Shankarrao Bhagwantrao Patil and others v. The State of Maharashtra & Ors.

Case / Petition Number:
Civil Appeal Nos. 5712-5713 of 2021 and 5714-5715 of 2021

Case Synopsis & Summary

The Supreme Court heard two related Civil Appeals arising from land acquisition under the Land Acquisition Act, 1894. The State acquired land in Bhoom taluka, with two separate awards being challenged: an initial award fixing Rs. 232 per sq m and Rs. 217 per sq m for portions of the land, and a later correction reducing the range. The High Court reduced the compensation to Rs. 317 per sq m (29 per sq ft) by applying development deductions and excluding non-bona fide sale exemplars that included houses. The landowners contended for a higher land-value based on nearby sale deeds (Exhibits 30 and 31) claiming Rs. 150 per sq ft; they pressed for measuring value through the best exemplar and applying an appropriate deduction for development. The State argued the land carried houses and that the sale exemplars were not strictly comparable; it urged substantial deductions for development costs and to rely on smaller exemplars. The Court reaffirmed that large blocks require deductions for development (roads, open spaces, etc.) and that such deductions are variable (20%–75%), depending on facts; it excluded Exhibit 31 as non-bonafide and held that Exhibit 30 should form the basis, with a 50% development deduction, resulting in Rs.70 per sq ft as market value. The Court also allowed interest on the compensation from possession under Article 142. The appeals are disposed of with these directions.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Hemant Gupta
  • V. Ramasesubramanian
Judgment Date
2021-09-20
Court Decision / Holding
Appeals disposed of. The Court held that Exhibit 30 is the valid exemplar; Exhibit 31 is excluded as non-bonafide. Deduction for development is warranted; in these facts a 50% deduction is appropriate. Thus, the market value is Rs.70 per square foot (137.76/2 rounded to Rs.70). In addition to statutory benefits, the landowners are entitled to 9% interest per annum from the date of possession (1984/1992) till the date of notification under Section 4, with other statutory benefits from the date of the award to realization. These directions finalize the dispute, and the appeals are disposed of accordingly.
Final Disposition
Appeals disposed of.

Parties to the Case

Appellants / Petitioners

  • Shankarrao Bhagwantrao Patil and others

Respondents

  • The State of Maharashtra & Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Mr. Jayant Bhushan (Senior Advocate)

Counsels for Respondents

  • • Mr. Sachin Patil

Provisions of Law Cited

Section 4 of The Land Acquisition Act, 1894Section 18 of The Land Acquisition Act, 1894Article 142 of the Constitution of India

Legal Doctrines & Maxims

  • Deduction for development: when valuing large tracts of land, deductions for development works (roads, open spaces, etc.) are necessary and the percentage is not fixed; it varies between 20% and 75% depending on facts (Lal Chand; Kasturi and Ors.).
  • Best exemplar principle in determining land value: select the closest sale exemplar to the acquired land and adjust for development and other factors; if an exemplar relates to a different plot, proper deductions must be made (Chimanlal Hargovinddas; Lal Chand).
  • 33% deduction could be applied in some cases where development cost reduction serves as a reasonable approximation (Maya Devi).
  • Development cost includes two components: area set aside for development and the actual cost of development works; combined deduction can reach up to 75%.
  • Pre-acquisition interest: Courts have entertained interest for pre-acquisition possession under Article 142 to do substantial justice; interest from the date of possession until the date of notification may be ordered.
  • Exemplar honesty and bonafides: sale exemplars must be bonafide; non-bonafide exemplars (e.g., those involving houses not part of the acquired land) should be excluded.

Submissions & Arguments

Contentions of Appellants / Petitioners

The landowners argued that the sale exemplars near the acquired land (Exhibits 30 and 31) reflect the true market value and, after deducting development costs and non-land components, should yield a much higher per-square-foot rate. They urged applying the highest exemplar as per Mehrawal Khewaji Trust, with a 33% deduction for development in large tracts (per Maya Devi), and sought interest from possession under Article 142. Exhibit 31 was contended to be bonafide; however, it was later excluded as non-bonafide. The landowners pressed for Rs.150 per square foot as market value, plus statutory benefits and pre-notification interest.

Contentions of Respondents

The State contended that houses existed on the exemplar land; Exhibit 31 is not part of the acquired survey and thus not relevant for valuation. The sale exemplars were for smaller plots and not strictly comparable; they urged a major development-deduction (around 50%) and exclusive reliance on Exhibit 30 as the best comparable. It argued that development costs and house values must be excluded from land-value calculation.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (9)

Case NameCitationTreatmentExplanation
Mehrawal Khewaji Trust v State of PunjabMehrawal Khewaji Trust v State of Punjab, [2]DistinguishedThe court found Mehrawal Khewaji Trust inapplicable here because the exemplar used by the appellants was not bonafide.
Maya Devi (Dead) Thr. Lrs v State of Haryana and AnrMaya Devi (Dead) Thr. Lrs v State of Haryana and Anr, [3]PositiveCited to support the principle that a development-deduction (e.g., 33% or more) may be applied to large tracts when small exemplars are used.
R.L. Jain v. DDA & OrsR.L. Jain v. DDA & Ors, [4]PositiveRelied upon for pre-acquisition interest considerations and related remedies.
Madishetti Bala Ramul v. Land Acquisition OfficerMadishetti Bala Ramul v. Land Acquisition Officer, [5]PositiveCited in relation to pre-acquisition interest and compensation determinants.
Tahera Khotoon & Ors. v. Revenue Divisional Officer/Land Acquisition Officer & OrsTahera Khotoon & Ors. v. Revenue Divisional Officer/Land Acquisition Officer & Ors, [6]PositiveSupport for pre-acquisition interest and valuation principles.
Balwan Singh & Ors. v. Land Acquisition Collector & AnrBalwan Singh & Ors. v. Land Acquisition Collector & Anr, [7]PositiveSupport for the valuation and development-deduction framework.
Chimanlal Hargovinddas v. Special Land Acquisition Officer, Poona and AnrChimanlal Hargovinddas v. Special Land Acquisition Officer, Poona and Anr, [8]PositiveSet out the rule that deduction for development is fact-sensitive and not fixed.
Lal Chand v. Union of India and Anr.Lal Chand v. Union of India and Anr., [9]PositiveIllustrates variability (20%–75%) of development deductions.
Kasturi and Ors. v. State of HaryanaKasturi and Ors. v. State of Haryana, [10]PositiveAcknowledges multiple factual factors that influence development-deduction percentage.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,525 words•~17 min read

In The Court Record

Shankarrao Bhagwantrao Patil and others v. The State of Maharashtra & Ors.

## **REPORTABLE** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** **CIVIL APPEAL NOS. 5712-5713 OF 2021 (ARISING OUT OF SLP (CIVIL) NOS. 33471-33472 OF 2016)** SHANKARRAO BHAGWANTRAO PATIL ETC. .....APPELLANT(S) VERSUS THE STATE OF MAHARASHTRA & Ors. .....RESPONDENT(S) ## **W I T H** **CIVIL APPEAL NOS. 5714-5715 OF 2021 (ARISING OUT OF SLP (CIVIL) NOS. 33876-33877 OF 2016)** ## **J U D G M E N T** ## **HEMANT GUPTA, J.** Signature Not Verified Digitally signed by Jayant Kumar Arora Date: 2021.09.29 13:39:27 IST Reason: **1.** The present appeals are directed against the order dated 22.03.2016 passed by the High Court of Judicature at Bombay, Aurangabad in the First Appeals filed by the land owners and the State determining the compensation of the land acquired at the rate of Rs.317/- per square meter (29 per square feet) apart from the statutory benefits, thus reducing the compensation awarded by the learned Reference Court on 13.08.2003 at the rate of Rs. 70 per square feet. _**1**_ **2.** The land of the appellants measuring 40R (1R = 100 square meters or 1089 square feet) comprising of a land survey no. 220/4/b was taken into possession by the State through private negotiations on 14.09.1984. The market price payable to the landowners was to be settled by negotiations but, since the price could not be decided, therefore the land comprising land survey no. 220/4/b admeasuring 40R was intended to be acquired vide notification dated 04.02.1999 under Section 4 of The Land Acquisition Act, 1894[1] published in the Maharashtra Government Gazette. Such land is the subject matter of Civil Appeals arising out of SLP (Civil) Nos. 33471-33472 of 2016. The State also intended to acquire land admeasuring 30R and 20R comprising of Survey Number 212/b and 220/4 vide the above said notification as well. The possession of such land was taken on 21.10.1992. Such land is the subject matter of Civil Appeals arising out of SLP (Civil) Nos.33876-33877 of 2016. The other statutory requirements were completed and two separate awards were announced. The learned Special Land Acquisition Collector determined market value considering the two sale instances both dated 24.04.1997 forming a part of the land comprising of Survey No. 220 of an area of 92 square meters sold for a sum of Rs. 3500/-. The first award was announced on 26.03.2002 in respect of the land admeasuring 40R. The learned Special Land Acquisition Collector awarded a sum of Rs.232/- per square meter. The second award was announced by 1 For short the ‘Act’ _**2**_ the Land Acquisition Collector on 6.4.2002 awarding a compensation of Rs.217/- per square meter for 1390 square meters of land out of Survey No. 220/4 and Rs.168/- per square meters comprising of Survey No. 212/1/b, whereas in respect of the land admeasuring 100 square meters out of Survey No. 212/1/b, a compensation of Rs. 179/- per square meter was granted. ## **3.** ## **4.** The land owners dissatisfied with the amount of compensation, sought reference under Section 18 of the Act claiming compensation at the rate of Rs. 150/- per square feet for the entire land measuring 90R. It has also come on record that the land, subject matter of the appeals, is similarly situated and forms a part of Bhoom Municipal Council. The population of Bhoom Municipal Council is 17510 and the land is described in the revenue record as barren land. PW 1 – Shankarrao had admitted that the land was rocky and moorum (powdered rock) soil. The land owners relied upon two sale deeds, i.e. Exhibit 30 dated 05.04.1995 whereby the land falling under Survey No. 220 was sold for a sum of Rs. 3,00,051/- in pursuance of an agreement to sell dated 02.11.1994. A sum of Rs. 1,00,000/- was to be paid before 1.11.1995. The Reference Court calculated the rate of the sale price, it was recorded to be Rs. 137.76 per square feet. The rate has not been disputed before the High Court or even before this Court. The land owners relied upon another sale deed i.e. Exhibit 31 dated 04.09.1996 whereby the land measuring 49.5 x 16.5 feet (816. 75 square feet) was sold for a sum of Rs.1,90,000/- _**3**_ that is Rs. 232.50 per square feet. Such property is described as Municipal Council New Property Number 1480 and 1480/1. The learned Reference Court arrived at the compensation of Rs.70/- per square feet of the land acquired after deducting 20% of the price mentioned in Exhibit 30 and 31 on account of development charges. ## **5.** ## **6.** However, the High Court in further appeals filed by the State and the land owners dismissed the appeal of the land owners for enhancement but reduced the compensation to Rs.317/- square meter (29 per square feet). The High Court found that the sale instances are in respect of the land but in fact the houses were constructed thereon therefore, the sale deed includes the cost of construction of the house, such cost has to be reduced. The High Court also held that since the acquisition is of a large area of 9000 square meters, therefore, the suitable development charges are required to be deducted as the sale instances pertain to the smaller area. After discussing the evidence, the High Court redetermined the compensation as mentioned above. Before this Court, Mr. Jayant Bhushan, learned Senior Advocate on behalf of the land owners argued that as per Exhibit 30, a plot measuring 66 x 33 feet (2178 square feet/ 202 square meter) was sold at the rate of Rs.137.76 per square feet. Another sale instance Exhibit 31, a plot measuring 815.75 square feet was sold at the rate of Rs.232.62 per square feet. The land, subject matter of the sale instance Exhibit 30 and 31 are close to the acquired land inas- _**4**_ much as the land in Exhibit 31 is just 150 feet from the acquired land. It is argued that the sale instances are of an open land. Therefore, the finding of the High Court that the land had houses is not supported by evidence as the permission for construction was granted only in the year 1997 after the acquisition of sale deed dated 1996. The learned counsel further argued that in view of the judgment of this Court in **Meharawal Khewaji Trust** v. **State of Punjab[2]** , the highest rates from the sale exemplar is to be taken, therefore, Exhibit 31 is a more suitable exemplar which is required to be made the basis for determination of compensation. ## **7.** The learned counsel for the appellant also relied upon the judgment of this Court reported as **Maya Devi (Dead) Thr. Lrs** v. **State of Haryana and Anr** .[3] that 33% deduction could be made for large lands being acquired when the exemplar is for a smaller area. Thus, with Exhibit 31 having the sale price of Rs.232/- per square feet and 33% deduction is made, the rate would come out to be Rs.160 per square feet. Therefore, the amount claimed by the land owners i.e. at the rate of Rs.150/- per square feet should have been awarded. **8.** It is also argued that since the possession was taken in the year 1984/ 1992 though the notification under Section 4 of the Act was published in the year 1999, therefore, an interest on the amount of compensation awarded from the date of possession should have been granted. The reliance is placed upon judgments of this Court > 2( 2012) 5 SCC 432 > 3 (2018) 2 SCC 474 _**5**_ reported as **R.L. Jain** v. **DDA & Ors** .[4] , **Madishetti Bala Ramul** v. **Land Acquisition Officer[5]** , **Tahera Khotoon & Ors.** v. **Revenue Divisional Officer/Land Acquisition Officer & Ors[6]** ., **Balwan Singh & Ors.** v. **Land Acquisition Collector & Anr** .[7] . It is thus argued that the order of the High Court to remit the matter to the Collector for determination of the compensation from the date of possession till the date of notification is clearly erroneous and the land owners would remain further deprived of the value of the acquisition of land. ## **9.** On the other hand, Mr. Sachin Patil, learned counsel for the State argued that houses were constructed on the land in question which is evident from the Tax Assessment Register for the period 1983-84 till 1.1.97 (Annexure A-3) filed by the appellant with additional documents showing the assignment of House property number. In fact, the sale deed itself is of Municipal Council Property No. 1186/1 (New No. 1481/1). Still further, the permission to construct relied upon by the appellant is dated 28.1.1997 which was granted to the vendor, though the land stood sold to the appellant on 4.9.1996. Thus, the entire story of the land being an open land is not true. It is argued that the land, subject to the sale exemplar is a very small area as against the large track of acquired land measuring almost 2 acres. The sale exemplars relied upon by the appellants are of the smaller area. Therefore, the deduction of at least 50% is re- > 4 (2004) 4 SCC 79 5 (2007) 9 SCC 650 6 (2014) 13 SCC 613 7 (2016) 13 SCC 412 _**6**_ quired to be made towards the land required for development works apart from the deduction on account of the value of the house constructed. It is argued that the sale exemplars Exhibit 30 and 31 respectively are not relevant since they are not a part of the land which is the subject matter of the acquisition. In fact, the sale exemplars referred to the Reference Court are in respect of the land acquired. Therefore, the said sale instances become the most relevant exemplars. **10.** We have heard the learned counsel for the parties. We find that the Exemplar Exhibit 30 is in respect of Survey No. 220 of a sale deed executed on 05.04.1995. Exemplar 31 is not a part of Survey No. 220 but has been assigned Municipal Council New Property No. 1480 and 1481/1, because the land is situated close to the acquired land. The argument that the construction was raised in pursuance of the permission granted on 28.01.1997, therefore, the finding of the High Court that the house was already constructed is not tenable. We find that the reliance of the appellant on the Exemplar Exhibit 31 is absolutely untenable and based on a false representation. A perusal of the permission dated 28.01.1997 shows that it was granted to Govind Rajaram Bhagwat for the construction of a house on Plot No. 1480/1, vendor. Such property had already been sold on 04.09.1996. Still further, the house tax assessment register produced by the appellant shows that the property was assessed to house tax in the name of Govind Rajaram Bhagwat from the year 1983-1984 till 01.01.1997. Therefore, such land _**7**_ had a house constructed thereon, which was assessed to House Tax as well. The commencement certificate is not reliable since it is granted to the vendor of the purchaser. Therefore, Exhibit 31 is excluded from consideration. **11.** Thus, the judgment of this Court in **Mehrawal Khewaji Trust** is of no help to the appellant inasmuch as the best exemplar Exhibit 31 referred to by the appellant has been found to be a non-bonafide transaction. In the absence of such an exemplar, only Exhibit 30 remains to be examined in which, the plot of land, of the same survey number was sold at the rate of Rs. 137.76 per square feet. **12.** The question of deductions on account of an exemplar of a smaller plot as compared to a larger area under acquisition has come up for consideration before this Court in **Chimanlal Hargovinddas** v. **Special Land Acquisition Officer, Poona and Anr** .[8] . This Court held as under: - “8. …….The first two grounds are devoid of merit. It is common knowledge that when a large block of land is required to be valued, appropriate deduction has to be made for setting aside land for carving out roads, leaving open spaces, and plotting out smaller plots suitable for construction of buildings. The extent of the area required to be set apart in this connection has to be assessed by the court having regard to the shape, size and situation of the concerned block of land etc. There cannot be any hard and fast rule as to how much deduction should be made to account for this factor. It is essentially a question of fact depending on the facts and circumstances of each case. It does not involve drawing upon any principle of law. xxx xxx xxx 12. In the result appellant must be awarded compensation at Rs 7000 per acre subject to deduction or allowance of 25 8 (1988) 3 SCC 751 _**8**_ per cent to account for land required to be set apart for roads, open spaces etc. In other words appellant will be entitled to be paid compensation for 13 acres 7 gunthas comprised in Survey No. 85 at Rs 5250 per acre (Rs 7000 less 25 per cent i.e. less 1750 = Rs 5250) in place of the lesser sum awarded by the High Court. Appeal must be partly allowed to this extent accordingly.” **13.** In the aforesaid case, reliance of the landowners was on an exemplar which reflected the sale price of Rs. 20,000/- per acre which was situated on the Ganeshkhand Road as against Rs. 7,000/- per acre assessed by the High Court. The Court noticed that the unloading was Rs. 13,000/- per acre which works out at 65%. **14.** In the judgment reported as **Lal Chand** v. **Union of India and Anr.[9]** , this Court held that deduction for development is to be made to arrive at the market value of large tracts of undeveloped agricultural land (with potential for development) the deduction varies from 20% to 75% of the price of such developed plots. This Court held as under: “13. The percentage of “deduction for development” to be made to arrive at the market value of large tracts of undeveloped agricultural land (with potential for development), with reference to the sale price of small developed plots, varies between 20% to 75% of the price of such developed plots, the percentage depending upon the nature of development of the layout in which the exemplar plots are situated. 14. The “deduction for development” consists of two components. The first is with reference to the area required to be utilised for developmental works and the second is the cost of the development works. For example, if a residential layout is formed by DDA or similar statutory authority, it may utilise around 40% of the land area in the layout, for roads, drains, parks, playgrounds and civic amenities (community facilities), > 9 (2009) 15 SCC 769 _**9**_ etc. 15. The development authority will also incur considerable expenditure for development of undeveloped land into a developed layout, which includes the cost of levelling the land, cost of providing roads, underground drainage and sewage facilities, laying water lines, electricity lines and developing parks and civil amenities, which would be about 35% of the value of the developed plot. The two factors taken together would be the “deduction for development” and can account for as much as 75% of the cost of the developed plot. xxx xxx xxx 22. Some of the layouts formed by the statutory development authorities may have large areas earmarked for water/sewage treatment plants, water tanks, electrical substations, etc. in addition to the usual areas earmarked for roads, drains, parks, playgrounds and community/civic amenities. The purpose of the aforesaid examples is only to show that the “deduction for development” factor is a variable percentage and the range of percentage itself being very wide from 20% to 75%.” **15.** This Court in the judgment reported as **Kasturi and Ors.** v. **State of Haryana[10] ,** held that there may be various factual factors which may have to be taken into consideration while applying the cut in payment of compensation towards developmental charges, maybe in some cases it is more than 1/3rd and in some cases less than 1/3rd. This Court held as under: “7 …….. However, in cases of some land where there are certain advantages by virtue of the developed area around, it may help in reducing the percentage of cut to be applied, as the developmental charges required may be less on that account. There may be various factual factors which may have to be taken into consideration while applying the cut in payment of compensation towards developmental charges, maybe in some cases it is more than 1/3rd and in some cases less than 1/3rd. It must be remembered that there is difference between a developed area and an area having potential value, which is yet to be developed. The fact that 10 (2003) 1 SCC 354 _**10**_ an area is developed or adjacent to a developed area will not ipso facto make every land situated in the area also developed to be valued as a building site or plot, particularly when vast tracts are acquired, as in this case, for development purpose.” **16.** Exhibit 30 is part of the same survey number whereby land was sold at the rate of Rs.137.76 square feet. In the present case, there is no evidence that the sale exemplar Exhibit 30 was a part of any developed layout but is an isolated instance of sale. Such sale of a small area as compared to the acquisition of 9000 square meters can be taken into consideration after a suitable deduction is made on account of the development cost. The land in question was rocky and had a moorum soil. Such land is not cultivable. Still further, the State has taken possession of a part of the land in 1984 and another part in 1992 as is apparent from the reading of the two awards of the Special Land Acquisition Officer. The Bhoom town has a small population of 17150. The possession of the land was taken for construction of government quarters and a road. Since the use of the land for a government quarter was known, therefore, the smaller area was sold keeping in view the intended use of the land acquired for the residential purposes. The deduction of 50% is proper as the sale deed was executed after 11 years of possession of rocky land and moorum soil was taken. Therefore, we find that deduction towards the development cost at the rate of 50% is warranted in the facts of the present case. Thus, the compensation to be awarded is (137.76/2= 69 rounded off to Rs.70 per square feet) which was the market value assessed by the _**11**_ Reference Court as well. **17.** We find that the order of the learned Reference Court is justified in law whereas the High Court has reduced the compensation drastically without any reasonable basis. Therefore, we find that the appellant is entitled to a compensation at the rate of Rs.70/- per square feet from the date of award by the Land Acquisition Collector. Apart from statutory benefits, such compensation has been arrived at keeping in view the development activity that has already taken place by the virtue of possession of the acquired land delivered to the State. **18.** The possession of the land acquired was taken in the year 1984/ 1992. The land owners have claimed interest from 1984/1992 when the possession was taken, whereas the acquisition is in the year 1999. In respect of the argument for determination of amount of compensation from the date possession was taken by the State till the date of notification under Section 4 of the Act, judgments relied upon by the appellant have been referred to in para 8 above. A perusal of the said judgments shows that grant of payment of interest for the pre-acquisition period is in the nature of an order passed under Article 142 of the Constitution to do substantial justice. Keeping in view the aforesaid judgments, we find that instead of remitting the matter to the Land Acquisition Collector for determination of the compensation for use and occupation by the State, we deem it appropriate to decide this issue in the present appeal itself. _**12**_ **19.** There is no evidence that such land was being put to use by the landowners even prior to the taking of possession by the State. But the fact remains that the possession has been taken without payment of compensation depriving the landowners of the right to use land. Therefore, the land owners would be entitled to interest on the amount of compensation awarded at the rate of 9% per annum from the date of possession which was taken in the year 1984/1992 till the date of notification under Section 4 of the Act on the amount awarded after acquisition that is the sum of Rs.70/- per square feet. The appellant shall be entitled to others statutory benefits on the compensation amount of Rs.70/- per square feet from the date of award till realization. With the above said directions, the appeals are disposed of. **.............................................J. (HEMANT GUPTA)** **.............................................J.** **(V. RAMASUBRAMANIAN)** **NEW DELHI; SEPTEMBER 20, 2021** _**13**_
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.