Sibu Jacob v. Kerala State Electricity Board

Case / Petition Number:
OP.No. 32159 of 2001(C)

Case Synopsis & Summary

The Kerala High Court deals with a consumer dispute over electricity charges alleged to have been wrongly billed due to a faulty meter. On 7 August 2001, an inspection revealed that in a three‑phase meter, the second phase ran in reverse, leading to a claim for Rs. 83,393 as a penalty (Ext.P2). The petitioner challenged these demands, arguing that the Electrical Inspector, under Section 26(6) of the Indian Electricity Act, must decide meter correctness and determine any payable energy charges, rather than the board. He relied on a Division Bench decision in Nirmala Metal Industries v. K.S.E.B. (2006) and his own earlier petitions, asserting no reference to the Electrical Inspector had occurred. The board maintained that Ext.P1 acknowledged fault; if the meter is faulty, the petitioner cannot invoke 26(6) unless a dispute arises, and the failure to contest Ext.P1 should not bar the demand. The court carefully analyzes Section 26(6) and quotes Tata Hydro-Electric Power Supply Co. Ltd. v. Union of India and Atma Steel, treating CT as an apparatus within 26(7). It concludes that a dispute arises only when a party contests a fact; here the petitioner did not challenge Ext.P1, so the board’s demand for charges for the period prior to discovery is justified. Exts.P5–P7 are quashed, and the board is to issue fresh bills based on three months’ average consumption after meter replacement.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. Siri Jagan
Judgment Date
2009-12-03
Court Decision / Holding
The writ petition is disposed of as above. Exts.P5 to P7 are quashed. The respondents are directed to issue fresh bills in place of Ext.P6 to P7 on the basis of the average consumption of the petitioner for three months subsequent to the replacement of the meter.
Final Disposition
Writ petition disposed of; Exts.P5–P7 quashed; fresh bills to be issued based on three months’ average consumption after meter replacement.

Parties to the Case

Appellants / Petitioners

  • Sibu Jacob, Executive Partner, Kochupurackal Rubbers, Poovanthuruthu, Kottayam

Respondents

  • The Kerala State Electricity Board (represented by its Secretary)
  • Sub Engineer, Kerala State Electricity Board, Nattakom Section, Kottayam
  • Senior Superintendent, Electrical Major Section, Pallom, Kottayam
  • The Executive Engineer, Electrical Division, Pallom, Kottayam

Legal Representation & Advocates

Counsels for Petitioners

  • • Mr. R. Sudhir (Adv.)

Counsels for Respondents

  • • S. Kodoth Sreedharan, SC for KSEB (R1-3)
  • • C.K. Karunakaran, SC for KSEB (R1-3)

Provisions of Law Cited

Section 26(6) of the Indian Electricity Act, 1910Section 26(7) of the Indian Electricity Act, 1910

Legal Doctrines & Maxims

  • The register of the meter shall, in the absence of fraud, be conclusive proof of the energy quantity (Section 26(6)).
  • A difference or dispute arises as to whether a meter is or is not correct should be decided by an Electrical Inspector under Section 26(6).
  • CT is an apparatus within the meaning of Section 26(7) of the Act (as discussed in Tata Hydro-Electric Power Supply Co. Ltd. v. Union of India).

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that the respondents had no jurisdiction to decide meter correctness or determine energy charges for a possibly faulty meter without reference to an Electrical Inspector under Section 26(6). Relying on Nirmala Metal Industries v. K.S.E.B., he argues the Board cannot demand charges for alleged short recording without proper reference. He asserts that Ext.P1's fault could have triggered reference only if a dispute arose, which did not occur since Ext.P1 was not challenged promptly.

Contentions of Respondents

The Board argues that Ext.P1 acknowledged fault; by not challenging it, the petitioner accepted the meter’s fault, negating the need for Section 26(6) reference. It asserts Ext.P2 and subsequent bills (Exts.P5–P7) were issued pending correction, and charges for the short recording can be demanded. The respondents defend continuing billing on a method other than the faulty meter’s reading and argue that in the absence of a dispute under 26(6), reference is not mandatory.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Nirmala Metal Industries v. K.S.E.B.2006(3) KLT 465DistinguishedCourt references the Division Bench decision but distances its applicability to the present case, indicating the facts here do not align with the reasoning in Nirmala Metal regarding the necessity of Section 26(6) reference.
Tata Hydro-Electric Power Supply Co. Ltd. v. Union of IndiaAIR 2003 SC 1581PositiveCited to support that a dispute under Section 26(6) arises only when facts are contested and that CT is an apparatus within Section 26(7), shaping the interpretation of meter-related disputes.
U.P.S.E.B. v. Atma Steel—PositiveRelied upon (supra) to discuss the interpretation of the Act’s provisions regarding meter apparatus and related references.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,012 words•~10 min read

In The Court Record

Sibu Jacob v. Kerala State Electricity Board

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.SIRI JAGAN** **THURSDAY, THE 3RD DECEMBER 2009 / 12TH AGRAHAYANA 1931** **OP.No. 32159 of 2001(C)** **-----------------------** ## **PETITIONER(S):** - **---------------** **SIBU JACOB, EXECUTIVE PARTNER, KOCHUPURACKAL RUBBERS, INDUSTRIAL DEPARTMENT PLOT, POOVANTHURUTHU, KOTTAYAM.** **BY ADV. MR.R.SUDHIR** ## **RESPONDENT(S):** ## **---------------** **1. THE KERALA STATE ELECTRICITY BOARD, THIRUVANANTHAPURAM, REPRESENTED BY ITS SECRETARY.** **2. SUB ENGINEER, KERALA STATE ELECTRICITY BOARD, NATTAKOM SECTION, KOTTAYAM.** **3. SENIOR SUPERINTENDENT, ELECTRICAL MAJOR SECTION, PALLOM, KOTTAYAM.** **4. THE EXECUTIVE ENGINEER, ELECTRICAL DIVISION, PALLOM, KOTTAYAM.** - **ADV. SRI.KODOTH SREEDHARAN, SC, KSEB SRI.C.K.KARUNAKARAN, SC FOR KSEB FOR R1-3** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 03/12/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **OP.No. 32159 of 2001(C)** ## **APPENDIX** ## **PETITIONER'S EXHIBITS:** - **EXT.P1 - A TRUE COPY OF THE SITE MAHAZAR PREPARED BY THE 2ND RESPONDENT DATED 7.8.2001.** - **EXT.P2 - A TRUE COPY OF THE NOTICE DATED 8.8.2001 ISSUED BY THE 3RD RESPONDENT.** - **EXT.P3 - A TRUE COPY OF THE JUDGMENT IN O.P. NO. 24313 OF 2001 DATED 16.8.2001 OF THE COURT.** - **EXT.P4 - A TRUE COPY OF THE PROCEEDINGS DATED 17.10.2001 OF THE 4TH RESPONDENT.** **EXT.P5 - A TRUE COPY OF THE BILL DATED 16.8.2001 INVOICE NO. 84358.** **EXT.P6 - A TRUE COPY OF THE BILL INVOICE NO. 84662 DATED 15.9.2001.** **EXT.P7 - A TRUE COPY OF THE BILL INVOICE NO. 3662 DATED 15.10.2001.** ## **// TRUE COPY //** ## **PA TO JUDGE** **rhs** ## **S. SIRI JAGAN, J** **................................................ O.P. No. 32159 of 2001** **................................................. Dated this the 3[rd] day of December, 2009** ## **J U D G M E N T** The petitioner is a consumer of electricity. On 7.8.2001, the 2[nd] respondent inspected the electrical installation at the petitioner's premises and prepared Ext.P1 Mahazar, wherein it was stated that on examination of the meter in detail, which is a three phase meter, the 1[st] and 3[rd] phases were working properly and the 2[nd] phase was found running in the reverse direction. Thereafter, the petitioner was served with Ext.P2 notice claiming an amount of Rs. 83,393/- which is described as a penalty charged as per the inspection report of the 2[nd] respondent. The petitioner challenged Ext.P2 bill before this court by filing O.P. No. 24313 of 2001. By Ext.P3 judgment, this court relegated the petitioner to the remedy by way of appeal before the Executive Engineer. Pursuant thereto, the petitioner filed an appeal before the Executive Engineer, who by Ext.P4 order rejected the contentions of the petitioner and confirmed Ext.P2 bill. Thereafter, the petitioner was again served with Exts.P6 and P7 bills demanding charges for the probable energy consumed by the petitioner through the faulty meter, on the **O.P. No. 32159 of 2001** -2- assumption that the meter was recording only[1] /3rd of the actual consumption. The petitioner is challenging Exts.P2, P4, P5, P6 and P7. 2. The primary contention of the petitioner is that the respondents had no jurisdiction to decide the question as to whether the meter was faulty and if the meter was faulty, the energy charges payable by the consumer for the period in question. According to the petitioner, that jurisdiction rests exclusively with the Electrical Inspector under Section 26(6) of the Indian Electricity Act, which was applicable at the relevant time and without reference to the electrical inspector, respondents could not have demanded and recovered energy charges on the assumption that the meter was recording only[1] /3rd of the actual consumption. According to the petitioner, since the respondents have not chosen to refer the dispute to the electrical inspector under Section 26(6), going by the Division Bench decision of this court in **Nirmala Metal Industries v. K.S.E.B.** [2006(3) KLT 465], the Board cannot demand electricity charges for the alleged short recording of electricity consumed by the alleged faulty meter. He also relies on my decision in O.P. Nos. 26123, 27988 and 29518 of 1999, by judgment dated 14.10.2008. **O.P. No. 32159 of 2001** -3- 3. The standing counsel for the electricity board contends that in so far as the petitioner has not challenged Ext.P1 Mahazar, it must be presumed that he has accepted the fact that the meter was faulty and therefore there was nothing wrong in the respondents demanding the electricity charges from the petitioner on the ground that the meter was recording only[1] /3rd of the actual consumption. The contention is that if the petitioner had a dispute that the meter is actually correct, it was for him to raise that dispute and seek reference under Section 26(6). The petitioner having not done so, he cannot now dispute the correctness of the demand made is the contention raised by the respondents. Regarding Exts.P5 to P7 bills, the contention is that in order for the petitioner to decide whether to seek reference under Section 26(6) or not the respondents did not replace the meter for three months and for that period also the electricity charges were demanded on the basis that the meter was recording only[1] /3rd of the actual consumption. 4. I have considered the rival contentions in detail. 5. In view of the pleadings before me, the question to be decided is as to whether the bills issued by the respondents for recovery of electricity charges without first resorting to reference **O.P. No. 32159 of 2001** -4- under Section 26(6) of the Indian Electricity Act is valid or not. Section 26(6) reads thus: “Where any difference or dispute arises as to - whether any meter referred to in sub section (1) is or is not correct, the matter shall be decided, upon the application of either party, by an Electrical Inspector; and where the meter has, in the opinion of such Inspector ceased to be correct, such Inspector shall estimate the amount of the energy supplied to the consumer or the electrical quantity contained in the supply, during such time, not exceeding six months, as the meter shall not, in the opinion of such Inspector, have been correct; but save as aforesaid, the register of the meter shall, in the absence of fraud, be conclusive proof of such amount or quantity:” (underlining supplied) 6. As is clear from the first sentence of Section 26(6), in order to attract jurisdiction of the Electrical Inspector under that Section a difference or dispute as to whether any meter is or is not correct should arise. The counsel for the petitioner would argue that the word 'arise' means “come into being” or “come to notice or action as a result of” as given in Oxford Dictionary. According to him, word 'arise' should be considered in contradistinction with 'raised'. Therefore, according to him as soon as a meter is found faulty a dispute arises and therefore electricity board is bound to refer that dispute under Section 26(6) to the Electrical Inspector. I am unable to agree. If that be so, in every case, where the meter is found faulty, automatically the electricity board would be bound to **O.P. No. 32159 of 2001** -5- refer the matter to the Electrical Inspector. That is not what is contemplated under Section 26(6). A dispute or difference would arise only when one party asserts the existence or non-existence of a fact and the other party disputes the existence or non-existence of that fact. When one person asserts the existence or non existence of a fact and the other party does not dispute the same there arises no difference or dispute. Therefore, going by the reasoning given by the counsel for the petitioner himself only if a difference or dispute arises the jurisdiction of the electrical inspector attracted. That is the law declared by the Supreme Court in **Tata Hydro-Electric Power Supply Co. Ltd. v. Union of India** [AIR 2003 SC 1581], wherein in paragraph 15 it is held thus: “It was urged before the High Court as also before us that having regard to the judgment of this Court in U.P.S.E.B. v. Atma Steel (supra) it is no longer open to the appellant to contend that CT was not an apparatus within the meaning of Section 26(7) of the Act. Having perused the judgment of this Court in Atma Steel's case (supra), we also entertain no doubt that CT is an apparatus within the meaning of Section 26(7) of the Act.” 7. Here, in Ext.P1 Mahazar it is specifically stated that on detailed inspection it was found that one phase of the three phase meter was running in reverse direction. It does not need any expertise to understand from the same that what it means is that **O.P. No. 32159 of 2001** -6- the meter is faulty. Therefore as soon as Ext.P1 is received the petitioner must have known that according to the respondents the meter is faulty. If the petitioner had a case that the meter is not faulty he should have contested Ext.P1 immediately on receipt of the same. Only if he had done so, a difference or dispute would arise as to whether the meter is or is not correct. It is also pertinent to note that in Ext.P8 memorandum of writ petition in W.P(C) No. 24313/2001, which the petitioner has produced along with I.A. No. 15257 of 2009, the petitioner did not choose to challenge Ext.P1 although he had produced Ext.P1 in that writ petition also. In fact in Ext.P9 appeal filed by the petitioner as directed in Ext.P3 judgment, there is no assertion that the meter is not faulty nor is there a demand for reference of the any dispute under Section 26(6). The explanation of the petitioner for this is that at that time the petitioner was not aware that Ext.P2 demand was for deficit current charges for the past six months on account of the fault in the meter, since Ext.P2 specifically stated that demand is for penalty. It is prepared that in Ext.P2 the respondents have chosen to describe the demand as penalty charged as per the inspection report. Even then the petitioner cannot dispute the fact that going by Ext.P1 it is abundantly clear **O.P. No. 32159 of 2001** -7- that according to the respondents the meter was faulty. Therefore if the petitioner had a contention that the meter was not faulty the petitioner was bound to raise that dispute, when only the dispute would arise as contemplated under Section 26(6) of the Indian Electricity Act. Therefore in my opinion since the petitioner condescended to the fact that the meter was faulty, the respondents were not bound to refer any dispute for decision of the electrical inspector as required under Section 26(6). 8. Then the only the question is whether the petitioner is liable to pay the amount demanded by the respondents on account of the defect in the meter. Nowhere has the petitioner disputed the specific statement in Ext.P1 that one of the phases of the power meter was running in the reverse direction. That being so, it is clear that the meter was recording only[1] /3rd of the consumption. In such circumstances, the respondents are justified and demanding the electricity charges for the balance[2] /3rd[ consumption for six] months prior to the date of detection of the defect in the meter. Therefore I do not find any merit in the challenge against Exts.P2 and P4. 9. But after having found the meter to be faulty it is not proper on the part of the respondents to continue billing the **O.P. No. 32159 of 2001** -8- petitioner by a calculator on the basis of the reading in the faulty meter. The maximum they could have done is to charge the petitioner for the average consumption per month as per the reading in the replaced meter. Accordingly Exts.P5 to P7 bills are quashed. The respondents are directed to issue fresh bills in the place of Ext.P6 to P7 on the basis of the average consumption of the petitioner for three months subsequent to the replacement of the meter. The writ petition is disposed of as above. sd/- **S. SIRI JAGAN, JUDGE** rhs // True copy // PA to Judge
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.