Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 1995Division BenchAppeals allowed; set aside lower courts' judgme...

State of Gujarat v. Dayashamjibhai

Case / Petition Number:
Civil Appeal No. 8117 of 1995

Case Synopsis & Summary

This decision concerns land acquisition under the Land Acquisition Act, 1894 for irrigation project No. 2. The landowners entered written consent agreements under Section 11(2), agreeing to accept the compensation determined by the Land Acquisition Officer plus 25% in addition, and to forego their right to seek reference under Section 18. After payment, they moved for a reference under Section 18, and the Reference Court increased the compensation, a result confirmed by the Gujarat High Court. The State contends that the agreements were not registered under the Indian Registration Act, and therefore could not contract out of statutory provisions. The Supreme Court held that the contract between the owners and the Collector under Section 11(2) is binding; the award made according to the agreement is an award with the consent of the parties, obviating the need for a Section 18 reference. The entitlement to a reference under Section 18 arises only if there is non-acceptance of the award; with a written contract, there is no protest to receive compensation, and thus no right to reference. The Court also held that the Section 11(4) provision dispenses with registration of such agreements. Consequently, civil court jurisdiction to re-evaluate adequacy of compensation or to determine higher market value is foreclosed. The appeals were allowed and the reference court’s and High Court’s judgments were set aside, without costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. Ramaswamy
  • B. L. Hansaria
Judgment Date
1995-08-25
Court Decision / Holding
Appeals allowed. The orders of the Reference Court, as confirmed by the High Court, are set aside. No costs.
Final Disposition
Appeals allowed; set aside lower courts' judgments; no costs.

Parties to the Case

Appellants / Petitioners

  • State of Gujarat

Respondents

  • Daya Shamji Bhai and others

Legal Representation & Advocates

Counsels for Petitioners

  • • D. Dave
  • • N. Mukherjee
  • • Ms. Hemantika Wahi

Provisions of Law Cited

Land Acquisition Act, 1894 – Section 11(2) (award in terms of agreement)Land Acquisition Act, 1894 – Section 11(4)Land Acquisition Act, 1894 – Section 18Land Acquisition Act, 1894 – Section 31(1)Land Acquisition Act, 1894 – Section 31(2)Land Acquisition Act, 1894 – Section 23(1)Land Acquisition Act, 1894 – Section 23(2)Land Acquisition Act, 1894 – Section 28Indian Registration Act, 1908 – Section 4(1)

Legal Doctrines & Maxims

  • Consent award under Section 11(2) binds the parties and obviates the need for reference under Section 18.
  • Notwithstanding clause in Section 11(2) permits award without further inquiry when parties agree in writing to terms.
  • Agreement under Section 11(2) obviates the requirement of registration under the Indian Registration Act, 1908 (Section 11(4)).
  • Right to reference under Section 18 is conditioned on non-acceptance of the award; acceptance with consent forecloses reference.

Submissions & Arguments

Contentions of Appellants / Petitioners

The State contends that the written consent agreements under Section 11(2) of the Land Acquisition Act, 1894—though not registered under the Indian Registration Act, 1908—are valid and binding. Since the award is made in terms of the contract, there is no necessity for reference under Section 18. The proviso to Section 31(2) and the non-necessity of protest support this position; once consent is given, the right to reference (under Section 18) does not arise. Registration is not required for such agreements under Section 11(4). The civil court therefore has no jurisdiction to reassess compensation or market value.

Contentions of Respondents

The landowners argued that reference under Section 18 should be permissible where the reference court enhanced compensation. They contended that non-registration of the agreements should not strip them of their legal right to challenge the adequacy of compensation in civil court. They maintained that Section 18 lies beyond the scope of the consent and that the contract should not bar statutory rights to seek higher compensation.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,179 words•~10 min read

In The Court Record

State of Gujarat v. Dayashamjibhai

A ## STATE OF GUJARAT ETC. ETC. _v._ ## DAYA SHAMJI BHAI ETC. ETC. AUGUST 25, 1995 ## B [K. RAMASWAM:V AND B.L. HANSARIA, JJ.] _Land Acquisition_ Ac~ _1894: Sections 11, 12, 18 and 31(1)._ _Reference Cowt-Power to enhance compensation-Agreement-Landowner's agreeing to receive compensation in tenns of agreement and fore go_ c _the right of reference-Payment of compensation accordingly-Held landowne1:s have no 1ight to seek reference-Civil Court has not jurisdiction to go into adequacy of the compensation--Agreement entered under Section 11(2) needs no_ regi.stratio1~. D _Indian Registration Act, 1908 :_ _Agreement under section 11 (2) of Land Acquisition Act, 1894-Registration of-Held not required._ THe respondents-land owners, whose lands were acquired, entered E into agreements under section 11(2) of the Land Acquisition Act, 1894 whereunder they consented to accept the compensation determined by the Land Acquisition Officer and 25% more thereof and agreed to forego their right to seek reference under Section 18. However, after accepting compensation in terms of the agreements, they sought reference under section 18 of the Act. The reference Court enhanced the compensation and rejected F the State's reliance on the agreement on the ground that they were not registered under the Registration Act. On appeals preferred by State the High Court confirmed the judgment of the reference Court. Against the decision of the High Court State preferred appeals before this Court. ## G Allowing the appeals, this Court HELD : 1. The contract between the owners and the Collector regarding the terms to be included in the award of the Collector is conclusive and binds the parties. The award made under Section 11(2) of the Land Acquisition Act in terms of the agreement between the parties is an award with H consent obviating the necessity of reference under Section 18. [92-D; A] 88 89 STATE _v._ DAYASHAMJIBHAI 2. The entitlement to make reference to civil court under Section A 18(1) and within the period prescribed under sub-section (2) is conditioned upon non-acceptance of the award. Under the second proviso to sub-section (2) of Section 31 "no person who has received the amount otherwise than under protest shall be entitled to make any application under Section 18". Once an agreement was entered by the parties, the B question of objection to receive Compensation under protest does not arise. So, the respondents have no right to seek a reference to the civil court under Section 18 of the Act. [91-F-H; 92-A] B 3. Only a valid reference under Section 18 confers jurisdiction on the civil court to consider whether the compensation awarded by the Collector C is just and fair. Thereafter, when it finds that the Collector ought to have awarded higher compensation, the civil court gets jurisdiction to award statutory benefits on higher compensation from the date of taking possession only. In view of the specific contract made by the respondents in terms of Section 11(2), they are not entitled to seek a reference. Consequently, the civil Court is devoid of jurisdiction to go into the adequacy of compenD sation awarded by the Collector or prevailing market value as on the date of notification under Section 4(1) to determine the compensation under section 23(1) and to grant statutory benefits. (92-G-H; 93-A] 4. By operation of Section 11(4), the need for registration of the E agreement is obviated. (93-B] CIVIL APPELLATE JURISDICTION _:_ Civil Appeal No. 8117 of 1995 Etc. Etc. From the Judgment and Order dated 3.7.92 of the Gujarat High Court in F.A. No. 17743 of 1991. D. Dave, N. Mukherjee and Ms. Hemantika Wahi for the Appellants. The following Order of the Court was delivered : G Cday condoned. Leave granted. Though notice has been served on all the respondents, none appears either in person or through counsel in all the appeals. Notification under Section 4(1) of the Land Acquisition Act, 1894 H 90 SUPREME COURT REPORTS (1995] SUPP. 3 S.C.R. A B c D E (for short, 'the Act') was published on December 18, 1980 acquiring large extent of lands for the purpose of irrigation dam No. 2 Project. The land owners had given their consent in writing on March 11, 1983 agreeing to accept the compensation determined by the land Acquisition Officer and 25 per cent more thereof and also agreed not to seek any reference under Section 18. The market value was determined by the Collector on March 25, 1983, and 25 per cent in addition thereto wa_s awarded. Respondents were paid in terms of the consent agreements signed by the respondents and sanctioned by the Superintending Engineer, Rajkot. Subsequent thereto, the respondent sought for reference under Section 18 on April 26, 1986. The Assistant Judge, Morbi in Rajkot by his award and decree dated June· 29, 1991 enhanced compensation to the rate Rs. 200 per acre for the Bagayat land and Rs. 140 per acre for Jirayat land. Feeling aggrieved, when the appellants filed appeals, the Gujarat High Court confirmed the same by the impugned judgment and decree dated July 3, 1992. Thus these appeals by special leave. The only question is whether the claimants of the land are entitled to seek reference under section 18 and the civil court can determine higher compensation. Section 11(2) of the Act empowers the parties to enter into an agreement and an award in terms thereof is permissible. In the agreement they had specifically accepted that owners would receive compensation and 25 per cent of the compensation in addition and had agreed to forego their right to seek reference under Section 18 of the Act. The owners and the Special Land Acquisition Officer had agreed under Sectionll(2) of the Act that the Land Acquisition Officer would make the award ·in terms of the contract. Clause 14 of the agreement reads thus : F "The land owners will not go to any Court under Section 18 of the Act." In the award, it is seen that the Land Acquisition Officer while awarding the compensation, had also worked out the addition of 25% and G awarded total compensation to the Land owners. It is not in dispute that they had been paid accordingly. In the award, the Land Acquisition Officer has specifically stated that : H "As discussed in para 9-A and as mentioned in para 9-B, I fix the value of the lands, under acquisition in this case, for Bagayat Lands at Rs. 110 per acre, for Jirayat Lands at Rs. 80 and for waste lands 91 STATE _v._ DAYASHAMJIBHAI at Rs. 10 per acre and further order to pay as such. Moreover, in A this case, the persons interested has demanded for 25% consent more. The consent rate is sanctioned by the Superintending Engineer, Rajkot Irrigation Circle, Rajkot vide his letter No. PB/4/General/LA0/1519, dated 25.3.1983 and accordingly I also order to pay the amount of 25% consequent rate. B ''In view of the above agreement and in view of the discussion made by the Land Acquisition Officer in the award and working details given in the annexures made therein, it is clear that the parties having contracted to receive compensation the question emerges whether they are entitled to seek a reference. On making an award under Section 11 and issuance of c the notice under Section 12 of the Act, the Collector is enjoined under Section 31(1) to tender payment of the compensation awarded by him to the interested persons entitled thereto to receive the compensation according to the terms of the award. Under the section proviso to sub-section (2) of Section 31 "no person who has received the amount otherwise than D 11 under protest shall be entitled to make any application under Section 18 • The entitlement to make reference to civil court under Section 18(1) and within the period prescribed under sub-section (2) is conditioned upon non-acceptance of the award. Sub-section (1) of Section 18 makes the matter clear thus : "Any person interested who has not accepted the award E may, by written application to the Collector, require that the matter be referred by the Collector for the determination of the Court regarding his objection, be it to the measurement of the land, the amount of the compensation, the persons to whom it is payable, or the apportionment of the compensation among the persons interested." The right and entitlement to seek reference would, therefore, arise when the amount of compensation F was received under protest in writing which would manifest the intention of the owner of non-acceptance of the award. Section 11 (2) opens with an non-obstante clause "notwithstanding anything contained in sub-section (1)" and provides that "if at any stage of the proceedings, the Collector is saLisficd that all the persons interested in the land who appeared before G him have agreed in writing on the matters to be included in the award of the Collector in the form prescribed by rules made by the appropriate Government, he may, without making further enquiry, make an award according to the terms of such agreement. By virtue of sub-section ( 4), "notwithstanding anything contained in the Registration Act, 1908, no agreement made under sub-section (2) shall be liable to registration under H c F SUPREME COURT REPORTS (1995) SUPP. 3 S.C.R. 92 - A that Act". The award made under Section 11 (2) in terms of the agreement is, therefore, an award with consent obviating the necessity of reference under Section 18. The Reference Court negatived the contention of the State and its reliance on agreement of the parties on the ground that since the said B agreements were not registered utjtder Registration Act, they cannot contract out from statute. Therefore the Reference Court has the power to award higher compensation. It is seen that in the contract had agreed to receive compensation and 25 per cent more in addition thereto. They had also agreed not to seek any reference under Section 18. In the light of the c above, no option is left to the parties under Section 18 to seek reference. Sub- section (2) of Section 11 gives right to the parties to enter into an agreement to receive award compensation awarded under Section 11 in terms of the contract. In fact, it would be more expeditious to have the dispute sorted out so as to avoid delay in determination of proper comD pensation. The contract between the owners and the Collector in writing of the terms to be included in the award of the Collector is conclusive and binds the parties. They would not be entitled to seek any reference for enhancement of the compensation required to be adjudicated under Section 23(1) of the Act. It would be seen that when compensation was received under protest, Section 18 gets attracted. B c E The question of awarding interest and statutory benefits arises when the civil court finds that the amount of compensation awarded to the land owners by the Collector is not adequate and the prevailing market value is higher than the market value determine<! by the Land Acquisition Officer F under Section 23(1). For entitlement to solatium under Section 23(2). "in addition to" market value the court shall award solatium; Under Section 28, if the court gets power to award interest, when court opines that the Collector "ought to have awarded compensation in excess of the sum which the collector did award the compensation". In other words, valid reference under Section 18 confers jurisdiction on the civil court to consider whether G the compensation awarded by the Collector is just and fair. Thereafter, when it finds that the Collector ought to have awarded higher compensation, the civil court gets jurisdiction to award statutory benefits on higher compensation from the date of taking possession only. In view of the specific contract made by the respondents in terms of Section 11(2), they H are not entitled to seek a reference. Consequently, the civil court is devoid 93 STATE _v._ DAYASHAMJIBHAI of jurisdiction to go into the adequacy of compensation awarded by the A Collector or prevailing market value as on the date of notification under Section 4(1) to determine the compensation under Section 23(1) and to grant statutory benefits. By operation of Sectionll( 4), the need for registration of the agreement is obviated. As seen in the contract, the respondents have foregone B their right of seeking reference in lieu of 25% more than the compensation determined by the Collector under Section 11(2) of.the Act. In fact, 25 per cent in addition to the market value determined by the Collector in his award under section 11 (1) had been paid as the consideration to forego reference. Even otherwise, once an agreement was entered by the parties, C the question of objection to receive compensation under protest does not arise. So, they have no right to seek a reference to the civil court under Section 18 of the Act. The appeals are accordingly allowed. The orders of the reference court as confirmed by the High Court are set aside but, in the circumstanD ces, without costs. SLP (C) No. 20637 of 1995 (CC 3519/95) Issue notice. T.N.A. Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (1995) Decisions
1995-02-23

Inder Singh v. State of Punjab

Inder Singh, convicted under Section 302 IPC for the murder of Amar Singh, questions the High Court’s affirmation of his life-term sentence. The prosecution’s version is that Amar Singh, who had gone to see off a tractor driver, did not return home; on the night of 31 March/1 April 1984, the appellant, armed with a barchha, lay in wait behind a heap of manure and suddenly sprang upon Amar Singh, while PW4 (the deceased’s father) and PW5 (the mother) were trying to intervene. Amar Singh died instantaneously from a fatal neck wound, with the post‑mortem revealing injuries that pointed to a lethal strike. The Trial Court convicted the appellant under Section 302 IPC, while acquitting two co‑accused. In the appeal before the Supreme Court, the defence argued that the appellant’s motive was merely to thrash Amar Singh for suspected theft of cauliflowers, and that lying in wait with a weapon did not necessarily prove an intention to kill. The Court rejects this: the manner of the assault, the weapon used, the location and extent of the injuries, and the fact that PW4 was also injured while trying to save Amar Singh indicate a determined intention to cause fatal injury. The Court also notes the prompt FIR, the medical evidence, and the recovery of the weapon as corroboration, sustaining the conviction. The appeal is dismissed.

1995-03-27

SUBORDINATE SERVICES SELECTION BOARD v. BIR SINGH AND ANR./RAM NIWAS AND ORS.

This Supreme Court decision concerns the interpretation of reservation in Ex-Servicemen posts and the eligibility of dependents of ex-servicemen for clerical posts in A-class offices. The case arose from a dispute over whether dependents of ex-servicemen, who possess Matriculation but do not have First Division in Matriculation or Second Division in Intermediate, could be considered for appointment to A-class clerical posts when ex-servicemen are unavailable and vacancies exist in the reserved quota. The government had reserved A-class posts for ex-servicemen and prescribed stratified qualifications for A-class and B-class offices; in 1979, to avoid lapsing of reserved posts, it was decided that dependent sons and daughters of ex-servicemen who fulfilled all prescribed conditions should be considered on merit for posts reserved for ex-servicemen to the extent of non-availability of suitable ex-servicemen. The respondents, dependents of ex-servicemen, argued that the 7.9.1991 advertisement did not distinguish between A- and B-class posts and that their Matriculation alone made them eligible for A-class posts on par with ex-servicemen. The High Court held them eligible, but the Court reversed, holding that such dependents are not entitled unless they meet the prescribed qualifications (Matric with First Division or Intermediate with Second Division) or are ex-servicemen. The appeals were allowed.

1995-11-01

Yadu Nandan Garg v. State of Rajasthan and Ors.

This appeal concerns a preliminary notification under Section 4(1) of the Rajasthan Land Acquisition Act, 1953 for the 'planned development of Jaipur city' and a declaration under Section 6 issued after the improvement scheme had been finalised. The appellant, Yadu Nandan Garg, had purchased part of the land in 1970 and built a residence there, while Anand Nursery nearby obtained an exemption. The challenge focused on: (i) alleged unexplained delay between the preliminary notification and the declaration, (ii) discriminatory treatment in granting exemption to Anand Nursery but not to the appellant, and (iii) misdescriptions of survey numbers in the Section 9 notice, namely 265 vs 265/1. The Rajasthan High Court had dismissed the challenge, and the Supreme Court, in its division bench, upheld the validity of the acquisition. The Court held that a purchaser cannot acquire title against the State by clinging to an encumbrance after the notification and finalisation of the scheme; under Section 16 the State is entitled to possession with absolute title free from encumbrances. It rejected the contention of inordinate delay, noting the usual administrative time involved in finalising the scheme. It also held that wrong exemptions or mis-stated survey numbers do not invalidate the notification under Section 4(1), provided the main survey number is mentioned, and that discrimination claims fail given lack of a universal benefit. Consequently, the appeal was dismissed without costs.

1995-09-19

Controller of Examination, Utkal University and Anr. v. Paurnamasi Das and Anr.

These two Civil Appeals arise from challenges to the awarding of BA honours by Utkal University under its Regulations for pre-degree and final degree examinations, and the operation of the 1990 Hard Case Rule. Regulation 12 prescribes separate classification in pre-degree and final degree exams, to be shown on the diploma, with specific percentage thresholds for Second Class and First Class honours in both stages. Regulation 16(b) makes the final degree honours list depend solely on marks obtained in the final examination, subject to retaining honours in the pre-degree stage. The Hard Case Rule provides grace marks (up to 0.5%) to enable a candidate to retain honours or attain a higher class, but must be applied per part of the examination. The respondents, in two appeals, were short by 4 marks in their final degree honours papers, seeking to add 4 grace marks (0.5% of 800) by aggregating marks across pre-degree and final degree, an approach the High Court accepted but the University challenged. The Court held that the Hard Case Rule applies separately to each examination part, and that only up to 2 grace marks could be added in the final degree examination (not across parts). The High Court’s view was thus incorrect, and the appeals were allowed with writ petitions dismissed."