Shree Ram Urban Infrastructure Ltd. & Anr. v. State of Maharashtra & Ors.
Case Synopsis & Summary
Shree Ram Urban Infrastructure Ltd. (SRUIL) challenged development permissions for a private multi-storeyed complex in Mumbai, comprising a main residential building (56 floors) and a Public Parking Lot (PPL) with three basements and 15 upper floors. The plans, sanctioned under the Maharashtra Regional and Town Planning Act, 1966 (MRTP Act) read with the Development Control Regulations for Greater Bombay, 1991 (DCR), provided for incentive Floor Space Index (FSI) on the land owned by private owners once the PPL was handed over to the Corporation. Although the commencement certificate for the PPL extended only to the plinth level, SRUIL constructed all 15 floors; the residential building rose to 56 floors while the commencement certificate for the main building was up to the 43rd floor. In 2011, the Corporation issued a circular restricting PPL to two basements, ground, and four upper floors; a stop-work notice followed. SRUIL challenged these actions in civil suits and PILs. The High Court held the PPL construction beyond the plinth illegal; the matter moved to the Supreme Court (transferred PILs and transfer petitions). The Court held that the PPL’s beyond-plinth construction and the main building’s upper floors progressed under deemed permission under Regulation 6(4) of DCR 1991 and that the refuge area determination did not require interference. The Court upheld the refuge-area order, directed the Corporation to take over the PPL, and to decide on 13 floors (44–56) within a month. It partly allowed the appeal and dismissed transfer petitions.
Find Cases Like This
Explore other judgments dealing with similar legal situations, facts, or statutory provisions.
Case Details & Bench
- Court
- Supreme Court of India
- Hon'ble Judges
- Arun Mishra
- Vineet Saran
- Judgment Date
- 2019-10-24
- Court Decision / Holding
- Partly allowing the appeal; dismissing the transfer petitions. The Court held that deemed permission accrued under Regulation 6(4) and upheld the refuge-area determination. It directed the Corporation to take over the PPL and proceed to decide on the 44–56 floors of the main residential building, within one month from today. PILs filed by Janhit Manch were dismissed.
- Final Disposition
- The Supreme Court partly allowed the appeals and dismissed the Transfer petitions. It held that deemed permission accrued for the PPL and upheld the CFO’s refuge-area determination. The Court directed the Corporation to take over the PPL and proceed to decide on the 44th–56th floors of the residential building within one month. Janhit Manch’s PILs and related transfers were dismissed.
Parties to the Case
Appellants / Petitioners
- Shree Ram Urban Infrastructure Ltd. & Anr.
Respondents
- State of Maharashtra
- Municipal Corporation of Greater Mumbai (MCGM)
Legal Representation & Advocates
Counsels for Petitioners
- • C. U. Singh
- • Arvind Nayar
- • Neeraj Kishan Kaul
- • Pinaki Mishra
- • Ms. Meera Mathur
- • Ms. Garima Prashad
- • Lalit Kataria
Counsels for Respondents
- • Atmaram N.S. Nadkarni (ASG)
- • S. Sukumaran
- • Anand Sukumar
- • Bhupesh Kumar Pathak
Provisions of Law Cited
Legal Doctrines & Maxims
- constructive res judicata
- ipse dixit
- deemed permission
- public interest (concept)
Submissions & Arguments
Contentions of Appellants / Petitioners
The appellants contended that the PPL was sanctioned under DCR 33(24) and that the deemed permission under Regulation 6(4) accrued on lapse of 15 days’ notice without a reply, allowing construction up to the 16th floor of the PPL and up to 56 floors of the main building with incentive FSI. They argued that the Circular of 22.6.2011 restricting PPL floors did not have force of law against statutory DCR provisions and that the High Court erred in delegitimizing the deemed permission; regularisation could proceed under MRTP Act provisions (Sections 44, 53(3)) without negating the earlier permission. They urged that the CFO’s refuge-area determination should be upheld as per the approved plans and NBC guidelines, and that possession and progress could be regularised rather than demolitions.
Contentions of Respondents
The respondents argued that the 2011 circular and subsequent directives restricted PPL floors and that regularisation could be limited by statutory regulations; they asserted that deemed permission could be revisited or modified under MRTP Act provisions and that the High Court’s directions to recalculate FSI and refuge areas were valid to protect public safety. They contended that performative acts in 2011–2013 required re-examination under MRTP Act Sections 51 and 53(3) and those directives could not be overridden by older permissions; they supported the Corporation’s take-over and reconsideration of 44–56 floors, under the government directives and NBC considerations.
Explore This Legal Issue
Find relevant judgments and authoritative positions on the legal questions discussed here.
Cited Precedents (7)
| Case Name | Citation | Treatment | Explanation |
|---|---|---|---|
| Kohinoor CTNL Infrastructure Co, Pvt. Ltd. & Anr. v. The MCGM & Ors. | (2013) 3 BCR 410 | Mentioned Only | Cited in the judgment but not relied upon for controlling outcome. |
| Suresh Estates Pvt. Ltd. & Ors. v. Municipal Corporation of Greater Mumbai & Ors. | (2007) 14 SCC 439 | Mentioned Only | Cited as reference, not a decisive authority in the judgment. |
| T. Vijayalakshmi & Ors. v. Town Planning Member & Anr. | (2006) 8 SCC 502 | Mentioned Only | Cited in footnotes as relevant authority but not the core basis for decision. |
| Pune Municipal Corporation & Anr. v. Promoters & Builders Association & Anr. | (2004) 10 SCC 796 | Mentioned Only | Cited in discussion but not central to the ruling. |
| Godrej and Boyce Manufacturing Co. Ltd. v. State of Maharashtra & Ors. | (2009) 5 SCC 24 | Mentioned Only | Cited as part of background authorities. |
| Indore Municipal Corporation & Anr. v. Dr. Hemalata & Ors. | (2010) 4 SCC 435 | Positive | Relied upon for principle that possible misuse cannot vitiate sanctioned permission. |
| Muni Suvrat-Swami Jain S.M.P. Sangh v. Arun Nathuram Gaikwad & Ors. | (2006) 8 SCC 590 | Mentioned Only | Cited in passing; not the primary ruling. |
Apply This to My Facts
Share your situation and test whether this judgment governs, supports, or challenges your case.
In The Court Record
Shree Ram Urban Infrastructure Ltd. & Anr. v. State of Maharashtra & Ors.
Related Decisions & Precedents from Supreme Court of India (2019)
Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors.
Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors. concerns allegations that Uber, in its ride‑hailing network, abused a dominant position under the Competition Act, 2002. The case arose on appeals challenging the Competition Appellate Tribunal’s order in Appeal No. 31 of 2016, which upheld the Director General’s inquiry into whether Uber’s pricing and incentive practices violated Section 4. The Supreme Court analysed whether the information before it sufficed to constitute a prima facie case under Section 26(1) and whether there was abuse of a dominant position in the National Capital Region. It focused on the two ingredients for abuse: the existence of a dominant position and its misuse. The court considered, based on a statement summarizing driver incentives and a period when Uber reportedly paid high incentives to fleet owners, that Uber may have pursued a pricing strategy that would affect its competitors. Under Section 4(2)(a), abuse includes an unfair price, including predatory pricing. The Court accepted that there is a prima facie case for infringement, yet did not itself interfere with the Appellate Tribunal’s order and dismissed the appeals. It directed the Director General to complete the investigation within six months from today.
STATE OF BIHAR & ORS. v. DR. CHAITRAYA KUMAR SINGH & ORS.
This civil appeal concerns the reorganization of the erstwhile Bihar into Bihar and Jharkhand in 2000 and the post-allocation transfer of an employee. The first respondent, Dr. Chaitraya Kumar Singh, was initially allocated to Jharkhand in 2007 as an Ayurvedic Medical Officer and, following Union guidelines permitting transfer after final allocations, was re-allocated to Bihar on 6 September 2010 with mutual consent of both States. Bihar issued formal orders, and the respondent joined Jharkhand in 2007; however, he remained in Jharkhand and continued to work there until his retirement on 30 April 2017. A few days before retirement, he filed a writ petition in Jharkhand seeking relief to join Bihar and to be relieved by Jharkhand so that Bihar could accept joining. The Jharkhand High Court confirmed a Single Judge’s order directing Bihar to absorb him. The appellants contend that after the 2010 allocation there was no vacancy, the respondent did not pursue available remedies promptly, and seven years of service in Jharkhand after allocation render absorption in Bihar inappropriate. The Court agrees, noting the allocation to Bihar continued to hold and the petitioner failed to pursue remedies in time; his superannuation in Jharkhand eliminates the basis for absorption. The relieving order issued post-retirement is irrelevant. The appeal is allowed, the High Court’s order set aside, and there shall be no costs; pending applications are disposed.
PUNJAB FINANCIAL CORPORATION v. M/S PAULBRO LEATHERS PVT. LTD.
Punjab Financial Corporation (lender) filed against Paulbro Leathers Pvt. Ltd. after Paulbro defaulted on a loan. The dispute was settled under the Corporation’s One Time Settlement (OTS) policy on 01.04.2003, and a court-ordered reference to a Chartered Accountant (CA) was made to determine the remaining outstanding balance. After the CA submitted his report, a new dispute arose about the precise liability and how much had been paid, prompting the Corporation to issue a demand for Rs. 49,86,713 which Paulbro disputed in a writ petition before the Punjab and Haryana High Court. The High Court allowed the petition on the ground that the entire exercise had been carried out with consent and no objection had been raised, effectively barring re-opening of the settlement. The appellant challenged these rulings in this Court. The Supreme Court held that the settlement created a fresh dispute arising out of its terms and that the matter must be decided on its merits under the law. It emphasized that the High Court should record how and on what basis Paulbro satisfied the settlement and discharged liability, and if needed, refer the report to another CA. The Court remanded the case to the High Court to decide the writ petition afresh on merits, with a directions to decide expeditiously (preferably within six months).
RAJESH KUMAR DWIVEDI v. STATE OF U.P. & ANR.
Rajesh Kumar Dwivedi challenges the rejection of his candidature for the post of Instructor in Fitter at Government Industrial Training Institutes in Uttar Pradesh. An advertisement of 17 March 2008 required candidates to possess a certificate in the respective trade from the NCVT, in addition to experience. Dwivedi possessed three National Trade Certificates from Model Industrial Training Institute, Haldwani (one-year basic training in Mechanical, six-month Fitter General module, six-month Metrology and Engineering Inspection), but did not hold a two-year NCVT certificate. The High Court had dismissed his writ petition, holding that three separate courses could not be treated as equivalent to the NCVT qualification. Dwivedi relied on (i) the 16 December 1983 circular clarifying equivalence between the Restructured and Conventional patterns of the Craftsmen Training Scheme, and (ii) 1988 and 1992 UP circulars recognizing MITI, Haldwani training as equivalent to NCVT, including a two-year Fitter trade certificate. The State argued that the amended UP ITI Rules require NCVT certification and that the reliance on circulars cannot override the Rules. The Supreme Court held that the eligibility condition is to have a certificate in the respective trade from NCVT, and that if the State had earlier treated certain qualifications as equivalent through its circulars, such equivalence cannot be disregarded. Consequently, the appellant’s candidature could not be validly rejected, and the State was directed to appoint him within two months. The decision underscores how State-issued equivalence can complement or override rigid Rule-based qualifications when consistently recognized.