is primary but reviewable; supports judicial scrutiny when power is misused or irrational.
Roshan Lal & Ors. v. State of Haryana & Ors.2003 (3) PLR 199DistinguishedHigh Court relied on Roshan Lal to bar reacquisition; the Supreme Court held that Roshan Lal does not apply on these facts and disagreed with applying estoppel in this context.
Pune Municipal Corporation & Anr. v. Harakchand Misirimal Solanki & Ors.2014 (3) SCC 183PositiveCited for interpretation of Section 24(2) and the non-obstante effect of the 2013 Act; supports the remand framework and the lapse of older proceedings.
Somavanti v. Punjab1963 (2) SCR 774; AIR 1963 SC 151PositiveCited for the concept that public purpose is broad and dynamic and the Government’s declaration is the controlling factor, subject to judicial scrutiny.
United Community Services v. Omaha Nat. Bank77 NW 2d 576; 162 Neb 786Mentioned OnlyQuoted as an illustrative view on public purpose, not as binding Indian precedent.
People ex rel Adamowski v. Chicago R.R. Terminal Authority151 NE 2d 311Mentioned OnlyCited in definition of public purpose; used illustratively.
Central Control Board v. Cannon Brewery Co. Ltd.1919 AC 744Mentioned OnlyHistorical principle cited regarding government powers and purchase payments; not central to the dispositive reasoning here.
Green v. Frazier176 NW 11; 17; 44 ND 395Mentioned OnlyCited for general notions of public purpose; not a controlling authority in the current ratio decidendi.
Daulat Singh Surana & Ors. (repeat)2007 (1) SCC 641PositiveAffirms public purpose doctrine; used to explain the variability and government prerogative in designating public purpose.
Savitri Devi / Other references—Mentioned OnlyOther references to land acquisition law within the judgment; not enshrined as controlling authority.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,797 words•~22 min read

In The Court Record

STATE OF HARYANA v. M/S. VINOD OIL & GENERAL MILLS & ANR.

## [2014] 13 S.C.R. 524 A ## STATE OF HARYANA& ORS. V. M/S. VINOD OIL& GENERAL MILLS &ANR. ## B (Civil Appeal Nos. 9098-9099 of 2014) SEPTEMBER 23, 2014 ## **[T. S. THAKUR AND R. BANUMATHI, JJ.]** - _Land Acquisition Act, 1894 ss. 4 and 6 -Acquisition_ - c _of industrial land For the residential and commercial_ - _purpose The acquired strip of land measuring 19 mar/as is contiguous to the factory and can be adjusted in the Planning Scheme and hence acquisition thereof is quashed -Anbther strip measuring 1 Kanai 11 mar/as is hindrance_ - **D** _for the wholesome development of the scheme, hence acquisition thereof upheld- In view of s. 24(2) of Acquisition Act of 2013, matter remitted to High Court to examine certain_ - - _factual aspects Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation,_ - E _Resettlement Act, 2013-_ s. _24(2)._ _Public Purpose- Meaning and determination of- Held: A public purpose includes a purpose involving general interest of community as opposed to individual interest_ - **F** _State is the first judge to determine whether there exists public purpose._ ## **Disposing of the appeals, the Court** **HELD: 1. The action of the State in first approving** G **setting up of a factory and then acquiring the same cannot be held as unreasonable. Permission for change of land use and developing the area as an industry, has no relevance while considering the validity of** ac~uisition. **The fact that the factory and building was** **H** 524 STATE OF HARYANA v. M/S. VINOD OIL & GENERAL 525 MILLS put up in the lands with the approval of the authority A cannot be a bar for acquisition of the land. Public interest overrides individual's interests. The only effect of permission for such change in land use and approval for construction and developing the area as an industry can be recognized as valid only to the extent as to B confer right upon the land owners to recover the appropriate compensation. [Paras 7, 8][530-D; F-H; 531-A-B] 2. Public purpose includes a purpose involving c general interest of community as opposed to the interest of an individual directly or indirectly involved. Individual interest must give way to public interest as far as public purpose in respect of acquisition of land is concerned. Prima facie, State is the first Judge to determine whether D there exists public purpose or not. But the decision of the State is not beyond judicial scrutiny. The requirement of land for residential and commercial purposes and for development of the Sector involves in it an element of general interest of the community and hence, must be E regarded as a 'public purpose' as opposed to the particular interest of individuals. [Paras 9, 11 and 12] [531-D-E; 533-E; 534-C-D] _Dau/at Singh Surana_ & _Ors. v. First Land Acquisition Collector&· Ors._ 2006 (8) Suppl. SCR 1076 : (2007) 1 SCC 641; _Sooraram Pratap Reddy_ & _Ors. v. Distt. Collector, Ranga Reddy Dist._ & _Ors._ 2008 (13) SCR 126: (2008) 9 SCC - 552 relied on. F G 3. There is no bar to the subsequent acquisition of the land nor is there a bar for issuance of successive notification for acquisition of the land. In the present case, earlier notification was issued for the same H > 526 SUPREME COURT REPORTS [2014] 13 S.C.R. A purpose for which subsequent acquisition was made. The subsequent acquisition was done, when the State felt that the land sought to be acquired cannot be adjusted in the development of the Plan. [Para 15] [535-C-E] ## B _Roshan Lal_ & Ors. vs. _State of Haryana_ & Ors. 2003 (3) PLR 199 - referred to. 4. Khasra No. 148/2/2, which is contiguous to the factory of the respondents, can be adjusted in the C Planning Scheme of the Sector and on this ground, the order of quashing the acquisition thereof is affirmed. Insofar as another strip of 1 Kanai 11 Marla of land is concerned this strip of land is hindrance for the D wholesome development of the Sector and the same cannot be adjusted in the development of the Sector. Order of quashing acquisition of this strip of land is upheld. [Paras 16, 17][536-B-F] 5. In view of the plea that by virtue of Section 24 (2) E of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation, ResettlementAct, 2013 the subject of acquisition shall be deemed to have lapsed, certain factual aspects viz., (i) whether F possession of the land measuring 1Kanai11 Marlas has been taken or not; (ii) whether the compensation in respect of this acquired land was paid or not have to be examined. Since the 2013 Act has come into force with effect from 1.1.2014, the High Court did not have G occasion to examine whether proceedings already initiated under the Land Acquisition Act, 1894 have lapsed on account of the alleged non-payment of compensation and the failure of the authorities to take over possession of the land acquired from them. The H 527 # STATE OF HARYANA v. M/S. VINOD OIL & GENERAL MILLS **matter is remitted to the High Court to examine the above** A **limited questions in respect of the acquisition of the land 1 Kanai 11 Marla. [Para 21][538-A-E]** _Pune Municipal Corporation_ & _Anr. v. Harakchand Misirimal Solanki_ & _Ors_ **.2014 (1) SCR 783** : **(2014) 3 sec 183 - referred to.** B ## **Case Law Reference:** **2006 (8) Suppl. SCR 1076 relied on Para 10** c **2008 (13) SCR 126 relied on Para 11 2003** (3) **PLR 199 referred to Para 13 2014 (1) SCR 783** • **referred to Para 20** CIVIL APPELLATE JURISDICTION: Civil Appeal D Nos. 9098-9099 of 2014. From the judgment and order dated 25.05.2007 in CWP Nos. 17 458 and 17 469 of 2006 passed by the High Court of Punjab and Haryana at Chandigarh. E Narender Hooda, Sr. Adv., Vineet Malik, Nupur Choudhary, Kamal Mohan Gupta for the Appellants. Puneet Jindal, Sr. Adv., Rajat Sharma, Subhashish F Bhowmick, Dr. Kailash Chand for the Respondents. The Judgment of the Court was delivered by **R. BANUMATHI, J.** 1. Delay condoned. Leave granted. 2. These appeals arise out of the judgment of High Court G of Punjab and Haryana in and by which the High Court quashed the acquisition of the lands of the respondents, _intera/ia,_ on various grounds. Feeling aggrieved, State of Haryana is before us. H 528 [2014] 13 S.C.R. ## SUPREME COURT REPORTS A A 3. Facts in nutshell giving rise to these appeals are as under:- The respondents being a partnership concern had set up an industrial unit in the year 1981 which is running under the name and style of M/s. Vinod Oil and General Mills. On 19.5.1992, Haryana Government issued a notification under B Section 4 of the Land Acquisition Act, 1894 (for short 'Act') in which the land of the respondents was also included. The respondents submitted their objections under Section 5-A of the Act and after considering their objections, the State Government excluded the land of the respondents from the C acquisition proceedings before declaration under Section 6 of the Act. Later at the time of planning of the Sector, it was felt that two strips of lands of the respondents are creating hindrance in the wholesome Development Plan of the Sector. D Haryana Government again initiated acquisition proceedings by issuance of notification under Section 4 of the Act on 15.3.2004 to acquire the land in the area of village Hissar Hadbast No.146 and village Satrod Khas and Satrod Khurd Hadbast Nos.154 & 155, Tehsil and District Hissar including E the lands of the respondents for public purpose, namely, for development and utilization of land for residential and commercial Sector 9 & 11, Hissar. The respondents filed their objections under Section 5-A of the Act and after hearing the respondents, the Government decided to acquire the land F in dispute and the declaration under Section 6 of the Act was issued on 14.3.2005 and thereafter notice under Section 9 of the Act was also issued. Challenging the acquisition proceedings, the partnership concern filed two writ petitions one by Savitri Devi, one of the partners (CWP No.17 469/ G 2006) and the another by Mis. Vinod Oil and General Mills, a registered partnership firm through Shri lnder Sain Aggarwal (CWP No.17458/2006) praying to quash the notifications dated 15.3.2004 and 14.3.2005 under Sections 4 and 6 of the Act and also prayed for direction to release their land from H acquisition proceedings. STATE OF HARYANA v. M/S. VINOD OIL & GENERAL 529 MILLS [R. BANUMATHI, J.] 4. The High Court quashed the acquisition proceedings, A _interalia,_ on the grounds:- (i) having permitted the change of land use for developing the area as an industry and after 26 years cannot turn around and acquire the land for development of residential and commercial purposes; (ii) lands having been released from earlier acquisition in 1992 B cannot be included in the notification for re-acquisition; (iii) the land of the respondents being located in one of the corners of the sector that is proposed to be developed, the same could be conveniently adjusted in the Plan/Scheme. B c 5. Mr. Narendra Hooda, learned Addi. Advocate General, appearing for the State of Haryana, submitted that the development and utilization of land for residential and commercial purpose in Sector 9 & 11, Hissar will benefit many people and the High Court erred in not appreciating that the D interest of the individuals could not come in the way of development plan. Learned counsel further submitted that at the time of planning of sector, it was noticed that the land in dispute was creating hindrance in development of the sector and the High Court did not properly appreciate the hindrance E that is being caused by the land, for the development of the sector as residential and commercial sector. It was submitted that the release of the land from acquisition in the earlier notification in 1992 would not in any way bar fresh acquisition of the same land. F D 6. Mr. Puneet Jindal, learned Senior Counsel appearing for the respondents/claimants submitted that when the respondents' lands were earlier sought to be acquired, upon consideration of objections by _the_ respondents that they have G set up industry and put up constructions in their lands and after · verification of the same, the claim of the respondents was accepted by the Government and the land of the respondents was then released from acquisition and while so, the H 530 SUPREME COURT REPORTS [2014] 13 S.C.R. - A notification issued by the State of Haryana seeking to acquire the land again is illegal and arbitrary and the High Court has rightly quashed the acquisition. 7. Acquisition of respondents' lands was held to be - B vitiated on the ground that State having granted permission to the respondents for change of land use and develop the area as an industry cannot turn around after twenty six years to acquire the land saying that the same is required to be developed for residential purposes and the action of the - c respondent/State was held to be arbitrary. Of course, Director of Town and Country Planning, Haryana earlier granted permission to the respondents herein for change of land use for construction of Oil and General Mills in their lands in 23 Kanai 6 Marla in Khasra No.148/1, 148/2 and 149/10. The - D fact that the factory and building was put up in the lands with the approval of the authority cannot be a bar for acquisition of the land. Public interesfo'verrides individual's interests. In our view, the High Court was not justified in saying that the acquisition is bad since permission was earlier granted for - E change of land use and developing the area as an industry and that Government is estopped from initiating acquisition proceedings. 8. Permission for change of land use and developing - F the area as an industry, in our view, has no relevance while considering the validity of acquisition. If we are to hold that once permission is granted for change of land use for developing the area as an industry and thereafter State cannot acquire it, then a situation may arise that for all time to come, - G the particular area cannot be acquired which may not be in the larger public interest. We are'also unable to agree with the view taken by the High Court that the action of the respondents/ State in approving setting up of a factory and then acquiring the same is unreasonable. It is not as if the lands where H STATE OF HARYANA v. M/S. VINOD OIL & GENERAL 531 MILLS [R. BANUMATHI, J.] factories are set up are immune from any acquisition. The only A effect of permission for such change in land use and approval for construction and developing the area as an industry can be recognized as valid only to the extent as to confer right upon the land owners to recover the appropriate compensation. B B 9. The land was acquired for development and utilization of the same for residential and commercial purposes in Sector 9 & 11, Hissar. So far as the purpose of acquisition of land is concerned, the High Court observed that _"the acquisition_ c _is not for essential public services such as development of infrastructure, railways, metro or the purpose related thereto, irrigation, water supply,· drainage, road, communication etc ..... "._ High Court was not correct in observing that only development of infrastructure, railways or irrigation, water D supply, drainage, road etc. are primary public purposes. Public purpose includes a purpose involving general interest of community as opposed to the interest of an individual directly or indirectly involved. Individual interest must give way to public interest as far as public purpose in respect of acquisition of E land is concerned. 10. The concept of 'public purpose' was dealt with in detail in _Dau/at Singh Surana_ & _Ors._ vs. _First Land Acquisition Collector_ & _Ors._ (2007) 1 SCC 641, in which this Court has F held as under:- "49. In _United Community Services_ v. _Omaha Nat. Bank_ (77 NW 2d 576, 585, 162 Neb 786) the Court observed that a public purpose has for its objective the promotion G of the public health, safety, morals, security, prosperity, contentment and the general welfare of all the inhabitants. 50. In _People ex rel Adamowski_ vs. _Chicago R.R. Terminal Authority_ (151 NE 2d 311, 314, 14111 2d 230) H > 532 SUPREME COURT REPORTS [2014] 13 S.C.R. - A the Court observed that public purpose is not static concept, but is flexible and is capable of expansion to meet conditions of complex society that were not within contemplation of framers of the Constitution. - B 51. In _Greenv. Frazier(176_ NW 11, 17, 44 ND 395), the Court observed that a public purpose or public business has for its objective the promotion of the public health, safety, morals, general welfare, security, prosperity and contentment of all the inhabitants or residents within a - c given political division, as for example, a State, the sovereign powers of which are exercised to promote such public purpose or public business. 52. In the words of Lord Atkinson in _Central Control Board_ v. _Cannon Brewery Co.Ltd._ {1919AC 744: 88 LJCh464: D 121 LT 361 (HL)} the power to take compulsorily raises . by implication a right to payment. - E 59. In _Somavantiv. State of Punjab_ (1963) 2 SCR 774: AIR 1963 SC 151 the Court observed that public purpose must include an object in which the general interest of the community, as opposed to the particular interest of individuals, is directly and vitally concerned. - F Public purpose is bound to change with the times and the prevailing conditions in a given area and, therefore, it would not be a practical proposition even to attempt an extensive definition of it. It is because of this that the legislature has left it to the Government to say what is a - G public purpose and also to declare the need of a given land for a public purpose. 60. The Constitution Bench of this Court in _Somavanti_ observed that whether in a particular case the purpose H ## STATE OF HARYANA v. M/S. VINOD OIL & GENERAL 533 MILLS [R. BANUMATHI, J.] for which land was needed was a public purpose or not A was for the Government to be satisfied about and the declaration of the Government would be final subject to one exception, namely, that where there was a colourable exercise of the power the declarations would be open to challenge at the instance of the aggrieved B party. 73. Public purpose cannot and should not be precisely C defined and its scope and ambit be limited as far as acquisition of land for the public purpose is concerned. Public purpose is not static. It also changes with the passage of time, needs and requirements of the community. Broadly speaking, public purpose means 0 the general interest of the community as opposed to the interest of an individual." 11. Prima facie, State is the first Judge to determine whether there exists public purpose or not. But the decision of . the State is not beyond judicial scrutiny. The Courts have the E jurisdiction and it Is their duty to determine the matter whenever a question is raised whether a requisition order is or is not for · a public purpose. In _Sooraram Pratap Reddy_ & _Ors., vs. Dlstt. Collector, Ranga Reddy Dist._ & _Ors., (2008) 9 SCC_ F _552,_ it was held as under: "133 .......... It is primarily for the State to decide whether there exits public purpose or not. Undoubtedly, the decision of the State is not beyond judicial scrutiny. In appropriate cases, where such power is exercised ma/a G _fide_ or for collateral purposes or the purported action is _dehors_ the Act, irrational or otherwise unreasonable or the so-called purpose is "no public purpose" at all and fraud on statute is apparent, a writ-court can undoubtedly H 534 SUPREME COURT REPORTS [2014] 13 S.C.R. A interfere. But except in such cases, the declaration of the Government is not subject to judicial review. In other words, a writ court, while exercising powers under Articles 32, 226 or 136 of the Constitution, cannot substitute its own judgment for the judgment of the Government as to B what constitutes "public purpose"." 12. While determining the question whether a requisition order is or is not for a public purpose, the facts and circumstances in each case are to be closely examined in order c to determine whether a public purpose has been established. The requirement of land for residential and commercial purposes and for development of the Sector involves in it an element of general interest of the community and whatever furthers the general interest must be regarded as a 'public D purpose' as opposed to the particular interest of individuals. 13. High Court quashed the acquisition on yet another ground that the land was sought to be acquired earlier by issuing notification dated 19.5.1992 under Section 4 of the E Act and accepting the respondents' objections, their land was earlier released and ignoring the said fact situation, the State arbitrarily included the land of the respondents in the notification under Section 4 of the Act for reacquisition. Relying upon its own judgment in _Roshan Lal_ & _Ors._ vs. _State of_ F _Haryana_ & _Ors._ 2003 (3) PLR 199, the High Court quashed the acquisition proceedings i~voking principle of estoppel. 14. Mr. Narender Hooda, learned Addi. Advocate General, appearing for the appellants/State of Haryana, G submitted that the judgment rendered in _Roshan Lal_ (supra) does not apply in the facts of the present case, since in the said case, the land was earlier released on certain conditions and then again acquired the land and the Government was bound by the earlier conditions. But in the present case, there H STATE OF HARYANA v. M/S. VINOD OIL & GENERAL 535 MILLS [R. BANUMATHI, J.] was no such condition imposed on either party at the time when A the land was released earlier. It is further submitted that the respondents have a total area of 23 Kanai 6 Marla, out of which only small portion in two small strips are sought to be acquired which is very much required for the development of the Sector. B 15. As regards contention of the learned counsel for the respondents that the land once released cannot be subsequently reacquired, in our view, there is no bar to the subsequent acquisition of the land nor is there a bar for issuance of successive notification for acquisition of the land. c It would not be right to contend that because the land was already released, it cannot be acquired by subsequent notification. If it is to be held that land already released cannot be reacquired, an anomalous situation may arise that the land cannot be acquired for all time to come even if it is genuinely D required. It is not in dispute that the earlier notification is issued by the State for the development of the land for residential and commercial purposes which is same purpose for subsequent acquisition as well. When the State felt that the land sought to be acquired cannot be adjusted in the development of the Plan, E there is no bar for issuance of notification for acquisition of the land. 16. Yet another ground on which the High Court quashed the acquisition is that the land of the respondents is located in F • one corner of the area that is proposed to be developed and the land of the respondents could conveniently be adjusted in the planning scheme. We have perused the Plan of Sector 9 & 11. Two chunks of lands of the respondents one strip measuring 19 Marla and another measuring 1 Kanai 11 Marla G are sought to be acquired. 19 Marla of land in Khasra No. 148/2/2 standing in the name of Savitri Devi measures 192'.6"x 27'.6" feet. In this small strip of land of 19 Marla, office block, laboratory and Mandir (place of worship) are said H 536 SUPREME COURT REPORTS [2014] 13 S.C.R. - A to have been constructed. Main sheds of the factory and the land underneath have not been acquired. According to the respondents, this small strip of land of 19 Marla is not contiguous with the other land of Government/HUDA and in the absence of office building, laboratory, the respondents will - B not be able to run their factory. We find substance in the contention of the respondents that Khasra No. 148/2/2, the small strip of land which is contiguous to their factory appears to be in the corner of the Development Plan and the same can be adjusted in the Planning Scheme of the Sector and - C on this ground, we affirm the order of the High Court quashing the acquisition in respect of Khasra No.148/2/2 measuring 19 Marla. 17. Insofar as another strip of 1 Kanai 11 Marla of land D which stands in the name of Mis. Vinod Oil and General MiUs, this strip of land in Khasra No.149 is situated in the midst of Sector 9 & 11. We find substance in the submission of the State that this strip of land is an hindrance for the wholesome development of the Sector and the same cannot be adjusted E in the development of the Sector. Order of the High Court quashing acquisition of this strip of land measuring 1 Kanai 11 Marla in Khasra No.149 is set aside and the acquisition of 1 Kanai 11 Marla in Khasra No.149 is upheld. F 18. Regarding acquisition of 1 Kanai 11 Marla in Khasra • No.149, on behalf of the respondents it wasihen argued that by virtue of Section 24 (2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation, Resettlement Act, 2013 (hereinafter referred to as 'the Act G 2013'), the subject of acquisition shall be deemed to have lapsed because the award is prior to the commencement of the Act 2013 and since no compensation has been paid to the respondents nor the amount was deposited and the ·possession was not taken. H STATE OF HARYANA v. M/S. VINOD OIL & GENERAL 537 MILLS [R. BANUMATHI, J.] 19. Learned counsel for the appellants Mr. Hooda A submitted that there is no default on the part of the appellants and hence the acquisition proceedings have riot lapsed under Section 24(2) of the Act 2013. He, however, submitted that the matter be remitted back to the High Court for consideration of that aspect as was ordered in Civil Appeal No. 8104/2014 B and connected matters titled _Surjit Kaur_ vs. State _of Haryana_ & _Ors._ decided on 5.9.2014 by this Court where similar situation prevailed. 20. Considering the scope of Section 24(2) of the Act c 2013 in _Pune Municipal Corporation &Anr._ Vs. _Harakchand Misirimal Solanki_ & _Ors.,_ (2014) 3 SCC 183, in para (11) this Court has held as under:- "11. Section 24(2) also begins with _non obstante_ clause. D This provision has overriding effect over Section 24(1 ). Section 24(2) enacts that in relation to the land acquisition proceedings initiated under the 1894 Act, where an award has been made five years or more prior to the commencement of the 2013 Act and either of the two E contingencies is satisfied viz. (i) physical possession of the land has not been taken, or (ii) the compensation has not been paid; such acquisition proceedings ·shall be deemed to have lapsed. On the lapse of such acquisition proceedings, if the appropriate Government F still chooses to acquire the land which was the subjectmatter of acquisition under the 1894 Act then it has to initiate the proceedings afresh under the 2013Act. The proviso appended to Section 24(2) deals with a situation where in respect of the acquisition initiated under the G 1894 Act an award has been made and compensation in respect of a majority of landholdings has not been deposited in the account of the beneficiaries then all the beneficiaries specified in the Section 4 notification H 538 SUPREME COURT REPORTS [2014] 13 S.C.R. A become entitled to compensation under the 2013 Act." 21. Since the new Land Acquisition Act has come into force with effect from 1.1.2014, the High Court did not have occasion to examine whether proceedings already initiated B under the Land Acquisition Act, 1894 have lapsed on account of the alleged non-payment of compensation to the respondents and the failure of the authorities to take over possession of the land acquired from them. Having regard to the submission of the learned counsel for the respondents, c certain factual aspects viz., (i) whether possession of the land in Khasra No. 149 has been taken or not; (ii) whether the compensation in respect of the acquired land in K~ 15r<1 No. 149 was paid or not have to be examined. We are of the view that instead of this Court examining the above issues D by itself, it would be better if the matter is remitted back to the High Court to examine the above limited questions in respect of the acquisition of the land 1 Kanai 11 Marla in Khasra No.149. E E 22. In the result, we uphold the order passed by the High Court quashing the acquisition of the land 19 Marla in Khasra No.148/2/2. So far as the acquisition of land measuring 1 Kanai **11** Mirla in Khasra No.149(CWP No.17 458/2006), the order of the High Court is set aside and it is held that the F acquisition proceedings have been properly concluded in respect of the said extent of land acquired in Khasra No.149 and the matter is remitted to the High Court to examine the limited questions as aforesaid. We further direct that the status quo as it exists today in regard to disputed property shall be G maintained by the parties pending disposal of the writ petition. We restore the CWP. No. 17458/2006 (M/s Vinod Oil and General Mills Vs. State of Haryana & Ors.) on the file of the High Court. Since the writ petition is of the year 2006, we request the High Court to dispose of the same as expeditiously **H** 539 . # STATE OF HARYANA v. M/S. VINOD OIL & GENERAL MILLS [R. BANUMATHI, J.] as possible preferably within a period of four months from the A date of receipt of copy of this judgment. The appeals stand disposed of accordingly. In the facts and circumstances ofthe case, no order as to costs. B Kalpana K. Tripathy Appeals disposed of.
End of Judgment Record
Browse All Supreme Court of India (2014) Decisions
2014-07-01

Duryodhan Rout v. State of Orissa

These appeals challenge a common judgment convicting Duryodhan Rout of rape and murder of a 10-year-old girl, Subhasini Bhoi. The trial court convicted him under IPC sections 376(f), 302, and 201 and sentenced him to death; on reference, the High Court remitted the death sentence for the 302 offence to life imprisonment while keeping the other sentences unchanged. The prosecution's case rested solely on circumstantial evidence. PW-1 and PW-2 saw the accused with the victim on a bicycle around 4 p.m. and returning alone about an hour later; PW-5 (father) and PW-6 (mother) testified that the child was taken on the pretext of talking on the phone. In custody, the accused confessed before PW-3 and PW-4, and under Section 27 of the Evidence Act the recovery of the body and the underwear was recorded; the autopsy by PW-9 indicated throttling and injuries consistent with rape. The chain of circumstances — last-seen with the victim, recovery of the corpse in the jungle, and the forensic findings — formed a robust basis for conviction. The central legal issue was whether sentences for multiple offences should run consecutively. The Court held that life imprisonment is the remainder of a convict's natural life, and the proviso to Section 31(2) Cr.P.C. prevents aggregation beyond fourteen years, thus consecutive sentences cannot be imposed where life imprisonment is one of the terms. Consequently, all IPC sentences should run concurrently; the death sentence for the 302 offence was replaced by life imprisonment, and the appeal was allowed in part.

2014-12-16

Nand Kishore v. State of Madhya Pradesh

This is a criminal original jurisdiction writ petition under Article 32 challenging the continued incarceration of a convict under Section 302 IPC, with the petitioner contending entitlement to the Juvenile Justice (Care and Protection of Children) Act, 2000 (JJC Act) protections on the ground that he was a juvenile at the time of the offence (born 14 April 1980; incident on 18 June 1997). The Court scrutinized documentary and oral evidence from the Juvenile Justice Board indicating the petitioner’s true date of birth and concluded that on the date of occurrence he was 17 years 2 months 4 days old, thereby satisfying the juvenile criteria. The judgment clarifies a central legal question: whether the protections and benefits under the JJC Act, enacted in 2000, can be extended to those convicted before its coming into force if they were juveniles at the time of the offence. Relying on earlier decisions such as Hariram v. State of Rajasthan and Ajay Kumar v. State of Madhya Pradesh (and others), the Court held that a person who had not completed 18 years on the date of offence is entitled to the Act’s benefits as if the provisions had always existed, effectively retroactively applying the protective regime. The petition was allowed; the petitioner is to be released forthwith, with bail bonds and sureties discharged, reflecting the Court’s protective stance for juveniles in criminal proceedings.

2014-04-24

Vishal Goyal & Ors. v. State of Karnataka & Ors.

This batch of writ petitions under Article 32 concerns admissions to Post Graduate Medical and Dental courses in government medical/dental colleges and the state quota in private colleges in Karnataka for the 2014-2015 academic year. The petitioners, who completed MBBS/BDS in Karnataka, challenged sub-clause (a) of clause 2.1 of two National Board of Examinations Information Bulletins (PGET-2014) which defined “Karnataka Origin” to permit admission only to those who satisfy certain criteria, effectively excluding many who studied in Karnataka institutions. They argued this violates Article 14 (equality before law and equal protection of laws) and undermines merit-based selection for postgraduate courses. They invoked Dr. Pradeep Jain & Others v. Union of India (1984) to contend that institutional preference may be permissible but must conform to equality; Magan Mehrotra v. Union of India (2003), Saurabh Chaudhri v. Union of India (2003), and Nikhil Himthani v. State of Uttarakhand (2013) were cited to support the continuing emphasis on merit and equality. The State countered that Article 371J allows reservation for the Hyderabad-Karnataka region and argued that the Pradeep Jain framework applies only to government or state-instrumentality institutions and not to private colleges. The Court held sub-clause (a) ultra vires Article 14, directed fresh Information Bulletins, and ordered admissions in accordance with the law on the basis of existing entrance test results, with the general counselling schedule from Dr. Fraz Naseem & Ors. not applying for 2014-2015 Karnataka admissions.

2014-08-21

SINGH RAM (D) THR. L.Rs. v. SHEO RAM & ORS.

This is a Supreme Court of India decision on the limit of time within which a usufructuary mortgagee can seek relief, and the corresponding equity of redemption for the mortgagor. The appellants challenged the Punjab and Haryana High Court Full Bench’s view that there is no fixed time for redemption in a usufructuary mortgage and that the right to seek redemption arises on payment/deposit of mortgage money, irrespective of the mortgage date. The HP High Court’s decision was later reversed by a larger bench of this Court in the context of reconciling conflicting precedents such as Sampuran Singh, Prabhakaran and Jayasingh Dhyanu Mhoprekar, Parichhan Mistry and Harbans etc., emphasizing that Section 62 of the Transfer of Property Act confers a special right on the usufructuary mortgagor to recover possession, which begins only when the mortgage money is paid out of rents and profits or when paid/deposited by the mortgagor. Article 61 of the Limitation Act governs the period for redeeming or recovering possession (30 years from accrual of the right, unless restricted). The Court reaffirms the principle ‘once a mortgage, always redeemable’ and rejects a blanket 30-year extinguishment rule for usufructuary mortgages, upholding the Full Bench view of the Punjab and Haryana High Court and dismissing the appeals. The decision emphasizes equity, statutory recognition under Section 62, and the distinctive treatment of usufructuary mortgages.